500 2001 - 514 2022
514 2039 - 530 2057
530 2058 - 540 2015
540 2016 - 550 2004
550 2006 - 560 6013
Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
514 2039 PERM CONC TRF BARR (F - SHAPE) (SPL) LF     17,590.400 61.76087 3
514 2052 PERM CONC TRF BARR (SGL SLP) (TY 1) (54" LF 200.000 76.00000 9,380.000 89.27597 3
514 2059 PERM CONC TRF BARR (SGL SLP) (TY 1) (48" LF     20.000 400.00000 1
514 2065 PRM CON TRF BAR (SAFETY SH) (TY 1) (HPC) LF     115.000 105.00000 1
514 2066 PRM CON TRF BAR (SG SLP) (TY 1) (42") (HPC LF 1,561.500 100.00000 2,051.500 105.97124 2
514 2068 PERM CTB (SGL SLP) TY3 (36") (MOD) LF     190.000 212.86000 1
528 2001 COLORED TEXTURED CONC (4") SY 137.000 80.00000 21,863.060 74.60207 17
528 2002 COLORED TEXTURED CONC (6") SY     18,827.030 87.02895 9
528 2003 COLORED TEXTURED CONC (8") SY     2,936.000 95.52000 1
528 2004 LANDSCAPE PAVERS SY 1,103.000 55.00000 22,662.000 58.67403 27
528 2006 COLORED TEXTURED CONC (5") SY     10,462.000 73.37660 6
528 2007 LANDSCAPE PAVERS (TY I) SY     144.000 130.00000 1
528 2008 LANDSCAPE PAVERS (TY II) SY     277.000 130.00000 1
528 2009 LANDSCAPE PAVERS (TY III) SY     130.000 130.00000 1
528 2010 LANDSCAPE PAVERS (TY IV) SY     385.000 130.00000 1
528 2017 LANDSCAPE PAVERS (TYPE 5) SY     267.000 130.00000 1
528 2018 COLORED TEXTURED CONC (9") SY     23.000 200.00000 1
528 2026 LANDSCAPE PAVERS (OPT1) SY     1,315.000 51.57000 1
528 2028 LANDSCAPE PAVERS (OPT2) SY     625.000 51.57000 1
528 2030 COLORED TEXTURED CONC (11") (CROSS WALKS SY     4,379.000 107.82507 2
528 2031 LANDSCAPE PAVERS (BRICK) (SIDEWALK) SY     3,844.000 60.30000 1
528 2032 LANDSCAPE PAVERS (BRICK) (CROSSWALK) SY     834.000 61.50647 2
529 2001 CONC CURB (TY I) LF 41.000 20.00000 76,146.200 7.90865 22
529 2002 CONC CURB (TY II) LF 8,650.000 20.19814 92,847.000 11.37403 41
529 2003 CONC CURB & GUTTER (TY I) LF 64.000 33.39000 19,694.100 14.21445 12
529 2004 CONC CURB & GUTTER (TY II) LF 975.000 23.93744 424,885.270 15.00931 70
529 2005 CONC CURB (MONO) (TY I) LF 60.000 45.00000 62,659.000 6.48115 15
529 2006 CONC CURB (MONO) (TY II) LF 74,959.000 2.28420 670,161.000 2.88731 57
529 2007 CONC CURB (DOWEL) LF     97,461.000 8.23672 19
529 2008 CONC CURB & GUTTER (SPECIAL) LF     4,384.000 16.28011 2
529 2009 CONCRETE CURB (SPECIAL) LF 20.000 93.00000 17,721.000 17.74222 12
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF 2,639.000 18.67715 36,241.000 18.32991 13
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF 120.000 35.00000 1,605.000 16.14584 7
529 2012 CONC CURB & GUTTER (TY A) (BARRIER) LF     5,531.000 20.33909 4
529 2013 CONC CURB (TY A) (BARRIER) LF     50.000 44.00000 1
529 2014 CONC CURB (TY C) LF     10,790.000 11.99692 4
529 2015 CONC CURB (TY I) (REINF) LF     5,656.000 3.39529 2
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     11,327.700 18.57152 4
529 2018 CONC CURB (MONO) (TY II) (SPECIAL) LF     8,098.000 2.00000 1
529 2019 CONC CURB & GUTTER (TY B) (MOUNTABLE) LF     6,415.000 10.17557 2
529 2020 CONC CURB & GUTTER (TY A) (VALLEY GUTTER LF     168.000 33.00000 1
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF     5,008.000 13.85220 5
529 2023 CONC CURB (MONO) LF     200.000 22.50000 1
529 2024 CONC CURB (MOUNTABLE) LF     2,771.000 7.00000 1
529 2026 CONC CURB (ARMOR CURB SLOT) LF     401.000 199.00249 4
529 2032 CONC CURB (TY B) MOUNTABLE LF     8,269.300 7.73323 2
529 2034 CONC GUTTER (TY B) VALLEY GUTTER LF     28.000 32.55000 1
529 2037 CONC CURB (TY II) (REINF) LF     14.000 36.00000 1
529 2038 CONC CURB AND GUTTER (TY A) LF     628.000 14.23726 2
529 2040 CONC CURB (TY II) (MOD) LF     54.000 40.00000 1
529 2052 CURB AND GUTTER (TYPE I - C) LF     327.000 25.00000 1
529 2057 CURB AND GUTTER (TYPE II - C) LF     1,006.000 17.00000 1
529 2059 CONC CURB & GUTTER (TY I) (MOD) LF     1,538.000 19.64109 3
529 2061 CONC CURB (TY C1) LF 50.000 85.00000 1,227.000 56.44668 8
529 2062 CONC CURB (TY C2) LF     921.000 83.96091 2
529 2064 CONC CURB (TY F1) LF     648.500 85.43832 4
529 2065 CONC CURB (TY F2) LF     2,811.000 98.03895 4
529 2066 CONC CURB (RIBBON) (MOD) LF 195.000 17.50000 3,905.000 14.32481 4
529 2069 CONC CURB AND GUTTER (TY I) (REINF) LF     786.000 27.72000 1
529 2070 CONCRETE CURB (TYPE U - TURN) (SPECIAL) LF     2,282.000 30.15031 2
529 2071 CONC CURB (SLOTTED) LF     595.000 25.29412 3
529 2075 CONC CURB (TY 1) (MOD) LF     355.000 26.69014 2
529 2076 CONC GUTTER (2') LF     169.900 33.00000 1
529 2083 CONC CURB & GUTTER (SPANDREL) LF     785.000 22.80000 1
529 2084 CONC CURB (ARMOR CURB SLOT) (MOD) LF     144.000 204.75000 1
529 2086 CONC CURB (DOWEL) (SLOTTED) LF     2,083.000 17.57297 4
529 2094 CONC CURB (TY F3) LF     3,085.000 123.28227 5
529 2095 CONC CURB (MONO) (TY II) (DOWEL) (SAWTOOTH LF     27.000 40.00000 1
529 2107 CONC CURB (TY I) (DOWEL) (REINF) LF     2,425.000 15.00000 1
529 2108 CONC CURB (MONO) (TY I) (REINF) LF     5,077.000 1.00000 1
529 2109 CONC CURB (MONO) (TY II) (REINF) LF     4,601.000 1.34000 1
530 2001 INTERSECTIONS (CONC) EA     1.000 7,500.00000 1
530 2002 INTERSECTIONS (ACP) EA     89.000 3,740.09685 8
530 2003 INTERSECTIONS (SURF TREAT) EA     31.000 3,487.26903 5
530 2004 INTERSECTIONS (CONC) SY     9,144.000 69.89534 3
530 2005 INTERSECTIONS (ACP) SY 1,522.000 34.34156 72,985.190 23.50262 36
530 2006 INTERSECTIONS (SURF TREAT) SY 824.000 18.00000 32,921.400 22.81304 20
530 2007 DRIVEWAYS (CONC) EA     72.000 5,644.09514 11
530 2008 DRIVEWAYS (ACP) EA 39.000 1,050.00000 1,448.000 1,537.28764 24
530 2009 DRIVEWAYS (SURF TREAT) EA     545.000 1,361.00009 11
530 2010 DRIVEWAYS (CONC) SY 5,104.300 68.83285 199,964.000 58.18256 165
530 2011 DRIVEWAYS (ACP) SY 13,527.000 36.86730 278,725.580 33.95045 130
530 2012 DRIVEWAYS (SURF TREAT) SY 12,125.000 22.22187 125,278.000 22.13307 48
530 2014 TURNOUTS (ACP) EA 22.000 1,425.00000 560.000 1,618.85682 18
530 2015 TURNOUTS (SURF TREAT) EA     321.000 376.00748 7
530 2017 TURNOUTS (ACP) SY 1,008.000 63.98611 8,555.340 51.36651 23
530 2018 TURNOUTS (SURF TREAT) SY 1,155.000 18.00727 15,692.710 20.91363 21
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY 368.000 19.00000 4,666.700 48.95031 3
530 2023 DRIVEWAYS AND TURNOUTS (ACP) SY     1,654.000 19.98938 3
530 2024 DRIVEWAYS AND TURNOUTS (SURF TREAT) SY     7,627.000 28.79940 3
530 2029 DRIVEWAYS (OTHER) SY     5,683.270 16.94350 6
530 2030 DRIVEWAYS (ACP) (TYPE 1) SY     12,135.000 23.40278 6
530 2031 DRIVEWAYS (ACP) (TYPE 2) SY     2,052.000 24.40921 4
530 2036 DRIVEWAYS (CONC) (TYPE 2) SY     3,910.100 68.26098 3
530 2037 DRIVEWAYS (CONC) (TYPE 1) SY     1,747.000 61.57355 4
530 2038 DRIVEWAYS (CONC) (HES) SY 6,982.000 68.20000 25,353.000 75.02454 11
530 2050 DRIVEWAYS (SURF TREAT) (TYPE 1) SY     15,655.200 19.79741 4
530 2051 DRIVEWAYS (SURF TREAT) (TYPE 2) SY     781.100 47.94636 2
530 2056 INTERSECTIONS (CONC) (HES) SY     1,124.000 76.00000 1
530 2057 TURNOUTS (RAP) SY     1,453.000 31.00000 1