AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Thursday, April 06, 2017
ITEMS 105 6054 TO 161 6023
ItemsItemsBid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0497
0500 - 0560
0610 - 0690
0700 - 0788
0800 - 0800
1000 - 1133
2000 - 2228
3000 - 3271
4000 - 4191
5000 - 5969
6000 - 6920
7001 - 7669
8020 - 8998
9010 - 9063
100 2001 - 105 6049
105 6054 - 161 6023
161 6028 - 192 2015
192 2016 - 193 6024
Item NoDescriptionUnitsMarch 31, 2017Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
105 6054REMOVING STAB BASE & ASPH PAV (18")SY  1,807.00011.000001
105 6057REMOVE STAB BS & ASPH PAV (5"-10")SY  7,342.0002.720001
105 6058REMOVING STAB BASE & ASPH PAV (10"-12"SY  114,870.0008.000001
105 6061REMOV STAB BASE & ASPH PAV (8"-20")SY  17,432.0007.000001
105 6063REMOVE STAB BASE AND ASPH PAV (1"-3")SY  16,358.0003.000001
105 6069REMOVING STAB BASE & ASPH PAV (4" - 6"SY  5,080.0006.865763
105 6070REMOVING STAB BASE & ASPH PAV (6" - 8"SY  30,994.6005.446474
105 6073REMOV STAB BASE AND ASPH PAV (22")SY  12,717.00015.830382
105 6074REMOVING STAB BASE AND ASPH PAV (4")SY  209,867.0002.149264
105 6077REMOVING STAB BASE & ASPH PAV (8")SY  11,033.0006.791083
105 6078REMOVE STAB BASE & ASPH PAV (24"-38")SY  8,826.00014.158062
105 6082REMOVING STAB BASE & ASPH PV(10 TO 16"SY  8,844.00010.500001
105 6084REM STAB BASE & ASPH (6"-12")SY7,950.0006.0000032,758.0002.213442
105 6087REMOVING STAB BASE AND ASPH PAV(8.5")SY6,810.0003.250006,810.0003.250001
105 6091REMOVING STAB BASE & ASPH PAV (8"-12")SY  9,057.00010.000001
105 6092REMOVING STAB BASE AND ASPH PAV (5"-8"SY  303,617.0001.900001
105 6094REMOVING STAB BASE & ASPH PAV(12"-27")SY  57,449.0007.881552
105 6096REMOV STAB BASE AND ASPH PAV (0"-12")SY2,912.0005.00000332,375.0002.270925
105 6105REMOVING STAB BASE AND ASPH PAV(15")SY  28,178.0007.007944
105 6108RMV STAB BASE & ASPH PV (17")SY  17,866.0007.000001
105 6111REMOVE STAB BASE & ASPH (8")CY  1,749.0002.250001
105 6115REMOVE STAB BS & ASPH PAV (7.5"-15.5")SY  32,092.0004.000001
105 6116RMV TRT & UNTRT BASE & ASPH PV(10"-15"SY  33,399.0007.000001
105 6117REMOV STAB BASE & ASPH PAV (9.5"-15")SY  12,131.00011.000001
105 6118REMOVE TRTD BASE & ASPH (11 )CY  260.0005.000001
105 6119RMV TRT BASE & ASPH PAV (0"-19")SY  46,046.0006.100001
105 6120REMOVING STAB BASE AND ASPH PAV (3"-5"SY  111,804.0001.830001
106 6001OBLITERATING ABANDONED ROADSTA  73.0261,713.906836
106 6002OBLITERATING ABANDONED ROADSY  4,351.0006.204633
110 2001EXCAVATION (ROADWAY)CY  192,105.0006.137745
110 2002EXCAVATION (CHANNEL)CY  100.00020.000001
110 6001EXCAVATION (ROADWAY)CY1,723,798.0007.952727,419,259.1108.14521258
110 6002EXCAVATION (CHANNEL)CY1,752.20013.38167227,937.60010.1164367
110 6003EXCAVATION (SPECIAL)CY679.70021.6509693,937.02010.8716022
110 6004EXCAVATION (ROADWAY AND CHANNEL)CY  9,268.00012.076725
112 6001SUBGRADE WIDENING (ORD COMP)STA269.740225.580197,256.460409.9072941
112 6002SUBGRADE WIDENING (DENS CONT)STA323.300153.189983,932.670537.7593317
112 6003SUBGRADE WIDENING (DENS CONT)SY14,012.0006.9243514,012.0006.924352
132 2001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY  110.00012.000001
132 2002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY  23,787.00013.000001
132 2006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY  178,269.0007.462534
132 2036EMBANK(FINAL)(DC)(TY E)(CSBE)CY  1,563.00035.155472
132 2037EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  1,025.00039.498542
132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY515.30024.46478123,992.80012.5337425
132 6002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY700.00030.4200099,033.80013.521417
132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY32,811.00012.222831,566,916.4009.4658271
132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY20,604.0009.805571,734,269.0009.0793240
132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY927.00022.80475172,252.90011.5972134
132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY2,116,760.0005.360024,855,006.6007.1694585
132 6007EMBANKMENT (FINAL)(ORD COMP)(TY D)CY60.00042.000005,140.00015.487455
132 6008EMBANKMENT (FINAL)(DENS CONT)(TY D)CY  22,015.20010.526676
132 6011EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)CY884.80055.222654,924.80022.226494
132 6013EMBANKMENT (ORIGINAL)(ORD COMP)(TY C)CY  686.00029.000001
132 6017EMBANKMENT (VEHICLE)(ORD COMP)(TY A)CY50.00075.000001,155.00020.907983
132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY184.00031.4673948,040.00017.4337723
132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY  64,084.00011.4501316
132 6022EMBANKMENT (VEHICLE)(DENS CONT)(TY C)CY  697.00020.998572
132 6025EMBANKMENT (FINAL) (DENS CONT) (TY C1)CY  1,584,684.9507.9179113
132 6026EMBANKMENT (FINAL) (DENS CONT) (TY C2)CY  1,269,964.9106.0242014
132 6033EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPRCY  493.00070.000001
132 6035EMBANK(FINAL)(DC)(TY E)(CSBE)CY  44,737.00035.586187
132 6036EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  205.00030.000001
132 6037EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPRCY  2,839.00044.033112
132 6044EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  4,211.00030.000001
132 6047EMBANKMENT (FINAL)(ORD COMP)(TY C1)CY  6,671.0007.000001
134 6001BACKFILL (TY A)STA1,041.900120.0499116,324.300171.8751240
134 6002BACKFILL (TY B)STA6,435.560112.0320920,013.020138.0208852
134 6003BACKFILL (TY C)STA510.000308.100001,096.480440.320185
134 6004BACKFILL (TY A OR B)STA1,724.000132.8174913,902.280157.1201852
134 6005BACKFILL TY ACY  1,569.00032.510044
134 6010BACKFILL (TY B)LF  18,775.0001.146303
134 6011BACKFILLING PAVEMENT EDGESCY  1,333.60044.740252
150 6001BLADINGSTA553.00021.265823,674.170170.4760723
150 6002BLADINGHR214.00098.079444,012.000118.8180580
150 6003BLADINGLF  18,026.000.572352
152 6001ROAD GRADER WORK (ORD COMP)STA246.740150.000002,233.200220.3133512
154 6002SCRAPER WORK (DENS CONT)YH  100.0001.000001
156 6001BULLDOZER WORKHR15.00050.00000268.00091.791044
158 6002SPEC EXCAV WORK (BACKHOE)HR  164.00056.067075
158 6003SPEC EXCAV WORK (HYD EXCAVATOR)HR35.00061.428571,216.00064.9836215
158 6006SPEC EXCAV WORK (VEHICLE)CY  61.000100.000001
160 2006FURNISHING AND PLACING TOPSOIL (3")SY  76,974.0001.749162
160 6001FURNISHING AND PLACING TOPSOIL (4")STA  941.510219.699215
160 6002FURNISHING AND PLACING TOPSOIL (6")STA  242.750550.000001
160 6003FURNISHING AND PLACING TOPSOIL (4")SY184,003.000.998002,958,074.0001.32247101
160 6004FURNISHING AND PLACING TOPSOIL (6")SY283,379.0001.40000452,446.0001.278414
160 6005FURNISHING AND PLACING TOPSOILCY898.50029.799674,255.80027.7672613
160 6006FURNISHING AND PLACING TOPSOIL (3")SY  92,371.300.732243
160 6008FURNISHING AND PLACING TOPSOIL (12")SY  1,809.0004.190001
161 2009EROSION CONTROL COMPOSTCY  152.00028.300002
161 2012GENERAL USE COMPOSTCY  40.00027.700001
161 2014COMPOST MANUF TOPSOIL (BOS OR PB) (4")SY  1,800.0004.000001
161 2017COMPOST MANUF TOPSOIL (BIP) (4")SY  30,216.0001.004792
161 6005COMPOST MANUF TOPSOIL (4")SY  2,712.0003.000001
161 6008EROSION CONTROL COMPOST (2")SY8,345.0001.650008,345.0001.650001
161 6009EROSION CONTROL COMPOSTCY  31,287.00030.625769
161 6012GENERAL USE COMPOSTCY  22,090.05034.2388312
161 6017COMPOST MANUF TOPSOIL (4")SY36,039.0001.808105,250,554.0001.2377260
161 6022GENERAL USE COMPOST (4")SY16,260.0003.0000069,994.0004.560205
161 6023EROSION CONTROL COMPOST (4")SY  89,414.0002.322124