AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Thursday, November 20, 2014
ITEMS 529 2002 TO 531 2019
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
0800 - 0800
1003 - 1151
2021 - 2328
3042 - 3287
4007 - 4682
5050 - 5997
6005 - 6986
7224 - 7661
8008 - 8999
9009 - 9059
500 2001 - 529 2001
529 2002 - 531 2019
531 2020 - 544 2009
544 2012 - 560 2036
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
529 2002 CONC CURB (TY II) LF     100,174.000 11.83106 40
529 2003 CONC CURB & GUTTER (TY I) LF 4,851.000 16.00000 40,344.100 15.67778 17
529 2004 CONC CURB & GUTTER (TY II) LF 5,939.000 17.07493 491,443.570 14.47911 72
529 2005 CONC CURB (MONO) (TY I) LF     91,061.000 5.82091 15
529 2006 CONC CURB (MONO) (TY II) LF 3,151.000 2.00000 645,639.000 2.92574 57
529 2007 CONC CURB (DOWEL) LF 1,949.000 12.63325 137,886.000 8.35046 19
529 2008 CONC CURB & GUTTER (SPECIAL) LF 3,770.000 16.00000 4,384.000 16.28011 2
529 2009 CONCRETE CURB (SPECIAL) LF     16,817.000 16.48272 10
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF     20,631.000 19.75426 9
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     1,485.000 14.62227 6
529 2012 CONC CURB & GUTTER (TY A) (BARRIER) LF     5,531.000 20.33909 4
529 2013 CONC CURB (TY A) (BARRIER) LF     50.000 44.00000 1
529 2014 CONC CURB (TY C) LF     10,790.000 11.99692 4
529 2015 CONC CURB (TY I) (REINF) LF     5,421.000 1.00000 1
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     706.000 61.68739 2
529 2018 CONC CURB (MONO) (TY II) (SPECIAL) LF     8,098.000 2.00000 1
529 2019 CONC CURB & GUTTER (TY B) (MOUNTABLE) LF 520.000 15.00000 6,415.000 10.17557 2
529 2020 CONC CURB & GUTTER (TY A) (VALLEY GUTTER LF     168.000 33.00000 1
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF     3,960.000 14.02821 6
529 2023 CONC CURB (MONO) LF     200.000 22.50000 1
529 2024 CONC CURB (MOUNTABLE) LF     2,771.000 7.00000 1
529 2026 CONC CURB (ARMOR CURB SLOT) LF     485.000 199.17526 5
529 2032 CONC CURB (TY B) MOUNTABLE LF     8,269.300 7.73323 2
529 2034 CONC GUTTER (TY B) VALLEY GUTTER LF     28.000 32.55000 1
529 2035 CONC CURB & GUTTER (TY II) (MOD) LF     562.000 17.00000 1
529 2037 CONC CURB (TY II) (REINF) LF     14.000 36.00000 1
529 2038 CONC CURB AND GUTTER (TY A) LF     628.000 14.23726 2
529 2040 CONC CURB (TY II) (MOD) LF     54.000 40.00000 1
529 2052 CURB AND GUTTER (TYPE I - C) LF     327.000 25.00000 1
529 2057 CURB AND GUTTER (TYPE II - C) LF     1,006.000 17.00000 1
529 2059 CONC CURB & GUTTER (TY I) (MOD) LF     1,538.000 19.64109 3
529 2060 CONC CURB & GUTTER (RIBBON) (MOD) LF     673.000 15.00000 1
529 2061 CONC CURB (TY C1) LF     1,673.000 58.06986 8
529 2062 CONC CURB (TY C2) LF     942.000 83.89490 3
529 2064 CONC CURB (TY F1) LF     602.000 80.45141 3
529 2065 CONC CURB (TY F2) LF     2,714.000 96.98094 4
529 2066 CONC CURB (RIBBON) (MOD) LF     3,710.000 14.15792 3
529 2070 CONCRETE CURB (TYPE U - TURN) (SPECIAL) LF     3,221.000 34.03434 2
529 2071 CONC CURB (SLOTTED) LF     595.000 25.29412 3
529 2075 CONC CURB (TY 1) (MOD) LF     120.000 30.00000 1
529 2076 CONC GUTTER (2') LF     169.900 33.00000 1
529 2083 CONC CURB & GUTTER (SPANDREL) LF     1,298.000 44.65000 1
529 2084 CONC CURB (ARMOR CURB SLOT) (MOD) LF     144.000 204.75000 1
529 2086 CONC CURB (DOWEL) (SLOTTED) LF 998.000 12.00000 2,148.000 17.50419 5
529 2094 CONC CURB (TY F3) LF     3,439.000 126.15603 6
529 2095 CONC CURB (MONO) (TY II) (DOWEL) (SAWTOOTH LF     27.000 40.00000 1
529 2107 CONC CURB (TY I) (DOWEL) (REINF) LF     2,425.000 15.00000 1
529 2108 CONC CURB (MONO) (TY I) (REINF) LF     5,077.000 1.00000 1
529 2109 CONC CURB (MONO) (TY II) (REINF) LF     4,601.000 1.34000 1
530 2001 INTERSECTIONS (CONC) EA     1.000 7,500.00000 1
530 2002 INTERSECTIONS (ACP) EA     31.000 4,555.76194 5
530 2003 INTERSECTIONS (SURF TREAT) EA     22.000 4,398.42455 4
530 2004 INTERSECTIONS (CONC) SY     686.000 91.10350 5
530 2005 INTERSECTIONS (ACP) SY 4,365.000 17.01000 98,574.190 17.07487 37
530 2006 INTERSECTIONS (SURF TREAT) SY 2,059.000 19.40000 21,999.400 20.24185 16
530 2007 DRIVEWAYS (CONC) EA     56.000 5,245.97946 9
530 2008 DRIVEWAYS (ACP) EA     1,353.000 1,555.79268 20
530 2009 DRIVEWAYS (SURF TREAT) EA     249.000 938.99900 10
530 2010 DRIVEWAYS (CONC) SY 4,536.000 64.73082 202,054.570 57.48009 160
530 2011 DRIVEWAYS (ACP) SY 17,506.000 28.35311 274,873.580 31.83495 124
530 2012 DRIVEWAYS (SURF TREAT) SY     83,290.000 23.30018 40
530 2014 TURNOUTS (ACP) EA 16.000 1,500.00000 521.000 1,062.44687 17
530 2015 TURNOUTS (SURF TREAT) EA     321.000 376.00748 7
530 2017 TURNOUTS (ACP) SY     9,627.340 40.42869 22
530 2018 TURNOUTS (SURF TREAT) SY 1,784.000 21.22000 11,582.710 19.18982 16
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY     9,188.700 37.93620 3
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     1,735.000 5.20000 1
530 2023 DRIVEWAYS AND TURNOUTS (ACP) SY     1,570.000 18.60191 2
530 2024 DRIVEWAYS AND TURNOUTS (SURF TREAT) SY     4,577.000 21.33559 2
530 2029 DRIVEWAYS (OTHER) SY     7,259.270 15.17666 8
530 2030 DRIVEWAYS (ACP) (TYPE 1) SY     11,060.000 24.46250 5
530 2031 DRIVEWAYS (ACP) (TYPE 2) SY     1,860.000 25.63855 3
530 2036 DRIVEWAYS (CONC) (TYPE 2) SY     3,910.100 68.26098 3
530 2037 DRIVEWAYS (CONC) (TYPE 1) SY     1,747.000 61.57355 4
530 2038 DRIVEWAYS (CONC) (HES) SY     12,819.000 72.68155 8
530 2050 DRIVEWAYS (SURF TREAT) (TYPE 1) SY 13,681.000 19.40000 15,655.200 19.79741 4
530 2051 DRIVEWAYS (SURF TREAT) (TYPE 2) SY 735.000 50.64000 781.100 47.94636 2
530 2057 TURNOUTS (RAP) SY 1,453.000 31.00000 1,453.000 31.00000 1
530 2058 DRIVEWAYS (OTHER) EA     45.000 740.00000 2
530 2075 DRIVEWAYS (GRAVEL) SY 1,688.000 13.00000 8,781.500 13.30179 9
530 2078 DRIVEWAYS (SURF TREAT) (TYPE 3) SY     1,904.000 13.65284 2
530 2090 DRIVEWAYS (FL BS) SY     4,897.000 18.72272 7
531 2002 CONC SIDEWALKS (4') (6") LF     16.000 70.00000 1
531 2003 CONC SIDEWALKS (5') (6") LF     120.000 35.00000 1
531 2004 CONC SIDEWALKS (6") SY 469.000 63.52068 122,360.200 48.00169 36
531 2005 CURB RAMPS (TY 1) EA 13.000 2,948.46154 1,651.000 1,311.34671 89
531 2006 CURB RAMPS (TY 2) EA     541.000 1,388.26865 54
531 2007 CURB RAMPS (TY 3) EA     1,161.000 1,224.09891 18
531 2008 CURB RAMPS (TY 4) EA     14.000 1,680.83214 6
531 2009 CURB RAMPS (TY 6) EA     1,022.000 1,318.80641 14
531 2010 CURB RAMPS (TY 7) EA 24.000 2,429.16667 2,761.000 1,195.04240 82
531 2011 CURB RAMPS (TY 8) EA 4.000 1,200.00000 37.000 1,187.82270 7
531 2012 CURB RAMPS (TY 9) EA     26.000 2,372.17538 6
531 2013 CURB RAMPS (TY 20) EA 21.000 2,100.00000 87.000 1,558.80839 11
531 2014 CURB RAMPS (TY 22) EA 5.000 1,800.00000 133.000 2,354.23391 39
531 2015 CONC SIDEWALKS (4") SY 5,423.000 44.21778 233,155.700 43.63802 79
531 2016 CONC SIDEWALKS (6') (6") LF     21,222.000 39.29729 3
531 2017 CURB RAMPS (TY 21) EA 2.000 5,967.00000 272.000 1,586.20901 54
531 2018 CURB RAMPS (SPECIAL) EA     25.000 3,015.11760 7
531 2019 CONC SIDEWALKS (4.5") SY     3,440.000 37.00000 1