AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Wednesday, November 9, 2016
ITEMS 533 2006 TO 560 6013
Items Items Bid Code Range
0100 - 0192
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1000 - 1122
2001 - 2238
3003 - 3271
4001 - 4491
5001 - 5445
6000 - 6834
7000 - 7665
8020 - 8852
9054 - 9054
500 2001 - 510 2003
510 6001 - 531 6041
533 2006 - 560 6013
Item No Description Units October 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     149,788.000 0.53031 2
533 6001 RUMBLE STRIPS (SHOULDER) LF 905.000 7.00000 1,066,475.000 0.15269 9
533 6002 RUMBLE STRIPS (CENTERLINE) LF     711,793.000 0.31214 10
536 2002 CONC MEDIAN SY     10.000 85.00000 1
536 6002 CONC MEDIAN SY 50.000 169.00000 254.970 145.43476 6
536 6004 CONC DIRECTIONAL ISLAND SY     110.000 82.72727 2
536 6005 CONCRETE MEDIAN (NOSE) SY 120.000 80.00000 120.000 80.00000 1
536 6007 CONC DIRECTIONAL ISLAND (12") LF     156.000 88.00000 1
536 6008 CONC DIRECTIONAL ISLAND (24") LF     452.900 58.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     1,900.000 13.02632 8
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     2,875.000 19.77391 4
540 2003 MTL THRIE - BEAM GD FEN (TIM POST) LF     140.000 38.00000 3
540 2005 TERMINAL ANCHOR SECTION EA     19.000 118.57895 4
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     904.000 3.26327 5
540 2008 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     104.000 1.44231 3
540 2009 TERMINAL ANCHOR SECTION ADJUSTMENT EA     2.000 62.50000 2
540 2010 TRANSITION ADJUSTMENT EA     3.000 197.00000 3
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     24.000 580.20833 5
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     7.000 332.14286 3
540 2013 MTL BEAM GD FEN TRANS (T101) EA     10.000 680.00000 5
540 2016 MTL BM GD FN TRANS (THRIE) (RND TIM POST EA     12.000 500.00000 1
540 2031 MTL BM GD FN (REMOVE & RESET) LF     700.000 2.14286 2
540 2032 MTL BM GD FN TRANSITION (REMOVE & RESET) EA     1.000 50.00000 1
540 2037 MTL W - BEAM GD FEN (CRT POST) (SHRT RAD LF     110.000 10.00000 1
540 2039 MTL BEAM GD FEN TRANS (THRIE - BEAM) (OPT1 EA     4.000 1,500.00000 1
540 2040 MTL BEAM GD FEN TRANS (THRIE - BEAM) (OPT2 EA     4.000 1,700.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     20.000 895.50000 8
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     125.000 24.50000 4
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 5,025.000 21.80597 26,971.000 21.34796 50
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF 1,000.000 20.00000 5,738.500 23.58970 19
540 6003 MTL THRIE - BEAM GD FEN (TIM POST) LF     380.000 32.45395 12
540 6004 MTL THRIE - BEAM GD FEN (STEEL POST) LF     75.000 14.00000 2
540 6005 TERMINAL ANCHOR SECTION EA     140.000 109.20229 22
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 7.000 1,557.14286 244.000 1,421.73898 44
540 6007 MTL BEAM GD FEN TRANS (TL2) EA     18.000 547.22222 7
540 6008 MTL BEAM GD FEN TRANS (T101) EA     30.000 1,006.25667 14
540 6010 MTL W - BEAM GD FEN ADJUSTMENT LF 200.000 17.00000 5,752.000 9.36813 20
540 6011 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     218.000 11.67615 11
540 6012 TERMINAL ANCHOR SECTION ADJUSTMENT EA     11.000 86.09273 6
540 6013 TRANSITION ADJUSTMENT EA 1.000 1,200.00000 16.000 190.24500 12
540 6014 SHORT RADIUS LF 35.000 40.00000 1,720.000 25.84160 8
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA     14.000 838.16429 2
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 9.000 1,322.22222 153.000 1,015.06013 29
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF     737.500 21.23254 13
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 4.000 900.00000 36.000 563.55000 4
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     100.000 10.00000 4
540 6022 MTL THRIE - BEAM GD FEN (STEEL POST) EA     4.000 2,000.00000 1
540 6023 MTL BEAM GD FEN TRANS (THRIE BEAM) 28" EA     5.000 2,000.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     5,175.000 3.91715 8
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     39.000 219.30769 8
542 6001 REMOVE METAL BEAM GUARD FENCE LF 4,693.000 5.01492 32,118.000 3.22201 51
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 9.000 127.77778 495.000 296.33859 45
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL LF     123.000 19.13285 4
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA 2.000 200.00000 13.000 163.84615 6
542 6005 RM MTL BM GD FEN TRANS (T101) EA     7.000 267.14286 2
543 6001 CABLE BARRIER SYSTEM (TL - 3) LF     500.000 10.00000 1
543 6002 CABLE BARRIER SYSTEM (TL - 4) LF     1,000.000 4.00000 1
543 6020 CABLE BARRIER TERMINAL SECTION (TL - 4) EA     1.000 300.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     23.000 1,419.56522 4
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     7.000 214.28571 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     8.000 95.62500 3
544 2004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     4.000 1,500.50000 2
544 2005 GDRAIL END TRT (INST) (WOOD POST) (TY II) EA     1.000 1.00000 1
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     3.000 1,540.33333 2
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA     24.000 2,200.00000 2
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 3,250.00000 427.000 2,500.13710 39
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     22.000 538.63636 10
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 350.00000 431.000 168.72838 26
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     92.000 1,670.04022 11
544 6005 GDRAIL END TRT (INST) (WOOD POST) (TY II) EA     100.000 3,625.00000 6
544 6006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     156.000 1,836.75250 7
544 6007 GDRAIL END TRT (INSTALL) (HBA POST) EA     189.000 2,305.50265 12
545 2003 CRASH CUSH ATTEN (REMOVE) EA     1.000 2,000.00000 1
545 2004 CRASH CUSH ATTEN (INSTL) (FASTRACC) EA     1.000 10,000.00000 1
545 6001 CRASH CUSH ATTEN (INSTL) EA     13.000 10,365.38462 8
545 6002 CRASH CUSH ATTEN (DES SOURCE) EA     4.000 2,900.00000 3
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000 1,200.00000 14.000 1,471.42857 6
545 6004 CRASH CUSH ATTEN (STKPL) EA     2.000 1,825.00000 2
545 6005 CRASH CUSH ATTEN (REMOVE) EA 6.000 666.66667 44.000 694.72114 26
545 6006 CRASH CUSH ATTEN (INSTL) (L) (N) (TL2) EA     1.000 17,000.00000 1
545 6007 CRASH CUSH ATTEN (INSTL) (L) (N) (TL3) EA     9.000 16,231.50222 3
545 6008 CRASH CUSH ATTEN (INSTL) (L) (N) (70) EA     3.000 20,433.33333 3
545 6010 CRASH CUSH ATTEN (INSTL) (L) (W) (TL3) EA     5.000 16,600.00000 1
545 6013 CRASH CUSH ATTEN (INSTL) (R) (N) (TL3) EA     4.000 10,050.00000 2
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA 3.000 9,000.00000 9.000 7,267.06889 5
545 6024 CRASH CUSHION ATTEN (INSTALL) (TRACC) EA 1.000 10,000.00000 2.000 12,000.00000 2
550 6001 CHAIN LINK FENCE (INSTALL) (6') LF     5,125.000 20.63902 6
550 6002 CHAIN LINK FENCE (REPAIR) (6') LF     8,035.000 9.88799 7
550 6003 CHAIN LINK FENCE (REMOVE) LF     3,000.000 4.16667 5
550 6004 GATE (INSTALL) (DOUBLE) (6' X 14') EA     6.000 1,116.66667 3
550 6005 GATE (REPAIR) (DOUBLE) (6' X 14') EA     3.000 1,100.00000 2
550 6007 CHAIN LINK FENCE (REPAIR) (4') LF     1,750.000 12.28571 5
552 2004 WIRE FENCE (TY D) LF     1,847.000 5.00000 1
552 2005 GATE (TY 1) EA     3.000 900.00000 1
552 2008 WIRE FENCE (WATER GAP) LF     132.000 75.00000 1
552 2012 GATE (SPECIAL) EA     9.000 500.00000 1
552 2019 BRACE POST (REPLACEMENT) (METAL) EA     7.000 550.00000 1
552 2020 T - POST (REPLACEMENT) (METAL) EA     55.000 25.00000 1
552 2021 WIRE FENCE (WATER GAP) (SPECIAL) LF     400.000 60.00000 1
552 6001 WIRE FENCE (TY A) LF     60.000 10.00000 1
552 6002 WIRE FENCE (TY B) LF     382.000 9.00000 1
552 6003 WIRE FENCE (TY C) LF     400.000 17.70000 1
552 6008 WIRE FENCE (WATER GAP) LF     122.000 4.92000 1
556 2008 PIPE UNDERDRAINS (TY 8) (6") LF     4,229.000 35.00000 1
556 6008 PIPE UNDERDRAINS (TY 8) (6") LF     2,457.000 27.19780 4
560 6007 MAILBOX INSTALL - S (WC - POST) TY 3 EA     1.000 300.00000 1
560 6009 MAILBOX INSTALL - S (RR - POST) TY 4 EA     3.000 600.00000 1
560 6011 MAILBOX INSTALL - S (TWW - POST) TY 4 EA     44.000 175.00000 1
560 6013 MAILBOX INSTALL - M (TWW - POST) TY 4 EA     1.000 405.00000 1