AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Tuesday, September 30, 2014
ITEMS 528 2028 TO 531 2012
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1003 - 1151
2021 - 2314
3042 - 3287
4001 - 4681
5050 - 5997
6005 - 6986
7384 - 7642
8008 - 8999
9009 - 9059
500 2001 - 528 2026
528 2028 - 531 2012
531 2013 - 542 2008
542 2009 - 560 2008
560 2009 - 560 2036
Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
528 2028 LANDSCAPE PAVERS (OPT2) SY 625.000 51.57000 625.000 51.57000 1
528 2030 COLORED TEXTURED CONC (11") (CROSS WALKS SY 2,061.000 120.00000 4,379.000 107.82507 2
528 2031 LANDSCAPE PAVERS (BRICK) (SIDEWALK) SY     3,844.000 60.30000 1
528 2032 LANDSCAPE PAVERS (BRICK) (CROSSWALK) SY     376.000 70.65000 1
529 2001 CONC CURB (TY I) LF 8.000 100.00000 88,535.200 7.74530 24
529 2002 CONC CURB (TY II) LF 7,765.000 15.37722 82,375.000 12.18097 42
529 2003 CONC CURB & GUTTER (TY I) LF 2,639.000 13.12952 36,429.100 15.92765 18
529 2004 CONC CURB & GUTTER (TY II) LF 45,354.370 12.99819 528,444.570 14.76810 76
529 2005 CONC CURB (MONO) (TY I) LF 13,969.000 6.28016 59,980.000 5.49493 14
529 2006 CONC CURB (MONO) (TY II) LF 128,099.000 3.01411 724,554.000 2.91419 60
529 2007 CONC CURB (DOWEL) LF 603.000 3.00000 149,331.000 8.47264 22
529 2008 CONC CURB & GUTTER (SPECIAL) LF     614.000 18.00000 1
529 2009 CONCRETE CURB (SPECIAL) LF 219.000 31.00000 16,815.000 16.51204 10
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF 2,834.000 31.66426 35,470.000 20.69378 10
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     1,444.000 14.46958 5
529 2012 CONC CURB & GUTTER (TY A) (BARRIER) LF 1,523.000 21.87556 5,531.000 20.33909 4
529 2013 CONC CURB (TY A) (BARRIER) LF     50.000 44.00000 1
529 2014 CONC CURB (TY C) LF 175.000 21.93000 10,790.000 11.99692 4
529 2015 CONC CURB (TY I) (REINF) LF     5,421.000 1.00000 1
529 2016 CONC CURB (TY F) LF     13,341.000 20.80000 1
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     706.000 61.68739 2
529 2018 CONC CURB (MONO) (TY II) (SPECIAL) LF     8,098.000 2.00000 1
529 2019 CONC CURB & GUTTER (TY B) (MOUNTABLE) LF 5,895.000 9.75000 5,895.000 9.75000 1
529 2020 CONC CURB & GUTTER (TY A) (VALLEY GUTTER LF     168.000 33.00000 1
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF 751.000 20.47936 3,960.000 14.02821 6
529 2023 CONC CURB (MONO) LF     200.000 22.50000 1
529 2024 CONC CURB (MOUNTABLE) LF     2,771.000 7.00000 1
529 2026 CONC CURB (ARMOR CURB SLOT) LF     527.000 196.04516 6
529 2029 CONC CURB & GUTTER (TY II A) LF     3,916.000 16.50000 1
529 2030 CONC CURB (MONO) (TY II A) LF     337.000 16.50000 1
529 2032 CONC CURB (TY B) MOUNTABLE LF 1,136.000 7.00000 8,269.300 7.73323 2
529 2034 CONC GUTTER (TY B) VALLEY GUTTER LF 28.000 32.55000 28.000 32.55000 1
529 2035 CONC CURB & GUTTER (TY II) (MOD) LF     4,384.000 13.15943 3
529 2037 CONC CURB (TY II) (REINF) LF     14.000 36.00000 1
529 2038 CONC CURB AND GUTTER (TY A) LF     628.000 14.23726 2
529 2040 CONC CURB (TY II) (MOD) LF     6,595.000 15.20470 2
529 2052 CURB AND GUTTER (TYPE I - C) LF     327.000 25.00000 1
529 2057 CURB AND GUTTER (TYPE II - C) LF     1,006.000 17.00000 1
529 2059 CONC CURB & GUTTER (TY I) (MOD) LF     1,538.000 19.64109 3
529 2060 CONC CURB & GUTTER (RIBBON) (MOD) LF     673.000 15.00000 1
529 2061 CONC CURB (TY C1) LF     2,671.000 57.59876 9
529 2062 CONC CURB (TY C2) LF     942.000 83.89490 3
529 2064 CONC CURB (TY F1) LF     1,701.000 73.69885 4
529 2065 CONC CURB (TY F2) LF     3,044.000 95.41106 5
529 2066 CONC CURB (RIBBON) (MOD) LF     6,138.000 14.96137 5
529 2070 CONCRETE CURB (TYPE U - TURN) (SPECIAL) LF     6,096.000 34.48976 3
529 2071 CONC CURB (SLOTTED) LF     595.000 25.29412 3
529 2075 CONC CURB (TY 1) (MOD) LF     120.000 30.00000 1
529 2076 CONC GUTTER (2') LF     169.900 33.00000 1
529 2083 CONC CURB & GUTTER (SPANDREL) LF     1,298.000 44.65000 1
529 2084 CONC CURB (ARMOR CURB SLOT) (MOD) LF     144.000 204.75000 1
529 2086 CONC CURB (DOWEL) (SLOTTED) LF     3,290.000 17.54498 5
529 2094 CONC CURB (TY F3) LF     9,364.000 115.93343 7
529 2095 CONC CURB (MONO) (TY II) (DOWEL) (SAWTOOTH LF     27.000 40.00000 1
529 2107 CONC CURB (TY I) (DOWEL) (REINF) LF 2,425.000 15.00000 2,425.000 15.00000 1
529 2108 CONC CURB (MONO) (TY I) (REINF) LF     5,077.000 1.00000 1
529 2109 CONC CURB (MONO) (TY II) (REINF) LF     4,601.000 1.34000 1
530 2001 INTERSECTIONS (CONC) EA     1.000 7,500.00000 1
530 2002 INTERSECTIONS (ACP) EA     58.000 3,912.90724 7
530 2003 INTERSECTIONS (SURF TREAT) EA     54.000 1,934.17296 4
530 2004 INTERSECTIONS (CONC) SY     942.000 85.88471 6
530 2005 INTERSECTIONS (ACP) SY 13,412.200 22.09597 130,515.190 17.34820 43
530 2006 INTERSECTIONS (SURF TREAT) SY 2,639.000 24.10424 19,414.400 19.19027 16
530 2007 DRIVEWAYS (CONC) EA 14.000 3,150.00000 67.000 4,780.22164 12
530 2008 DRIVEWAYS (ACP) EA 288.000 1,041.64931 1,653.000 1,444.45342 25
530 2009 DRIVEWAYS (SURF TREAT) EA     470.000 745.01500 13
530 2010 DRIVEWAYS (CONC) SY 23,268.000 61.34280 220,840.570 56.65473 168
530 2011 DRIVEWAYS (ACP) SY 61,095.300 29.70800 277,478.580 31.88029 133
530 2012 DRIVEWAYS (SURF TREAT) SY 9,432.000 16.84166 105,491.000 21.77000 44
530 2014 TURNOUTS (ACP) EA 131.000 1,117.36641 521.000 1,190.18200 18
530 2015 TURNOUTS (SURF TREAT) EA     582.000 453.91478 12
530 2017 TURNOUTS (ACP) SY 1,506.700 47.67241 11,993.340 44.83239 25
530 2018 TURNOUTS (SURF TREAT) SY     12,576.710 20.79184 18
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY     9,188.700 37.93620 3
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     12,152.000 27.17068 2
530 2023 DRIVEWAYS AND TURNOUTS (ACP) SY     1,570.000 18.60191 2
530 2024 DRIVEWAYS AND TURNOUTS (SURF TREAT) SY     4,577.000 21.33559 2
530 2029 DRIVEWAYS (OTHER) SY 1,884.000 15.17834 7,259.270 15.17666 8
530 2030 DRIVEWAYS (ACP) (TYPE 1) SY     13,770.000 25.66574 7
530 2031 DRIVEWAYS (ACP) (TYPE 2) SY     7,659.000 31.96941 4
530 2036 DRIVEWAYS (CONC) (TYPE 2) SY 55.100 80.00000 5,188.100 64.25536 4
530 2037 DRIVEWAYS (CONC) (TYPE 1) SY     1,814.000 61.07222 5
530 2038 DRIVEWAYS (CONC) (HES) SY     19,468.000 77.38406 11
530 2050 DRIVEWAYS (SURF TREAT) (TYPE 1) SY 71.200 5.00000 2,504.200 24.12787 4
530 2051 DRIVEWAYS (SURF TREAT) (TYPE 2) SY 46.100 5.00000 46.100 5.00000 1
530 2058 DRIVEWAYS (OTHER) EA     45.000 740.00000 2
530 2075 DRIVEWAYS (GRAVEL) SY     8,004.500 13.55871 9
530 2078 DRIVEWAYS (SURF TREAT) (TYPE 3) SY     2,031.000 14.73757 3
530 2090 DRIVEWAYS (FL BS) SY 1,387.000 25.00000 4,897.000 18.72272 7
531 2002 CONC SIDEWALKS (4') (6") LF     16.000 70.00000 1
531 2003 CONC SIDEWALKS (5') (6") LF     120.000 35.00000 1
531 2004 CONC SIDEWALKS (6") SY 18,055.000 64.73517 114,315.200 48.44527 36
531 2005 CURB RAMPS (TY 1) EA 309.000 1,194.56553 1,664.000 1,288.97977 92
531 2006 CURB RAMPS (TY 2) EA 56.000 1,649.70232 478.000 1,422.10255 55
531 2007 CURB RAMPS (TY 3) EA 205.000 762.55366 1,068.000 1,224.41800 17
531 2008 CURB RAMPS (TY 4) EA     20.000 1,556.58250 7
531 2009 CURB RAMPS (TY 6) EA 150.000 1,093.69667 998.000 1,326.93051 15
531 2010 CURB RAMPS (TY 7) EA 535.000 1,384.00652 3,164.000 1,194.65045 86
531 2011 CURB RAMPS (TY 8) EA 5.000 1,414.88800 33.000 1,186.34667 6
531 2012 CURB RAMPS (TY 9) EA     35.000 2,019.42857 7