| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | LAVACA |
| Highway |
US0077 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6022-54-001 |
| Proj ID |
RMC - 602254001 |
| Work Type |
PICNIC AREA MAINTENANCE, LAVACA COUNTY |
| |
|
0.001 |
8535.00 |
0.00 |
2645.00 |
30.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-12-98 |
| Work Began |
02-02-98 |
| Work Completed |
|
| Time Computed |
02-02-98 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
48 |
| Percent Time Used |
13 |
| Contractor(s) |
| MAYO'S CONTRACTOR'S |
SUBCONTRACTOR(S) FOR CCSJ: 6022-54-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12971302 |
|
Totals |
8535.00 |
0.00 |
2645.00 |
30.9 |
|
| County | DEWITT |
| Highway |
US0087 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6033-91-001 |
| Proj ID |
RMC - 603391001 |
| Work Type |
TREE TRIM / REMOVAL & UNDERBRUSH REMOVAL |
| |
|
87.000 |
86700.00 |
0.00 |
30730.00 |
37.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-04-99 |
| Work Began |
01-19-99 |
| Work Completed |
|
| Time Computed |
01-11-99 |
| Contract Working Days |
70 |
| Addl Days Granted |
0 |
| Working Days Charged |
74 |
| Percent Time Used |
105 |
| Contractor(s) |
| L.P. COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6033-91-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09981306 |
|
Totals |
86700.00 |
0.00 |
30730.00 |
37.0 |
|
| County | FAYETTE |
| Highway |
SH0071 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6034-06-001 |
| Proj ID |
RMC - 603406001 |
| Work Type |
LANDSCAPE MAINTENANCE |
| |
|
0.001 |
3600.00 |
0.00 |
1500.00 |
41.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-15-99 |
| Work Began |
01-22-99 |
| Work Completed |
|
| Time Computed |
01-22-99 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
6 |
| Percent Time Used |
1 |
| Contractor(s) |
| ETCETERA MAINTENANCE SERVICE INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6034-06-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09981311 |
|
Totals |
3600.00 |
0.00 |
1500.00 |
41.6 |
|
| County | GONZALES |
| Highway |
IH0010 |
| From |
GONZALES, LAVACA |
| To |
& DEWITT COUNTIES |
| CSJ |
6051-44-001 |
| Proj ID |
RMC - 605144001 |
| Work Type |
SPECIALTY & RAISED PAVEMENT MARKINGS |
| |
|
0.001 |
215846.55 |
0.00 |
75068.05 |
34.7 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
06-13-00 |
| Work Began |
06-20-00 |
| Work Completed |
|
| Time Computed |
06-20-00 |
| Contract Working Days |
55 |
| Addl Days Granted |
0 |
| Working Days Charged |
18 |
| Percent Time Used |
32 |
| Contractor(s) |
| PAIGE BARRICADES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6051-44-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03001307 |
|
Totals |
215846.55 |
0.00 |
75068.05 |
34.7 |
|
| County | VICTORIA |
| Highway |
US0059 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6057-64-001 |
| Proj ID |
SUP - 605764001 |
| Work Type |
REST AREA MAINTENANCE |
| |
|
0.001 |
155529.92 |
0.00 |
161087.37 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
03-30-00 |
| Work Began |
04-01-00 |
| Work Completed |
|
| Time Computed |
04-01-00 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
395 |
| Percent Time Used |
108 |
| Contractor(s) |
| GULF BEND INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6057-64-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03001308 |
|
Totals |
155529.92 |
0.00 |
161087.37 |
99.9 |
|
| County | DEWITT |
| Highway |
US0183 |
| From |
US 87 |
| To |
VARIOUS |
| CSJ |
6062-47-001 |
| Proj ID |
SUP - 606247001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
0.001 |
21360.72 |
0.00 |
20928.60 |
97.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-16-00 |
| Work Began |
08-16-00 |
| Work Completed |
|
| Time Computed |
08-16-00 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
381 |
| Percent Time Used |
104 |
| Contractor(s) |
| GULF BEND INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6062-47-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08001302 |
|
Totals |
21360.72 |
0.00 |
20928.60 |
97.9 |
|
| County | DEWITT |
| Highway |
US0183 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6075-39-001 |
| Proj ID |
SUP - 607539001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
0.001 |
21360.72 |
0.00 |
20285.88 |
94.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-04-01 |
| Work Began |
09-04-01 |
| Work Completed |
|
| Time Computed |
09-04-01 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
362 |
| Percent Time Used |
99 |
| Contractor(s) |
TIBH INDUSTRIES, INC. GULF BEND INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6075-39-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08011301 |
|
Totals |
21360.72 |
0.00 |
20285.88 |
94.9 |
|
| County | AUSTIN |
| Highway |
US0090 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-80-001 |
| Proj ID |
RMC - 615480001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
230431.60 |
0.00 |
146941.20 |
63.7 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
06-04-07 |
| Work Began |
06-11-07 |
| Work Completed |
|
| Time Computed |
06-11-07 |
| Contract Working Days |
75 |
| Addl Days Granted |
0 |
| Working Days Charged |
20 |
| Percent Time Used |
26 |
| Contractor(s) |
| WAYNE YANCEY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-80-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061301 |
|
Totals |
230431.60 |
0.00 |
146941.20 |
63.7 |
|
| County | CALHOUN |
| Highway |
US0087 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-81-001 |
| Proj ID |
RMC - 615481001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
200831.00 |
37036.00 |
179634.00 |
89.4 |
| Work Order |
05-16-07 |
| Work Began |
05-23-07 |
| Work Completed |
|
| Time Computed |
05-23-07 |
| Contract Working Days |
65 |
| Addl Days Granted |
0 |
| Working Days Charged |
24 |
| Percent Time Used |
36 |
| Contractor(s) |
| R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6154-81-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061302 |
|
Totals |
200831.00 |
37036.00 |
179634.00 |
89.4 |
|
| County | COLORADO |
| Highway |
US0090 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-82-001 |
| Proj ID |
RMC - 615482001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
219272.00 |
0.00 |
141910.00 |
64.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-25-07 |
| Work Began |
06-01-07 |
| Work Completed |
|
| Time Computed |
06-01-07 |
| Contract Working Days |
90 |
| Addl Days Granted |
0 |
| Working Days Charged |
45 |
| Percent Time Used |
50 |
| Contractor(s) |
| RDV, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-82-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061303 |
|
Totals |
219272.00 |
0.00 |
141910.00 |
64.9 |
|
| County | DEWITT |
| Highway |
US0087 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-83-001 |
| Proj ID |
RMC - 615483001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
337004.20 |
0.00 |
221665.50 |
65.7 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
06-18-07 |
| Work Began |
06-25-07 |
| Work Completed |
|
| Time Computed |
06-25-07 |
| Contract Working Days |
115 |
| Addl Days Granted |
0 |
| Working Days Charged |
45 |
| Percent Time Used |
39 |
| Contractor(s) |
| COASTAL MAINTENANCE |
SUBCONTRACTOR(S) FOR CCSJ: 6154-83-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061304 |
|
Totals |
337004.20 |
0.00 |
221665.50 |
65.7 |
|
| County | FAYETTE |
| Highway |
US0077 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-84-001 |
| Proj ID |
RMC - 615484001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
245702.40 |
0.00 |
170158.08 |
69.2 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
06-14-07 |
| Work Began |
06-21-07 |
| Work Completed |
|
| Time Computed |
06-21-07 |
| Contract Working Days |
85 |
| Addl Days Granted |
0 |
| Working Days Charged |
26 |
| Percent Time Used |
30 |
| Contractor(s) |
| BEN E. SMITH TRACTORS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-84-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061305 |
|
Totals |
245702.40 |
0.00 |
170158.08 |
69.2 |
|
| County | FAYETTE |
| Highway |
US0090 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-85-001 |
| Proj ID |
RMC - 615485001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
184097.00 |
0.00 |
129049.50 |
70.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-25-07 |
| Work Began |
06-01-07 |
| Work Completed |
|
| Time Computed |
06-01-07 |
| Contract Working Days |
65 |
| Addl Days Granted |
0 |
| Working Days Charged |
18 |
| Percent Time Used |
27 |
| Contractor(s) |
| L. M. TRACTOR, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-85-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061306 |
|
Totals |
184097.00 |
0.00 |
129049.50 |
70.0 |
|
| County | GONZALES |
| Highway |
US0090 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-86-001 |
| Proj ID |
RMC - 615486001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
157870.16 |
0.00 |
99308.48 |
62.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-14-07 |
| Work Began |
05-21-07 |
| Work Completed |
|
| Time Computed |
05-21-07 |
| Contract Working Days |
50 |
| Addl Days Granted |
0 |
| Working Days Charged |
23 |
| Percent Time Used |
46 |
| Contractor(s) |
| TOM E. BLACKWELL |
SUBCONTRACTOR(S) FOR CCSJ: 6154-86-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061307 |
|
Totals |
157870.16 |
0.00 |
99308.48 |
62.9 |
|
| County | GONZALES |
| Highway |
US0183 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-87-001 |
| Proj ID |
RMC - 615487001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
280631.74 |
0.00 |
192889.58 |
69.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-14-07 |
| Work Began |
05-21-07 |
| Work Completed |
|
| Time Computed |
05-21-07 |
| Contract Working Days |
90 |
| Addl Days Granted |
0 |
| Working Days Charged |
49 |
| Percent Time Used |
54 |
| Contractor(s) |
| TOM E. BLACKWELL |
SUBCONTRACTOR(S) FOR CCSJ: 6154-87-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061308 |
|
Totals |
280631.74 |
0.00 |
192889.58 |
69.0 |
|
| County | LAVACA |
| Highway |
US0077 |
| From |
VARIOUS |
| To |
. |
| CSJ |
6154-89-001 |
| Proj ID |
RMC - 615489001 |
| Work Type |
MOWING HIGHWAY RIGHTS OF WAY |
| |
|
0.001 |
313584.00 |
0.00 |
260850.00 |
83.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-22-07 |
| Work Began |
05-29-07 |
| Work Completed |
|
| Time Computed |
05-29-07 |
| Contract Working Days |
105 |
| Addl Days Granted |
0 |
| Working Days Charged |
18 |
| Percent Time Used |
17 |
| Contractor(s) |
| R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6154-89-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12061309 |
|
Totals |
313584.00 |
0.00 |
260850.00 |
83.1 |
|
| County | FAYETTE |
| Highway |
US0077 |
| From |
FAYETTE COUNTY |
| To |
VARIOUS SITES |
| CSJ |
6155-64-001 |
| Proj ID |
SUP - 615564001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
0.001 |
129793.36 |
4375.00 |
104504.60 |
100.0 |
| Work Order |
10-30-06 |
| Work Began |
11-01-06 |
| Work Completed |
10-31-08 |
| Time Computed |
11-01-06 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
730 |
| Percent Time Used |
100 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6155-64-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10061332 |
|
Totals |
129793.36 |
4375.00 |
104504.60 |
100.0 |
|
| County | WHARTON |
| Highway |
SH0071 |
| From |
VARIOUS LIMITS IN WHARTON, |
| To |
MATAGORDA AND AUSTIN COUNTIES |
| CSJ |
6158-65-001 |
| Proj ID |
RMC - 615865001 |
| Work Type |
ONE - WAY TRAFFIC CONTROL (ON CALL) |
| |
|
0.001 |
150000.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| E R CONTRACTORS |
SUBCONTRACTOR(S) FOR CCSJ: 6158-65-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03071304 |
|
Totals |
150000.00 |
0.00 |
0.00 |
0.0 |
|
| County | LAVACA |
| Highway |
UA0077 |
| From |
UA 77 RAILROAD OVERPASS |
| To |
YOAKUM |
| CSJ |
6162-46-001 |
| Proj ID |
SUP - 616246001 |
| Work Type |
LANDSCAPE MOWING & MAINTENANCE |
| |
|
0.001 |
4800.00 |
0.00 |
2400.00 |
50.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-01-07 |
| Work Began |
07-01-07 |
| Work Completed |
|
| Time Computed |
07-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
458 |
| Percent Time Used |
62 |
| Contractor(s) |
TIBH INDUSTRIES, INC. EARTHLY VISIONS OUTREACH |
SUBCONTRACTOR(S) FOR CCSJ: 6162-46-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05071331 |
|
Totals |
4800.00 |
0.00 |
2400.00 |
50.0 |
|
| County | VICTORIA |
| Highway |
US0059 |
| From |
VARIOUS SITES IN VICTORIA, JACKSON |
| To |
AND WHARTON COUNTIES |
| CSJ |
6166-11-001 |
| Proj ID |
SUP - 616611001 |
| Work Type |
LITTER PICKUP AT VARIOUS SITES |
| |
|
77.400 |
116000.00 |
0.00 |
29000.16 |
25.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-28-07 |
| Work Began |
10-09-07 |
| Work Completed |
|
| Time Computed |
10-09-07 |
| Contract Working Days |
240 |
| Addl Days Granted |
0 |
| Working Days Charged |
44 |
| Percent Time Used |
18 |
| Contractor(s) |
TIBH INDUSTRIES, INC. EARTHLY VISIONS OUTREACH |
SUBCONTRACTOR(S) FOR CCSJ: 6166-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07071331 |
|
Totals |
116000.00 |
0.00 |
29000.16 |
25.0 |
|