Tabulation of Bids for Project C 1727-2-24
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | MOORE | Let Date: | 02/02/24 |
Type: | REHABILITATE EXISTING ROADWAY | Seq No: | 3203 |
Time: | 299 WORKING DAYS | Project ID: | C 1727-2-24 |
Highway: | FM 281 | Contract #: | 02243203 |
Length: | 9.387 | CCSJ: | 1727-02-024 |
Limits: | |||
From: | HARTLEY COUNTY LINE | Check: | $100,000 |
To: | US 287 | Misc Cost: |
Estimate | $39,780,977.59 | % Over/Under | Company |
Bidder 1 | $41,097,397.10 | +3.31% | J. LEE MILLIGAN, INC. |
Bidder 2 | $53,171,995.48 | +33.66% | KIEWIT INFRASTRUCTURE SOUTH CO. |
Bidder 3 | $53,788,762.80 | +35.21% | RK HALL, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1046017 | REMOVING CONC (DRIVEWAYS) | SY | 678.000 | 23.00 | 1 2 3 | 35.000 100.000 136.020 |
1056044 | REMOVING STAB BASE AND ASPH PAV (10") | SY | 141,451.000 | 5.00 | 1 2 3 | 9.200 9.310 5.710 |
1106001 | EXCAVATION (ROADWAY) | CY | 86,677.000 | 14.00 | 1 2 3 | 16.500 21.220 23.410 |
1326002 | EMBANKMENT (FINAL)(DENS CONT)(TY A) | CY | 31,837.000 | 19.00 | 1 2 3 | 20.500 16.470 32.990 |
1346002 | BACKFILL (TY B) | STA | 69.000 | 300.00 | 1 2 3 | 183.000 250.000 1,463.560 |
1646035 | DRILL SEEDING (PERM) (RURAL) (CLAY) | SY | 297,176.000 | 0.29 | 1 2 3 | 0.200 0.210 0.190 |
2476064005 | FL BS (CMP IN PLC)(TY A GR 4) (6") | SY | 250,360.000 | 20.00 | 1 2 3 | 15.500 17.030 12.510 |
2606012 | LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) | TON | 2,957.000 | 300.00 | 1 2 3 | 415.000 521.820 520.130 |
2606027 | LIME TRT (EXST MATL)(8") | SY | 250,360.000 | 4.15 | 1 2 3 | 4.950 5.590 3.910 |
3106009 | PRIME COAT (MC-30) | GAL | 61,294.000 | 4.80 | 1 2 3 | 5.650 6.360 6.580 |
3146009001 | EMULS ASPH (EROSN CONT)(MULTI) | GAL | 28,963.000 | 4.09 | 1 2 3 | 5.350 5.600 4.320 |
3516019 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") | SY | 2,500.000 | 10.00 | 1 2 3 | 51.350 45.000 38.220 |
3546021 | PLANE ASPH CONC PAV(0" TO 2") | SY | 2,430.000 | 4.56 | 1 2 3 | 10.750 12.370 8.270 |
4006005 | CEM STABIL BKFL | CY | 211.000 | 240.00 | 1 2 3 | 413.000 357.290 356.950 |
4006006 | CUT & RESTORING PAV | SY | 2,589.000 | 159.00 | 1 2 3 | 93.450 145.000 71.390 |
4026001 | TRENCH EXCAVATION PROTECTION | LF | 207.000 | 5.00 | 1 2 3 | 25.000 19.490 19.470 |
4326001 | RIPRAP (CONC)(4 IN) | CY | 6.000 | 800.00 | 1 2 3 | 1,315.000 974.430 973.500 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 25.000 | 800.00 | 1 2 3 | 1,060.000 1,299.240 1,005.950 |
4606007 | CMP (GAL STL 48 IN) | LF | 72.000 | 600.00 | 1 2 3 | 220.000 324.810 324.500 |
4626055002 | CONC BOX CULV (6 FT X 4 FT)(EXTEND) | LF | 93.000 | 1,100.00 | 1 2 3 | 1,155.000 1,624.040 1,622.500 |
4646005001 | RC PIPE (CL III)(24 IN) | LF | 2,475.000 | 145.00 | 1 2 3 | 123.500 168.900 168.740 |
4646010001 | RC PIPE (CL III)(48 IN) | LF | 240.000 | 300.00 | 1 2 3 | 320.000 487.210 486.750 |
4666103 | HEADWALL (CH - PW - 0) (DIA= 48 IN) | EA | 1.000 | 16,000.00 | 1 2 3 | 36,150.000 37,677.830 37,642.000 |
4676022 | SET (TY I) (48 IN) (4: 1) (C) | EA | 3.000 | 9,180.00 | 1 2 3 | 22,550.000 12,992.360 12,980.000 |
4676219 | SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C) | EA | 6.000 | 14,300.00 | 1 2 3 | 19,765.000 16,890.060 16,874.000 |
4676390 | SET (TY II) (24 IN) (RCP) (4: 1) (C) | EA | 2.000 | 3,600.00 | 1 2 3 | 3,920.000 2,598.470 2,596.000 |
4676395 | SET (TY II) (24 IN) (RCP) (6: 1) (P) | EA | 88.000 | 2,080.00 | 1 2 3 | 3,675.000 2,923.280 2,920.500 |
4806001 | CLEAN EXIST CULVERTS | EA | 4.000 | 2,200.00 | 1 2 3 | 4,225.000 6,496.180 4,543.000 |
4966004 | REMOV STR (SET) | EA | 24.000 | 2,150.00 | 1 2 3 | 910.000 649.620 649.000 |
4966007 | REMOV STR (PIPE) | LF | 1,022.000 | 60.00 | 1 2 3 | 68.000 15.590 15.580 |
4966008 | REMOV STR (BOX CULVERT) | LF | 78.000 | 162.00 | 1 2 3 | 115.000 129.920 129.800 |
5006001 | MOBILIZATION | LS | 1.000 | 3,038,000.00 | 1 2 3 | 4,100,000.000 6,633,626.830 4,884,061.400 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 17.000 | 30,000.00 | 1 2 3 | 36,100.000 106,863.280 41,662.380 |
5066021005 | CONSTRUCTION EXITS (INSTALL) (TY 2) | SY | 279.000 | 30.00 | 1 2 3 | 58.000 310.570 282.070 |
5066024005 | CONSTRUCTION EXITS (REMOVE) | SY | 279.000 | 14.65 | 1 2 3 | 20.000 18.310 16.570 |
5066041005 | BIODEG EROSN CONT LOGS (INSTL) (12") | LF | 3,545.000 | 3.95 | 1 2 3 | 8.500 12.240 11.120 |
5066043005 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 3,545.000 | 2.76 | 1 2 3 | 3.000 1.750 1.590 |
5086001 | CONSTRUCTING DETOURS | SY | 96,312.000 | 72.00 | 1 2 3 | 86.150 110.000 92.550 |
5106001 | ONE-WAY TRAF CONT (FLAGGER CONT) | HR | 24.000 | 50.00 | 1 2 3 | 195.000 600.000 198.580 |
5306004 | DRIVEWAYS (CONC) | SY | 726.000 | 125.00 | 1 2 3 | 195.000 368.830 208.340 |
5306005 | DRIVEWAYS (ACP) | SY | 4,050.000 | 63.00 | 1 2 3 | 46.500 125.000 88.490 |
5336003 | RUMBLE STRIPS (SHOULDER) ASPHALT | LF | 96,380.000 | 0.20 | 1 2 3 | 0.250 0.210 0.060 |
5336004 | RUMBLE STRIPS (CENTERLINE) ASPHALT | LF | 48,300.000 | 0.21 | 1 2 3 | 0.250 0.210 0.060 |
5406002001 | MTL W-BEAM GD FEN (STEEL POST) | LF | 1,050.000 | 33.29 | 1 2 3 | 35.000 42.550 38.650 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 775.000 | 3.22 | 1 2 3 | 3.200 3.900 3.540 |
5426006 | MTL BM GD FEN (REMOVE & REINSTALL) | LF | 275.000 | 46.00 | 1 2 3 | 18.000 22.090 20.060 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 6.000 | 3,660.00 | 1 2 3 | 3,540.000 4,352.440 3,953.000 |
5446002 | GUARDRAIL END TREATMENT (MOVE & RESET) | EA | 2.000 | 500.00 | 1 2 3 | 2,115.000 2,598.470 2,360.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 4.000 | 322.00 | 1 2 3 | 317.000 389.770 354.000 |
5606011 | MAILBOX INSTALL-S (TWW-POST) TY 4 | EA | 5.000 | 300.00 | 1 2 3 | 425.000 389.770 472.000 |
5606013 | MAILBOX INSTALL-M (TWW-POST) TY 4 | EA | 1.000 | 712.00 | 1 2 3 | 845.000 909.460 944.000 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 14.000 | 775.00 | 1 2 3 | 950.000 1,169.310 1,062.000 |
6446002 | IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | EA | 10.000 | 8,785.00 | 1 2 3 | 1,200.000 1,429.160 1,268.500 |
6446004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T) | EA | 18.000 | 990.00 | 1 2 3 | 1,135.000 1,429.160 1,268.500 |
6446005 | IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT) | EA | 4.000 | 1,000.00 | 1 2 3 | 1,190.000 1,429.160 1,327.500 |
6446007 | IN SM RD SN SUP&AM TY10BWG(1)SA(U) | EA | 3.000 | 1,000.00 | 1 2 3 | 1,295.000 1,948.850 1,445.500 |
6446027 | IN SM RD SN SUP&AM TYS80(1)SA(P) | EA | 2.000 | 917.00 | 1 2 3 | 1,460.000 1,948.850 1,628.400 |
6446037 | IN SM RD SN SUP&AM TYS80(1)SA(U-WC) | EA | 1.000 | 1,430.00 | 1 2 3 | 1,785.000 1,948.850 1,994.200 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 43.000 | 405.00 | 1 2 3 | 115.000 103.940 129.800 |
6586060 | REMOVE DELIN & OBJECT MARKER ASSMS | EA | 46.000 | 5.00 | 1 2 3 | 16.000 24.000 17.700 |
6586093 | INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI) | EA | 22.000 | 70.00 | 1 2 3 | 160.000 129.920 177.000 |
6586099 | INSTL OM ASSM (OM-2Z)(WFLX)GND | EA | 12.000 | 132.00 | 1 2 3 | 160.000 129.920 177.000 |
6626008 | WK ZN PAV MRK NON-REMOV (W)6"(SLD) | LF | 296,190.000 | 0.34 | 1 2 3 | 0.260 0.320 0.300 |
6626037 | WK ZN PAV MRK NON-REMOV (Y)6"(SLD) | LF | 300,090.000 | 0.34 | 1 2 3 | 0.260 0.320 0.300 |
6626109 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 416.000 | 1.74 | 1 2 3 | 1.700 2.600 3.460 |
6626111 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 4,834.000 | 1.74 | 1 2 3 | 1.750 2.600 3.460 |
6666018007 | REFL PAV MRK TY I (W)6"(DOT)(100MIL) | LF | 255.000 | 4.25 | 1 2 3 | 1.050 1.300 1.180 |
6666036007 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 430.000 | 3.20 | 1 2 3 | 1.400 1.690 1.530 |
6666306007 | RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) | LF | 170.000 | 1.07 | 1 2 3 | 0.800 0.970 0.890 |
6666309007 | RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | LF | 106,834.000 | 1.12 | 1 2 3 | 0.700 0.820 0.740 |
6666318007 | RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) | LF | 12,430.000 | 1.00 | 1 2 3 | 0.700 0.870 0.790 |
6666321007 | RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | LF | 20,580.000 | 1.20 | 1 2 3 | 0.700 0.840 0.770 |
6686076 | PREFAB PAV MRK TY C (W) (24") (SLD) | LF | 629.000 | 16.00 | 1 2 3 | 12.700 15.590 14.160 |
6686077 | PREFAB PAV MRK TY C (W) (ARROW) | EA | 4.000 | 250.00 | 1 2 3 | 238.000 292.330 265.500 |
6686085 | PREFAB PAV MRK TY C (W) (WORD) | EA | 2.000 | 300.00 | 1 2 3 | 345.000 422.250 383.500 |
6686089 | PREFAB PAV MRK TY C (W) (RR XING) | EA | 5.000 | 690.00 | 1 2 3 | 685.000 844.500 767.000 |
6726007 | REFL PAV MRKR TY I-C | EA | 32.000 | 4.00 | 1 2 3 | 10.600 12.990 11.800 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 1,067.000 | 4.00 | 1 2 3 | 5.300 6.500 5.900 |
6776001 | ELIM EXT PAV MRK & MRKS (4") | LF | 129,687.000 | 0.45 | 1 2 3 | 0.600 0.710 0.650 |
30776058 | SP MIXES SP-D SAC-A PG70-28 | TON | 54,239.000 | 141.00 | 1 2 3 | 146.000 160.000 174.520 |
30776075 | TACK COAT | GAL | 33,611.000 | 5.50 | 1 2 3 | 7.650 7.830 7.820 |
30836002 | EMULSIFIED ASPHALT BASE (PT MX) 6" | SY | 245,084.000 | 36.00 | 1 2 3 | 28.300 41.440 66.880 |
61856002002 | TMA (STATIONARY) | DAY | 10.000 | 430.00 | 1 2 3 | 525.000 1,000.000 515.990 |
61856003002 | TMA (MOBILE OPERATION) | HR | 40.000 | 100.00 | 1 2 3 | 100.000 250.000 117.540 |