The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:LAMPASASLet Date:01/06/23
Type:RESURFACE ROADWAYSeq No:3218
Time:50 WORKING DAYSProject ID:F 2023(376)
Highway:FM 2657Contract #:01233218
Length:0.000CCSJ:2786-01-018
Limits: 
From:0.412 MI. S OF US 190Check:$64,000
To:FM 2808Misc Cost:
Estimate$3,188,056.67% Over/UnderCompany
Bidder 1$2,365,646.87-25.80%LONE STAR PAVING COMPANY
Bidder 2$2,391,762.93-24.98%TEXAS MATERIALS GROUP, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
3106009PRIME COAT (MC-30)GAL16,900.0005.001
2
2.800
5.500
3166173002AGGR(TY-B GR-3 SAC-B)CY902.000120.001
2
154.500
107.000
3166536002ASPH (CRS-2 OR CRS-2H)GAL39,433.0004.501
2
3.500
3.250
3516006FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")SY275.000110.001
2
86.000
120.000
3516013FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")SY9,117.00045.001
2
28.000
29.000
3546045PLANE ASPH CONC PAV (2")SY112,664.0002.501
2
1.400
1.750
4326001RIPRAP (CONC)(4 IN)CY0.8001,000.001
2
2,000.000
2,300.000
5006001MOBILIZATIONLS1.000305,000.001
2
50,000.000
93,100.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO3.00010,000.001
2
14,300.000
2,400.000
5566007PIPE UNDERDRAINS (TY 7) (6")LF1,157.00060.001
2
77.000
50.000
6626004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF24,350.0000.501
2
0.170
0.120
6626032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF8,218.0000.501
2
0.210
0.130
6626034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF48,700.0001.001
2
0.170
0.130
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA5,454.0001.611
2
1.250
1.000
6666078007REFL PAV MRK TY I (W)(WORD)(100MIL)EA4.000400.001
2
275.000
385.000
6666181007REFL PAV MRK TY II (W) 18" (SLD)LF186.0004.461
2
1.760
2.000
6666182007REFL PAV MRK TY II (W) 24" (SLD)LF724.0004.131
2
2.750
2.000
6666184007REFL PAV MRK TY II (W) (ARROW)EA4.000400.001
2
77.000
40.000
6666300007RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF3,195.0000.551
2
0.430
0.550
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF16,549.0000.551
2
0.430
0.540
6666312007RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF6,558.0000.551
2
0.430
0.440
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF19,219.0000.551
2
0.430
0.540
6726007REFL PAV MRKR TY I-CEA286.0005.001
2
6.100
6.250
6726009REFL PAV MRKR TY II-A-AEA418.0005.001
2
6.100
6.250
30776034SP MIXES SP-C SAC-B PG76-22TON12,955.300120.001
2
104.000
105.750
61856002002TMA (STATIONARY)DAY88.000192.001
2
200.000
0.010
61856003002TMA (MOBILE OPERATION)HR96.000100.001
2
75.000
20.000