AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WICHITA FALLS DISTRICT

Last Update: Friday, April 29, 2016
ITEMS 500 2001 TO 560 6013
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0780 - 0786
1122 - 1122
3002 - 3268
4022 - 4022
6001 - 6156
500 2001 - 560 6013
Item No Description Units April 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS     1.000 390,000.00000 1
500 6001 MOBILIZATION LS 2.000 325,000.00000 25.000 175,378.56000 25
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     9.000 8,600.00000 1
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 22.000 6,000.00000 171.000 4,459.40374 25
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     121.000 30.00000 1
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,340.000 32.46269 2,650.000 27.27547 6
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,340.000 8.59701 2,771.000 8.57091 7
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,880.000 3.04124 22,188.000 2.36033 12
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,880.000 1.02062 22,188.000 .73308 12
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 3,280.000 4.50000 12,035.000 3.38943 8
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     211.000 3.75000 1
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 1,050.000 10.00000 1,050.000 10.00000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 4,330.000 1.24249 13,296.000 .84074 10
510 6003 ONE - WAY TRAF CONT (PORT TRAF SIG) MO     2.000 4,000.00000 1
512 6001 PORT CTB (FUR & INST) (SGL SLOPE) (TY 1) LF     7,000.000 15.48571 2
512 6021 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF     1,350.000 10.00000 1
512 6025 PORT CTB (MOVE) (SGL SLP) (TY 1) LF     14,080.000 7.92756 2
512 6045 PORT CTB (STKPL) (LOW PROF) (TY 1) LF     1,350.000 10.00000 1
512 6049 PORT CTB (REMOVE) (SGL SLP) (TY 1) LF     7,000.000 12.65714 2
512 6053 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     10.000 6.50000 1
514 6013 PERM CTB (F - SHAPE) (TY 1) LF     10.000 48.00000 1
529 6002 CONC CURB (TY II) LF     11,589.000 2.50000 1
529 6008 CONC CURB & GUTTER (TY II) LF     1,968.000 24.71037 2
530 2010 DRIVEWAYS (CONC) SY     1,499.000 80.00000 1
530 2011 DRIVEWAYS (ACP) SY     2,133.000 40.00000 1
530 6002 INTERSECTIONS (ACP) SY     1,228.000 15.00000 1
530 6003 INTERSECTIONS (SURF TREAT) SY     712.000 2.50000 1
530 6004 DRIVEWAYS (CONC) SY     2,050.000 60.00000 1
530 6005 DRIVEWAYS (ACP) SY 1,827.000 30.00000 4,736.000 25.87854 6
530 6008 TURNOUTS (ACP) SY 528.000 21.00000 1,477.000 54.44414 3
530 6014 DRIVEWAYS AND TURNOUTS (ACP) SY     568.000 42.11268 2
530 6016 DRIVEWAYS (BASE) SY 3,800.000 18.41368 7,379.000 19.72110 5
531 6001 CONC SIDEWALKS (4") SY     1,094.000 69.66179 2
531 6004 CURB RAMPS (TY 1) EA     11.000 2,017.27273 2
531 6005 CURB RAMPS (TY 2) EA     4.000 2,100.00000 1
531 6016 CURB RAMPS (TY 21) EA     3.000 2,100.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     369,970.000 .18633 3
533 6002 RUMBLE STRIPS (CENTERLINE) LF 46,350.000 .20000 590,179.000 .21379 4
536 6002 CONC MEDIAN SY     1,308.000 64.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     490.000 17.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     4.000 1,600.00000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 625.000 23.52000 8,912.500 17.95189 6
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     350.000 24.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 8.000 2,000.00000 68.000 1,534.32353 3
540 6007 MTL BEAM GD FEN TRANS (TL2) EA     12.000 1,000.00000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 10.000 1,440.00000 53.000 1,154.94340 7
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF     125.000 31.25000 1
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 8.000 1,000.00000 8.000 1,000.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF     454.000 3.50000 1
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     4.000 220.00000 1
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     4.000 220.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF 400.000 5.00000 10,059.000 3.09760 4
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 100.00000 25.000 321.28000 4
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     2.000 300.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     4.000 2,400.00000 1
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 2,560.00000 76.000 2,456.57895 7
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     42.000 284.66667 3
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     6.000 1,950.00000 1
545 6001 CRASH CUSH ATTEN (INSTL) EA     12.000 7,400.00000 2
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     22.000 3,167.04545 2
545 6005 CRASH CUSH ATTEN (REMOVE) EA     12.000 1,039.58333 2
552 6003 WIRE FENCE (TY C) LF 380.000 10.00000 380.000 10.00000 1
560 2032 MAILBOX INSTALLTION (SINGLE) INSTALL ONL EA     43.000 170.00000 1
560 6004 MAILBOX INSTALL - S (TWG - POST) TY 2 EA 20.000 210.00000 20.000 210.00000 1
560 6005 MAILBOX INSTALL - D (TWG - POST) TY 2 EA 2.000 230.00000 2.000 230.00000 1
560 6006 MAILBOX INSTALL - M (TWG - POST) TY 2 EA 2.000 420.00000 2.000 420.00000 1
560 6011 MAILBOX INSTALL - S (TWW - POST) TY 4 EA     51.000 197.94118 4
560 6012 MAILBOX INSTALL - D (TWW - POST) TY 4 EA     11.000 247.27273 3
560 6013 MAILBOX INSTALL - M (TWW - POST) TY 4 EA     9.000 455.55556 2