MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 13 AS OF MAY 15, 2013 PAGE 37 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ AUSTIN AT DRAW CR 5175 | 0.055 | 273,616.44| 0.00| 0.00| 0.0| CR (WAGNER RD) STR # AA02-41-001 | | | | | | 0913-20-076 | | | | | | BR 2007(533) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-20-076 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133003 | TOTALS | 273,616.44| 0.00| 0.00| 0.0| ************************************************************************************************************************************ AUSTIN VARIOUS SCHOOL LOCATIONS | 1.338 | 564,758.53| 6,359.78| 544,739.45| 96.4| CS IN CITY OF SEALY | | | | | | 0913-20-083 | | | | | | STP 1102(301)SRS CONSTRUCT SIDEWALKS, CROSSWALKS | | | | | | | | | | | | WORK ORDER- 05-16-12 WORK BEGAN- 09-28-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-13-12 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 106 PERCENT TIME USED- 88 | | | | | | | | | | | | TRIPLE B SERVICES, L.L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-20-083 | | | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 0.54 | | | | CHAPA"S CONSTRUCTION | |SUB %: 32.49 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 5.38 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 5.12 | | | | AMERICAN DRILLING & SAWING | |SUB %: 0.38 | | | | CURB PLANET INC. | |SUB %: 0.22 | | | | JASSO"S SAWING & SEALING | |SUB %: 1.09 | | | | | | | | | | CONTRACT 04123029 | TOTALS | 564,758.53| 6,359.78| 544,739.45| 96.4| ************************************************************************************************************************************ AUSTIN 0.1 MI. NORTH OF US 90 | 1.000 | 3,799,066.71| 123,907.97| 1,799,188.29| 47.3| SH 36 0.1 MI. NORTH OF FM 1094 | | | | | | 0187-03-061 | | | | | | NH 2012(466) REHABILITATE ROADWAY | | | | | | | | | | | | WORK ORDER- 06-29-12 WORK BEGAN- 08-29-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-28-12 | | | | | | CONTRACT WORKING DAYS- 210 ADDL DAYS GRANTED- 4 | | | | | | WORKING DAYS CHARGED- 76 PERCENT TIME USED- 35 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0187-03-061 | | | | | | WOLFF CONSTRUCTION | |SUB %: 16.03 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 0.74 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.34 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 1.07 | | | | MURRAY CONSTRUCTION | |SUB %: 0.45 | | | | ROGER"S TREE SERVICE | |SUB %: 0.15 | | | | JUAN DEANDA TRUCKING, LLC DBA JUAN DEANDA TRUCKING | |SUB %: 0.48 | | | | BILL HALL JR. TRUCKING, LTD. | |SUB %: 1.34 | | | | | | | | | | CONTRACT 04123202 | TOTALS | 3,799,066.71| 123,907.97| 1,799,188.29| 47.3| ************************************************************************************************************************************ AUSTIN 0.4 MI. NORTH OF FM 1094 | 8.259 | 3,120,993.47| 0.00| 0.00| 0.0| FM 949 SH 36 | | | | | | 1106-02-020 | | | | | | STP 2013(595)HES WIDEN ROADWAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | KNIFE RIVER CORPORATION - SOUTH | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1106-02-020 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133204 | TOTALS | 3,120,993.47| 0.00| 0.00| 0.0| ************************************************************************************************************************************ AUSTIN SH 159 NORTH OF BELLVILLE | 8.540 | 10,689,701.03| 1,019,015.79| 1,767,756.11| 16.5| SH 36 WASHINGTON COUNTY LINE | | | | | | 0187-02-064 | | | | | | C 187-2-64 CONSTRUCT AUXILLARY LANES | | | | | | | | | | | | WORK ORDER- 10-24-12 WORK BEGAN- 01-14-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-23-12 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 14 | | | | | | WORKING DAYS CHARGED- 42 PERCENT TIME USED- 14 | | | | | | | | | | | | KNIFE RIVER CORPORATION - SOUTH | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0187-02-064 | | | | | | BATTERSON,LLP | |SUB %: 2.16 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.19 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.35 | | | | CEN TEX HYDROSEED, INC. | |SUB %: 0.10 | | | | DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) | |SUB %: 0.83 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.06 | | | | MURRAY CONSTRUCTION | |SUB %: 0.48 | | | | PEDRO CARLOS CONSTRUCTION CO. | |SUB %: 2.35 | | | | FARR FOUNDATION, INC. | |SUB %: 0.51 | | | | JEFFERY BAILEY TRUCKING, INC. | |SUB %: 1.04 | | | | | | | | | | CONTRACT 08123209 | TOTALS | 10,689,701.03| 1,019,015.79| 1,767,756.11| 16.5| ************************************************************************************************************************************ AUSTIN AT DRAW CR 5200 | 0.071 | 196,643.67| 4,884.50| 193,969.04|100.0| CR (ZETTEL RD) STR # AA03-00-001 | | | | | | 0913-20-079 | | | | | | BR 2008(612) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 10-12-12 WORK BEGAN- 11-12-12 | | | | | | DATE WORK COMPLETED- 04-26-13 TIME COMPUTED- 10-28-12 | | | | | | CONTRACT WORKING DAYS- 62 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 58 PERCENT TIME USED- 93 | | | | | | | | | | | | L.C. JORDAN & SON | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-20-079 | | | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 9.17 | | | | ODUM SERVICES, L.P. | |SUB %: 6.87 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.56 | | | | KOSSMAN CONTRACTING CO., INC. | |SUB %: 0.60 | | | | | | | | | | CONTRACT 09123006 | TOTALS | 196,643.67| 4,884.50| 193,969.04|100.0| ************************************************************************************************************************************ AUSTIN AT PINEY CREEK | 0.196 | 1,211,889.50| 48,701.00| 537,514.56| 44.3| FM 331 STR # 2937-01-001 | | | | | | 2937-01-007 | | | | | | BR 2013(129) STRUCTURES, BASE, SURFACING | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 02-04-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-08-13 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 44 PERCENT TIME USED- 58 | | | | | | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2937-01-007 | | | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 5.26 | | | | JMHP, INC. | |SUB %: 1.31 | | | | MESA ROD BUSTERS, INC. | |SUB %: 1.30 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.41 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.28 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 11.24 | | | | CEN TEX HYDROSEED, INC. | |SUB %: 0.67 | | | | | | | | | | CONTRACT 10123219 | TOTALS | 1,211,889.50| 48,701.00| 537,514.56| 44.3| ************************************************************************************************************************************ AUSTIN AT WEST FORK MILL CREEK CR 5178 | 0.075 | 225,407.70| 0.00| 196,508.76| 96.0| CR (MAREK ROAD) AA02-37-002 | | | | | | 0913-20-082 | | | | | | BR 2010(405) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 01-18-12 WORK BEGAN- 05-29-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-03-12 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 94 PERCENT TIME USED- 156 | | | | | | | | | | | | CONSTAR CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-20-082 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 0.88 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 7.15 | | | | CWA CONSTRUCTION, INC. | |SUB %: 2.77 | | | | CEN TEX HYDROSEED, INC. | |SUB %: 0.48 | | | | | | | | | | CONTRACT 12113003 | TOTALS | 225,407.70| 0.00| 196,508.76| 96.0| ************************************************************************************************************************************ CALHOUN AT AGUA DULCE BRANCH CR 508 | 0.072 | 352,620.00| 0.00| 0.00| 0.0| CR (SWEETWATER RD) STR# AA02-04-001 | | | | | | 0913-19-024 | | | | | | BR 1102(131) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | CONSTAR CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-19-024 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133006 | TOTALS | 352,620.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ CALHOUN AT HOG BAYOU | 2.710 | 397,123.00| 0.00| 0.00| 0.0| PW GUADALUPE DELTA WMA PROJECT | | | | | | 0913-19-025 | | | | | | C 913-19-25 ROAD IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-26-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LESTER CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-19-025 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133211 | TOTALS | 397,123.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ CALHOUN AT KELLER'S CREEK | 0.138 | 724,621.98| 0.00| 0.00| 0.0| FM 2143 STR # 2016-01-001 | | | | | | 2016-01-010 | | | | | | BR 2013(406) DEMO., STRUCTURAL, BASE, SURFACING | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 57 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2016-01-010 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133207 | TOTALS | 724,621.98| 0.00| 0.00| 0.0| ************************************************************************************************************************************ CALHOUN SH 238 | 6.879 | 3,292,866.80| 3,303.63| 2,909,788.96| 88.5| FM 1289 4.2 MI NORTH OF SH 185 | | | | | | 1438-01-022 | | | | | | STP 2012(378) BASE, GR., SURFACING | | | | | | | | | | | | WORK ORDER- 06-01-12 WORK BEGAN- 06-11-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-11-12 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 156 PERCENT TIME USED- 104 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1438-01-022 | | | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 0.79 | | | | MURRAY CONSTRUCTION | |SUB %: 0.22 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 2.31 | | | | RAMI MATERIALS TRANSPORT, LLC | |SUB %: 1.51 | | | | JUAN DEANDA TRUCKING, LLC DBA JUAN DEANDA TRUCKING | |SUB %: 1.51 | | | | | | | | | | CONTRACT 03123003 | TOTALS | 3,292,866.80| 3,303.63| 2,909,788.96| 88.5| ************************************************************************************************************************************ CALHOUN AT MONKEY SLOUGH | 0.109 | 942,515.30| 28,475.07| 28,475.07| 3.0| FM 1289 STR # 1438-01-003 | | | | | | 1438-01-024 | | | | | | BR 2012(528) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 06-18-12 WORK BEGAN- 08-25-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-17-12 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | REXCO CONSTRUCTION SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1438-01-024 | | | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.00 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 0.42 | | | | KL DURHAM CONSTRUCTION, LLC | |SUB %: 0.00 | | | | ODUM SERVICES, L.P. | |SUB %: 3.16 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 0.00 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 1.28 | | | | | | | | | | CONTRACT 05123010 | TOTALS | 942,515.30| 28,475.07| 28,475.07| 3.0| ************************************************************************************************************************************ CALHOUN ALONG HALF LEAGUE RD./SEADRIFT ST | 1.062 | 259,105.30| 0.00| 259,834.64| 99.9| CS IN CITY OF PORT LAVACA | | | | | | 0913-19-023 | | | | | | STP 1102(151)SRS CONSTRUCT SIDEWALKS | | | | | | | | | | | | WORK ORDER- 08-30-11 WORK BEGAN- 10-31-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-30-11 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 80 PERCENT TIME USED- 106 | | | | | | | | | | | | L.L. & F. CONSTRUCTION MANAGEMENT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-19-023 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 1.25 | | | | CROSS TEX CURBS | |SUB %: 2.74 | | | | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. | |SUB %: 5.71 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 4.79 | | | | | | | | | | CONTRACT 07113212 | TOTALS | 259,105.30| 0.00| 259,834.64| 99.9| ************************************************************************************************************************************ CALHOUN 4.2 MI. NORTH OF SH 185 | 3.241 | 1,648,606.49| 245,453.57| 245,453.57| 14.8| FM 1289 0.42 MI. NORTH OF SH 185 | | | | | | 1438-01-023 | | | | | | STP 2012(650)HES SET FIXED OBJECTS & CONST. SHLDS. | | | | | | | | | | | | WORK ORDER- 09-13-12 WORK BEGAN- 04-16-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-12-12 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 8 PERCENT TIME USED- 8 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1438-01-023 | | | | | | D&S TEXAS ICON CONSTRUCTION, LLC | |SUB %: 0.61 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 2.38 | | | | | | | | | | CONTRACT 08123007 | TOTALS | 1,648,606.49| 245,453.57| 245,453.57| 14.8| ************************************************************************************************************************************ COLORADO AT WEST MUSTANG CREEK | 0.123 | 589,199.00| 0.00| 618,658.97| 99.9| FM 333 #0897-01-001 | | | | | | 0897-01-011 | | | | | | BR 2012(608) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-16-12 WORK BEGAN- 10-17-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-15-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 3 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 103 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0897-01-011 | | | | | | EE CONSTRUCTION, LLC | |SUB %: 23.49 | | | | FUQUAY, INC. | |SUB %: 1.54 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 6.19 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.34 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.20 | | | | ODUM SERVICES, L.P. | |SUB %: 3.05 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.25 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.23 | | | | PITTS CONSTRUCTION, INC. | |SUB %: 0.27 | | | | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | |SUB %: 21.54 | | | | | | | | | | CONTRACT 06123207 | TOTALS | 589,199.00| 0.00| 618,658.97| 99.9| ************************************************************************************************************************************ DEWITT AT MANAHUILLA CREEK CR 294 | 0.066 | 276,156.23| 0.00| 257,359.22| 97.2| CR (YKT SLICKFIELD ROAD) #AA0293003 | | | | | | 0913-17-032 | | | | | | BR 2010(290) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 03-12-12 WORK BEGAN- 06-05-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-10-12 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 94 PERCENT TIME USED- 125 | | | | | | | | | | | | RELMCO, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-17-032 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 0.81 | | | | DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) | |SUB %: 4.51 | | | | FUQUAY, INC. | |SUB %: 1.50 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 6.11 | | | | | | | | | | CONTRACT 01123012 | TOTALS | 276,156.23| 0.00| 257,359.22| 97.2| ************************************************************************************************************************************ DEWITT EMIL BLANK ROAD | 13.549 | 9,614,974.97| 0.00| 0.00| 0.0| US 183 0.20 MI. NORTH OF US 77A | | | | | | 0154-04-030 | | | | | | C 154-4-30 CONSTRUCT AUX. LANES FOR SUPER 2 | | | | | | | | | | | | WORK ORDER- 04-26-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-12-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0154-04-030 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133003 | TOTALS | 9,614,974.97| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DEWITT AT DRAW CR 264 | 0.066 | 487,910.26| 0.00| 0.00| 0.0| CR (CABEZA RD) STR # AA03-05-001 | | | | | | 0913-17-033 | | | | | | BR 2011(921) STRUCTURE, BASE, SURFACING | | | | | | | | | | | | WORK ORDER- 05-08-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | RELMCO, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-17-033 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133214 | TOTALS | 487,910.26| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DEWITT VARIOUS LOCATIONS | 0.100 | 687,193.00| 2,500.00| 663,559.00| 96.5| VA IN DEWITT, GONZALES & LAVACA CO. | | | | | | 0913-00-085 | | | | | | STP 2012(468) CONSTRUCT CURB RAMPS | | | | | | | | | | | | WORK ORDER- 06-04-12 WORK BEGAN- 02-04-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-02-12 | | | | | | CONTRACT WORKING DAYS- 160 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 116 PERCENT TIME USED- 72 | | | | | | | | | | | | TI-ZACK CONCRETE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-00-085 | | | | | | FAASS TRUCKING, INC. | |SUB %: 1.93 | | | | GLOBE ELECTRIC SUPPLY COMPANY, INC. | |SUB %: 3.78 | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 2.00 | | | | | | | | | | CONTRACT 04123011 | TOTALS | 687,193.00| 2,500.00| 663,559.00| 96.5| ************************************************************************************************************************************ DEWITT VARIOUS LOCATIONS | 0.100 | 495,921.40| 10,646.40| 332,943.45| 67.1| VA IN FAYETTE AND COLORADO CO. | | | | | | 0913-00-086 | | | | | | STP 2012(526) CONSTRUCT CURB RAMPS | | | | | | | | | | | | WORK ORDER- 06-18-12 WORK BEGAN- 03-11-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-16-12 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 103 PERCENT TIME USED- 68 | | | | | | | | | | | | TI-ZACK CONCRETE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-00-086 | | | | | | SPEEDY PAVING | |SUB %: 0.78 | | | | | | | | | | CONTRACT 05123015 | TOTALS | 495,921.40| 10,646.40| 332,943.45| 67.1| ************************************************************************************************************************************ DEWITT VARIOUS LOCATIONS | 0.100 | 475,081.00| 430,230.45| 430,230.45| 90.5| VA IN AUSTIN, MATAGORDA, & WHARTON CO. | | | | | | 0913-00-088 | | | | | | STP 2012(527) CONSTRUCT CURB RAMPS | | | | | | | | | | | | WORK ORDER- 06-18-12 WORK BEGAN- 04-05-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-16-12 | | | | | | CONTRACT WORKING DAYS- 165 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 98 PERCENT TIME USED- 59 | | | | | | | | | | | | TI-ZACK CONCRETE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-00-088 | | | | | | PAVEMENT MARKINGS INC. | |SUB %: 1.39 | | | | | | | | | | CONTRACT 05123217 | TOTALS | 475,081.00| 430,230.45| 430,230.45| 90.5| ************************************************************************************************************************************ DEWITT AT THOMAS CREEK | 0.197 | 739,543.00| 0.00| 0.00| 0.0| FM 952 STR # 0941-02-002 | | | | | | 0941-02-014 | | | | | | BR 2013(702) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HILL COUNTRY BRIDGE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0941-02-014 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133011 | TOTALS | 739,543.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DEWITT KARNES COUNTY LINE | 10.012 | 2,526,305.92| 56,484.12| 2,357,804.46| 93.3| SH 72 FM 2980 | | | | | | 0270-02-039 | | | | | | STP 2012(738) ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 08-21-12 WORK BEGAN- 09-10-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-06-12 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 18 | | | | | | WORKING DAYS CHARGED- 76 PERCENT TIME USED- 97 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0270-02-039 | | | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.49 | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 0.29 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 4.65 | | | | MURRAY CONSTRUCTION | |SUB %: 0.29 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.31 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 0.15 | | | | | | | | | | CONTRACT 07123027 | TOTALS | 2,526,305.92| 56,484.12| 2,357,804.46| 93.3| ************************************************************************************************************************************ DEWITT FM 237 | 5.650 | 2,737,650.86| 251,237.01| 873,111.69| 31.8| SH 72 4.79 MI. SOUTH OF US 87 | | | | | | 0270-01-049 | | | | | | STP 2013(072) ADD SHOULDERS | | | | | | | | | | | | WORK ORDER- 11-28-12 WORK BEGAN- 12-13-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-14-12 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 60 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0270-01-049 | | | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.29 | | | | D&S TEXAS ICON CONSTRUCTION, LLC | |SUB %: 0.72 | | | | DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) | |SUB %: 0.73 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 4.12 | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 0.44 | | | | MURRAY CONSTRUCTION | |SUB %: 0.32 | | | | M.V. HENKE ENTERPRISES, INC. | |SUB %: 0.48 | | | | RAMI MATERIALS TRANSPORT, LLC | |SUB %: 0.97 | | | | JUAN DEANDA TRUCKING, LLC DBA JUAN DEANDA TRUCKING | |SUB %: 0.97 | | | | | | | | | | CONTRACT 09123208 | TOTALS | 2,737,650.86| 251,237.01| 873,111.69| 31.8| ************************************************************************************************************************************ DEWITT 4.7 MI. WEST OF US 87 | 4.726 | 1,234,582.79| 3,095.64| 1,445,178.38| 99.9| SH 72 US 87 | | | | | | 0270-01-050 | | | | | | STP 2013(128) ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 11-14-12 WORK BEGAN- 02-13-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-30-12 | | | | | | CONTRACT WORKING DAYS- 15 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 15 PERCENT TIME USED- 100 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0270-01-050 | | | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.80 | | | | D&S TEXAS ICON CONSTRUCTION, LLC | |SUB %: 0.32 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 4.74 | | | | EGGEMEYER TREE SERVICE | |SUB %: 1.33 | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 0.29 | | | | | | | | | | CONTRACT 10123013 | TOTALS | 1,234,582.79| 3,095.64| 1,445,178.38| 99.9| ************************************************************************************************************************************ FAYETTE AT EAST NAVIDAD RIVER | 0.543 | 2,064,333.41| 150,226.96| 1,545,210.18| 74.8| US 90 STR # 0026-03-030 | | | | | | 0026-03-039 | | | | | | BR 2012(377) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 05-22-12 WORK BEGAN- 07-23-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-23-12 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 124 PERCENT TIME USED- 80 | | | | | | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0026-03-039 | | | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 2.68 | | | | KEYSTONE SITEWORK | |SUB %: 5.93 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.94 | | | | JUST GROOVING, LTD. | |SUB %: 0.26 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.58 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 5.60 | | | | BATTEN DRILLING, INC. | |SUB %: 0.35 | | | | CENTRAL CONSTRUCTION SERVICES, INC. | |SUB %: 0.31 | | | | | | | | | | CONTRACT 03123207 | TOTALS | 2,064,333.41| 150,226.96| 1,545,210.18| 74.8| ************************************************************************************************************************************ FAYETTE 1.03 MI. SOUTH OF FM 2436 | 6.136 | 7,342,654.52| 297,199.20| 4,358,951.57| 59.3| US 77 0.39 MI. SOUTH OF FM 956 | | | | | | 0268-02-034 | | | | | | STP 2012(484) ADD PASSING LANE FOR SUPER 2 HWY | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 06-19-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-19-12 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 150 PERCENT TIME USED- 83 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0268-02-034 | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.12 | | | | D&S TEXAS ICON CONSTRUCTION, LLC | |SUB %: 1.54 | | | | EGGEMEYER LAND CLEARING, LLC | |SUB %: 0.58 | | | | DUSTROL, INC. | |SUB %: 0.09 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 1.63 | | | | RELMCO, INC. | |SUB %: 16.94 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 2.14 | | | | MURRAY CONSTRUCTION | |SUB %: 0.59 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 0.12 | | | | | | | | | | CONTRACT 03123228 | TOTALS | 7,342,654.52| 297,199.20| 4,358,951.57| 59.3| ************************************************************************************************************************************ FAYETTE LEE COUNTY LINE | 12.321 | 3,046,231.73| 0.00| 0.00| 0.0| US 77 ROITSCH ST. IN LA GRANGE | | | | | | 0211-06-055 | | | | | | STP 2013(699) PAVEMENT REPAIR AND ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | KNIFE RIVER CORPORATION - SOUTH | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0211-06-055 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133212 | TOTALS | 3,046,231.73| 0.00| 0.00| 0.0| ************************************************************************************************************************************ FAYETTE SCHULENBURG SOUTH CITY LIMITS | 14.309 | 6,078,391.95| 279,249.20| 1,492,914.08| 24.5| US 77 LAVACA COUNTY LINE | | | | | | 0269-01-027 | | | | | | C 269-1-27 CONSTRUCT AUXILLARY LANES | | | | | | | | | | | | WORK ORDER- 09-13-12 WORK BEGAN- 12-11-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-12-12 | | | | | | CONTRACT WORKING DAYS- 210 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 84 PERCENT TIME USED- 40 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0269-01-027 | | | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 2.84 | | | | MURRAY CONSTRUCTION | |SUB %: 0.54 | | | | M.V. HENKE ENTERPRISES, INC. | |SUB %: 0.11 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.22 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 3.10 | | | | RELMCO, INC. | |SUB %: 5.29 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.37 | | | | | | | | | | CONTRACT 07123214 | TOTALS | 6,078,391.95| 279,249.20| 1,492,914.08| 24.5| ************************************************************************************************************************************ GONZALES US 90 | 9.180 | 5,947,632.83| 0.00| 0.00| 0.0| IH 10 FAYETTE C/L | | | | | | 0535-05-035 | | | | | | IM 0106(101) ACP SURFACING | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-01-13 | | | | | | CONTRACT WORKING DAYS- 96 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0535-05-035 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133003 | TOTALS | 5,947,632.83| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GONZALES AT LIVE OAK CREEK | 0.066 | 244,980.00| 0.00| 224,289.00| 96.1| CR (CR 354) AA03-54-001 | | | | | | 0913-22-034 | | | | | | BR 2010(525) STRUCTRUAL, GR, SURFACING | | | | | | | | | | | | WORK ORDER- 06-21-12 WORK BEGAN- 08-20-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-20-12 | | | | | | CONTRACT WORKING DAYS- 43 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 62 PERCENT TIME USED- 144 | | | | | | | | | | | | CONSTAR CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-22-034 | | | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 5.50 | | | | C. W. & A.,INC | |SUB %: 1.42 | | | | | | | | | | CONTRACT 05123021 | TOTALS | 244,980.00| 0.00| 224,289.00| 96.1| ************************************************************************************************************************************ GONZALES PARKING LOTS AND RV PULLOUTS | 0.001 | 330,812.00| 0.00| 0.00| 0.0| PW WITHIN PALMETTO STATE PARK | | | | | | 0913-22-045 | | | | | | C 913-22-45 WIDEN AND OVERLAY RV PULLOUTS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-09-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 35 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | RAMMING PAVING COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-22-045 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133016 | TOTALS | 330,812.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GONZALES AT DRAW | 0.293 | 1,055,377.51| 0.00| 0.00| 0.0| FM 108 STR # 0715-01-008 | | | | | | 0715-01-017 | | | | | | BR 2013(700) WIDEN BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BEAR CREEK CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0715-01-017 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133214 | TOTALS | 1,055,377.51| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GONZALES AT ELM CREEK BRANCH | 0.413 | 1,904,944.76| 0.00| 0.00| 0.0| FM 108 STR# 0715-02-014 | | | | | | 0715-02-013 | | | | | | BR 2013(701) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HILL COUNTRY BRIDGE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0715-02-013 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133218 | TOTALS | 1,904,944.76| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GONZALES CR 327 | 10.188 | 7,905,107.21| 63,675.70| 8,089,741.63| 99.9| US 183 1.1 MI. SOUTH OF FM 2067 | | | | | | 0154-02-026 | | | | | | NH 1102(417) CONSTRUCT AUXILIARY LANES | | | | | | | | | | | | WORK ORDER- 09-30-11 WORK BEGAN- 01-02-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-29-11 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 256 PERCENT TIME USED- 94 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0154-02-026 | | | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.21 | | | | DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) | |SUB %: 1.72 | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 0.22 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.81 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 1.96 | | | | MURRAY CONSTRUCTION | |SUB %: 0.35 | | | | BILL HALL JR. TRUCKING, LTD. | |SUB %: 0.93 | | | | PENNTEX MILLING, LLC | |SUB %: 0.05 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 0.41 | | | | | | | | | | CONTRACT 07113242 | TOTALS | 7,905,107.21| 63,675.70| 8,089,741.63| 99.9| ************************************************************************************************************************************ GONZALES AT FIVE MILE CREEK CR 298 | 0.139 | 426,647.41| 51,024.54| 172,423.81| 40.4| CR (CR 298) STR # AA02-98-002 | | | | | | 0913-22-038 | | | | | | BR 2011(597) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 02-05-13 WORK BEGAN- 03-12-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-12-13 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 27 PERCENT TIME USED- 36 | | | | | | | | | | | | AARON, DAVID CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-22-038 | | | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 8.10 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 4.97 | | | | O & S TRAFFIC SUPPLIES | |SUB %: 0.45 | | | | | | | | | | CONTRACT 12123016 | TOTALS | 426,647.41| 51,024.54| 172,423.81| 40.4| ************************************************************************************************************************************ JACKSON AT DRY CREEK CR 721 | 0.085 | 322,931.00| 0.00| 303,911.80| 98.1| CR (CR 317A) STR # AA02-77-001 | | | | | | 0913-18-022 | | | | | | BR 2011(303) STRUCTURAL, GR, SURFACING | | | | | | | | | | | | WORK ORDER- 03-16-12 WORK BEGAN- 06-15-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-15-12 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 97 PERCENT TIME USED- 129 | | | | | | | | | | | | CONSTAR CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-18-022 | | | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 7.14 | | | | | | | | | | CONTRACT 02123015 | TOTALS | 322,931.00| 0.00| 303,911.80| 98.1| ************************************************************************************************************************************ JACKSON ETC CR 407 | 159.987 | 6,398,283.46| 515,006.39| 1,003,663.95| 15.6| LP 521 ETC MENEFEE ST. IN EDNA | | | | | | 0089-11-004 | | | | | | STP 2013(127) SEAL COAT | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 02-25-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-25-13 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | F. N. PLOCH CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0089-11-004 | | | | | | BATTERSON,LLP | |SUB %: 13.97 | | | | | | | | | | CONTRACT 10123222 | TOTALS | 6,398,283.46| 515,006.39| 1,003,663.95| 15.6| ************************************************************************************************************************************ LAVACA MAIN STREET | 0.001 | 79,102.00| 0.00| 0.00| 0.0| FM 532 DEPOT STREET IN MOULTON | | | | | | 1007-03-019 | | | | | | STP 2013(350) LANDSCAPE PROJECT | | | | | | | | | | | | WORK ORDER- 03-06-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 41 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1007-03-019 | | | | | | HIGHWAY BARRICADES AND SERVICES, LLC | |SUB %: 2.71 | | | | | | | | | | CONTRACT 01133225 | TOTALS | 79,102.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LAVACA 0.821 MI. WEST OF US 77 | 10.501 | 2,314,921.52| 0.00| 0.00| 0.0| US 77A US 90A | | | | | | 0269-03-033 | | | | | | STP 2013(592) ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0269-03-033 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133019 | TOTALS | 2,314,921.52| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LAVACA AT SANDY CREEK | 0.197 | 674,856.10| 110,568.14| 614,987.75| 91.1| CR (CR 14A) STR # AA05-63-001 | | | | | | 0913-29-032 | | | | | | BR 2007(371) STRUCTURES, BASE, SURFACING | | | | | | | | | | | | WORK ORDER- 06-28-12 WORK BEGAN- 08-25-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-27-12 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 85 PERCENT TIME USED- 80 | | | | | | | | | | | | A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-29-032 | | | | | | DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) | |SUB %: 4.80 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 0.76 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.21 | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 0.57 | | | | SHINN & GREGORY, INC. | |SUB %: 7.16 | | | | EE CONSTRUCTION, LLC | |SUB %: 13.75 | | | | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | |SUB %: 14.60 | | | | | | | | | | CONTRACT 05123224 | TOTALS | 674,856.10| 110,568.14| 614,987.75| 91.1| ************************************************************************************************************************************ LAVACA DEWITT COUNTY LINE | 11.649 | 2,608,000.01| 0.00| 0.00| 0.0| SH 111 US 77 | | | | | | 0346-06-046 | | | | | | STP 2013(594) PAVEMENT REPAIR & ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-08-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0346-06-046 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133035 | TOTALS | 2,608,000.01| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LAVACA 0.20 MI SOUTH OF FM 318 | 14.415 | 9,709,623.41| 744,954.26| 2,614,602.30| 26.9| US 77 1.70 MI NORTH OF SH 111 | | | | | | 0370-01-033 | | | | | | C 370-1-33 CONSTRUCT AUXILLARY LANES | | | | | | | | | | | | WORK ORDER- 09-17-12 WORK BEGAN- 11-16-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-16-12 | | | | | | CONTRACT WORKING DAYS- 285 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 25 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0370-01-033 | | | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.19 | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 2.40 | | | | MURRAY CONSTRUCTION | |SUB %: 0.50 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 1.68 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.14 | | | | M.V. HENKE ENTERPRISES, INC. | |SUB %: 0.15 | | | | | | | | | | CONTRACT 07123219 | TOTALS | 9,709,623.41| 744,954.26| 2,614,602.30| 26.9| ************************************************************************************************************************************ LAVACA AT WILLOW CREEK CR 444 | 0.068 | 242,125.14| 24,436.53| 197,736.22| 81.6| CR (CR 122) STR # AA04-44-002 | | | | | | 0913-29-041 | | | | | | BR 2011(164) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 12-12-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-12-12 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 51 PERCENT TIME USED- 85 | | | | | | | | | | | | BPI ENVIRONMENTAL SERVICES INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-29-041 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.80 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 0.00 | | | | LARGE & SONS_FOUNDATION DRILLING,INC. | |SUB %: 9.47 | | | | | | | | | | CONTRACT 09123032 | TOTALS | 242,125.14| 24,436.53| 197,736.22| 81.6| ************************************************************************************************************************************ MATAGORDA FM 1301 | 9.516 | 376,154.50| 0.00| 354,579.74| 94.2| FM 1728 SH 35 | | | | | | 1686-01-013 | | | | | | STP 2011(780)HRR SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | WORK ORDER- 02-15-11 WORK BEGAN- 04-05-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-05-11 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 12 | | | | | | WORKING DAYS CHARGED- 117 PERCENT TIME USED- 100 | | | | | | | | | | | | STONERIDGE CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1686-01-013 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.73 | | | | | | | | | | CONTRACT 01113218 | TOTALS | 376,154.50| 0.00| 354,579.74| 94.2| ************************************************************************************************************************************ MATAGORDA AT COLORADO RIVER WEST RELIEF | 0.316 | 2,680,479.60| 403,367.46| 2,611,930.33| 97.5| FM 521 STR # 0846-03-012 | | | | | | 0846-03-037 | | | | | | BR 2012(523) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 06-14-12 WORK BEGAN- 09-04-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-13-12 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 110 PERCENT TIME USED- 104 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0846-03-037 | | | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.72 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.77 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.03 | | | | DUSTROL, INC. | |SUB %: 0.70 | | | | JMHP, INC. | |SUB %: 1.74 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.13 | | | | KOSSMAN CONTRACTING CO., INC. | |SUB %: 0.20 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 11.00 | | | | S & S BRIDGE PAINTING, INC. | |SUB %: 0.12 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 11.72 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.14 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.24 | | | | | | | | | | CONTRACT 05123034 | TOTALS | 2,680,479.60| 403,367.46| 2,611,930.33| 97.5| ************************************************************************************************************************************ MATAGORDA AT GIWW | 0.043 | 185,829.00| 0.00| 235,713.49| 99.9| FM 457 STR # 0605-01-016 | | | | | | 0605-01-058 | | | | | | BR 2012(522) STRINGER AND DECK REPAIR | | | | | | | | | | | | WORK ORDER- 06-21-12 WORK BEGAN- 01-03-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 33 ADDL DAYS GRANTED- 5 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 160 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0605-01-058 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 1.04 | | | | | | | | | | CONTRACT 05123037 | TOTALS | 185,829.00| 0.00| 235,713.49| 99.9| ************************************************************************************************************************************ MATAGORDA AT COLORADO RIVER EAST RELIEF | 0.384 | 3,358,617.20| 360,626.23| 2,295,324.30| 68.3| FM 521 STR # 0846-03-007 | | | | | | 0846-03-043 | | | | | | BR 2012(524) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-25-12 WORK BEGAN- 08-28-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-28-12 | | | | | | CONTRACT WORKING DAYS- 165 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 114 PERCENT TIME USED- 69 | | | | | | | | | | | | JASIRI CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0846-03-043 | | | | | | 5 J"S CONSTRUCTION GROUP, LLC | |SUB %: 4.46 | | | | DUSTROL, INC. | |SUB %: 0.57 | | | | EE CONSTRUCTION, LLC | |SUB %: 6.91 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.16 | | | | INDUSTRIAL CONSTRUCTION CO. | |SUB %: 1.96 | | | | KOSSMAN CONTRACTING CO., INC. | |SUB %: 0.17 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 12.81 | | | | ODUM SERVICES, L.P. | |SUB %: 3.75 | | | | S & S BRIDGE PAINTING, INC. | |SUB %: 0.23 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 9.66 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.11 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.54 | | | | LUPE RUBIO CONSTRUCTION CO., INC. | |SUB %: 8.33 | | | | HIGHWAY BARRICADES AND SERVICES, LLC | |SUB %: 0.76 | | | | | | | | | | CONTRACT 05123235 | TOTALS | 3,358,617.20| 360,626.23| 2,295,324.30| 68.3| ************************************************************************************************************************************ MATAGORDA SIDEWALKS CONNECTING ELEM. SCHOOLS | 1.736 | 363,182.49| 0.00| 293,135.89| 88.1| CS IN PALACIOS | | | | | | 0913-21-044 | | | | | | STP 1102(321)SRS CONSTRUCT SIDEWALKS | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 01-20-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-11-12 | | | | | | CONTRACT WORKING DAYS- 121 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 175 PERCENT TIME USED- 144 | | | | | | | | | | | | CONSTAR CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-21-044 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 1.65 | | | | D & P COASTAL MARINE CONSTRUCTION | |SUB %: 1.26 | | | | BATTERSON,LLP | |SUB %: 3.09 | | | | | | | | | | CONTRACT 08113252 | TOTALS | 363,182.49| 0.00| 293,135.89| 88.1| ************************************************************************************************************************************ VICTORIA ON CR 139 (ARNOLD ROAD) | 0.064 | 348,225.00| 0.00| 0.00| 0.0| CR AT DRAW STR # AA01-20-002 | | | | | | 0913-27-052 | | | | | | BR 2011(294) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 03-22-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | CONSTAR CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-27-052 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133027 | TOTALS | 348,225.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VICTORIA AT DRAW CR 39 | 0.061 | 264,835.00| 0.00| 0.00| 0.0| CR (NURSERY RD) #AA0146002 | | | | | | 0913-27-051 | | | | | | BR 2010(179) REP. STRUCTURE, BASE, GRADING | | | | | | | | | | | | WORK ORDER- 05-08-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | EASTER CONSTRUCTION INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-27-051 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133228 | TOTALS | 264,835.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VICTORIA 0.6 MI. WEST OF SALEM ROAD | 1.865 | 17,811,122.38| 1,125,758.46| 17,105,369.34| 96.7| LP 463 0.5 MI. EAST OF MOCKINGBIRD LN. | | | | | | 2350-01-043 | | | | | | PTF 2011(942) CONSTRUCT 2 4-LANE OVERPASSES | | | | | | | | | | | | WORK ORDER- 05-31-11 WORK BEGAN- 06-06-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-06-11 | | | | | | CONTRACT WORKING DAYS- 285 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 371 PERCENT TIME USED- 129 | | | | | | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2350-01-043 | | | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 3.04 | | | | ATS DRILLING, L.P. | |SUB %: 1.11 | | | | DORAN STEEL, INC. | |SUB %: 0.16 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.78 | | | | J & M CONTRACTING, COMPANY | |SUB %: 8.58 | | | | M & M INDUSTRIAL PAINTING | |SUB %: 0.04 | | | | MURRAY CONSTRUCTION | |SUB %: 0.26 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.04 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 0.59 | | | | MERCER CONSTRUCTION CO. | |SUB %: 0.25 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.06 | | | | PENNTEX MILLING INC. | |SUB %: 0.11 | | | | AARON CONCRETE CONTRACTORS, L.P. | |SUB %: 1.67 | | | | SOUTH TEXAS INDUSTRIAL COATINGS, L.L.C. | |SUB %: 0.06 | | | | | | | | | | CONTRACT 03113224 | TOTALS | 17,811,122.38| 1,125,758.46| 17,105,369.34| 96.7| ************************************************************************************************************************************ VICTORIA 0.02 MI. NORTH OF LOOP 463 | 3.446 | 14,995,694.93| 0.00| 0.00| 0.0| US 59 0.03 MI. NORTH OF US 87 | | | | | | 0088-05-089 | | | | | | C 88-5-89 CONSTRUCT FRONTAGE ROADS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-15-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HUNTER INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0088-05-089 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133205 | TOTALS | 14,995,694.93| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WHARTON FM 961 | 6.837 | 3,624,360.17| 43,175.00| 3,828,954.15| 99.9| US 59 0.45 MI. EAST OF FM 960 | | | | | | 0089-07-143 | | | | | | NH 2012(350) PAVEMENT REPAIR AND ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 03-16-12 WORK BEGAN- 05-08-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-01-12 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 90 PERCENT TIME USED- 112 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0089-07-143 | | | | | | BATTERSON,LLP | |SUB %: 2.39 | | | | CHEROKEE SERVICES | |SUB %: 1.27 | | | | | | | | | | CONTRACT 02123215 | TOTALS | 3,624,360.17| 43,175.00| 3,828,954.15| 99.9| ************************************************************************************************************************************ WHARTON FM 102 | 10.413 | 2,257,894.57| 0.00| 0.00| 0.0| FM 1161 SH 60 | | | | | | 1303-01-017 | | | | | | STP 2013(486)HES WIDEN ROADWAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JAMES CONSTRUCTION GROUP, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1303-01-017 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133033 | TOTALS | 2,257,894.57| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WHARTON 0.215 MI. S. OF AUSTIN COUNTY LINE | 4.819 | 2,921,571.83| 0.00| 0.00| 0.0| SH 60 US 90A | | | | | | 0240-02-030 | | | | | | STP 2013(485) RESTORE ROADWAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JAMES CONSTRUCTION GROUP, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0240-02-030 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133234 | TOTALS | 2,921,571.83| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WHARTON BU 59 SOUTH OF EL CAMPO | 1.978 | 663,365.15| 0.00| 0.00| 0.0| US 59 SL 524 NORTH OF HILLJE (NB ONLY) | | | | | | 0089-06-028 | | | | | | NH 2013(590) PAVEMENT REPAIR & SURFACING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JAMES CONSTRUCTION GROUP, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0089-06-028 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133028 | TOTALS | 663,365.15| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WHARTON AT TRES PALACIOS RIVER IN EL CAMPO | 0.164 | 1,218,475.90| 0.00| 0.00| 0.0| SH 71 STR # 0266-06-036 | | | | | | 0266-06-044 | | | | | | BR 2013(593) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 135 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | MENADE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0266-06-044 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133229 | TOTALS | 1,218,475.90| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WHARTON AT BLUE CREEK | 0.065 | 410,212.89| 35,029.00| 292,864.62| 74.7| CR EAST CALHOUN ST. #C003-45-001 | | | | | | 0913-09-045 | | | | | | BR 1102(207) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 08-21-12 WORK BEGAN- 11-07-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-20-12 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 83 PERCENT TIME USED- 138 | | | | | | | | | | | | REXCO CONSTRUCTION SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-09-045 | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.58 | | | | SPECIALTY DRILLING, LTD. | |SUB %: 5.68 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.29 | | | | | | | | | | CONTRACT 07123016 | TOTALS | 410,212.89| 35,029.00| 292,864.62| 74.7| ************************************************************************************************************************************ WHARTON 0.27 MI. WEST OF FM 960 | 4.109 | 2,875,006.16| 459,465.60| 1,332,108.87| 46.3| FM 102 0.53 MI. WEST OF WHARTON CITY LIMIT | | | | | | 0709-02-047 | | | | | | STP 2013(073) ADD SHOULDERS | | | | | | | | | | | | WORK ORDER- 11-01-12 WORK BEGAN- 01-07-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-31-12 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 58 PERCENT TIME USED- 55 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0709-02-047 | | | | | | BATTERSON,LLP | |SUB %: 3.79 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 7.45 | | | | SEMARCK LANDSCAPE SERVICES, INC. | |SUB %: 0.64 | | | | | | | | | | CONTRACT 09123247 | TOTALS | 2,875,006.16| 459,465.60| 1,332,108.87| 46.3| ************************************************************************************************************************************ WHARTON 0.1 MI. EAST OF US 59 | 9.350 | 1,812,780.35| 415,204.23| 565,975.23| 31.2| FM 1162 0.07 MI. SOUTH OF CR 422 | | | | | | 1304-01-018 | | | | | | STP 2013(245)HES WIDEN ROADWAY | | | | | | | | | | | | WORK ORDER- 01-18-13 WORK BEGAN- 02-18-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-03-13 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 47 PERCENT TIME USED- 44 | | | | | | | | | | | | BRANNAN PAVING CO., LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1304-01-018 | | | | | | MURRAY CONSTRUCTION | |SUB %: 1.36 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 3.06 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 4.17 | | | | STAFF CONCRETE | |SUB %: 5.87 | | | | | | | | | | CONTRACT 12123031 | TOTALS | 1,812,780.35| 415,204.23| 565,975.23| 31.2| ************************************************************************************************************************************ WHARTON AT BLUE CREEK # 1 CR 421 | 0.213 | 1,070,386.80| 298,207.83| 618,800.03| 57.8| CR (CR 421) STR # AA04-00-001 | | | | | | 0913-09-047 | | | | | | BR 2011(926) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 01-29-13 WORK BEGAN- 02-25-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-04-13 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 34 PERCENT TIME USED- 22 | | | | | | | | | | | | JOHN REED AND COMPANY, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0913-09-047 | | | | | | KOSSMAN CONTRACTING CO., INC. | |SUB %: 0.19 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 1.41 | | | | ODUM SERVICES, L.P. | |SUB %: 3.01 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.32 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 2.92 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.06 | | | | | | | | | | CONTRACT 12123233 | TOTALS | 1,070,386.80| 298,207.83| 618,800.03| 57.8| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 163,499,204.24 DISTRICT ESTIMATES THIS MONTH 7,611,469.66 DISTRICT TOTAL ESTIMATES PAID TO DATE 65,615,262.35