|
||||
|
||||
| AVERAGE LOW BID UNIT PRICE - MAINTENANCE - WACO DISTRICT | ||||
| Last Update: Thursday, October 8, 2009 |
| ITEMS 310 2005 TO 361 2028 |
| Items | Items | Bid Code Range |
|---|---|---|
| 0104 - 0168 0247 - 0275 0310 - 0361 0400 - 0496 0502 - 0545 0618 - 0688 0712 - 0776 |
6055 - 6266 7126 - 7496 |
310 2005 - 361 2028 |
| Item No | Description | Units | Septembe 30, 2009 | Twelve Month Moving | Usage | ||
|---|---|---|---|---|---|---|---|
| Quantity | Avg Bid | Quantity | Avg Bid | ||||
| 310 2005 | PRIME COAT (MC - 30 OR AE - P) | GAL | 894.000 | 5.43624 | 2 | ||
| 316 2006 | ASPH (AC - 20 - 5TR) | GAL | 6,761.000 | 5.04590 | 2 | ||
| 316 2239 | AGGR (TY - PD GR - 4 SAC - B) | CY | 156.000 | 144.15385 | 2 | ||
| 340 2011 | D - GR HMA (METH) TY - B PG64 - 22 | TON | 357.000 | 100.00000 | 1 | ||
| 340 2050 | D - GR HMA (METH) TY - C PG70 - 22 | TON | 511.000 | 75.00000 | 1 | ||
| 340 2064 | D - GR HMA (METH) TY - C SAC - B PG76 - 22 | TON | 3,250.000 | 69.00000 | 1 | ||
| 340 2104 | D - GR HMA (METH) TY - D SAC - B PG64 - 22 | TON | 74.000 | 135.14000 | 1 | ||
| 340 2136 | D - GR HMA (METH) TY - D SAC - B PG76 - 22 | TON | 2,600.000 | 72.00000 | 1 | ||
| 351 2004 | FLEXIBLE PAVEMENT STRUCTURE REPAIR (8") | SY | 17,549.000 | 30.15743 | 2 | ||
| 354 2045 | PLANE ASPH CONC PAV (2") | SY | 29,543.000 | 0.90000 | 1 | ||
| 361 2003 | FULL - DEPTH REPAIR CRCP (10") | SY | 1,000.000 | 190.00000 | 1 | ||
| 361 2017 | FULL - DEPTH REPAIR CPJR (6") | SY | 200.000 | 175.00000 | 1 | ||
| 361 2028 | FULL - DEPTH REPAIR CRCP (6") | SY | 175.000 | 170.00000 | 1 | ||
| | ||||
|