Tabulation of Bids for Project BR 2011(921)
| Text version of this page | |||
| County: | DEWITT | Let Date: | 03/07/13 |
| Type: | REPLACE BRIDGE AND APPROACHES | Seq No: | 3214 |
| Time: | 45 WORKING DAYS | Project ID: | BR 2011(921) |
| Highway: | CR | Contract #: | 03133214 |
| Length: | 0.106 | CCSJ: | 0913-17-033 |
| Limits: | |||
| From: | AT DRAW CR 264 | Check: | $7,000.00 |
| To: | (CABEZA ROAD) | Misc Cost: | $500.00 |
| Estimate | $358,802.00 | % Over/Under | Company |
| Bidder 1 | $487,910.25 | +35.98% | RELMCO, INC. |
| Bidder 2 | $548,532.39 | +52.88% | DEAN WORD COMPANY, LTD. |
| Bidder 3 | $555,003.93 | +54.68% | RAY FARIS, INC. |
| Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
| 1102001 | EXCAVATION (ROADWAY) | CY | 302.000 | 30.00 | 1 2 3 |
25.000 34.463 17.300 |
| 1322005 | EMBANKMENT (FINAL) (ORD COMP) (TY C) | CY | 161.000 | 30.00 | 1 2 3 |
50.000 10.813 22.400 |
| 1502002 | BLADING | HR | 15.000 | 85.00 | 1 2 3 |
125.000 118.580 121.600 |
| 1642021002 | CELL FBR MLCH SEED (PERM) (RURAL) (SANDY | SY | 705.000 | 4.00 | 1 2 3 |
1.150 1.040 0.750 |
| 1642029002 | CELL FBR MLCH SEED (TEMP) (WARM) | SY | 176.000 | 0.50 | 1 2 3 |
2.875 2.600 0.750 |
| 1642031002 | CELL FBR MLCH SEED (TEMP) (COOL) | SY | 176.000 | 0.50 | 1 2 3 |
2.875 2.600 0.750 |
| 1682001 | VEGETATIVE WATERING | MG | 5.900 | 70.00 | 1 2 3 |
50.000 137.500 192.000 |
| 2472042033 | FL BS (CMP IN PLC) (TY A GR 2) (FNAL POS | CY | 285.000 | 65.00 | 1 2 3 |
100.000 80.781 74.250 |
| 2752001003 | CEMENT | TON | 4.000 | 200.00 | 1 2 3 |
250.000 239.745 224.000 |
| 2752114003 | CEMENT TREAT (NEW BASE) (8" TO 14") | SY | 178.000 | 5.00 | 1 2 3 |
20.000 20.680 9.600 |
| 3162015016 | ASPH (RC - 250) | GAL | 231.000 | 9.00 | 1 2 3 |
7.000 9.295 10.250 |
| 3162221016 | AGGR (TY - PB GR - 3 SAC - B) | CY | 28.000 | 250.00 | 1 2 3 |
300.000 440.330 378.900 |
| 3162566016 | ASPH (AC - 15P OR AC - 10 - 2TR OR CRS - | GAL | 922.000 | 7.00 | 1 2 3 |
7.000 5.863 10.250 |
| 3162675016 | AGGR (TY - E GR - 5) | CY | 8.000 | 250.00 | 1 2 3 |
300.000 684.618 838.400 |
| 4002005 | CEM STABIL BKFL | CY | 46.000 | 85.00 | 1 2 3 |
175.000 137.500 172.800 |
| 4032001 | TEMPORARY SPL SHORING | SF | 630.000 | 20.00 | 1 2 3 |
20.000 30.200 57.600 |
| 4072005 | SHEET PILING (PZ - 22) | SF | 3044.000 | 32.00 | 1 2 3 |
72.500 55.403 53.750 |
| 4202013002 | CL C CONC (MISC) | CY | 13.400 | 625.00 | 1 2 3 |
800.000 704.000 832.000 |
| 4322041 | RIPRAP (STONE COMMON) (DRY) (18 IN) | CY | 71.000 | 85.00 | 1 2 3 |
150.000 96.700 121.600 |
| 4622031015 | CONC BOX CULV (10 FT X 7 FT) | LF | 141.000 | 700.00 | 1 2 3 |
575.000 1260.331 875.000 |
| 4962009 | REMOV STR (BRIDGE 0 - 99 FT LENGTH) | EA | 1.000 | 8000.00 | 1 2 3 |
7500.000 6600.000 8320.000 |
| 5002001011 | MOBILIZATION | LS | 1.000 | 32000.00 | 1 2 3 |
35000.000 54084.149 61050.430 |
| 5022001033 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 3.000 | 1500.00 | 1 2 3 |
1600.000 1819.820 7262.800 |
| 5122008002 | PORT CTB (FUR & INST) (LOW PROF) (TY 1) | LF | 160.000 | 50.00 | 1 2 3 |
15.000 20.075 66.550 |
| 5122009002 | PORT CTB (FUR & INST) (LOW PROF) (TY 2) | LF | 80.000 | 50.00 | 1 2 3 |
15.000 28.490 66.550 |
| 5122044002 | PORT CTB (REMOVE) (LOW PROF) (TY 1) | LF | 160.000 | 6.00 | 1 2 3 |
15.000 12.375 32.000 |
| 5122045002 | PORT CTB (REMOVE) (LOW PROF) (TY 2) | LF | 80.000 | 6.00 | 1 2 3 |
15.000 14.190 32.000 |
| 5402001031 | MTL W - BEAM GD FEN (TIM POST) | LF | 200.000 | 22.00 | 1 2 3 |
19.550 17.680 25.600 |
| 5402014031 | MTL W - BEAM GD FEN (LOW FILL CULVERT) | LF | 100.000 | 35.00 | 1 2 3 |
46.000 41.600 56.000 |
| 5442004001 | GDRAIL END TRT (INST) (WOOD POST) (TY I) | EA | 4.000 | 2000.00 | 1 2 3 |
2127.500 1924.000 2732.800 |
| 6582261 | INSTL DEL ASSM (D - SW) SZ (TYC) GF1 (BI | EA | 6.000 | 20.00 | 1 2 3 |
17.250 15.600 21.750 |
| 11222037001 | TEMPORARY SEDIMENT CONTROL FENCE INSTLL | LF | 373.000 | 3.50 | 1 2 3 |
2.300 2.080 3.850 |
| 11222057001 | TEMPORARY SEDIMENT CONTROL FENCE REMOVE | LF | 373.000 | 0.50 | 1 2 3 |
0.322 0.291 1.300 |