AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Monday, August 14, 2017
ITEMS 105 6049 TO 161 6019
ItemsItemsBid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
0800 - 0800
1002 - 1133
2000 - 2228
3000 - 3267
4000 - 4191
5000 - 5969
6000 - 6920
7000 - 7143
8020 - 8947
9021 - 9063
100 2002 - 105 6048
105 6049 - 161 6019
161 6022 - 192 6003
192 6004 - 193 6024
Item NoDescriptionUnitsJuly 31, 2017Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
105 6049REMOVING STAB BASE & ASPH PAV (4"-22")SY  195,070.000.800001
105 6054REMOVING STAB BASE & ASPH PAV (18")SY91,044.0008.0000096,612.0008.000002
105 6057REMOVE STAB BS & ASPH PAV (5"-10")SY  7,342.0002.720001
105 6058REMOVING STAB BASE & ASPH PAV (10"-12"SY  154,652.0006.980163
105 6059REMOVING STAB BASE & ASPH PAV(13"-18")SY  3,216.00026.400001
105 6063REMOVE STAB BASE AND ASPH PAV (1"-3")SY  43.00020.000001
105 6069REMOVING STAB BASE & ASPH PAV (4" - 6"SY  148,699.0002.612566
105 6070REMOVING STAB BASE & ASPH PAV (6" - 8"SY  18,197.0003.363802
105 6072REMOVING STAB BASE & ASPH PAV(26"-32")SY  309.00021.000001
105 6073REMOV STAB BASE AND ASPH PAV (22")SY  12,717.00015.830382
105 6074REMOVING STAB BASE AND ASPH PAV (4")SY200.00051.00000136,138.0001.786364
105 6075REMOV STAB BASE AND ASPH PAV (10"-18")SY10,587.00018.0900024,383.00011.632123
105 6076REMOV STAB BASE AND ASPH PAV (2"-15")SY  136,350.0005.170533
105 6077REMOVING STAB BASE & ASPH PAV (8")SY  7,699.0007.350182
105 6078REMOVE STAB BASE & ASPH PAV (24"-38")SY  2,477.00012.000001
105 6081REMOV STAB BASE & ASPH PAV (4"-14")SY  8,850.0004.630001
105 6084REM STAB BASE & ASPH (6"-12")SY10,180.0003.0000042,938.0002.399933
105 6085REMOVING STAB BASE & ASPH PAV (0-19 INSY2,611.0007.350002,611.0007.350001
105 6087REMOVING STAB BASE AND ASPH PAV(8.5")SY  6,810.0003.250001
105 6092REMOVING STAB BASE AND ASPH PAV (5"-8"SY  303,617.0001.900001
105 6094REMOVING STAB BASE & ASPH PAV(12"-27")SY73,508.0005.49509196,894.0008.043806
105 6096REMOV STAB BASE AND ASPH PAV (0"-12")SY  740,790.3003.243867
105 6105REMOVING STAB BASE AND ASPH PAV(15")SY  28,935.0007.796744
105 6108RMV STAB BASE & ASPH PV (17")SY  17,866.0007.000001
105 6111REMOVE STAB BASE & ASPH (8")CY  1,749.0002.250001
105 6114REMOVING STAB BASE & ASPH PAV (12.5")SY  3,842.0006.000001
105 6115REMOVE STAB BS & ASPH PAV (7.5"-15.5")SY  32,929.0004.050842
105 6118REMOVE TRTD BASE & ASPH (11 )CY  260.0005.000001
105 6119RMV TRT BASE & ASPH PAV (0"-19")SY  46,046.0006.100001
105 6120REMOVING STAB BASE AND ASPH PAV (3"-5"SY  111,804.0001.830001
105 6122REMOVE TRT BASE & ASPH PAV (20"-30")SY  19,911.20011.500001
106 6001OBLITERATING ABANDONED ROADSTA6.6001,507.3500027.6562,009.455815
106 6002OBLITERATING ABANDONED ROADSY  22,860.0001.680057
110 2001EXCAVATION (ROADWAY)CY  72,363.0006.132584
110 6001EXCAVATION (ROADWAY)CY1,370,822.0004.787439,042,468.0807.66882276
110 6002EXCAVATION (CHANNEL)CY4,383.00015.80726252,861.60010.9864066
110 6003EXCAVATION (SPECIAL)CY6,707.00012.58086152,037.2209.8060727
110 6004EXCAVATION (ROADWAY AND CHANNEL)CY  5,593.00012.005194
112 6001SUBGRADE WIDENING (ORD COMP)STA2,134.460354.178347,118.960385.0187138
112 6002SUBGRADE WIDENING (DENS CONT)STA  3,312.850448.7548921
112 6003SUBGRADE WIDENING (DENS CONT)SY  14,012.0006.924352
132 2001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY  110.00012.000001
132 2006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY  44,886.00010.174712
132 2036EMBANK(FINAL)(DC)(TY E)(CSBE)CY  301.00040.000001
132 2037EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  768.00040.000001
132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY51,396.00017.91407144,980.80015.0292425
132 6002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY130,294.0003.12020245,877.7008.7256415
132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY536,393.0008.599771,199,850.4006.3710472
132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY192,438.0006.430051,776,233.0009.0307939
132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY17,613.00010.01471306,250.90011.2230045
132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY181,156.20012.848575,593,816.6707.27260102
132 6007EMBANKMENT (FINAL)(ORD COMP)(TY D)CY900.00015.000005,785.00015.212715
132 6008EMBANKMENT (FINAL)(DENS CONT)(TY D)CY  177,335.2004.431026
132 6011EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)CY  14,090.80013.492564
132 6013EMBANKMENT (ORIGINAL)(ORD COMP)(TY C)CY  889.50050.962902
132 6017EMBANKMENT (VEHICLE)(ORD COMP)(TY A)CY  185.000104.189192
132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY20.00050.0000040,154.00015.6366021
132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY3,906.00032.1505442,563.00013.5213617
132 6022EMBANKMENT (VEHICLE)(DENS CONT)(TY C)CY  639.00020.000001
132 6025EMBANKMENT (FINAL) (DENS CONT) (TY C1)CY356,742.10010.802971,721,955.1007.6336017
132 6026EMBANKMENT (FINAL) (DENS CONT) (TY C2)CY2,241,981.0005.326203,522,029.0005.5301118
132 6033EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPRCY  493.00070.000001
132 6035EMBANK(FINAL)(DC)(TY E)(CSBE)CY  85,818.00035.782879
132 6036EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  11,196.00044.473564
132 6037EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPRCY  4,096.00041.484382
132 6044EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  4,211.00030.000001
132 6055EMBANKMENT (FINAL)(ORD COMP)(TY C1)(ASCY  817.00058.000001
132 6056EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DSCY  9,231.00058.000001
134 6001BACKFILL (TY A)STA26.600350.0000012,499.480156.9286641
134 6002BACKFILL (TY B)STA2,190.820141.3664218,008.350136.6202252
134 6003BACKFILL (TY C)STA  1,618.310314.375465
134 6004BACKFILL (TY A OR B)STA2,131.080121.6199413,955.470157.0446856
134 6005BACKFILL TY ACY  909.00034.332513
134 6006BACKFILL (TY A)LF5,962.00010.000005,962.00010.000001
134 6008BACKFILL (TY A OR B)CY233.00025.00000233.00025.000001
134 6010BACKFILL (TY B)LF  39,050.0001.157825
134 6011BACKFILLING PAVEMENT EDGESCY  2,020.60038.708603
150 6001BLADINGSTA689.600223.586144,220.880204.1170428
150 6002BLADINGHR672.000143.640774,306.111116.8780391
150 6003BLADINGLF  350.0007.500001
152 6001ROAD GRADER WORK (ORD COMP)STA449.980420.000002,002.060265.878859
156 6001BULLDOZER WORKHR40.00050.00000255.00092.666675
158 6002SPEC EXCAV WORK (BACKHOE)HR  85.00051.400003
158 6003SPEC EXCAV WORK (HYD EXCAVATOR)HR  1,142.00074.0105811
158 6005SPEC EXCAV WORK (ORIGINAL)CY730.00013.0000033,420.00015.876423
160 2006FURNISHING AND PLACING TOPSOIL (3")SY  4,262.00011.000002
160 6001FURNISHING AND PLACING TOPSOIL (4")STA  788.740413.341235
160 6003FURNISHING AND PLACING TOPSOIL (4")SY1,908,861.000.304414,252,430.000.87992104
160 6004FURNISHING AND PLACING TOPSOIL (6")SY  382,146.0001.369743
160 6005FURNISHING AND PLACING TOPSOILCY  4,163.80027.5678813
160 6006FURNISHING AND PLACING TOPSOIL (3")SY5,162.0002.00000496,589.000.745624
160 6008FURNISHING AND PLACING TOPSOIL (12")SY  1,809.0004.190001
161 2009EROSION CONTROL COMPOSTCY  64.00043.750002
161 2017COMPOST MANUF TOPSOIL (BIP) (4")SY  22,986.0001.000001
161 6005COMPOST MANUF TOPSOIL (4")SY  2,712.0003.000001
161 6008EROSION CONTROL COMPOST (2")SY  8,345.0001.650001
161 6009EROSION CONTROL COMPOSTCY10,075.00015.0000027,482.00022.253827
161 6012GENERAL USE COMPOSTCY5,129.00022.3860417,685.00030.0566410
161 6017COMPOST MANUF TOPSOIL (4")SY520,064.0001.137906,021,033.0001.1381772
161 6019EROSION CONTROL COMPOST (1.5")SY16,205.0002.0300016,205.0002.030001