AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Thursday, March 20, 2014
ITEMS 752 2053 TO 774 2011
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1138
2092 - 2199
3035 - 3281
4003 - 4644
5049 - 5953
6005 - 6986
7008 - 7649
8020 - 8987
9054 - 9606
700 2001 - 735 2012
735 2068 - 738 2156
738 2158 - 752 2051
752 2053 - 774 2011
774 2012 - 788 2004
Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
752 2053 TREE TRIMMING EA     2,130.000 35.87324 11
752 2054 STUMP REMOVAL (12" OR LESS) EA     3,813.000 25.82669 11
752 2055 STUMP REMOVAL (GREATER THAN 12") EA     2,375.000 50.64926 15
752 2056 TREE REMOVAL (72" - 84" DIA) EA     4.000 1,200.00000 1
752 2057 TREE TRIMMING & BRUSH REMOVAL LF 446,000.000 0.49000 446,000.000 0.49000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 95,510.000 1.75479 3,822,405.000 1.35098 41
760 2002 DITCH CLEAN / RESHAPING (CU YD IN PLACE) CY     21,900.000 8.56164 2
760 2003 DITCH CLEAN / RESHAPING (CU YD IN VEHICLE CY     100,000.000 3.82000 1
764 2001 DRAIN INLET CLEANING EA 1,175.000 65.40426 11,879.000 34.55729 21
764 2002 PUMP STATION WELL CLEANING EA 32.000 1,800.00000 258.000 1,303.41085 13
764 2003 BASKET AND INLET PIPE CLEANING EA     224.000 361.25000 12
764 2004 DOWNSPOUT CLEANING EA 83.000 350.00000 425.000 226.43529 8
764 2005 SUMP CLEANING EA     101.000 372.07921 10
764 2006 STORM SEWER CLEANING (PIPE) (12" - 18" DIA LF 20,000.000 2.25000 101,051.000 3.16369 18
764 2007 STORM SEWER CLEANING (PIPE) (19" - 24" DIA LF 30,734.000 2.41121 120,727.000 3.55666 17
764 2008 STORM SEWER CLEANING (PIPE) (25" - 30" DIA LF 15,000.000 2.50000 47,502.000 3.85482 16
764 2009 STORM SEWER CLEANING (PIPE) (31" - 36" DIA LF 5,000.000 2.75000 35,149.000 4.98286 17
764 2010 STORM SEWER CLEANING (PIPE) (37" - 42" DIA LF 2,476.000 4.14378 6,676.000 5.38927 13
764 2011 STORM SEWER CLEANING (PIPE) (43" - 54" DIA LF 2,334.000 5.14482 8,771.000 6.56174 17
764 2012 STORM SEWER CLEANING (PIPE) (55" - 74" DIA LF     1,725.000 8.86667 6
764 2013 STORM SEWER CLEANING (PIPE) (75" - 96" DIA LF     20.000 7.00000 1
764 2014 STORM SEWER CLEAN (BOX CULV) (<6 SF) LF     800.000 8.00000 3
764 2015 STORM SEWER CLEAN (BOX CULV) (6 - <12 SF) LF 750.000 10.00000 6,410.000 11.09594 10
764 2016 STORM SEWER CLEAN (BOX CULV) (12 - <24 SF) LF 750.000 15.00000 14,553.000 12.39641 13
764 2017 STORM SEWER CLEAN (BOX CULV) (24 - <48 SF) LF     16,926.060 16.48637 15
764 2018 STORM SEWER CLEAN (BOX CULV) (48 - <96 SF) LF     5,260.000 17.58793 7
764 2020 SLOTTED DRAIN CLEANING LF     52,245.000 3.56723 13
764 2021 PUMP STATION WELL CLNING (X - LG PUMP STN EA     19.000 5,547.36842 2
764 2022 PUMP STATION WELL CLNING (LG PUMP STN) EA     32.000 2,650.00000 1
764 2023 STORM SEWER CLEAN (PIPE) (18" OR LESS) LF     67,020.000 1.75000 2
764 2024 STORM SEWER CLEAN (PIPE) (19" TO 30") LF     26,275.000 3.00000 2
764 2025 STORM SEWER CLEAN (PIPE) (31" TO 42") LF     2,225.000 8.50000 2
764 2026 STORM SEWER CLEAN (PIPE) (43" TO 48") LF     200.000 10.95000 1
764 2028 STORM SEWER CLEANING (PIPE) (<12"DIA) LF     1,000.000 2.60000 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 23,000.000 9.76630 339,965.000 9.56013 67
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 580.000 5.57793 4,600.500 8.95662 60
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 166.250 6.57895 2,896.500 8.74711 61
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 925.000 35.86486 23,651.000 19.32271 56
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 1,080.000 37.73148 6,745.000 32.88853 53
770 2006 REALIGN POSTS EA 675.000 19.44444 19,459.000 29.21134 63
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 211.000 1.43773 491.000 5.14819 44
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 11.000 36.11818 338.000 20.94142 43
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 34.000 1,838.22206 1,190.000 1,644.11601 56
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 115.000 695.65217 1,440.000 590.86111 63
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 7,475.000 13.31104 131,313.000 16.30726 65
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 780.000 41.66667 14,431.000 20.61825 65
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA 35.000 5.00000 728.000 8.77060 8
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 32.000 17.13938 1,601.000 43.29151 53
770 2016 REPAIR SINGLE GUARDRAIL TERMINAL EA 10.000 900.00000 20.000 490.00000 2
770 2017 REPAIR RAIL ELEMENT (T4S) LF 175.000 10.00000 575.000 8.43478 3
770 2018 REM / REPL TIMBER POST W / O CONC FND EA 400.000 65.00000 9,960.000 26.86044 13
770 2019 REM / REPL STEEL POST W / O CONC FND EA 50.000 5.00000 886.000 133.90519 12
770 2020 REM / REPL TIMBER POST W / CONC FND EA 50.000 5.00000 373.000 126.72118 11
770 2021 REM / REPL STEEL POST W / CONC FND EA 50.000 5.00000 585.000 123.17094 14
770 2022 REM & RESET SGT IMPACT HEAD EA 75.000 144.19467 2,555.000 217.11472 50
770 2023 REPLACE SGT OBJECT MARKER EA 40.000 58.80000 898.000 25.03118 49
770 2024 REPLACE SGT CABLE ANCHOR EA 42.000 71.47619 1,073.000 58.45978 50
770 2025 REPLACE SGT CABLE ASSEMBLY EA 54.000 88.96296 1,203.000 76.28687 53
770 2026 REPLACE SGT STRUT EA 18.000 55.77778 527.000 35.71063 54
770 2027 REMOVE & REPLACE BLOCKOUT EA 30.000 32.82333 9,877.000 7.37012 45
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     190.000 130.21053 12
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     8,730.000 8.85624 11
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF 10.000 9.02000 40,150.000 10.35194 9
770 2031 INSTALL BLOCKOUT EA 20.000 17.00000 315.000 9.20635 8
770 2032 REMOVE AND RESET SGT IMPACT HEAD EA     24.000 50.00000 1
770 2033 INSTALL BLOCKOUT EA 25.000 50.00000 1,000.000 9.12500 6
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA 17.000 100.54471 287.000 221.32146 10
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 250.000 14.13600 5,575.000 12.41686 32
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA     118.000 238.66737 7
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA 20.000 10.25000 87.000 9.42529 5
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     554.000 28.75803 5
770 2039 REM / REPL TIM / STL POST W CONC FND (FURN EA     157.000 67.76146 4
770 2040 RAISE RAIL ELEMENT LF 60.000 1.45000 32,360.000 3.71561 24
770 2043 REPLACE SINGLE GDRAIL TERM POST (FURN) EA     30.000 200.00000 3
770 2044 REPLACE SGT CABLE ANCHOR (FURN) EA     400.000 28.39000 3
770 2045 REPLACE SGT CABLE ASSEMBLY (FURN) EA     400.000 28.26750 3
770 2046 REPLACE SGT STRUT (FURN) EA     400.000 39.56750 3
770 2047 REPAIR RAIL ELEMENT (THRIE - BEAM) (FURN) LF     200.000 8.47000 3
770 2048 REP RAIL ELMNT (THRIE - BM TRANS) (FURN) LF     200.000 9.01750 3
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     420.000 46.46190 4
770 2051 RESET HINGED TOP SGT STL POST EA     20.000 50.00000 1
772 2001 POST AND CABLE FENCE (REMOVAL) LF 20.000 1.52000 1,700.000 2.75450 8
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA 2.000 132.00000 13.000 89.53846 5
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF 50.000 35.00000 56,307.000 3.30664 14
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA 1.000 75.00000 118.000 44.66102 9
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA 55.000 48.18182 1,007.000 73.17875 17
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA 1.000 75.00000 143.000 44.05594 11
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF 200.000 7.75500 39,895.000 3.19288 17
772 2009 POST AND CABLE FENCE (REPAIR) LF 125.000 7.00000 125.000 7.00000 1
774 2001 REMOVE AND REPLACE (TRACC) EA 1.000 3,000.00000 59.000 5,535.59322 13
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA 1.000 8,000.00000 42.000 8,476.19048 5
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA 2.000 17,207.90000 34.000 10,713.99412 15
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA 2.000 24,208.95500 16.000 23,572.99438 10
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA 10.000 216.00000 241.000 276.82539 12
774 2006 REPAIR (TRACC) EA     84.000 542.72024 10
774 2007 REPAIR (TRACC) LF 50.000 138.54000 341.000 53.23167 7
774 2008 REPAIR (WIDE TRACC) EA     50.000 280.94500 4
774 2009 REPAIR (WIDE TRACC) LF 60.000 290.00000 80.000 250.00000 3
774 2010 REPAIR (REACT) EA     62.000 436.91129 4
774 2011 REPAIR (CATCB - FRNT SECT) EA     18.000 2,219.44444 4