AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Wednesday, September 17, 2014
ITEMS 764 2005 TO 774 2037
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1138
2176 - 2199
3035 - 3281
4003 - 4568
5049 - 5953
6005 - 6986
7008 - 7658
8020 - 8987
700 2001 - 735 2072
735 2073 - 738 2177
738 2178 - 764 2004
764 2005 - 774 2037
774 2038 - 788 2004
Item No Description Units August 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
764 2005 SUMP CLEANING EA 3.000 700.00000 92.000 383.47826 9
764 2006 STORM SEWER CLEANING (PIPE) (12" - 18" DIA LF 2,200.000 7.53000 87,251.000 3.17773 17
764 2007 STORM SEWER CLEANING (PIPE) (19" - 24" DIA LF 500.000 7.80000 93,727.000 3.39587 16
764 2008 STORM SEWER CLEANING (PIPE) (25" - 30" DIA LF     41,802.000 3.73814 14
764 2009 STORM SEWER CLEANING (PIPE) (31" - 36" DIA LF 269.000 9.00000 25,718.000 5.15450 16
764 2010 STORM SEWER CLEANING (PIPE) (37" - 42" DIA LF     5,476.000 5.40152 11
764 2011 STORM SEWER CLEANING (PIPE) (43" - 54" DIA LF     7,346.000 6.20106 14
764 2012 STORM SEWER CLEANING (PIPE) (55" - 74" DIA LF     1,725.000 8.86667 6
764 2013 STORM SEWER CLEANING (PIPE) (75" - 96" DIA LF     20.000 7.00000 1
764 2014 STORM SEWER CLEAN (BOX CULV) (<6 SF) LF     800.000 8.00000 3
764 2015 STORM SEWER CLEAN (BOX CULV) (6 - <12 SF) LF     3,710.000 12.90431 8
764 2016 STORM SEWER CLEAN (BOX CULV) (12 - <24 SF) LF     12,403.000 12.46513 11
764 2017 STORM SEWER CLEAN (BOX CULV) (24 - <48 SF) LF 500.000 25.27000 11,726.060 17.58343 12
764 2018 STORM SEWER CLEAN (BOX CULV) (48 - <96 SF) LF 125.000 32.29000 1,635.000 23.73012 6
764 2020 SLOTTED DRAIN CLEANING LF     45,780.000 2.92540 9
764 2021 PUMP STATION WELL CLNING (X - LG PUMP STN EA     19.000 5,547.36842 2
764 2022 PUMP STATION WELL CLNING (LG PUMP STN) EA     32.000 2,650.00000 1
764 2028 STORM SEWER CLEANING (PIPE) (<12"DIA) LF     1,000.000 2.60000 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 24,000.000 17.00000 354,015.000 10.58738 65
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 310.000 6.64516 5,133.000 8.26398 59
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 340.000 19.70588 4,173.000 10.11795 60
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 900.000 36.66667 25,980.000 19.73793 55
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 60.000 36.66667 6,413.000 32.47503 53
770 2006 REALIGN POSTS EA 920.000 17.28261 11,765.000 15.02607 59
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 40.000 3.25000 479.000 3.62050 40
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 40.000 8.20000 326.000 14.72187 41
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 80.000 2,050.00000 1,059.000 1,558.67131 54
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 90.000 595.55556 1,525.000 546.99630 62
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 7,950.000 14.62264 124,073.000 12.40319 62
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 430.000 55.58140 13,942.000 25.15163 62
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA 200.000 5.00000 1,228.000 7.05212 9
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 55.000 91.09091 1,282.000 23.34229 46
770 2016 REPAIR SINGLE GUARDRAIL TERMINAL EA     20.000 490.00000 2
770 2017 REPAIR RAIL ELEMENT (T4S) LF     575.000 8.43478 3
770 2018 REM / REPL TIMBER POST W / O CONC FND EA 110.000 37.72727 9,180.000 16.99891 11
770 2019 REM / REPL STEEL POST W / O CONC FND EA 200.000 67.50000 600.000 31.35000 9
770 2020 REM / REPL TIMBER POST W / CONC FND EA 10.000 10.00000 213.000 13.03756 8
770 2021 REM / REPL STEEL POST W / CONC FND EA 300.000 106.66667 538.000 70.40520 10
770 2022 REM & RESET SGT IMPACT HEAD EA 15.000 133.33333 2,363.000 67.97338 45
770 2023 REPLACE SGT OBJECT MARKER EA 64.000 6.25000 854.000 22.88993 50
770 2024 REPLACE SGT CABLE ANCHOR EA 36.000 5.00000 827.990 24.41979 50
770 2025 REPLACE SGT CABLE ASSEMBLY EA 36.000 5.55556 1,031.000 54.53162 53
770 2026 REPLACE SGT STRUT EA 30.000 4.80000 546.990 32.16055 55
770 2027 REMOVE & REPLACE BLOCKOUT EA 550.000 10.54545 8,897.000 5.14526 42
770 2028 REPLACE HINGED TOP SGT STEEL POST EA 15.000 75.00000 147.000 100.18367 9
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF 2,060.000 4.05825 6,935.000 4.68392 11
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     2,180.000 5.01844 4
770 2031 INSTALL BLOCKOUT EA     135.000 21.02074 7
770 2032 REMOVE AND RESET SGT IMPACT HEAD EA     24.000 50.00000 1
770 2033 INSTALL BLOCKOUT EA     1,213.000 10.07284 7
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA 140.000 100.00000 408.000 183.96387 14
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 600.000 14.00000 6,112.000 12.24025 35
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA 18.000 100.00000 35.000 128.17143 5
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA 22.000 10.00000 98.000 10.05102 5
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA 8.000 11.00000 62.000 2.60000 3
770 2040 RAISE RAIL ELEMENT LF 800.000 2.75000 26,137.000 3.45897 21
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     20.000 40.00000 1
770 2051 RESET HINGED TOP SGT STL POST EA     80.000 50.00000 2
772 2001 POST AND CABLE FENCE (REMOVAL) LF     705.000 3.43284 7
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA     7.000 57.71429 4
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF 1,600.000 7.00000 50,612.000 3.27119 10
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     25.000 20.00000 6
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA 20.000 100.00000 497.000 18.99598 13
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA 5.000 75.00000 88.000 13.06818 8
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF 400.000 3.00000 11,185.000 1.65219 13
772 2009 POST AND CABLE FENCE (REPAIR) LF     125.000 7.00000 1
774 2001 REMOVE AND REPLACE (TRACC) EA     15.000 4,446.66667 9
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     3.000 5,500.00000 3
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     17.000 13,406.81176 13
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA     11.000 24,742.53727 9
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     131.000 210.03756 9
774 2006 REPAIR (TRACC) EA     67.000 768.48507 11
774 2007 REPAIR (TRACC) LF 15.000 500.00000 613.000 107.78956 8
774 2008 REPAIR (WIDE TRACC) EA     8.000 430.90625 3
774 2009 REPAIR (WIDE TRACC) LF 15.000 500.00000 81.000 320.98765 4
774 2010 REPAIR (REACT) EA     55.000 431.60909 3
774 2011 REPAIR (CATCB - FRNT SECT) EA     2.000 1,250.00000 2
774 2012 REPAIR (CATCB - REAR SECT) EA     1.000 500.00000 1
774 2014 REMOVE AND REPLACE (NARROW QUAD) EA     3.000 13,000.00000 3
774 2015 REPAIR (NARROW QUAD) EA     9.000 744.66667 6
774 2016 REMOVE AND REPLACE (WIDE QUAD) EA     1.000 15,000.00000 1
774 2017 REPAIR (WIDE QUAD) EA     13.000 748.00000 7
774 2018 REPAIR (CATGR - FRONT SECTION) EA     5.000 2,100.20000 5
774 2019 REPAIR (CATGR - END SECTION) EA     5.000 750.20000 5
774 2020 REMOVE AND REPLACE (VIA - STEEL BARRELS) EA     1.000 100.00000 1
774 2021 REPAIR (VIA - STEEL BARRELS) EA     38.000 5.00000 1
774 2022 REMOVE AND REPLACE (CATGR) EA     3.000 3,866.66667 3
774 2023 REPAIR REACT (N) (MISC HARDWARE) EA     169.000 677.27811 12
774 2024 REPAIR REACT (N) (REAR SEC "S") EA     19.000 89.68421 8
774 2025 REPAIR REACT (N) (REAR SEC "B") EA     17.000 88.47059 7
774 2026 REPAIR REACT (N) (FRONT SECTION) EA     34.000 204.64706 10
774 2027 REPAIR REACT (N) (CYLINDERS) EA     160.000 2,103.12500 12
774 2028 REPAIR (QUAD) (N) (BAY) EA 4.000 500.00000 110.000 722.77273 14
774 2029 REPAIR (QUAD) (W) (BAY) EA 4.000 500.00000 34.000 503.52941 9
774 2031 REPAIR (ENERGY ABSORB SYS) (GDRAIL) EA     20.000 447.50000 4
774 2033 REPAIR (GREAT SYS) (BAY) EA 6.000 700.00000 42.000 661.90476 4
774 2034 REPAIR REACT (MISC) (HARDWARE) EA     78.000 693.58974 4
774 2035 REPAIR REACT (CYLINDERS) EA     147.000 1,222.03571 11
774 2036 REPAIR REACT (W) (MISC) (HARDWARE) EA     74.000 765.94595 10
774 2037 REPAIR REACT (W) (CYLINDERS) EA     81.000 2,264.81481 11