AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Monday, March 31, 2014
ITEMS 530 2088 TO 540 2027
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1003 - 1144
2024 - 2203
3061 - 3278
4001 - 4659
5050 - 5997
6004 - 6986
7380 - 7642
8008 - 8995
9012 - 9050
500 2001 - 528 2005
528 2006 - 530 2087
530 2088 - 540 2027
540 2028 - 552 2007
552 2008 - 560 2036
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
530 2088 DRIVEWAYS (CONC) 5X SY     62.000 70.00000 1
530 2089 DRIVEWAYS (CONC) 3X SY     49.000 70.00000 1
530 2090 DRIVEWAYS (FL BS) SY     698.000 17.98926 4
531 2002 CONC SIDEWALKS (4') (6") LF     157.000 26.05096 2
531 2003 CONC SIDEWALKS (5') (6") LF 120.000 35.00000 27,481.000 27.35439 10
531 2004 CONC SIDEWALKS (6") SY 30.000 138.50000 94,220.710 37.82226 32
531 2005 CURB RAMPS (TY 1) EA 30.000 1,560.86400 995.000 1,271.47632 92
531 2006 CURB RAMPS (TY 2) EA 4.000 2,320.00000 254.000 1,455.13543 50
531 2007 CURB RAMPS (TY 3) EA     207.000 1,475.65459 15
531 2008 CURB RAMPS (TY 4) EA 6.000 1,353.60833 21.000 1,313.61476 7
531 2009 CURB RAMPS (TY 6) EA     191.000 1,332.00764 13
531 2010 CURB RAMPS (TY 7) EA 56.000 1,597.50000 1,977.000 1,165.82110 94
531 2011 CURB RAMPS (TY 8) EA 2.000 1,377.50000 17.000 1,097.35294 4
531 2012 CURB RAMPS (TY 9) EA     16.000 1,250.00000 4
531 2013 CURB RAMPS (TY 20) EA 6.000 1,000.00000 24.000 1,406.25500 10
531 2014 CURB RAMPS (TY 22) EA 10.000 2,270.50000 110.000 1,930.79936 32
531 2015 CONC SIDEWALKS (4") SY 22,344.000 47.46091 301,515.030 42.92102 77
531 2016 CONC SIDEWALKS (6') (6") LF     10,018.000 31.98772 5
531 2017 CURB RAMPS (TY 21) EA 10.000 1,737.03600 192.000 1,469.74260 50
531 2018 CURB RAMPS (SPECIAL) EA 5.000 4,560.00000 41.000 3,550.55951 9
531 2019 CONC SIDEWALKS (4.5") SY     3,654.000 39.40120 2
531 2020 CURB RAMPS (TY 2) (MOD) EA     51.000 1,259.29529 7
531 2022 CURB RAMPS (TY 7) (MOD) EA     14.000 985.71429 2
531 2023 CURB RAMPS (TY 1) (SPL) EA     3.000 1,750.00000 1
531 2024 CONC SIDEWALK (5") SY 10,571.000 35.68868 142,928.700 43.70936 34
531 2028 CONC SIDEWALK (5') (5") LF     952.000 37.23004 3
531 2034 CONC SIDEWALK (DRAIN) LF     201.000 304.82756 5
531 2035 CONCRETE SIDEWALKS (5') (4") LF 3,053.000 25.00000 83,950.800 19.81182 9
531 2036 CONC SIDEWALKS (8") (SPL RETAINING WALL SY     3,059.000 105.33119 5
531 2037 CONC SIDEWALK (BRIDGE) (5') (4") LF     252.000 366.66667 2
531 2038 CONC SIDEWALKS (STEPS) SY 29.800 245.00000 48.800 171.02459 2
531 2040 CURB RAMPS (TY 5) EA 23.000 1,223.91304 106.000 1,636.54255 29
531 2041 CURB RAMPS (TY 10) EA 34.000 1,482.50000 496.000 1,260.88855 42
531 2043 CONC SIDEWALKS (6') (5") LF     6,010.000 31.66271 2
531 2044 CURB RAMPS (TY 10) EA 8.000 1,435.90000 76.000 1,116.29026 11
531 2046 CURB RAMPS (TY 11) EA     11.000 1,440.90909 6
531 2047 CURB RAMPS (TY 5) (MOD) EA     5.000 1,440.00000 3
531 2051 CURB RAMPS (TY 10) (MOD) EA     18.000 1,472.22222 3
531 2054 CURB RAMPS SY 176.000 110.00000 9,915.300 111.50431 11
531 2062 CURB RAMPS (TY 21) (MOD) EA     6.000 1,400.00000 1
531 2065 CONC SIDEWALK (STEPS) SY     15.000 290.00000 2
531 2068 CURB RAMPS (TY 2) SY     8.000 194.01000 1
531 2070 CURB RAMPS (TY 5) SY     77.000 251.06494 2
531 2076 CONC SIDEWALK (5') (1'3") (BRIDGE) LF     42.000 427.02000 2
531 2077 CURB RAMPS (TY 3) (MOD) EA     1.000 2,000.00000 1
531 2082 SIDEWALK (SPL) (12") LF     69.000 136.50000 1
531 2083 CURB RAMPS (SPECIAL - 1) EA     16.000 5,750.00000 1
531 2085 CURB RAMPS (SPECIAL) SY     60.000 337.00000 1
531 2094 CONC SIDEWALKS (SPECIAL) (TYPE A) SY     208.000 53.00000 1
531 2104 CURB RAMPS (TY 7) (MOD - 1) EA     19.000 700.00000 1
531 2107 CURB RAMPS (TY - 12) EA     80.000 1,500.00000 1
531 2108 CONC SIDEWALKS (5") 1X SY     193.000 50.00000 1
531 2109 CONC SIDEWALKS (5") 2X SY     108.000 70.00000 1
531 2110 CONC SIDEWALKS (5") 3X SY     98.000 50.00000 1
531 2111 CONC SIDEWALKS (5") 4X SY     160.000 50.00000 1
531 2112 CONC SIDEWALKS (5") 5X SY     216.000 50.00000 1
531 2113 CONC SIDEWALKS (5") 6X SY     50.000 50.00000 1
531 2114 CURB RAMPS 1X SY     26.000 100.00000 1
531 2115 CURB RAMPS 4X SY     12.000 100.00000 1
531 2116 CURB RAMPS 6X SY     79.000 100.00000 1
531 2117 CURB RAMPS (FLARE) (RETROFIT) EA     10.000 1,723.48000 1
531 2118 CONC SIDEWALK (8') (6") (BRIDGE) LF     150.000 869.00000 1
531 2119 CONC SIDEWALKS (SHARED USE) (10'X6") SY     4,798.200 52.00000 1
531 2120 CURB RAMPS (TY21) (TRUNCATED DOME ONLY) EA     4.000 550.00000 1
533 2001 SHOULDER TEXTURING (MILLED) STA     17.040 340.00000 1
533 2003 SHOULDER TEXTURING (MILLED) LF     1,477,030.000 .07567 2
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF 1,297,446.000 .13493 12,455,464.940 .15559 95
533 2007 SHOULDER TEXTURING (MILLED) (CONCRETE) LF     189,233.000 .71216 10
533 2008 SHOULDER TEXTURING (ROLLED) (ASPHALT) LF     62,807.000 .34330 3
536 2001 CONC MEDIAN LF     3,564.500 32.40858 4
536 2002 CONC MEDIAN SY 25.000 150.00000 13,124.720 60.65925 35
536 2003 CONC DIRECTIONAL ISLAND LF     37,879.500 13.54276 3
536 2004 CONC DIRECTIONAL ISLAND SY 174.000 68.00000 9,843.020 63.68304 25
536 2005 CONC MEDIAN (DOWEL) (2') SY     504.000 60.00000 1
536 2006 CONC MEDIAN (MONO NOSE) SY     2,093.000 67.59783 10
536 2007 CONC DIRECTIONAL ISLAND 12" LF     268.000 10.00000 1
536 2008 CONC DIRECTIONAL ISLAND 24" LF     1,526.000 14.00000 1
536 2010 CONCRETE MEDIAN (DOWEL) (12") LF     124.000 65.00000 1
536 2011 CONC MEDIAN (DOWEL) (TRANSITION) LF     33.000 100.00000 1
538 2001 RIGHT OF WAY MARKERS EA 38.000 205.00000 559.000 202.19377 8
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 49,527.500 16.38711 352,019.970 17.02578 240
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF 30,870.000 18.39278 111,414.750 19.50872 60
540 2003 MTL THRIE - BEAM GD FEN (TIM POST) LF     1,325.000 15.04245 2
540 2004 MTL THRIE - BEAM GD FEN (STEEL POST) LF     12.000 1,212.25000 2
540 2005 TERMINAL ANCHOR SECTION EA 10.000 800.00000 163.000 861.94699 23
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF 6,900.000 6.50000 29,953.000 3.28315 6
540 2009 TERMINAL ANCHOR SECTION ADJUSTMENT EA 8.000 325.00000 8.000 325.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 240.000 1,290.07450 1,495.000 1,408.57415 179
540 2012 MTL BEAM GD FEN TRANS (TL2) EA 50.000 882.17980 285.000 976.07179 57
540 2013 MTL BEAM GD FEN TRANS (T101) EA 12.000 698.00000 89.000 702.08180 11
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 250.000 50.00000 4,672.000 49.77080 16
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF 570.000 20.03281 1,490.500 21.63832 18
540 2016 MTL BM GD FN TRANS (THRIE) (RND TIM POST EA     5.000 1,367.00000 2
540 2017 MTL W - BEAM GD FEN (ROUND TIMBER POST) LF     12,613.000 17.91112 5
540 2019 MTL BEAM GD FEN TRANS (THRIE) (STL POST EA     40.000 1,605.75000 4
540 2020 MTL BEAM GD FEN TRANS (TL2) (STL POST) EA     6.000 568.00000 1
540 2023 RADIAL TERMINAL ANCHOR SECTION (DRWY) EA     1.000 539.00000 1
540 2024 RADIAL TERMINAL ANCHOR SECTION (DRWY) EA 1.000 510.00000 1.000 510.00000 1
540 2025 TERMINAL ANCHOR SECTION (DRWY) (SPCL) EA 1.000 842.63000 12.000 596.66917 6
540 2027 MTL W - BEAM GD FEN (STEEL POST) (TY IV) LF     75.000 46.86493 1