| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | FAYETTE |
| Highway |
US 90 |
| From |
AT EAST NAVIDAD RIVER |
| To |
STR # 0026-03-030 |
| CSJ |
0026-03-039 |
| Proj ID |
BR 2012(377) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.543 |
2064333.41 |
150226.96 |
1545210.18 |
74.8 |
| Work Order |
05-22-12 |
| Work Began |
07-23-12 |
| Work Completed |
|
| Time Computed |
07-23-12 |
| Contract Working Days |
150 |
| Addl Days Granted |
5 |
| Working Days Charged |
124 |
| Percent Time Used |
80 |
| Contractor(s) |
| FORDE CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0026-03-039 ROADWAY SPECIALTIES, INC.(2.68%) KEYSTONE SITEWORK(5.93%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.94%) JUST GROOVING, LTD.(0.26%) MESA ROD BUSTERS, INC. (0.58%) HEMPHILL PILE DRIVING CO., A CORP. (5.60%) BATTEN DRILLING, INC.(0.35%) CENTRAL CONSTRUCTION SERVICES, INC.(0.31%)
|
| Contract # |
03123207 |
|
Totals |
2064333.41 |
150226.96 |
1545210.18 |
74.8 |
|
| County | VICTORIA |
| Highway |
US 59 |
| From |
0.02 MI. NORTH OF LOOP 463 |
| To |
0.03 MI. NORTH OF US 87 |
| CSJ |
0088-05-089 |
| Proj ID |
C 88-5-89 |
| Work Type |
CONSTRUCT FRONTAGE ROADS |
| |
|
3.446 |
14995694.93 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
09-15-13 |
| Contract Working Days |
270 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0088-05-089 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133205 |
|
Totals |
14995694.93 |
0.00 |
0.00 |
0.0 |
|
| County | WHARTON |
| Highway |
US 59 |
| From |
BU 59 SOUTH OF EL CAMPO |
| To |
SL 524 NORTH OF HILLJE (NB ONLY) |
| CSJ |
0089-06-028 |
| Proj ID |
NH 2013(590) |
| Work Type |
PAVEMENT REPAIR & SURFACING |
| |
|
1.978 |
663365.15 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
30 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| JAMES CONSTRUCTION GROUP, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 0089-06-028 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133028 |
|
Totals |
663365.15 |
0.00 |
0.00 |
0.0 |
|
| County | WHARTON |
| Highway |
US 59 |
| From |
FM 961 |
| To |
0.45 MI. EAST OF FM 960 |
| CSJ |
0089-07-143 |
| Proj ID |
NH 2012(350) |
| Work Type |
PAVEMENT REPAIR AND ACP OVERLAY |
| |
|
6.837 |
3624360.17 |
43175.00 |
3828954.15 |
99.9 |
| Work Order |
03-16-12 |
| Work Began |
05-08-12 |
| Work Completed |
|
| Time Computed |
05-01-12 |
| Contract Working Days |
75 |
| Addl Days Granted |
5 |
| Working Days Charged |
90 |
| Percent Time Used |
112 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0089-07-143 BATTERSON,LLP(2.39%) CHEROKEE SERVICES(1.27%)
|
| Contract # |
02123215 |
|
Totals |
3624360.17 |
43175.00 |
3828954.15 |
99.9 |
|
| County | JACKSON |
| Highway |
LP 521 ETC |
| From |
CR 407 |
| To |
MENEFEE ST. IN EDNA |
| CSJ |
0089-11-004 |
| Proj ID |
STP 2013(127) |
| Work Type |
SEAL COAT |
| |
|
159.987 |
6398283.46 |
515006.39 |
1003663.95 |
15.6 |
| Work Order |
11-09-12 |
| Work Began |
02-25-13 |
| Work Completed |
|
| Time Computed |
02-25-13 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| F. N. PLOCH CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0089-11-004 BATTERSON,LLP( 13.97%)
|
| Contract # |
10123222 |
|
Totals |
6398283.46 |
515006.39 |
1003663.95 |
15.6 |
|
| County | GONZALES |
| Highway |
US 183 |
| From |
CR 327 |
| To |
1.1 MI. SOUTH OF FM 2067 |
| CSJ |
0154-02-026 |
| Proj ID |
NH 1102(417) |
| Work Type |
CONSTRUCT AUXILIARY LANES |
| |
|
10.188 |
7905107.21 |
63675.70 |
8089741.63 |
99.9 |
| Work Order |
09-30-11 |
| Work Began |
01-02-12 |
| Work Completed |
|
| Time Computed |
11-29-11 |
| Contract Working Days |
270 |
| Addl Days Granted |
0 |
| Working Days Charged |
256 |
| Percent Time Used |
94 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0154-02-026 COWBELL TRAFFIC SERVICES, INC. (0.21%) DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (1.72%) FLASHER EQUIPMENT COMPANY(0.22%) RICE ENVIRONMENTAL SERVICES(0.81%) INTERSTATE BARRICADES & MARKINGS, INC. (1.96%) MURRAY CONSTRUCTION(0.35%) BILL HALL JR. TRUCKING, LTD. (0.93%) PENNTEX MILLING, LLC (0.05%) ROADWAY SPECIALTIES, INC.(0.41%)
|
| Contract # |
07113242 |
|
Totals |
7905107.21 |
63675.70 |
8089741.63 |
99.9 |
|
| County | DEWITT |
| Highway |
US 183 |
| From |
EMIL BLANK ROAD |
| To |
0.20 MI. NORTH OF US 77A |
| CSJ |
0154-04-030 |
| Proj ID |
C 154-4-30 |
| Work Type |
CONSTRUCT AUX. LANES FOR SUPER 2 |
| |
|
13.549 |
9614974.97 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-26-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
05-12-13 |
| Contract Working Days |
255 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0154-04-030 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133003 |
|
Totals |
9614974.97 |
0.00 |
0.00 |
0.0 |
|
| County | AUSTIN |
| Highway |
SH 36 |
| From |
SH 159 NORTH OF BELLVILLE |
| To |
WASHINGTON COUNTY LINE |
| CSJ |
0187-02-064 |
| Proj ID |
C 187-2-64 |
| Work Type |
CONSTRUCT AUXILLARY LANES |
| |
|
8.540 |
10689701.03 |
1019015.79 |
1767756.11 |
16.5 |
| Work Order |
10-24-12 |
| Work Began |
01-14-13 |
| Work Completed |
|
| Time Computed |
12-23-12 |
| Contract Working Days |
270 |
| Addl Days Granted |
14 |
| Working Days Charged |
42 |
| Percent Time Used |
14 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 0187-02-064 BATTERSON,LLP(2.16%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.19%) TEXAS ALTERNATIVE GRASSER, INC.(0.35%) CEN TEX HYDROSEED, INC.(0.10%) DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.83%) WEST TEXAS RUMBLE STRIP(0.06%) MURRAY CONSTRUCTION(0.48%) PEDRO CARLOS CONSTRUCTION CO.(2.35%) FARR FOUNDATION, INC.(0.51%) JEFFERY BAILEY TRUCKING, INC.(1.04%)
|
| Contract # |
08123209 |
|
Totals |
10689701.03 |
1019015.79 |
1767756.11 |
16.5 |
|
| County | AUSTIN |
| Highway |
SH 36 |
| From |
0.1 MI. NORTH OF US 90 |
| To |
0.1 MI. NORTH OF FM 1094 |
| CSJ |
0187-03-061 |
| Proj ID |
NH 2012(466) |
| Work Type |
REHABILITATE ROADWAY |
| |
|
1.000 |
3799066.71 |
123907.97 |
1799188.29 |
47.3 |
| Work Order |
06-29-12 |
| Work Began |
08-29-12 |
| Work Completed |
|
| Time Computed |
08-28-12 |
| Contract Working Days |
210 |
| Addl Days Granted |
4 |
| Working Days Charged |
76 |
| Percent Time Used |
35 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0187-03-061 WOLFF CONSTRUCTION ( 16.03%) ENVIRONMENTAL SAFETY SERVICES, INC.(0.74%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.34%) INTERSTATE BARRICADES & MARKINGS, INC. (1.07%) MURRAY CONSTRUCTION(0.45%) ROGER"S TREE SERVICE (0.15%) JUAN DEANDA TRUCKING, LLC DBA JUAN DEANDA TRUCKING (0.48%) BILL HALL JR. TRUCKING, LTD. (1.34%)
|
| Contract # |
04123202 |
|
Totals |
3799066.71 |
123907.97 |
1799188.29 |
47.3 |
|
| County | FAYETTE |
| Highway |
US 77 |
| From |
LEE COUNTY LINE |
| To |
ROITSCH ST. IN LA GRANGE |
| CSJ |
0211-06-055 |
| Proj ID |
STP 2013(699) |
| Work Type |
PAVEMENT REPAIR AND ACP OVERLAY |
| |
|
12.321 |
3046231.73 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 0211-06-055 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133212 |
|
Totals |
3046231.73 |
0.00 |
0.00 |
0.0 |
|
| County | WHARTON |
| Highway |
SH 60 |
| From |
0.215 MI. S. OF AUSTIN COUNTY LINE |
| To |
US 90A |
| CSJ |
0240-02-030 |
| Proj ID |
STP 2013(485) |
| Work Type |
RESTORE ROADWAY |
| |
|
4.819 |
2921571.83 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
120 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| JAMES CONSTRUCTION GROUP, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 0240-02-030 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03133234 |
|
Totals |
2921571.83 |
0.00 |
0.00 |
0.0 |
|
| County | WHARTON |
| Highway |
SH 71 |
| From |
AT TRES PALACIOS RIVER IN EL CAMPO |
| To |
STR # 0266-06-036 |
| CSJ |
0266-06-044 |
| Proj ID |
BR 2013(593) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.164 |
1218475.90 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
135 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| MENADE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0266-06-044 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133229 |
|
Totals |
1218475.90 |
0.00 |
0.00 |
0.0 |
|
| County | FAYETTE |
| Highway |
US 77 |
| From |
1.03 MI. SOUTH OF FM 2436 |
| To |
0.39 MI. SOUTH OF FM 956 |
| CSJ |
0268-02-034 |
| Proj ID |
STP 2012(484) |
| Work Type |
ADD PASSING LANE FOR SUPER 2 HWY |
| |
|
6.136 |
7342654.52 |
297199.20 |
4358951.57 |
59.3 |
| Work Order |
05-15-12 |
| Work Began |
06-19-12 |
| Work Completed |
|
| Time Computed |
06-19-12 |
| Contract Working Days |
180 |
| Addl Days Granted |
0 |
| Working Days Charged |
150 |
| Percent Time Used |
83 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0268-02-034 ROADSAFE TRAFFIC SYSTEMS, INC. (0.12%) D&S TEXAS ICON CONSTRUCTION, LLC (1.54%) EGGEMEYER LAND CLEARING, LLC (0.58%) DUSTROL, INC.(0.09%) ROADWAY SPECIALTIES, INC.(1.63%) RELMCO, INC. ( 16.94%) D. I. J. CONSTRUCTION, INC.(2.14%) MURRAY CONSTRUCTION(0.59%) W. W. FOUNDATION DRILLING, LTD.(0.12%)
|
| Contract # |
03123228 |
|
Totals |
7342654.52 |
297199.20 |
4358951.57 |
59.3 |
|
| County | FAYETTE |
| Highway |
US 77 |
| From |
SCHULENBURG SOUTH CITY LIMITS |
| To |
LAVACA COUNTY LINE |
| CSJ |
0269-01-027 |
| Proj ID |
C 269-1-27 |
| Work Type |
CONSTRUCT AUXILLARY LANES |
| |
|
14.309 |
6078391.95 |
279249.20 |
1492914.08 |
24.5 |
| Work Order |
09-13-12 |
| Work Began |
12-11-12 |
| Work Completed |
|
| Time Computed |
11-12-12 |
| Contract Working Days |
210 |
| Addl Days Granted |
0 |
| Working Days Charged |
84 |
| Percent Time Used |
40 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0269-01-027 FLASHER EQUIPMENT COMPANY(2.84%) MURRAY CONSTRUCTION(0.54%) M.V. HENKE ENTERPRISES, INC. (0.11%) TEXAS ALTERNATIVE GRASSER, INC.(0.22%) ROADWAY SPECIALTIES, INC.(3.10%) RELMCO, INC. (5.29%) COWBELL TRAFFIC SERVICES, INC. (0.37%)
|
| Contract # |
07123214 |
|
Totals |
6078391.95 |
279249.20 |
1492914.08 |
24.5 |
|
| County | LAVACA |
| Highway |
US 77A |
| From |
0.821 MI. WEST OF US 77 |
| To |
US 90A |
| CSJ |
0269-03-033 |
| Proj ID |
STP 2013(592) |
| Work Type |
ACP OVERLAY |
| |
|
10.501 |
2314921.52 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0269-03-033 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133019 |
|
Totals |
2314921.52 |
0.00 |
0.00 |
0.0 |
|
| County | DEWITT |
| Highway |
SH 72 |
| From |
FM 237 |
| To |
4.79 MI. SOUTH OF US 87 |
| CSJ |
0270-01-049 |
| Proj ID |
STP 2013(072) |
| Work Type |
ADD SHOULDERS |
| |
|
5.650 |
2737650.86 |
251237.01 |
873111.69 |
31.8 |
| Work Order |
11-28-12 |
| Work Began |
12-13-12 |
| Work Completed |
|
| Time Computed |
12-14-12 |
| Contract Working Days |
120 |
| Addl Days Granted |
0 |
| Working Days Charged |
72 |
| Percent Time Used |
60 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0270-01-049 COWBELL TRAFFIC SERVICES, INC. (0.29%) D&S TEXAS ICON CONSTRUCTION, LLC (0.72%) DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.73%) D. I. J. CONSTRUCTION, INC.(4.12%) FLASHER EQUIPMENT COMPANY(0.44%) MURRAY CONSTRUCTION(0.32%) M.V. HENKE ENTERPRISES, INC. (0.48%) RAMI MATERIALS TRANSPORT, LLC(0.97%) JUAN DEANDA TRUCKING, LLC DBA JUAN DEANDA TRUCKING (0.97%)
|
| Contract # |
09123208 |
|
Totals |
2737650.86 |
251237.01 |
873111.69 |
31.8 |
|
| County | DEWITT |
| Highway |
SH 72 |
| From |
4.7 MI. WEST OF US 87 |
| To |
US 87 |
| CSJ |
0270-01-050 |
| Proj ID |
STP 2013(128) |
| Work Type |
ACP OVERLAY |
| |
|
4.726 |
1234582.79 |
3095.64 |
1445178.38 |
99.9 |
| Work Order |
11-14-12 |
| Work Began |
02-13-13 |
| Work Completed |
|
| Time Computed |
11-30-12 |
| Contract Working Days |
15 |
| Addl Days Granted |
0 |
| Working Days Charged |
15 |
| Percent Time Used |
100 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0270-01-050 COWBELL TRAFFIC SERVICES, INC. (0.80%) D&S TEXAS ICON CONSTRUCTION, LLC (0.32%) D. I. J. CONSTRUCTION, INC.(4.74%) EGGEMEYER TREE SERVICE (1.33%) FLASHER EQUIPMENT COMPANY(0.29%)
|
| Contract # |
10123013 |
|
Totals |
1234582.79 |
3095.64 |
1445178.38 |
99.9 |
|
| County | DEWITT |
| Highway |
SH 72 |
| From |
KARNES COUNTY LINE |
| To |
FM 2980 |
| CSJ |
0270-02-039 |
| Proj ID |
STP 2012(738) |
| Work Type |
ACP OVERLAY |
| |
|
10.012 |
2526305.92 |
56484.12 |
2357804.46 |
93.3 |
| Work Order |
08-21-12 |
| Work Began |
09-10-12 |
| Work Completed |
|
| Time Computed |
09-06-12 |
| Contract Working Days |
60 |
| Addl Days Granted |
18 |
| Working Days Charged |
76 |
| Percent Time Used |
97 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0270-02-039 COWBELL TRAFFIC SERVICES, INC. (0.49%) FLASHER EQUIPMENT COMPANY(0.29%) HIGHWAY TECHNOLOGIES, INC. (4.65%) MURRAY CONSTRUCTION(0.29%) PRIMATE CONSTRUCTION, INC. (0.31%) ROADWAY SPECIALTIES, INC.(0.15%)
|
| Contract # |
07123027 |
|
Totals |
2526305.92 |
56484.12 |
2357804.46 |
93.3 |
|
| County | LAVACA |
| Highway |
SH 111 |
| From |
DEWITT COUNTY LINE |
| To |
US 77 |
| CSJ |
0346-06-046 |
| Proj ID |
STP 2013(594) |
| Work Type |
PAVEMENT REPAIR & ACP OVERLAY |
| |
|
11.649 |
2608000.01 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
07-08-13 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0346-06-046 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133035 |
|
Totals |
2608000.01 |
0.00 |
0.00 |
0.0 |
|
| County | LAVACA |
| Highway |
US 77 |
| From |
0.20 MI SOUTH OF FM 318 |
| To |
1.70 MI NORTH OF SH 111 |
| CSJ |
0370-01-033 |
| Proj ID |
C 370-1-33 |
| Work Type |
CONSTRUCT AUXILLARY LANES |
| |
|
14.415 |
9709623.41 |
744954.26 |
2614602.30 |
26.9 |
| Work Order |
09-17-12 |
| Work Began |
11-16-12 |
| Work Completed |
|
| Time Computed |
11-16-12 |
| Contract Working Days |
285 |
| Addl Days Granted |
0 |
| Working Days Charged |
72 |
| Percent Time Used |
25 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0370-01-033 COWBELL TRAFFIC SERVICES, INC. (0.19%) FLASHER EQUIPMENT COMPANY(2.40%) MURRAY CONSTRUCTION(0.50%) ROADWAY SPECIALTIES, INC.(1.68%) TEXAS ALTERNATIVE GRASSER, INC.(0.14%) M.V. HENKE ENTERPRISES, INC. (0.15%)
|
| Contract # |
07123219 |
|
Totals |
9709623.41 |
744954.26 |
2614602.30 |
26.9 |
|