AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Monday, March 31, 2014
ITEMS 105 2070 TO 162 2008
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1003 - 1144
2024 - 2203
3061 - 3278
4001 - 4659
5050 - 5997
6004 - 6986
7380 - 7642
8008 - 8995
9012 - 9050
100 2001 - 105 2069
105 2070 - 162 2008
164 2001 - 192 2042
192 2044 - 193 2019
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
105 2070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     6,657.770 4.66346 2
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY 52,192.000 2.01000 128,587.000 2.86381 3
105 2075 REMOV STAB BASE AND ASPH PAV (10" - 18") SY     32,139.000 7.86201 3
105 2076 REMOV STAB BASE AND ASPH PAV (2" - 15") SY     8,059.770 7.09549 4
105 2082 REMOVING STAB BASE & ASPH PV (10 TO 16" SY     3,466.000 8.76000 1
105 2083 REMOVE STAB BASE & ASPH PAV (0" - 11.25" SY     18,371.000 1.60000 1
105 2084 REM STAB BASE & ASPH (6" - 12") SY     721,471.000 2.10547 4
105 2085 REMOVING STAB BASE & ASPH PAV (0 - 19 IN SY     37,430.000 4.99714 3
105 2088 REMOVING STAB BASE AND ASPH PAV (0" - 5") SY     174,422.000 2.00000 1
105 2090 RMV STAB BS & ASPH PAV (11.5" - 22") SY     228,284.000 2.50000 1
105 2091 REMOVING STAB BASE & ASPH PAV (8" - 12") SY     3,807.000 15.00000 1
105 2094 REMOVING STAB BASE & ASPH PAV (12" - 27") SY     36,124.000 6.62003 3
105 2096 REMOV STAB BASE AND ASPH PAV (0" - 12") SY     13,435.000 2.32000 1
105 2097 REMOVING STAB BASE & ASPH PV (5" TO 13" SY 313.000 10.50000 3,757.000 3.39566 2
105 2098 REMOV STAB BASE & ASPH PAV (4" - 6") 1X SY     188.000 15.00000 1
105 2099 REMOV STAB BASE & ASPH PAV (4" - 6") 3X SY     47.000 15.00000 1
105 2100 REMOV STAB BASE & ASPH PAV (4" - 6") 4X SY     78.000 15.00000 1
105 2101 REMOV STAB BASE & ASPH PAV (4" - 6") 5X SY     246.000 15.00000 1
105 2102 REMOV STAB BASE & ASPH PAV (4" - 6") 6X SY     21.000 15.00000 1
105 2103 REMOVING STAB BASE & ASPH PAV (4" - 6") 8X SY     33.000 15.00000 1
105 2104 REMOVING STAB BASE AND ASPH PAV (10.5" SY     32,576.000 5.31000 1
106 2001 OBLITERATING ABANDONED ROAD STA 38.190 543.72872 503.690 904.00302 22
106 2002 OBLITERATING ABANDONED ROAD SY     21,273.000 5.92990 12
110 2001 EXCAVATION (ROADWAY) CY 223,119.000 7.01125 9,803,515.110 6.58095 343
110 2002 EXCAVATION (CHANNEL) CY 9,730.000 10.89520 285,436.300 7.52664 98
110 2003 EXCAVATION (SPECIAL) CY     1,013,957.950 5.04835 36
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY     111,416.000 4.30250 8
112 2001 SUBGRADE WIDENING (ORD COMP) STA 278.090 368.91823 17,147.740 277.29699 57
112 2002 SUBGRADE WIDENING (DENS CONT) STA     8,373.430 879.40672 45
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 1,157.000 27.00000 75,287.100 9.12060 16
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     221,831.000 7.90313 16
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 543.000 16.21110 1,236,705.120 5.97456 88
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY 99,842.000 11.34943 4,811,046.000 6.22796 59
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 4,752.000 13.28493 343,953.140 13.18195 58
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 334,003.000 9.50992 7,117,464.880 6.22032 127
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     152,575.000 3.13708 4
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY 32,752.000 4.00000 274,517.000 4.05938 11
132 2013 EMBANKMENT (ORIGINAL) (ORD COMP) (TY C) CY     75.000 25.00000 1
132 2015 EMBANKMENT (ORIGINAL) (ORD COMP) (TY D) CY     70.000 6.00000 1
132 2017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY 2,084.000 34.00000 2,084.000 34.00000 1
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     29,693.000 15.55673 17
132 2020 EMBANKMENT (VEHICLE) (DENS CONT) (TY B) CY     21,692.000 5.13830 3
132 2021 EMBANKMENT (VEHICLE) (ORD COMP) (TY C) CY     5,797.000 23.05232 5
132 2022 EMBANKMENT (VEHICLE) (DENS CONT) (TY C) CY     13,050.000 5.15326 3
132 2025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY 183,194.000 7.80428 1,429,283.000 6.43239 14
132 2026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 13,256.000 32.00000 447,310.000 10.25748 14
132 2031 EMBANKMENT (FINAL) (DENS CONT) (TY C3) CY     73,022.000 32.76000 1
132 2032 EMBANKMENT (FINAL) (DENS CONT) (TY C4) CY     1,810.000 40.89000 1
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     247,169.600 24.63408 13
132 2037 EMB (FNL) (DC) (TYE) (CSBE) (RWALL FND IMPR CY     36,273.000 22.99876 7
132 2044 EMBANKMENT (FINAL) (DC) (TY C) (RWAL FND) CY     12,955.000 37.38498 2
132 2049 EMBANKMENT (FINAL) (ORD COMP) (TY C1) CY     321,188.000 13.35000 1
132 2050 EMBANKMENT (FINAL) (ORD COMP) (TY C2) CY     416,678.000 2.16000 1
134 2001 BACKFILL (TY A) STA 2,950.900 99.50144 21,362.720 151.61062 50
134 2002 BACKFILL (TY B) STA 1,104.050 138.57281 17,501.424 148.25694 78
134 2003 BACKFILL (TY C) STA     1,034.720 209.88185 6
134 2004 BACKFILL (TY A OR B) STA 231.890 121.90379 18,867.900 143.90076 51
134 2008 BACKFILL (TY A OR B) CY     88.000 87.40000 1
134 2010 BACKFILL (TY B) LF     80,206.000 .88410 2
150 2001 BLADING STA 1.000 1,000.00000 9,344.560 75.75217 33
150 2002 BLADING HR 120.000 236.56667 3,397.570 113.79855 72
150 2003 BLADING LF     4,925.000 2.00000 1
152 2001 ROAD GRADER WORK (ORD COMP) STA 276.930 79.86997 2,658.600 139.95486 19
152 2002 ROAD GRADER WORK (ORD COMP) SY     976.000 33.00000 1
152 2003 ROAD GRADER WORK (DENS CONT) STA     2,134.040 423.18794 4
156 2001 BULLDOZER WORK HR     101.000 105.06931 3
158 2002 SPEC EXCAV WORK (BACKHOE) HR 50.000 100.00000 224.000 99.95536 3
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     85.000 80.23529 5
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     60,682.000 7.42944 6
158 2006 SPEC EXCAV WORK (VEHICLE) CY     6,500.000 4.00000 1
160 2001 FURNISHING AND PLACING TOPSOIL (4") STA     2,685.580 194.24566 9
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 100,320.000 1.49594 6,835,433.240 1.04931 104
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     203,374.000 1.23418 6
160 2005 FURNISHING AND PLACING TOPSOIL CY 50.000 25.00000 14,952.000 24.24193 25
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     246,118.000 1.03149 3
160 2007 FURNISHING AND PLACING TOPSOIL (3") STA     174.300 535.00000 1
160 2008 FURNISHING AND PLACING TOPSOIL (12") SY     732.000 8.50000 1
161 2001 COMPOST MANUF TOPSOIL (BOS) (4") STA     370.000 200.00000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY 106,136.000 1.52624 3,982,870.090 .90142 44
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY 7,124.000 5.00000 466,357.550 2.55770 12
161 2006 COMPOST MANUF TOPSOIL (PB) CY     1,338.000 22.00000 1
161 2008 EROSION CONTROL COMPOST (2") SY     296,856.260 .65969 7
161 2009 EROSION CONTROL COMPOST CY     1,288.500 24.84199 12
161 2011 GENERAL USE COMPOST (1") SY     19,141.000 2.35858 6
161 2012 GENERAL USE COMPOST CY     9,728.500 23.75599 5
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY 51,887.000 2.83900 501,357.860 1.31705 9
161 2015 COMPOST MANUF TOPSOIL (BOS OR PB) CY     483.000 42.40000 1
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY     1,376,052.900 .71479 22
161 2020 COMPOST MANUF TOPSOIL (BIP) (6") SY     2,493.000 4.08615 5
161 2022 GENERAL USE COMPOST (4") SY     2,285.000 3.00000 1
161 2023 EROSION CONTROL COMPOST (4") SY     3,078.000 6.00000 1
161 2025 GENERAL USE COMPOST (2") SY     1,324.000 8.00000 1
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     518.000 17.29923 3
161 2027 GENERAL USE COMPOST (2") SY     666.000 2.00000 1
161 2029 COMPOST MANUF TOPSOIL (BOS) (2") SY 196,804.000 .50000 196,804.000 .50000 1
162 2002 BLOCK SODDING SY 20,702.000 4.20866 3,176,694.020 2.60953 141
162 2003 STRAW OR HAY MULCH SY     3,568,321.050 .14283 38
162 2004 MULCH SODDING SY     103,822.000 .95264 3
162 2005 MULCH SODDING CY     8,376.000 8.25000 1
162 2008 ROLL SODDING SY     10,171.000 4.00000 1