Tabulation of Bids for Project RMC - 631017001
Text version of this page | |||
County: | WALKER | Let Date: | 02/02/17 |
Type: | MBGF & CABLE BARRIER REPAIR | Seq No: | 4013 |
Time: | 730 W | Project ID: | RMC - 631017001 |
Highway: | SH0030 | Contract #: | 02174013 |
Length: | 0.001 | CCSJ: | 6310-17-001 |
Limits: | |||
From: | VARIOUS | Check: | $7,000.000 |
To: | VARIOUS | Misc Cost: |
Estimate | $371,425.00 | % Over/Under | Company |
Bidder 1 | $269,255.00 | -27.51% | P-VILLE, INCORPORATED |
Bidder 2 | $419,920.00 | +13.06% | ISI CONTRACTING, INC. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 30.000 | 800.000 | 1 2 | 80.000 900.000 |
5006033 | MOBILIZATION (CALLOUT) | EA | 100.000 | 200.000 | 1 2 | 75.000 500.000 |
5406006 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 9.000 | 2,400.000 | 1 2 | 700.000 2,500.000 |
5406010 | MTL W-BEAM GD FEN ADJUSTMENT | LF | 150.000 | 10.000 | 1 2 | 1.000 12.000 |
7706001 | REPAIR RAIL ELEMENT (W - BEAM) | LF | 3,000.000 | 18.000 | 1 2 | 14.000 19.000 |
7706002 | REPAIR RAIL ELEMENT (THRIE - BEAM) | LF | 75.000 | 50.000 | 1 2 | 18.000 35.000 |
7706003 | REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) | LF | 40.000 | 50.000 | 1 2 | 18.000 35.000 |
7706004 | REPAIR RAIL ELEMENT (CURVED RAIL) | LF | 75.000 | 50.000 | 1 2 | 18.000 35.000 |
7706006 | RAISE RAIL ELEMENT | LF | 75.000 | 8.000 | 1 2 | 1.000 10.000 |
7706010 | REM / REPL TIMBER/STL POST W/O CONC FND | EA | 225.000 | 45.000 | 1 2 | 55.000 57.000 |
7706011 | REM / REPL TIMBER / STL POST W/CONC FND | EA | 10.000 | 55.000 | 1 2 | 55.000 58.000 |
7706016 | REPAIR STEEL POST WITH BASE PLATE | EA | 10.000 | 150.000 | 1 2 | 10.000 140.000 |
7706017 | REALIGN POSTS | EA | 225.000 | 8.000 | 1 2 | 10.000 10.000 |
7706019 | REMOVE & REPLACE BLOCKOUT | EA | 15.000 | 10.000 | 1 2 | 12.000 8.000 |
7706020 | REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS | EA | 200.000 | 10.000 | 1 2 | 12.000 9.000 |
7706021 | REPLACE SINGLE GDRAIL TERMINAL RAIL | LF | 450.000 | 20.000 | 1 2 | 16.000 25.000 |
7706022 | REPLACE SINGLE GDRAIL TERMINAL POST | EA | 50.000 | 50.000 | 1 2 | 55.000 58.000 |
7706023 | REPAIR OF TERMINAL ANCHORS POSTS | EA | 10.000 | 50.000 | 1 2 | 10.000 50.000 |
7706024 | REPLACE TERMINAL ANCHOR POSTS | EA | 10.000 | 50.000 | 1 2 | 10.000 100.000 |
7706027 | REMOVE GDRAIL END TRT / REPL WITH SGT | EA | 25.000 | 2,900.000 | 1 2 | 2,950.000 3,300.000 |
7706028 | REPL SINGLE GDRAIL TERM IMPACT HEAD | EA | 15.000 | 1,050.000 | 1 2 | 1,400.000 1,300.000 |
7706029 | REM & RESET SGT IMPACT HEAD | EA | 25.000 | 500.000 | 1 2 | 10.000 250.000 |
7706030 | REPLACE SGT CABLE ASSEMBLY | EA | 6.000 | 75.000 | 1 2 | 90.000 125.000 |
7706031 | REPLACE SGT CABLE ANCHOR | EA | 5.000 | 65.000 | 1 2 | 90.000 125.000 |
7706032 | REPLACE SGT STRUT | EA | 6.000 | 50.000 | 1 2 | 50.000 70.000 |
7706033 | REPLACE SGT OBJECT MARKER | EA | 5.000 | 30.000 | 1 2 | 1.000 35.000 |
7716002 | REPLACE POSTS (TL-4) | EA | 800.000 | 80.000 | 1 2 | 87.000 95.000 |
7716004 | CABLE SPLICE / TURNBUCKLE (TL-4) | EA | 15.000 | 95.000 | 1 2 | 200.000 400.000 |
7716006 | REPAIR CONCRETE FOUNDATION (TL-4) | EA | 125.000 | 270.000 | 1 2 | 20.000 55.000 |
7716008 | REPR OR REPLC CABLE BARR TERM SEC(TL-4) | EA | 10.000 | 345.000 | 1 2 | 300.000 1,000.000 |
7716010 | REPLACE CABLE (TL-4) | LF | 500.000 | 6.000 | 1 2 | 1.000 2.000 |
7716012 | REPLACE POST HARDWARE (TL-4) | EA | 150.000 | 20.000 | 1 2 | 30.000 50.000 |
60016001 | PORTABLE CHANGEABLE MESSAGE SIGN | DAY | 10.000 | 100.000 | 1 2 | 1.000 200.000 |