AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Monday, June 2, 2014
ITEMS 764 2003 TO 774 2022
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1138
2176 - 2199
3035 - 3281
4003 - 4568
5049 - 5953
6005 - 6986
7008 - 7649
8020 - 8987
700 2001 - 735 2072
735 2073 - 738 2176
738 2177 - 764 2002
764 2003 - 774 2022
774 2023 - 788 2004
Item No Description Units May 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
764 2003 BASKET AND INLET PIPE CLEANING EA     216.000 359.81481 11
764 2004 DOWNSPOUT CLEANING EA     425.000 226.43529 8
764 2005 SUMP CLEANING EA     93.000 378.27957 9
764 2006 STORM SEWER CLEANING (PIPE) (12" - 18" DIA LF     91,051.000 3.12675 17
764 2007 STORM SEWER CLEANING (PIPE) (19" - 24" DIA LF     95,727.000 3.44088 16
764 2008 STORM SEWER CLEANING (PIPE) (25" - 30" DIA LF     42,502.000 3.80833 15
764 2009 STORM SEWER CLEANING (PIPE) (31" - 36" DIA LF     26,149.000 5.21789 16
764 2010 STORM SEWER CLEANING (PIPE) (37" - 42" DIA LF     5,676.000 5.56356 12
764 2011 STORM SEWER CLEANING (PIPE) (43" - 54" DIA LF     7,771.000 6.82705 16
764 2012 STORM SEWER CLEANING (PIPE) (55" - 74" DIA LF     1,725.000 8.86667 6
764 2013 STORM SEWER CLEANING (PIPE) (75" - 96" DIA LF     20.000 7.00000 1
764 2014 STORM SEWER CLEAN (BOX CULV) (<6 SF) LF     800.000 8.00000 3
764 2015 STORM SEWER CLEAN (BOX CULV) (6 - <12 SF) LF     3,910.000 12.75575 9
764 2016 STORM SEWER CLEAN (BOX CULV) (12 - <24 SF) LF     12,553.000 12.45957 12
764 2017 STORM SEWER CLEAN (BOX CULV) (24 - <48 SF) LF     15,926.060 16.57970 14
764 2018 STORM SEWER CLEAN (BOX CULV) (48 - <96 SF) LF     5,260.000 17.58793 7
764 2020 SLOTTED DRAIN CLEANING LF     52,145.000 3.57023 12
764 2021 PUMP STATION WELL CLNING (X - LG PUMP STN EA     19.000 5,547.36842 2
764 2022 PUMP STATION WELL CLNING (LG PUMP STN) EA     32.000 2,650.00000 1
764 2023 STORM SEWER CLEAN (PIPE) (18" OR LESS) LF     67,020.000 1.75000 2
764 2024 STORM SEWER CLEAN (PIPE) (19" TO 30") LF     26,275.000 3.00000 2
764 2025 STORM SEWER CLEAN (PIPE) (31" TO 42") LF     2,225.000 8.50000 2
764 2026 STORM SEWER CLEAN (PIPE) (43" TO 48") LF     200.000 10.95000 1
764 2028 STORM SEWER CLEANING (PIPE) (<12"DIA) LF     1,000.000 2.60000 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 78,050.000 6.95195 432,215.000 8.97576 73
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 549.000 6.64845 5,181.000 8.95096 64
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 428.000 6.01636 4,072.500 9.96660 66
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 4,932.000 20.03650 27,650.000 19.77217 60
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 353.000 35.58074 7,060.000 33.03940 57
770 2006 REALIGN POSTS EA 1,323.000 14.67725 21,302.000 27.57213 69
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 80.000 2.70000 574.000 4.64636 48
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 84.000 2.61905 396.000 18.88939 47
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 162.000 1,412.65432 1,143.000 1,587.81544 63
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 149.000 288.56376 1,571.000 598.66709 69
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 20,220.000 5.61345 149,408.000 14.88163 71
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 2,036.000 18.42927 16,922.000 20.68396 71
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA 350.000 10.00000 1,078.000 9.16976 9
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 400.000 20.22500 1,849.000 35.18919 55
770 2016 REPAIR SINGLE GUARDRAIL TERMINAL EA     20.000 490.00000 2
770 2017 REPAIR RAIL ELEMENT (T4S) LF     575.000 8.43478 3
770 2018 REM / REPL TIMBER POST W / O CONC FND EA 1,200.000 1.00000 12,510.000 23.93925 14
770 2019 REM / REPL STEEL POST W / O CONC FND EA 50.000 1.00000 936.000 126.80556 13
770 2020 REM / REPL TIMBER POST W / CONC FND EA 10.000 1.00000 383.000 123.43864 12
770 2021 REM / REPL STEEL POST W / CONC FND EA 8.000 1.00000 593.000 121.52277 15
770 2022 REM & RESET SGT IMPACT HEAD EA 489.000 54.85276 3,156.000 189.01334 56
770 2023 REPLACE SGT OBJECT MARKER EA 120.000 9.45833 1,060.000 22.77642 57
770 2024 REPLACE SGT CABLE ANCHOR EA 78.000 2.94872 1,152.000 55.22425 57
770 2025 REPLACE SGT CABLE ASSEMBLY EA 140.000 77.03571 1,383.000 76.26761 60
770 2026 REPLACE SGT STRUT EA 85.000 2.17647 595.000 34.23109 62
770 2027 REMOVE & REPLACE BLOCKOUT EA 1,700.000 4.55747 12,012.000 6.96324 51
770 2028 REPLACE HINGED TOP SGT STEEL POST EA 45.000 50.00000 251.000 113.71315 14
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF 150.000 15.82000 9,830.000 8.45249 14
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     22,150.000 11.45057 8
770 2031 INSTALL BLOCKOUT EA 30.000 23.76000 130.000 19.90615 7
770 2032 REMOVE AND RESET SGT IMPACT HEAD EA     24.000 50.00000 1
770 2033 INSTALL BLOCKOUT EA 263.000 13.66297 1,263.000 10.06996 8
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA 10.000 41.80000 298.000 214.95725 13
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 229.000 17.44105 6,582.000 12.71459 37
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA     68.000 277.20956 6
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA     87.000 9.42529 5
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     304.000 33.82220 4
770 2039 REM / REPL TIM / STL POST W CONC FND (FURN EA     82.000 78.10732 3
770 2040 RAISE RAIL ELEMENT LF 275.000 7.18182 29,637.000 3.65597 26
770 2043 REPLACE SINGLE GDRAIL TERM POST (FURN) EA     20.000 175.00000 2
770 2044 REPLACE SGT CABLE ANCHOR (FURN) EA     200.000 5.98000 2
770 2045 REPLACE SGT CABLE ASSEMBLY (FURN) EA     200.000 5.73500 2
770 2046 REPLACE SGT STRUT (FURN) EA     200.000 5.78500 2
770 2047 REPAIR RAIL ELEMENT (THRIE - BEAM) (FURN) LF     100.000 7.29000 2
770 2048 REP RAIL ELMNT (THRIE - BM TRANS) (FURN) LF     100.000 6.73500 2
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     220.000 49.20000 3
770 2051 RESET HINGED TOP SGT STL POST EA 60.000 50.00000 80.000 50.00000 2
772 2001 POST AND CABLE FENCE (REMOVAL) LF     1,705.000 2.77575 9
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA     15.000 80.26667 6
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     55,312.000 3.33267 14
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     120.000 44.58333 10
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     917.000 79.97928 17
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     123.000 49.59350 10
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     39,795.000 3.19964 17
772 2009 POST AND CABLE FENCE (REPAIR) LF     125.000 7.00000 1
774 2001 REMOVE AND REPLACE (TRACC) EA     67.000 5,011.94030 15
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     43.000 8,465.11628 6
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     39.000 9,791.68718 17
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA     17.000 23,068.70059 11
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     261.000 265.19126 13
774 2006 REPAIR (TRACC) EA 26.000 596.15385 106.000 549.89151 11
774 2007 REPAIR (TRACC) LF 50.000 200.00000 638.000 93.73041 9
774 2008 REPAIR (WIDE TRACC) EA 2.000 500.00000 48.000 275.98438 4
774 2009 REPAIR (WIDE TRACC) LF     81.000 250.61728 4
774 2010 REPAIR (REACT) EA 25.000 500.00000 85.000 453.98235 4
774 2011 REPAIR (CATCB - FRNT SECT) EA 1.000 1,500.00000 18.000 2,288.88889 4
774 2012 REPAIR (CATCB - REAR SECT) EA 1.000 500.00000 10.000 790.00000 3
774 2014 REMOVE AND REPLACE (NARROW QUAD) EA     14.000 6,428.57143 5
774 2015 REPAIR (NARROW QUAD) EA     21.000 253.04762 6
774 2016 REMOVE AND REPLACE (WIDE QUAD) EA     1.000 15,000.00000 1
774 2017 REPAIR (WIDE QUAD) EA 4.000 250.50000 15.000 701.60000 8
774 2018 REPAIR (CATGR - FRONT SECTION) EA 1.000 2,000.00000 6.000 2,275.16667 5
774 2019 REPAIR (CATGR - END SECTION) EA 1.000 500.00000 6.000 992.83333 5
774 2020 REMOVE AND REPLACE (VIA - STEEL BARRELS) EA     1.000 100.00000 1
774 2021 REPAIR (VIA - STEEL BARRELS) EA     38.000 5.00000 1
774 2022 REMOVE AND REPLACE (CATGR) EA     4.000 4,375.00000 3