Tabulation of Bids for Project BR 2012(259)
| Text version of this page | |||
| County: | ANGELINA | Let Date: | 03/07/13 |
| Type: | REPLACE BRIDGE AND APPROACHES | Seq No: | 3206 |
| Time: | 60 WORKING DAYS | Project ID: | BR 2012(259) |
| Highway: | CS | Contract #: | 03133206 |
| Length: | 0.109 | CCSJ: | 0911-38-067 |
| Limits: | |||
| From: | DANIEL MCCALL ROAD | Check: | $7,000.00 |
| To: | OVER MOCCASIN CREEK | Misc Cost: | $500.00 |
| Estimate | $370,746.50 | % Over/Under | Company |
| Bidder 1 | $394,508.38 | +6.41% | LONGVIEW BRIDGE AND ROAD, LTD. |
| Bidder 2 | $443,383.95 | +19.59% | JW PAYNE CONSTRUCTION, LLC |
| Bidder 3 | $494,070.00 | +33.26% | EAST TEXAS BRIDGE, INC. |
| Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
| 1002002002 | PREPARING ROW | STA | 3.600 | 2500.00 | 1 2 3 |
5000.000 5000.000 3000.000 |
| 1052014 | REMOVING STAB BASE & ASPH PAV (7" - 12") | SY | 798.000 | 5.00 | 1 2 3 |
3.000 12.000 15.000 |
| 1102001 | EXCAVATION (ROADWAY) | CY | 562.000 | 8.00 | 1 2 3 |
15.000 15.000 12.000 |
| 1322003 | EMBANKMENT (FINAL) (ORD COMP) (TY B) | CY | 136.000 | 15.00 | 1 2 3 |
15.000 25.000 25.000 |
| 1602003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 609.000 | 1.00 | 1 2 3 |
0.500 3.500 2.000 |
| 1642009002 | BROADCAST SEED (TEMP) (WARM) | SY | 679.000 | 0.50 | 1 2 3 |
0.010 0.730 1.000 |
| 1642011002 | BROADCAST SEED (TEMP) (COOL) | SY | 679.000 | 0.50 | 1 2 3 |
0.010 0.730 1.000 |
| 1642021002 | CELL FBR MLCH SEED (PERM) (RURAL) (SANDY | SY | 1358.000 | 1.00 | 1 2 3 |
1.500 0.840 1.000 |
| 1682001 | VEGETATIVE WATERING | MG | 27.000 | 15.00 | 1 2 3 |
15.000 10.000 25.000 |
| 1692002002 | SOIL RETENTION BLANKETS (CL 1) (TY B) | SY | 120.000 | 2.50 | 1 2 3 |
1.150 2.410 3.000 |
| 4002005 | CEM STABIL BKFL | CY | 62.000 | 150.00 | 1 2 3 |
120.000 200.000 200.000 |
| 4162003 | DRILL SHAFT (30 IN) | LF | 186.000 | 130.00 | 1 2 3 |
180.000 100.000 215.000 |
| 4202003002 | CL C CONC (ABUT) | CY | 36.000 | 850.00 | 1 2 3 |
750.000 900.000 900.000 |
| 4202029002 | CL S CONC (SLAB) | CY | 43.200 | 750.00 | 1 2 3 |
600.000 650.000 900.000 |
| 4202031002 | CL S CONC (SHEAR KEY) | CY | 24.100 | 400.00 | 1 2 3 |
380.000 350.000 700.000 |
| 4252008001 | PRESTR CONC BOX BEAM (4B28) | LF | 223.500 | 175.00 | 1 2 3 |
200.000 220.000 230.000 |
| 4252009001 | PRESTR CONC BOX BEAM (5B28) | LF | 298.000 | 180.00 | 1 2 3 |
200.000 220.000 230.000 |
| 4282002001 | CONC SURF TREAT (CLASS II) | SY | 264.000 | 5.00 | 1 2 3 |
5.000 1.000 5.000 |
| 4322002 | RIPRAP (CONC) (5 IN) | CY | 52.000 | 400.00 | 1 2 3 |
410.000 450.000 425.000 |
| 4502161001 | RAIL (TY T223) | LF | 190.000 | 80.00 | 1 2 3 |
72.000 65.000 80.000 |
| 4962009 | REMOV STR (BRIDGE 0 - 99 FT LENGTH) | EA | 1.000 | 13000.00 | 1 2 3 |
10000.000 30000.000 25000.000 |
| 5002001011 | MOBILIZATION | LS | 1.000 | 34000.00 | 1 2 3 |
35000.000 42000.000 40000.000 |
| 5022001033 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 5.000 | 1000.00 | 1 2 3 |
1000.000 1200.000 1500.000 |
| 5402001031 | MTL W - BEAM GD FEN (TIM POST) | LF | 25.000 | 25.00 | 1 2 3 |
24.000 28.000 30.000 |
| 5402012031 | MTL BEAM GD FEN TRANS (TL2) | EA | 2.000 | 800.00 | 1 2 3 |
800.000 840.000 1200.000 |
| 5402044031 | DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION | EA | 2.000 | 1000.00 | 1 2 3 |
1000.000 1100.000 1300.000 |
| 5402046031 | MTL BM GD FEN TRANS (NON - SYM) | EA | 2.000 | 1200.00 | 1 2 3 |
1000.000 575.000 900.000 |
| 5442001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 2.000 | 2200.00 | 1 2 3 |
2000.000 2050.000 2500.000 |
| 6442059 | RELOCATE SM RD SN SUP & AM TY TWT | EA | 1.000 | 500.00 | 1 2 3 |
310.000 1002.010 900.000 |
| 6582241 | INSTL DEL ASSM (D - SW) SZ 1 (FLX) GF2 ( | EA | 4.000 | 30.00 | 1 2 3 |
26.000 27.000 45.000 |
| 6582259 | INSTL DEL ASSM (D - SW) SZ (TYC) CTB (BI | EA | 2.000 | 20.00 | 1 2 3 |
13.000 24.000 45.000 |
| 6582316 | INSTL OM ASSM (OM - 2Z) (FLX) GND | EA | 2.000 | 50.00 | 1 2 3 |
42.400 48.000 75.000 |
| 11222002001 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 80.000 | 30.00 | 1 2 3 |
29.000 28.950 35.000 |
| 11222009001 | ROCK FILTER DAMS (REMOVE) | LF | 80.000 | 10.00 | 1 2 3 |
6.000 8.230 12.000 |
| 11222037001 | TEMPORARY SEDIMENT CONTROL FENCE INSTLL | LF | 838.000 | 3.00 | 1 2 3 |
2.500 2.430 3.000 |
| 11222057001 | TEMPORARY SEDIMENT CONTROL FENCE REMOVE | LF | 838.000 | 1.00 | 1 2 3 |
0.750 0.730 1.000 |
| 32672106 | D - GR HMA (SQ) TY - D PG64 - 22 | TON | 318.000 | 130.00 | 1 2 3 |
160.000 169.150 200.000 |