AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WICHITA FALLS DISTRICT

Last Update: Friday, January 2, 2015
ITEMS 314 2010 TO 354 2023
Items Items Bid Code Range
0100 - 0168
0247 - 0275
0314 - 0354
0400 - 0496
0500 - 0560
0624 - 0690
0760 - 0760
1122 - 1122
3267 - 3276
4589 - 4589
5369 - 5926
6834 - 6834
314 2010 - 354 2023
Item No Description Units December 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
314 2010 EMULS ASPH (EROSN CONT) (SS - 1) GAL     8,905.000 3.05273 2
316 2225 AGGR (TY - PB GR - 5 SAC - B) CY     7,176.000 63.61000 1
316 2706 ASPH (TIER II) GAL     1,091,439.000 2.92000 1
316 2707 ASPH (TIER III) GAL     60,211.000 3.00000 1
316 2718 AGGR (TIER II) CY     19,711.000 61.80000 1
316 2719 AGGR (TIER III) CY     1,487.000 70.00000 1
351 2001 FLEXIBLE PAVEMENT STRUCTURE REPAIR (5") SY     7,000.000 38.00000 1
351 2002 FLEXIBLE PAVEMENT STRUCTURE REPAIR (6") SY 3,772.000 60.00000 3,772.000 60.00000 1
351 2004 FLEXIBLE PAVEMENT STRUCTURE REPAIR (8") SY     6,876.000 40.96335 3
351 2026 FLEX PAVEMENT STRUCTURE REPAIR (5" - 10" SY     200.000 80.00000 1
351 2028 FLEX PAVE STRUCTURE REPAIR (8" - 10") SY 1,000.000 70.00000 1,075.000 76.62791 2
354 2002 PLAN & TEXT ASPH CONC PAV (0" TO 2") SY     2,459.000 6.45710 2
354 2021 PLANE ASPH CONC PAV (0" TO 2") SY 70,533.000 1.56001 70,778.000 1.62730 4
354 2023 PLANE ASPH CONC PAV (0" TO 4") SY     1,493.000 25.00000 1