Tabulation of Bids for Project STP 2014(423)

Last Update: Wednesday, February 5, 2014
Text version of this page
County: HIDALGO Let Date: 02/05/14
Type: DRAINAGE IMPROVEMTS SOUTH OF BUS 83 Seq No: 3212
Time: 80 WORKING DAYS Project ID: STP 2014(423)
Highway: BU 83-S Contract #: 02143212
Length: 0.161 CCSJ: 0039-04-113
Limits:  
From: BUS 83 Check: $17,000.00
To: FLOODWAY ON DITCH 21 Misc Cost: $17,599.78
Estimate $854,988.09 % Over/Under Company
Bidder 1 $809,975.63 -5.26% CRG
Bidder 2 $1,003,443.40 +17.36% REIM CONSTRUCTION, INC.
Bidder 3 $1,070,804.50 +25.24% FOREMOST PAVING, INC.
Bidder 4 $1,285,674.00 +50.37% ANDERSON COLUMBIA CO., INC.
Bidder 5 $1,455,194.50 +70.20% TEXAS SAI, INC.
Bidder 6 $1,469,758.75 +71.90% SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
Bidder 7 $1,498,402.40 +75.25% J.D. ABRAMS, L.P.
Item Code Description Unit Quantity Unit Est. Bidder Unit Bid
1002002002 PREPARING ROW STA 5.800 1500.00 1
2
3
4
5
6
7
5912.540
790.000
400.000
2500.000
2000.000
1911.100
18000.000
1102002 EXCAVATION (CHANNEL) CY 116.000 8.93 1
2
3
4
5
6
7
8.000
11.000
10.000
33.000
40.000
39.850
5.000
1322006011 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 2223.000 24.01 1
2
3
4
5
6
7
9.500
19.000
20.000
33.000
20.000
16.670
13.000
1602005 FURNISHING AND PLACING TOPSOIL CY 50.000 48.40 1
2
3
4
5
6
7
15.500
64.000
15.000
40.000
20.000
24.120
30.000
1642028006 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) AC 1.280 1500.00 1
2
3
4
5
6
7
1800.000
3870.000
3500.000
6000.000
3500.000
1980.220
4000.000
1682001 VEGETATIVE WATERING MG 195.000 27.83 1
2
3
4
5
6
7
2.450
26.800
35.000
40.000
35.000
59.180
10.000
1692003002 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 917.000 0.92 1
2
3
4
5
6
7
1.500
1.650
1.500
2.000
1.500
1.660
2.000
4002005007 CEM STABIL BKFL CY 849.000 56.02 1
2
3
4
5
6
7
65.000
54.500
45.000
120.000
49.000
82.930
59.000
4002006007 CUT & RESTORING PAV SY 344.000 64.00 1
2
3
4
5
6
7
44.380
45.500
50.000
55.000
77.000
75.220
73.000
4002007007 STRUCT EXCAV (SPECIAL) CY 262.000 39.36 1
2
3
4
5
6
7
80.000
71.000
50.000
120.000
64.000
52.930
4.000
4002010007 CUT & RESTORING PAV (FLEX BASE) SY 150.000 46.20 1
2
3
4
5
6
7
44.000
22.600
16.000
32.000
24.000
42.680
33.000
4022001 TRENCH EXCAVATION PROTECTION LF 528.000 1.28 1
2
3
4
5
6
7
1.500
1.100
1.000
2.000
2.000
22.650
81.000
4032001 TEMPORARY SPL SHORING SF 1188.000 22.95 1
2
3
4
5
6
7
3.560
40.000
1.000
46.000
58.000
39.100
15.500
4322033 RIPRAP (STONE COMMON) (DRY) (12 IN) CY 23.000 86.88 1
2
3
4
5
6
7
104.000
82.500
50.000
132.000
110.000
298.240
115.000
4322066 RIPRAP (CONC) (CL B) CY 140.000 279.66 1
2
3
4
5
6
7
320.000
377.000
500.000
450.000
500.000
545.650
500.000
4622018015 CONC BOX CULV (7 FT X 7 FT) LF 144.000 500.00 1
2
3
4
5
6
7
525.000
551.000
860.000
650.000
1000.000
663.880
865.000
4622021015 CONC BOX CULV (8 FT X 6 FT) LF 88.000 665.70 1
2
3
4
5
6
7
535.000
489.000
590.000
693.000
700.000
803.100
800.000
4622032015 CONC BOX CULV (10 FT X 8 FT) LF 272.000 672.97 1
2
3
4
5
6
7
685.000
801.000
920.000
962.000
1400.000
932.930
1600.000
4642003006 RC PIPE (CL III) (18 IN) LF 232.000 35.54 1
2
3
4
5
6
7
38.000
48.250
45.000
44.000
65.000
42.320
58.000
4642009006 RC PIPE (CL III) (36 IN) LF 24.000 76.61 1
2
3
4
5
6
7
82.000
166.000
80.000
210.000
282.000
121.800
122.000
4652111001 INLET (COMPL) (TY C) (MOD) EA 2.000 5664.71 1
2
3
4
5
6
7
2800.000
3450.000
4000.000
6400.000
3800.000
3506.400
3000.000
4662011 WINGWALL (SW - 0) (HW=9 FT) EA 1.000 15000.00 1
2
3
4
5
6
7
10900.000
13700.000
24000.000
15000.000
27000.000
23078.870
20000.000
4662012 WINGWALL (SW - 0) (HW=10 FT) EA 1.000 15500.00 1
2
3
4
5
6
7
11500.000
15500.000
23000.000
17000.000
35000.000
24339.820
25000.000
4662024 WINGWALL (FW - 0) (HW=8 FT) EA 1.000 12000.00 1
2
3
4
5
6
7
9600.000
10500.000
16000.000
12500.000
17000.000
21098.050
15000.000
4662027 WINGWALL (FW - 0) (HW=11 FT) EA 1.000 28680.64 1
2
3
4
5
6
7
11600.000
18200.000
22000.000
17500.000
36000.000
24460.900
25000.000
4662038 WINGWALL (FW - S) (HW=8 FT) EA 1.000 9200.00 1
2
3
4
5
6
7
9800.000
10300.000
17000.000
13000.000
20000.000
21263.650
15000.000
4672286 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 4.000 900.00 1
2
3
4
5
6
7
800.000
806.000
900.000
1000.000
1400.000
1380.670
590.000
4962007 REMOV STR (PIPE) LF 378.000 11.74 1
2
3
4
5
6
7
6.500
18.250
12.000
17.000
14.000
9.030
9.000
4962042 REMOV STR (SMALL) EA 1.000 396.81 1
2
3
4
5
6
7
1600.000
453.000
3000.000
7000.000
500.000
3412.830
2400.000
5002001011 MOBILIZATION LS 1.000 40713.00 1
2
3
4
5
6
7
80000.000
31000.000
50000.000
100000.000
132555.000
134000.000
120000.000
5022001033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 5264.95 1
2
3
4
5
6
7
1800.000
1800.000
4000.000
3000.000
800.000
4850.000
1750.000
5302011006 DRIVEWAYS (ACP) SY 96.000 21.25 1
2
3
4
5
6
7
21.340
21.000
40.000
70.000
55.000
75.260
50.000
5402031031 MTL BM GD FN (REMOVE & RESET) LF 125.000 12.00 1
2
3
4
5
6
7
8.000
15.500
30.000
24.000
25.000
28.350
11.000
6582337006 INSTL OM ASSM (OM - 2Z) (FLX) GND (BI) EA 6.000 67.80 1
2
3
4
5
6
7
71.780
49.000
50.000
35.000
185.000
72.650
74.000
6582367006 INSTL DEL ASSM (D - DW) SZ1 (TYC) GF1 (B EA 4.000 17.50 1
2
3
4
5
6
7
28.130
19.250
50.000
35.000
175.000
81.470
21.000
6662012008 REFL PAV MRK TY I (W) 4" (SLD) (100MIL) LF 154.000 0.31 1
2
3
4
5
6
7
1.600
7.800
2.000
3.000
7.000
3.440
32.000
6662105008 REFL PAV MRK TY I (Y) 4" (BRK) (100MIL) LF 40.000 0.33 1
2
3
4
5
6
7
1.600
11.000
2.000
3.000
10.000
5.400
53.000
11222004001 ROCK FILTER DAMS (INSTALL) (TY 4) LF 104.000 35.00 1
2
3
4
5
6
7
30.000
46.250
45.000
90.000
70.000
58.220
88.000
11222009001 ROCK FILTER DAMS (REMOVE) LF 104.000 9.86 1
2
3
4
5
6
7
8.000
32.000
10.000
50.000
45.000
25.220
50.000
11222017001 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 156.000 26.41 1
2
3
4
5
6
7
11.810
31.250
20.000
35.000
33.000
17.180
38.000
11222019001 CONSTRUCTION EXITS (REMOVE) SY 156.000 12.02 1
2
3
4
5
6
7
5.300
8.950
5.000
12.000
10.000
8.930
6.600
11222048001 BIOGRD EROSN CONT LOGS (12" DIA) INSTALL LF 1279.000 3.42 1
2
3
4
5
6
7
4.250
7.700
9.000
10.000
7.000
4.590
9.000
11222056001 BIODEGRADBLE EROSION CONTROL LOGS REMOV LF 1279.000 0.48 1
2
3
4
5
6
7
1.000
1.750
2.000
3.000
2.000
0.910
2.200
40612031 IRRIGATION GATE (10 FT. X 8 FT.) EA 2.000 40000.00 1
2
3
4
5
6
7
42000.000
84000.000
44000.000
44000.000
55000.000
132736.700
58000.000
40612032 IRRIGATION WELL (15 FT. X 6.5 FT.) EA 2.000 20000.00 1
2
3
4
5
6
7
12000.000
37000.000
60000.000
55000.000
50000.000
62335.000
43000.000
43782001 THERMOPLASTIC PIPE (18 IN) (HDPE) LF 232.000 33.70 1
2
3
4
5
6
7
0.000
0.000
0.000
0.000
0.000
0.000
0.000