AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Monday, June 12, 2017
ITEMS 105 6054 TO 161 6022
ItemsItemsBid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1000 - 1133
2000 - 2228
3000 - 3267
4000 - 4191
5000 - 5969
6000 - 6920
7001 - 7669
8020 - 8947
9010 - 9063
100 2001 - 105 6049
105 6054 - 161 6022
161 6023 - 192 2065
192 2067 - 193 6024
Item NoDescriptionUnitsMay 31, 2017Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
105 6054REMOVING STAB BASE & ASPH PAV (18")SY  7,375.0008.735052
105 6057REMOVE STAB BS & ASPH PAV (5"-10")SY  7,342.0002.720001
105 6058REMOVING STAB BASE & ASPH PAV (10"-12"SY  114,870.0008.000001
105 6059REMOVING STAB BASE & ASPH PAV(13"-18")SY  3,216.00026.400001
105 6061REMOV STAB BASE & ASPH PAV (8"-20")SY  17,432.0007.000001
105 6063REMOVE STAB BASE AND ASPH PAV (1"-3")SY43.00020.0000016,401.0003.044572
105 6069REMOVING STAB BASE & ASPH PAV (4" - 6"SY81,549.0002.72000103,480.0002.622544
105 6070REMOVING STAB BASE & ASPH PAV (6" - 8"SY2,761.0004.0000032,748.6005.517595
105 6072REMOVING STAB BASE & ASPH PAV(26"-32")SY309.00021.00000309.00021.000001
105 6073REMOV STAB BASE AND ASPH PAV (22")SY  12,717.00015.830382
105 6074REMOVING STAB BASE AND ASPH PAV (4")SY  203,541.0001.892004
105 6075REMOV STAB BASE AND ASPH PAV (10"-18")SY379.00020.00000379.00020.000001
105 6076REMOV STAB BASE AND ASPH PAV (2"-15")SY136,350.0005.17053136,350.0005.170533
105 6077REMOVING STAB BASE & ASPH PAV (8")SY  11,033.0006.791083
105 6078REMOVE STAB BASE & ASPH PAV (24"-38")SY  8,826.00014.158062
105 6082REMOVING STAB BASE & ASPH PV(10 TO 16"SY  8,844.00010.500001
105 6084REM STAB BASE & ASPH (6"-12")SY  32,758.0002.213442
105 6087REMOVING STAB BASE AND ASPH PAV(8.5")SY  6,810.0003.250001
105 6091REMOVING STAB BASE & ASPH PAV (8"-12")SY  9,057.00010.000001
105 6092REMOVING STAB BASE AND ASPH PAV (5"-8"SY  303,617.0001.900001
105 6094REMOVING STAB BASE & ASPH PAV(12"-27")SY37,928.00014.0000095,377.00010.314643
105 6096REMOV STAB BASE AND ASPH PAV (0"-12")SY4,107.3004.99000336,482.3002.304116
105 6105REMOVING STAB BASE AND ASPH PAV(15")SY  28,935.0007.796744
105 6108RMV STAB BASE & ASPH PV (17")SY  17,866.0007.000001
105 6111REMOVE STAB BASE & ASPH (8")CY  1,749.0002.250001
105 6114REMOVING STAB BASE & ASPH PAV (12.5")SY  3,842.0006.000001
105 6115REMOVE STAB BS & ASPH PAV (7.5"-15.5")SY  32,929.0004.050842
105 6117REMOV STAB BASE & ASPH PAV (9.5"-15")SY  12,131.00011.000001
105 6118REMOVE TRTD BASE & ASPH (11 )CY  260.0005.000001
105 6119RMV TRT BASE & ASPH PAV (0"-19")SY  46,046.0006.100001
105 6120REMOVING STAB BASE AND ASPH PAV (3"-5"SY  111,804.0001.830001
106 6001OBLITERATING ABANDONED ROADSTA  20.4261,672.244203
106 6002OBLITERATING ABANDONED ROADSY20,724.0001.3088125,511.0002.206908
110 2001EXCAVATION (ROADWAY)CY  97,629.0006.486465
110 6001EXCAVATION (ROADWAY)CY647,659.0009.790597,603,120.7408.25753265
110 6002EXCAVATION (CHANNEL)CY6,899.00021.59893267,952.60010.8070768
110 6003EXCAVATION (SPECIAL)CY64,369.0008.61514157,976.22010.0384628
110 6004EXCAVATION (ROADWAY AND CHANNEL)CY  4,457.00013.026033
112 6001SUBGRADE WIDENING (ORD COMP)STA115.750246.582726,659.160415.4154740
112 6002SUBGRADE WIDENING (DENS CONT)STA192.020534.848874,252.160532.8499321
112 6003SUBGRADE WIDENING (DENS CONT)SY  14,012.0006.924352
132 2001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY  110.00012.000001
132 2006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY  49,200.00011.299273
132 2036EMBANK(FINAL)(DC)(TY E)(CSBE)CY  1,563.00035.155472
132 2037EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  1,025.00039.498542
132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY19,178.50010.01025136,827.80011.9480827
132 6002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY24,098.90017.89822123,332.70014.3790211
132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY53,476.0006.392391,605,620.4009.2635968
132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY65,390.00015.358581,698,532.0009.4499645
132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY42,681.00013.20891209,366.90011.5958238
132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY465,960.0008.660435,169,977.0507.6121693
132 6007EMBANKMENT (FINAL)(ORD COMP)(TY D)CY  5,140.00015.487455
132 6008EMBANKMENT (FINAL)(DENS CONT)(TY D)CY5,306.00015.7800029,013.20011.808456
132 6011EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)CY11,366.00010.0000014,090.80013.492564
132 6013EMBANKMENT (ORIGINAL)(ORD COMP)(TY C)CY  889.50050.962902
132 6017EMBANKMENT (VEHICLE)(ORD COMP)(TY A)CY135.000115.00000257.00090.061173
132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY426.00049.3662042,704.00016.2117225
132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY  63,641.00011.1992916
132 6022EMBANKMENT (VEHICLE)(DENS CONT)(TY C)CY  639.00020.000001
132 6025EMBANKMENT (FINAL) (DENS CONT) (TY C1)CY89,668.00010.243901,588,927.8008.2545113
132 6026EMBANKMENT (FINAL) (DENS CONT) (TY C2)CY6,689.00016.490001,251,715.5005.9923914
132 6033EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPRCY  493.00070.000001
132 6035EMBANK(FINAL)(DC)(TY E)(CSBE)CY  57,501.00035.442767
132 6036EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  6,357.00034.838762
132 6037EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPRCY  4,279.00040.993223
132 6044EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  4,211.00030.000001
132 6055EMBANKMENT (FINAL)(ORD COMP)(TY C1)(ASCY817.00058.00000817.00058.000001
132 6056EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DSCY9,231.00058.000009,231.00058.000001
134 6001BACKFILL (TY A)STA505.000132.9901015,417.240165.4395042
134 6002BACKFILL (TY B)STA488.630196.6563017,162.780137.3715750
134 6003BACKFILL (TY C)STA880.310320.439331,831.520326.770326
134 6004BACKFILL (TY A OR B)STA547.660193.0526412,581.070159.5544853
134 6005BACKFILL TY ACY  1,569.00032.510044
134 6010BACKFILL (TY B)LF20,275.0001.1684839,050.0001.157825
134 6011BACKFILLING PAVEMENT EDGESCY687.00027.000002,020.60038.708603
150 6001BLADINGSTA224.000134.429113,198.530189.6734224
150 6002BLADINGHR270.000120.564814,542.000116.6849089
150 6003BLADINGLF  18,026.000.572352
152 6001ROAD GRADER WORK (ORD COMP)STA156.000154.170002,166.090220.5542211
154 6002SCRAPER WORK (DENS CONT)YH  100.0001.000001
156 6001BULLDOZER WORKHR  276.00089.420295
158 6002SPEC EXCAV WORK (BACKHOE)HR8.00093.00000172.00057.784886
158 6003SPEC EXCAV WORK (HYD EXCAVATOR)HR36.00050.000001,126.00059.7602813
158 6006SPEC EXCAV WORK (VEHICLE)CY  61.000100.000001
160 2006FURNISHING AND PLACING TOPSOIL (3")SY  4,262.00011.000002
160 6001FURNISHING AND PLACING TOPSOIL (4")STA  941.510219.699215
160 6003FURNISHING AND PLACING TOPSOIL (4")SY241,113.0001.092123,093,203.0001.28610114
160 6004FURNISHING AND PLACING TOPSOIL (6")SY  298,866.0001.403112
160 6005FURNISHING AND PLACING TOPSOILCY  4,310.80027.7957514
160 6006FURNISHING AND PLACING TOPSOIL (3")SY387,040.000.65000472,702.000.622822
160 6008FURNISHING AND PLACING TOPSOIL (12")SY  1,809.0004.190001
161 2009EROSION CONTROL COMPOSTCY  184.00035.291303
161 2012GENERAL USE COMPOSTCY  40.00027.700001
161 2017COMPOST MANUF TOPSOIL (BIP) (4")SY  30,216.0001.004792
161 6005COMPOST MANUF TOPSOIL (4")SY  2,712.0003.000001
161 6008EROSION CONTROL COMPOST (2")SY  8,345.0001.650001
161 6009EROSION CONTROL COMPOSTCY320.00035.0000030,807.00030.687459
161 6012GENERAL USE COMPOSTCY80.00020.0000022,170.05034.1874513
161 6017COMPOST MANUF TOPSOIL (4")SY480,068.0001.295395,246,189.0001.2451761
161 6022GENERAL USE COMPOST (4")SY  69,994.0004.560205