| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | MONTAGUE |
| Highway |
US0082 |
| From |
VARIOUS LOCATIONS |
| To |
IN MONTAGUE AND COOKE COUNTIES |
| CSJ |
6099-22-001 |
| Proj ID |
RMC - 609922001 |
| Work Type |
LITTER PICKUP AND DISPOSAL |
| |
|
0.001 |
40695.80 |
0.00 |
25009.60 |
61.4 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-18-03 |
| Work Began |
07-21-03 |
| Work Completed |
|
| Time Computed |
07-25-03 |
| Contract Working Days |
79 |
| Addl Days Granted |
0 |
| Working Days Charged |
19 |
| Percent Time Used |
24 |
| Contractor(s) |
| KIJAN ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6099-22-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05030301 |
|
Totals |
40695.80 |
0.00 |
25009.60 |
61.4 |
|
| County | MONTAGUE |
| Highway |
US0287 |
| From |
VARIOUS LOCATIONS |
| To |
IN MONTAGUE AND CLAY COUNTIES |
| CSJ |
6099-25-001 |
| Proj ID |
RMC - 609925001 |
| Work Type |
LITTER PICKUP AND DISPOSAL |
| |
|
0.001 |
42925.00 |
0.00 |
33319.00 |
77.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-03-03 |
| Work Began |
07-07-03 |
| Work Completed |
|
| Time Computed |
07-10-03 |
| Contract Working Days |
81 |
| Addl Days Granted |
0 |
| Working Days Charged |
26 |
| Percent Time Used |
32 |
| Contractor(s) |
| KIJAN ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6099-25-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05030302 |
|
Totals |
42925.00 |
0.00 |
33319.00 |
77.6 |
|
| County | WILBARGER |
| Highway |
FM 2585 |
| From |
VARIOUS LOCATIONS |
| To |
IN WILBARGER COUNTY |
| CSJ |
6100-42-001 |
| Proj ID |
RMC - 610042001 |
| Work Type |
HOT MIX LEVEL - UP |
| |
|
5.000 |
229300.00 |
0.00 |
232209.74 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-12-03 |
| Work Began |
07-12-03 |
| Work Completed |
|
| Time Computed |
07-12-03 |
| Contract Working Days |
15 |
| Addl Days Granted |
0 |
| Working Days Charged |
8 |
| Percent Time Used |
53 |
| Contractor(s) |
| BICK'S CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6100-42-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06030301 |
|
Totals |
229300.00 |
0.00 |
232209.74 |
99.9 |
|
| County | MONTAGUE |
| Highway |
US 287 |
| From |
VARIOUS LOCATIONS IN |
| To |
MONTAGUE AND CLAY COUNTY |
| CSJ |
6113-14-001 |
| Proj ID |
RMC - 611314001 |
| Work Type |
LITTER PICKUP AND DISPOSAL |
| |
|
0.001 |
43808.65 |
0.00 |
11504.21 |
29.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-08-04 |
| Work Began |
10-11-04 |
| Work Completed |
|
| Time Computed |
10-15-04 |
| Contract Working Days |
95 |
| Addl Days Granted |
0 |
| Working Days Charged |
31 |
| Percent Time Used |
32 |
| Contractor(s) |
| COMMERCIAL SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6113-14-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05040302 |
|
Totals |
43808.65 |
0.00 |
11504.21 |
29.6 |
|
| County | MONTAGUE |
| Highway |
US 82 |
| From |
VARIOUS LOCATIONS IN MONTAGUE |
| To |
AND CLAY COUNTIES |
| CSJ |
6114-24-001 |
| Proj ID |
RMC - 611424001 |
| Work Type |
LITTER PICKUP AND DISPOSAL |
| |
|
0.001 |
35207.20 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
12-17-04 |
| Work Began |
01-26-05 |
| Work Completed |
|
| Time Computed |
12-24-04 |
| Contract Working Days |
87 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| COMMERCIAL SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6114-24-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05040303 |
|
Totals |
35207.20 |
0.00 |
0.00 |
0.0 |
|
| County | COOKE |
| Highway |
IH0035 |
| From |
VARIOUS LOCATIONS IN |
| To |
WICHITA FALLS DISTRICT |
| CSJ |
6149-50-001 |
| Proj ID |
RMC - 614950001 |
| Work Type |
ONCALL REPAIR AND / OR INST. LOOP DETECTOR |
| |
|
0.001 |
91575.00 |
0.00 |
26857.95 |
29.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-14-07 |
| Work Began |
02-22-07 |
| Work Completed |
|
| Time Computed |
02-14-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
595 |
| Percent Time Used |
81 |
| Contractor(s) |
| SIG-OP SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6149-50-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12060301 |
|
Totals |
91575.00 |
0.00 |
26857.95 |
29.3 |
|
| County | COOKE |
| Highway |
US0082 |
| From |
VARIOUS LOCATION IN |
| To |
COOKE COUNTY |
| CSJ |
6159-63-001 |
| Proj ID |
SUP - 615963001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
0.001 |
97022.46 |
0.00 |
65074.16 |
67.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
03-01-07 |
| Work Began |
03-01-07 |
| Work Completed |
|
| Time Computed |
03-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
580 |
| Percent Time Used |
79 |
| Contractor(s) |
TIBH INDUSTRIES, INC. MHMR SERVICES OF TEXOMA |
SUBCONTRACTOR(S) FOR CCSJ: 6159-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03070332 |
|
Totals |
97022.46 |
0.00 |
65074.16 |
67.0 |
|
| County | MONTAGUE |
| Highway |
US0081 |
| From |
VARIOUS LOCATIONS IN |
| To |
MONTAGUE COUNTY |
| CSJ |
6159-68-001 |
| Proj ID |
SUP - 615968001 |
| Work Type |
PICNIC AREA MAINT. & LITTER REMOVAL |
| |
|
0.001 |
133092.00 |
0.00 |
89222.00 |
67.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-01-07 |
| Work Began |
04-01-07 |
| Work Completed |
|
| Time Computed |
04-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
549 |
| Percent Time Used |
75 |
| Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6159-68-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070332 |
|
Totals |
133092.00 |
0.00 |
89222.00 |
67.0 |
|
| County | MONTAGUE |
| Highway |
US0082 |
| From |
VARIOUST LOCATIONS IN |
| To |
MONTAGUE COUNTY |
| CSJ |
6159-69-001 |
| Proj ID |
SUP - 615969001 |
| Work Type |
PICNIC AREA MAINT & LITTER REMOVAL |
| |
|
0.001 |
74328.50 |
0.00 |
51058.75 |
68.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-01-07 |
| Work Began |
04-01-07 |
| Work Completed |
|
| Time Computed |
04-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
549 |
| Percent Time Used |
75 |
| Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6159-69-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070333 |
|
Totals |
74328.50 |
0.00 |
51058.75 |
68.6 |
|
| County | COOKE |
| Highway |
US0082 |
| From |
MAINTENANCE/AREA COMPLEX |
| To |
IN COOKE COUNTY |
| CSJ |
6159-70-001 |
| Proj ID |
SUP - 615970001 |
| Work Type |
JANITORIAL & GROUNDS MAINTENANCE |
| |
|
0.001 |
73689.00 |
0.00 |
45525.45 |
61.7 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-01-07 |
| Work Began |
04-01-07 |
| Work Completed |
|
| Time Computed |
04-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
549 |
| Percent Time Used |
75 |
| Contractor(s) |
TIBH INDUSTRIES, INC. LIBERTY PROCLAIMED MINISTRY |
SUBCONTRACTOR(S) FOR CCSJ: 6159-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070334 |
|
Totals |
73689.00 |
0.00 |
45525.45 |
61.7 |
|
| County | COOKE |
| Highway |
IH0035 |
| From |
VARIOUS LOCATION IN |
| To |
COOKE COUNTY |
| CSJ |
6162-57-001 |
| Proj ID |
RMC - 616257001 |
| Work Type |
LITTER PICKUP & REMOVAL |
| |
|
0.001 |
185820.24 |
5580.90 |
122000.70 |
65.6 |
| Work Order |
07-01-07 |
| Work Began |
07-01-07 |
| Work Completed |
|
| Time Computed |
07-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
489 |
| Percent Time Used |
66 |
| Contractor(s) |
| METRO-TEX UTILITIES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6162-57-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06070302 |
|
Totals |
185820.24 |
5580.90 |
122000.70 |
65.6 |
|
| County | MONTAGUE |
| Highway |
US0287 |
| From |
VARIOUS LOCATION IN CLAY |
| To |
MONTAGUE, COOKE COUNTIES |
| CSJ |
6162-58-001 |
| Proj ID |
RMC - 616258001 |
| Work Type |
LITTER PICKUP & DISPOSAL |
| |
|
0.001 |
190999.93 |
6243.86 |
121147.34 |
63.4 |
| Work Order |
07-31-07 |
| Work Began |
08-01-07 |
| Work Completed |
|
| Time Computed |
08-07-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
458 |
| Percent Time Used |
62 |
| Contractor(s) |
| MINISTRY OF PROPERTY SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6162-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06070303 |
|
Totals |
190999.93 |
6243.86 |
121147.34 |
63.4 |
|
| County | WILBARGER |
| Highway |
US0287 |
| From |
FANNIN STREET |
| To |
BOWIE STREET IN VERNON |
| CSJ |
6162-59-001 |
| Proj ID |
RMC - 616259001 |
| Work Type |
LANDSCAPE MAINTENANCE |
| |
|
0.001 |
12535.56 |
0.00 |
5571.36 |
44.4 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-01-07 |
| Work Began |
08-21-07 |
| Work Completed |
|
| Time Computed |
08-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
427 |
| Percent Time Used |
58 |
| Contractor(s) |
| PRO LAWN |
SUBCONTRACTOR(S) FOR CCSJ: 6162-59-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07070301 |
|
Totals |
12535.56 |
0.00 |
5571.36 |
44.4 |
|
| County | COOKE |
| Highway |
IH0035 |
| From |
VARIOUS LOCATIONS IN |
| To |
COOKE COUNTY |
| CSJ |
6163-03-001 |
| Proj ID |
SUP - 616303001 |
| Work Type |
LANDSCAPE MAINTENANCE SERVICES |
| |
|
0.001 |
36414.00 |
0.00 |
16065.00 |
44.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
06-01-07 |
| Work Began |
06-01-07 |
| Work Completed |
|
| Time Computed |
06-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
488 |
| Percent Time Used |
66 |
| Contractor(s) |
TIBH INDUSTRIES, INC. MHMR SERVICES OF TEXOMA |
SUBCONTRACTOR(S) FOR CCSJ: 6163-03-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06070335 |
|
Totals |
36414.00 |
0.00 |
16065.00 |
44.1 |
|
| County | COOKE |
| Highway |
IH0035 |
| From |
GROUNDS MAINTENANCE AT GAINESVILLE |
| To |
TRAVEL INFORMATION CENTER |
| CSJ |
6164-52-001 |
| Proj ID |
SUP - 616452001 |
| Work Type |
GROUNDS MAINTENANCE |
| |
|
0.001 |
103782.72 |
0.00 |
60539.92 |
58.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-01-07 |
| Work Began |
08-01-07 |
| Work Completed |
|
| Time Computed |
08-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
427 |
| Percent Time Used |
58 |
| Contractor(s) |
TIBH INDUSTRIES, INC. PCSI, INC |
SUBCONTRACTOR(S) FOR CCSJ: 6164-52-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08070332 |
|
Totals |
103782.72 |
0.00 |
60539.92 |
58.3 |
|
| County | WICHITA |
| Highway |
IH0044 |
| From |
VARIOUS LOCATION IN |
| To |
WICHITA COUNTY |
| CSJ |
6167-37-001 |
| Proj ID |
SUP - 616737001 |
| Work Type |
PICNIC & LANDSCAPE AREA MAINTENANCE |
| |
|
0.001 |
41387.55 |
0.00 |
39718.47 |
95.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-01-07 |
| Work Began |
09-01-07 |
| Work Completed |
|
| Time Computed |
09-01-07 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
396 |
| Percent Time Used |
108 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORK SERVICES CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 6167-37-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09070331 |
|
Totals |
41387.55 |
0.00 |
39718.47 |
95.9 |
|
| County | WILBARGER |
| Highway |
US0070 |
| From |
VARIOUS LOCATIONS IN |
| To |
WILBARGER & WICHITA COUNTIES |
| CSJ |
6169-00-001 |
| Proj ID |
RMC - 616900001 |
| Work Type |
ROUTINE STREET SWEEPING & DEBRIS REMOVAL |
| |
|
0.001 |
263507.80 |
29809.45 |
148123.35 |
56.2 |
| Work Order |
02-01-08 |
| Work Began |
02-07-08 |
| Work Completed |
|
| Time Computed |
02-08-08 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
268 |
| Percent Time Used |
73 |
| Contractor(s) |
| WILSON CONTRACTING |
SUBCONTRACTOR(S) FOR CCSJ: 6169-00-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11070302 |
|
Totals |
263507.80 |
29809.45 |
148123.35 |
56.2 |
|
| County | COOKE |
| Highway |
IH0035 |
| From |
VARIOUS LOCATIONS IN |
| To |
WICHITA FALLS DISTRICT |
| CSJ |
6169-01-001 |
| Proj ID |
RMC - 616901001 |
| Work Type |
ROUTINE STREET SWEEPING |
| |
|
0.001 |
247084.40 |
0.00 |
108684.20 |
43.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-01-08 |
| Work Began |
02-04-08 |
| Work Completed |
|
| Time Computed |
02-08-08 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
240 |
| Percent Time Used |
65 |
| Contractor(s) |
| C & D MAINTENANCE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6169-01-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11070303 |
|
Totals |
247084.40 |
0.00 |
108684.20 |
43.9 |
|
| County | WICHITA |
| Highway |
US0082 |
| From |
GROUNDS MAINTENANCE AT |
| To |
WFS AREA OFFICE |
| CSJ |
6171-62-001 |
| Proj ID |
SUP - 617162001 |
| Work Type |
GROUNDS MAINTENANCE |
| |
|
0.001 |
17362.92 |
0.00 |
5356.47 |
30.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-01-07 |
| Work Began |
10-01-07 |
| Work Completed |
|
| Time Computed |
10-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
366 |
| Percent Time Used |
50 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORK SERVICES CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 6171-62-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10070331 |
|
Totals |
17362.92 |
0.00 |
5356.47 |
30.8 |
|
| County | YOUNG |
| Highway |
US0380 |
| From |
VARIOUS LOCATIONS IN |
| To |
YOUNG & ARCHER COUNTIES |
| CSJ |
6173-11-001 |
| Proj ID |
RMC - 617311001 |
| Work Type |
LITTER PICKUP & REMOVAL |
| |
|
0.001 |
74582.84 |
0.00 |
2899.62 |
3.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
03-21-08 |
| Work Began |
03-27-08 |
| Work Completed |
|
| Time Computed |
03-28-08 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
4 |
| Percent Time Used |
0 |
| Contractor(s) |
| ANED CONSULTANTS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6173-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12070301 |
|
Totals |
74582.84 |
0.00 |
2899.62 |
3.8 |
|