AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Monday, March 31, 2014
ITEMS 528 2006 TO 530 2087
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1003 - 1144
2024 - 2203
3061 - 3278
4001 - 4659
5050 - 5997
6004 - 6986
7380 - 7642
8008 - 8995
9012 - 9050
500 2001 - 528 2005
528 2006 - 530 2087
530 2088 - 540 2027
540 2028 - 552 2007
552 2008 - 560 2036
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
528 2006 COLORED TEXTURED CONC (5") SY     5,326.000 78.55361 4
528 2016 COLORED TEXTURED CONCRETE (4 1 / 2") SY     303.000 90.00000 1
528 2018 COLORED TEXTURED CONC (9") SY 23.000 200.00000 695.000 192.36144 2
528 2029 CROSSWALK PAVERS SY     60.000 100.00000 1
528 2033 LANDSCAPE PAVERS 1X SY     16.000 100.00000 1
528 2034 CROSSWALK PAVERS 8X SY     135.000 100.00000 1
528 2035 LANDSCAPE PAVERS SY 6X SY     8.000 100.00000 1
529 2001 CONC CURB (TY I) LF 300.000 22.90867 60,661.000 12.20161 23
529 2002 CONC CURB (TY II) LF 660.000 12.31818 80,318.100 11.22165 42
529 2003 CONC CURB & GUTTER (TY I) LF 390.000 30.60000 53,028.980 14.18809 17
529 2004 CONC CURB & GUTTER (TY II) LF 27,798.000 15.59547 343,992.980 16.30863 86
529 2005 CONC CURB (MONO) (TY I) LF 2,171.000 6.01336 83,975.000 4.35804 16
529 2006 CONC CURB (MONO) (TY II) LF 65,894.000 1.58896 919,073.400 3.64973 65
529 2007 CONC CURB (DOWEL) LF 1,734.000 14.50000 109,226.000 9.07769 32
529 2008 CONC CURB & GUTTER (SPECIAL) LF     314.000 30.00000 1
529 2009 CONCRETE CURB (SPECIAL) LF     1,423.000 24.45959 5
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF 2,474.000 14.00000 97,897.000 15.96532 13
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF 1,080.000 12.00000 1,273.000 13.97093 2
529 2012 CONC CURB & GUTTER (TY A) (BARRIER) LF 3,681.000 20.00000 4,983.000 19.72402 5
529 2013 CONC CURB (TY A) (BARRIER) LF     172.000 65.00000 1
529 2014 CONC CURB (TY C) LF     197.000 18.00000 1
529 2016 CONC CURB (TY F) LF     18,657.000 27.85392 4
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     3,769.000 47.84842 5
529 2018 CONC CURB (MONO) (TY II) (SPECIAL) LF     32,621.000 12.71527 2
529 2019 CONC CURB & GUTTER (TY B) (MOUNTABLE) LF     58,719.000 12.85444 5
529 2020 CONC CURB & GUTTER (TY A) (VALLEY GUTTER LF 168.000 33.00000 201.000 34.01299 2
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF     2,869.000 14.32377 6
529 2023 CONC CURB (MONO) LF     544.000 6.88971 2
529 2024 CONC CURB (MOUNTABLE) LF     4,067.000 9.00000 1
529 2026 CONC CURB (ARMOR CURB SLOT) LF     196.000 255.38214 4
529 2028 CONC VALLEY GUTTER (TY A) (6 FT) LF     315.000 13.30000 1
529 2029 CONC CURB & GUTTER (TY II A) LF     3,916.000 16.50000 1
529 2030 CONC CURB (MONO) (TY II A) LF     337.000 16.50000 1
529 2032 CONC CURB (TY B) MOUNTABLE LF     35,074.000 7.95404 4
529 2035 CONC CURB & GUTTER (TY II) (MOD) LF     4,873.000 14.47905 5
529 2036 CONC CURB (TY A) LF     120.000 10.00000 1
529 2037 CONC CURB (TY II) (REINF) LF     19,574.000 12.38116 3
529 2038 CONC CURB AND GUTTER (TY A) LF     388.000 20.00000 1
529 2040 CONC CURB (TY II) (MOD) LF     8,387.000 14.39252 2
529 2047 CONC CURB (TYPE II - B) LF     734.300 41.40756 3
529 2052 CURB AND GUTTER (TYPE I - C) LF 327.000 25.00000 610.000 23.60820 2
529 2056 CURB AND GUTTER (TYPE II - B) LF     78.000 24.42000 1
529 2059 CONC CURB & GUTTER (TY I) (MOD) LF     635.000 21.00000 1
529 2060 CONC CURB & GUTTER (RIBBON) (MOD) LF     673.000 15.00000 1
529 2061 CONC CURB (TY C1) LF 50.000 85.00000 3,154.000 48.90151 6
529 2062 CONC CURB (TY C2) LF     21.000 81.00000 1
529 2064 CONC CURB (TY F1) LF     1,111.000 69.83798 2
529 2065 CONC CURB (TY F2) LF     586.000 78.40580 4
529 2066 CONC CURB (RIBBON) (MOD) LF     13,888.000 17.09244 6
529 2068 CONC CURB (TY C3) LF     725.000 93.32000 1
529 2069 CONC CURB AND GUTTER (TY I) (REINF) LF     2,173.000 20.29132 2
529 2070 CONCRETE CURB (TYPE U - TURN) (SPECIAL) LF     13,361.000 31.26021 8
529 2071 CONC CURB (SLOTTED) LF     14,446.110 7.77816 6
529 2076 CONC GUTTER (2') LF     48.000 25.00000 1
529 2083 CONC CURB & GUTTER (SPANDREL) LF     1,298.000 44.65000 1
529 2086 CONC CURB (DOWEL) (SLOTTED) LF     37,150.000 7.55551 6
529 2094 CONC CURB (TY F3) LF     7,012.000 109.67938 4
529 2096 CONC CURB (MONO) (TY II) (DOWEL) (REINF) LF     703.000 14.00000 1
529 2099 CONC CURB & GUTTER (TY II) 1X LF     222.000 25.00000 1
529 2100 CONC CURB & GUTTER (TY I) 8X LF     53.000 30.00000 1
529 2101 CONC CURB & GUTTER (TY II) 2X LF     116.000 25.00000 1
529 2102 CONC CURB & GUTTER (TY II) 3X LF     152.000 25.00000 1
529 2103 CONC CURB & GUTTER (TY II) 4X LF     32.000 25.00000 1
529 2104 CONC CURB & GUTTER (TY II) 6X LF     127.000 25.00000 1
529 2106 CONC CURB (MONO) (TY II) 8X LF     66.000 15.00000 1
530 2002 INTERSECTIONS (ACP) EA     102.000 2,547.05569 9
530 2003 INTERSECTIONS (SURF TREAT) EA     54.000 860.00000 4
530 2004 INTERSECTIONS (CONC) SY     8,206.000 64.24840 7
530 2005 INTERSECTIONS (ACP) SY 3,052.000 25.71950 128,062.140 18.93741 49
530 2006 INTERSECTIONS (SURF TREAT) SY     22,976.000 23.21067 18
530 2007 DRIVEWAYS (CONC) EA     60.000 5,062.91667 11
530 2008 DRIVEWAYS (ACP) EA 32.000 1,216.89063 677.000 1,569.49114 24
530 2009 DRIVEWAYS (SURF TREAT) EA     664.000 939.17605 16
530 2010 DRIVEWAYS (CONC) SY 9,578.000 64.12718 207,740.040 57.53683 173
530 2011 DRIVEWAYS (ACP) SY 10,987.720 40.61331 301,761.360 28.59414 147
530 2012 DRIVEWAYS (SURF TREAT) SY 5,489.000 23.52391 90,052.400 22.50251 44
530 2014 TURNOUTS (ACP) EA 1.000 1,500.00000 356.000 1,223.00562 16
530 2015 TURNOUTS (SURF TREAT) EA     493.000 578.16331 13
530 2017 TURNOUTS (ACP) SY 440.000 48.47693 43,588.200 35.56946 28
530 2018 TURNOUTS (SURF TREAT) SY     13,880.300 23.84160 22
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY     4,890.000 26.00000 1
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     12,152.000 27.17068 2
530 2024 DRIVEWAYS AND TURNOUTS (SURF TREAT) SY     7,747.000 26.03150 2
530 2028 DRIVEWAYS AND TURNOUTS (SURF TREAT) EA     12.000 1,450.00000 1
530 2029 DRIVEWAYS (OTHER) SY     3,575.000 10.98434 4
530 2030 DRIVEWAYS (ACP) (TYPE 1) SY     9,026.000 32.51972 10
530 2031 DRIVEWAYS (ACP) (TYPE 2) SY     7,714.000 37.37050 3
530 2032 DRIVEWAYS (ACP) (TYPE 3) SY     3,032.000 33.99736 3
530 2036 DRIVEWAYS (CONC) (TYPE 2) SY     4,188.700 53.45561 5
530 2037 DRIVEWAYS (CONC) (TYPE 1) SY     752.000 51.53856 6
530 2038 DRIVEWAYS (CONC) (HES) SY     13,713.000 80.91636 15
530 2050 DRIVEWAYS (SURF TREAT) (TYPE 1) SY     2,594.000 35.35325 4
530 2051 DRIVEWAYS (SURF TREAT) (TYPE 2) SY     602.000 43.00000 1
530 2056 INTERSECTIONS (CONC) (HES) SY     281.000 63.00000 1
530 2058 DRIVEWAYS (OTHER) EA 1.000 2,500.00000 4.000 700.00000 2
530 2075 DRIVEWAYS (GRAVEL) SY 330.500 17.18608 24,204.270 11.74241 13
530 2078 DRIVEWAYS (SURF TREAT) (TYPE 3) SY     2,200.000 27.70205 2
530 2084 DRIVEWAYS (APRON) (CONC) (HES) SY     1,378.000 80.00000 1
530 2086 DRIVEWAYS (CONC) 1X SY     105.000 70.00000 1
530 2087 DRIVEWAYS (CONC) 4X SY     10.000 70.00000 1