MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 03 AS OF MAY 15, 2013 PAGE 7 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ BAYLOR 2.78 MILES EAST OF RM 1919 | 5.896 | 10,550,963.24| 348,744.81| 5,283,310.28| 50.0| US 277 0.64 MILES EAST OF US 183/283 | | | | | | 0156-06-039 | | | | | | C 156-6-39 WIDEN NON-FREEWAY | | | | | | | | | | | | WORK ORDER- 08-20-12 WORK BEGAN- 09-10-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-10-12 | | | | | | CONTRACT WORKING DAYS- 269 ADDL DAYS GRANTED- 10 | | | | | | WORKING DAYS CHARGED- 144 PERCENT TIME USED- 51 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0156-06-039 | | | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 0.26 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.28 | | | | W.S. CONSTRUCTION COMPANY | |SUB %: 6.55 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.10 | | | | ZACK BURKETT CO. | |SUB %: 26.33 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 1.32 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.08 | | | | | | | | | | CONTRACT 06123203 | TOTALS | 10,550,963.24| 348,744.81| 5,283,310.28| 50.0| ************************************************************************************************************************************ BAYLOR US 82 | 0.847 | 3,332,046.95| 89,766.00| 1,347,124.26| 40.4| FM 422 EAST CITY LIMITS OF SEYMOUR | | | | | | 0814-01-027 | | | | | | C 814-1-27 UPGRADING OF A NON-FREEWAY FACILITY | | | | | | | | | | | | WORK ORDER- 09-13-12 WORK BEGAN- 02-11-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-11-13 | | | | | | CONTRACT WORKING DAYS- 245 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 45 PERCENT TIME USED- 18 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0814-01-027 | | | | | | W.S. CONSTRUCTION COMPANY | |SUB %: 36.49 | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 0.56 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.55 | | | | ZACK BURKETT CO. | |SUB %: 26.68 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.02 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 4.81 | | | | | | | | | | CONTRACT 07123006 | TOTALS | 3,332,046.95| 89,766.00| 1,347,124.26| 40.4| ************************************************************************************************************************************ BAYLOR KNOX COUNTY LINE | 11.161 | 11,926,754.60| 615,039.37| 1,128,349.57| 9.4| US 277 2.155 MILES WEST OF US 183 | | | | | | 0157-01-062 | | | | | | NH 2013(235) WIDEN NON-FREEWAY | | | | | | | | | | | | WORK ORDER- 02-06-13 WORK BEGAN- 03-25-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-25-13 | | | | | | CONTRACT WORKING DAYS- 385 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 23 PERCENT TIME USED- 5 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0157-01-062 | | | | | | W.S. CONSTRUCTION COMPANY | |SUB %: 5.55 | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 0.36 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.07 | | | | ZACK BURKETT CO. | |SUB %: 26.21 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.40 | | | | | | | | | | CONTRACT 12123202 | TOTALS | 11,926,754.60| 615,039.37| 1,128,349.57| 9.4| ************************************************************************************************************************************ CLAY EAST CITY LIMITS OF HENRIETTA | 12.888 | 5,114,930.10| 0.00| 0.00| 0.0| US 82 MONTAGUE COUNTY LINE | | | | | | 0044-03-047 | | | | | | NH 2013(784) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 177 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ZACK BURKETT CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0044-03-047 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133021 | TOTALS | 5,114,930.10| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COOKE NEAR CR 450 | 16.030 | 1,701,551.66| 0.00| 0.00| 0.0| FM 373 US 82 | | | | | | 0823-01-028 | | | | | | STP 2013(337) RESTORATION | | | | | | | | | | | | WORK ORDER- 03-19-13 WORK BEGAN- 05-01-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-04-13 | | | | | | CONTRACT WORKING DAYS- 69 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 10 PERCENT TIME USED- 14 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0823-01-028 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.30 | | | | LANCO TURF & SEEDING, INC. | |SUB %: 1.30 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.19 | | | | | | | | | | CONTRACT 01133214 | TOTALS | 1,701,551.66| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COOKE AT ROCK CREEK (WEST BOUND) | 0.151 | 1,434,092.60| 0.00| 0.00| 0.0| US 82 . | | | | | | 0045-01-056 | | | | | | BR 2013(399) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 04-11-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HODGES AND SON CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0045-01-056 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133009 | TOTALS | 1,434,092.60| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COOKE FM 1306 | 11.855 | 2,224,039.60| 0.00| 0.00| 0.0| FM 51 FM 922 | | | | | | 0312-01-072 | | | | | | STP 2013(469) ASPHALTIC CONCRETE PAVEMENT OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 39 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0312-01-072 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133212 | TOTALS | 2,224,039.60| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COOKE NEAR FM 1202 | 12.652 | 14,049,262.01| 162,661.39| 13,950,084.87| 99.2| IH 35 ETC NEAR US 82 | | | | | | 0194-02-087 | | | | | | STP 2011(441)ES UPGRADING OF FREEWAY FACILITY | | | | | | | | | | | | WORK ORDER- 11-04-10 WORK BEGAN- 02-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-14-11 | | | | | | CONTRACT WORKING DAYS- 600 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 558 PERCENT TIME USED- 93 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0194-02-087 | | | | | | WRIGHT CONSTRUCTION CO., INC. | |SUB %: 13.36 | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 9.73 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.12 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.04 | | | | FARR FOUNDATION, INC. | |SUB %: 0.14 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 7.70 | | | | LONE STAR MANHOLE & STRUCTURES, LLC | |SUB %: 1.98 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.23 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.18 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.25 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.15 | | | | BREDA COMPANY, INC. | |SUB %: 0.78 | | | | SKAGGS ROAD BORING INC. | |SUB %: 3.17 | | | | C & C DIRECTIONAL BORING | |SUB %: 0.20 | | | | J. E. GUZMAN CONSTRUCTION, INC. | |SUB %: 0.09 | | | | RUSSO CORPORATION | |SUB %: 0.19 | | | | KEY'S TAPPING & CONSTRUCTION SERVICES, INC. | |SUB %: 0.00 | | | | A & A CONSTRUCTION | |SUB %: 0.59 | | | | A-1 ASPHALT PAVING | |SUB %: 0.08 | | | | MCRYAN HAULING, INC. | |SUB %: 0.51 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.56 | | | | PACIFIC PAINT CO. | |SUB %: 1.17 | | | | ANTIGO CONSTRUCTION, INC. | |SUB %: 0.17 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.36 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.30 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.07 | | | | GLS MASONRY, INC. | |SUB %: 0.50 | | | | DOWN UNDER CONSTRUCTION | |SUB %: 0.02 | | | | | | | | | | CONTRACT 09103002 | TOTALS | 14,049,262.01| 162,661.39| 13,950,084.87| 99.2| ************************************************************************************************************************************ MONTAGUE CR 410 (DEEN ROAD) AT BRANCH OF | 0.200 | 616,009.30| 0.00| 0.00| 0.0| CR DENTON CREEK | | | | | | 0903-28-049 | | | | | | BR 2012(768) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 04-30-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-26-13 | | | | | | CONTRACT WORKING DAYS- 101 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 2 PERCENT TIME USED- 1 | | | | | | | | | | | | HODGES AND SON CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0903-28-049 | | | | | | ODUM SERVICES, L.P. | |SUB %: 3.23 | | | | CROSSROADS, L.P. | |SUB %: 0.68 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.42 | | | | | | | | | | CONTRACT 02133221 | TOTALS | 616,009.30| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MONTAGUE FRUITLAND ROAD | 5.019 | 3,739,358.56| 7,394.40| 3,736,370.10| 99.9| US 81 WISE COUNTY LINE (SBL) | | | | | | 0013-05-055 | | | | | | NH 2012(355) REHABILITAITON OF EXISTING ROADWAY | | | | | | | | | | | | WORK ORDER- 05-16-12 WORK BEGAN- 09-06-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-01-12 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 16 | | | | | | WORKING DAYS CHARGED- 145 PERCENT TIME USED- 106 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0013-05-055 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 3.96 | | | | DUSTROL, INC. | |SUB %: 1.28 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 24.71 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 2.18 | | | | W.O.E. CONSTRUCTION | |SUB %: 1.61 | | | | GJ SEEDING, LLC | |SUB %: 1.40 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.12 | | | | INTERSTATE IMPROVEMENT, INC. | |SUB %: 3.63 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.68 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.90 | | | | | | | | | | CONTRACT 03123016 | TOTALS | 3,739,358.56| 7,394.40| 3,736,370.10| 99.9| ************************************************************************************************************************************ MONTAGUE MONTAGUE | 14.179 | 3,371,976.79| 0.00| 0.00| 0.0| FM 455 FM 1749 | | | | | | 0845-01-016 | | | | | | STP 2013(686) REHABILTATION OF EXISTING ROADWAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 151 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0845-01-016 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133231 | TOTALS | 3,371,976.79| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MONTAGUE AT UP RR, 0.8 MI WEST OF US 81 | 0.589 | 6,249,421.47| 339,564.37| 4,843,040.39| 77.4| US 82 NEAR RINGGOLD | | | | | | 0044-04-044 | | | | | | STP 1102(216)RGS REPLACE EXISTING BRIDGE FACILITY | | | | | | | | | | | | WORK ORDER- 09-06-11 WORK BEGAN- 01-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-05-11 | | | | | | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 210 PERCENT TIME USED- 82 | | | | | | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0044-04-044 | | | | | | TEXAS SHAFTS, INC. | |SUB %: 2.66 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.31 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.11 | | | | JM MATERIALS, INC. | |SUB %: 0.14 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 0.53 | | | | TRAC-WORK, INC. | |SUB %: 9.59 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.22 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.32 | | | | MOBILE ENTERPRISES, INC. | |SUB %: 1.39 | | | | ERWIN STEEL WORKS, LLC | |SUB %: 0.52 | | | | ODUM SERVICES, L.P. | |SUB %: 0.28 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 7.92 | | | | AR DANIEL SERVICES | |SUB %: 0.91 | | | | J. E. GUZMAN CONSTRUCTION, INC. | |SUB %: 0.26 | | | | MAXIM CRANE WORKS | |SUB %: 0.12 | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 0.60 | | | | | | | | | | CONTRACT 08113202 | TOTALS | 6,249,421.47| 339,564.37| 4,843,040.39| 77.4| ************************************************************************************************************************************ MONTAGUE 1.42 MILES NORTH OF STAR MANN ROAD | 5.000 | 2,497,972.59| 170,020.55| 607,547.48| 24.3| FM 677 0.136 MILES SW OF FM 1630 | | | | | | 1352-01-019 | | | | | | STP 2013(152)HES REHABILITATION OF EXISTING ROADWAY | | | | | | | | | | | | MONTAGUE US 82 | 4.112 | 606,688.27| 0.00| 0.00| 0.0| FM 677 1.42 MI NORTH OF STAR MANN ROAD | | | | | | 1352-01-020 | | | | | | STP 2013(153) REHABILITATION OF EXISTING ROADWAY | | | | | | | | | | | | WORK ORDER- 12-03-12 WORK BEGAN- 01-21-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-21-13 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 45 PERCENT TIME USED- 30 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1352-01-019 | | | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 8.81 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.85 | | | | HJC FARMS, INC. | |SUB %: 0.95 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.45 | | | | J. E. GUZMAN CONSTRUCTION, INC. | |SUB %: 1.94 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.42 | | | | | | | | | | CONTRACT 11123219 | TOTALS | 3,104,660.86| 170,020.55| 607,547.48| 19.5| ************************************************************************************************************************************ MONTAGUE ETC WEST CITY LIMITS OF NOCONA | 4.640 | 1,327,705.84| 0.00| 0.00| 0.0| US 82 ETC NEAR SEVENTH STREET | | | | | | 0044-04-057 | | | | | | NH 2013(232) OVERLAY | | | | | | | | | | | | WORK ORDER- 02-13-13 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-14-13 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ZACK BURKETT CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0044-04-057 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12123227 | TOTALS | 1,327,705.84| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WICHITA NEAR MAURINE STREET | 2.500 | 145,604.00| 0.00| 0.00| 0.0| IH 44 . | | | | | | 0043-09-120 | | | | | | IM 0448(015) MISCELLANEOUS CONSTRUCTION | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ANALYTICAL TECHNOLOGY CONSULTANTS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0043-09-120 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133018 | TOTALS | 145,604.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WICHITA IN CITY OF WFS, AT CITY VIEW ELEM | 1.500 | 781,215.78| 0.00| 0.00| 0.0| CS ON CITY VIEW DRIVE AND CRESCENT LN | | | | | | 0903-03-096 | | | | | | STP 1102(526)SRS SAFE ROUTES TO SCHOOL 2009 PROGRAM | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-03-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | KEN-DO CONTRACTING, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0903-03-096 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133209 | TOTALS | 781,215.78| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WICHITA US 82/287 UNDER WINDTHORST ROAD | 1.000 | 2,692,739.05| 279,859.22| 1,955,958.68| 72.6| US 82 . | | | | | | 0044-01-094 | | | | | | C 44-1-94 REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-31-12 WORK BEGAN- 09-10-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-16-12 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 159 PERCENT TIME USED- 72 | | | | | | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0044-01-094 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.62 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.80 | | | | TEXAS SHAFTS, INC. | |SUB %: 2.34 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.82 | | | | HJC FARMS, INC. | |SUB %: 0.50 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.30 | | | | MICA CORPORATION | |SUB %: 0.96 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 1.53 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.09 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.33 | | | | | | | | | | CONTRACT 06123022 | TOTALS | 2,692,739.05| 279,859.22| 1,955,958.68| 72.6| ************************************************************************************************************************************ WICHITA NEAR MISSLE ROAD | 4.518 | 844,419.71| 0.00| 0.00| 0.0| SH 240 WICHITA RIVER | | | | | | 0156-03-045 | | | | | | STP 2013(234) OVERLAY | | | | | | | | | | | | WORK ORDER- 02-05-13 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-06-13 | | | | | | CONTRACT WORKING DAYS- 32 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ZACK BURKETT CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0156-03-045 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12123032 | TOTALS | 844,419.71| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WILBARGER US 70 | 4.982 | 2,961,200.50| 238,528.74| 1,425,951.75| 48.1| FM 3207 FM 433 | | | | | | 3317-01-005 | | | | | | STP 2012(687) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 09-17-12 WORK BEGAN- 11-19-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-16-12 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 89 PERCENT TIME USED- 49 | | | | | | | | | | | | ZACK BURKETT CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3317-01-005 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.73 | | | | DUSTROL, INC. | |SUB %: 0.21 | | | | W.S. CONSTRUCTION COMPANY | |SUB %: 16.17 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 1.18 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.30 | | | | COTHRAN TRUCKING, LLC | |SUB %: 1.14 | | | | | | | | | | CONTRACT 08123242 | TOTALS | 2,961,200.50| 238,528.74| 1,425,951.75| 48.1| ************************************************************************************************************************************ YOUNG ETC SH 16 | 152.503 | 6,568,222.50| 758,997.00| 847,424.00| 12.9| US 380 ETC JACK COUNTY LINE | | | | | | 0134-03-029 | | | | | | STP 2013(090) SEALCOAT | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-25-12 | | | | | | CONTRACT WORKING DAYS- 58 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | NORTHEASTERN PAVERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0134-03-029 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 22.91 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.41 | | | | | | | | | | CONTRACT 10123212 | TOTALS | 6,568,222.50| 758,997.00| 847,424.00| 12.9| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 82,736,175.12 DISTRICT ESTIMATES THIS MONTH 3,010,575.85 DISTRICT TOTAL ESTIMATES PAID TO DATE 35,125,161.38