Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 1,295,042.14500 17.000 398,937.31118 17
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 24.000 16,291.25000 146.000 5,442.12329 17
508 2002 CONSTRUCTING DETOURS SY 3,545.000 59.80000 3,545.000 59.80000 1
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF     840.000 12.00000 1
512 2013 PORT CTB (DES SOURCE) (SNGL SLP) (TY 1) LF 2,730.000 12.80000 3,120.000 12.07500 2
512 2017 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF 2,260.000 9.70000 2,260.000 9.70000 1
512 2018 PORT CTB (DES SOURCE) (LOW PROF) (TY 2) LF 180.000 13.55000 180.000 13.55000 1
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     5,880.000 5.00000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF 1,670.000 5.30000 1,670.000 5.30000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF 760.000 7.70000 760.000 7.70000 1
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF 60.000 16.70000 60.000 16.70000 1
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF     840.000 12.00000 1
512 2031 PORT CTB (STKPL) (SNGL SLP) (TY 1) LF 2,730.000 11.90000 3,120.000 11.28750 2
512 2035 PORT CTB (STKPL) (LOW PROF) (TY 1) LF 2,260.000 7.85000 2,260.000 7.85000 1
512 2036 PORT CTB (STKPL) (LOW PROF) (TY 2) LF 180.000 11.70000 180.000 11.70000 1
528 2004 LANDSCAPE PAVERS SY 2,326.000 57.10000 2,326.000 57.10000 1
529 2006 CONC CURB (MONO) (TY II) LF 19,889.000 1.28000 19,889.000 1.28000 1
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF 2,474.000 14.00000 2,474.000 14.00000 1
530 2005 INTERSECTIONS (ACP) SY 988.000 17.00000 5,430.000 14.02413 3
530 2006 INTERSECTIONS (SURF TREAT) SY     3,975.000 17.22819 3
530 2010 DRIVEWAYS (CONC) SY 1,635.000 68.64000 2,254.000 67.59807 4
530 2011 DRIVEWAYS (ACP) SY 2,134.000 18.41627 37,400.000 14.72640 4
530 2012 DRIVEWAYS (SURF TREAT) SY     23,736.000 14.81152 3
530 2014 TURNOUTS (ACP) EA     14.000 500.00000 1
530 2015 TURNOUTS (SURF TREAT) EA     78.000 473.46154 2
530 2017 TURNOUTS (ACP) SY 13.000 17.00000 273.000 15.09524 2
530 2018 TURNOUTS (SURF TREAT) SY     1,200.000 20.00000 1
531 2005 CURB RAMPS (TY 1) EA 8.000 1,179.49000 8.000 1,179.49000 1
531 2008 CURB RAMPS (TY 4) EA 5.000 1,333.33000 5.000 1,333.33000 1
531 2015 CONC SIDEWALKS (4") SY 5,276.000 37.95000 5,276.000 37.95000 1
531 2017 CURB RAMPS (TY 21) EA 1.000 2,214.36000 1.000 2,214.36000 1
531 2028 CONC SIDEWALK (5') (5") LF     633.000 37.84992 2
531 2044 CURB RAMPS (TY 10) EA 8.000 1,435.90000 8.000 1,435.90000 1
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF 970.000 21.33000 10,670.000 18.85378 9
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 7.000 1,579.49000 39.000 1,478.37000 4
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     335.000 43.13433 2
540 2019 MTL BEAM GD FEN TRANS (THRIE) (STL POST EA     40.000 1,605.75000 4
540 2020 MTL BEAM GD FEN TRANS (TL2) (STL POST) EA     6.000 568.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     6.000 978.00000 1
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     100.000 20.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 2,159.000 1.79000 10,519.000 2.15113 6
542 2002 REMOVING TERMINAL ANCHOR SECTION EA 9.000 153.85000 17.000 141.68529 2
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     16.000 185.00000 2
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 9.000 2,312.82000 11.000 2,255.94364 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     92.000 247.78261 4
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA     122.000 1,870.98361 8
545 2001 CRASH CUSH ATTEN (INSTL) EA 3.000 2,820.51000 3.000 2,820.51000 1
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA 3.000 2,820.51000 21.000 1,821.97762 3
545 2003 CRASH CUSH ATTEN (REMOVE) EA 3.000 1,538.46000 7.000 1,087.91143 3
552 2003 WIRE FENCE (TY C) LF     1,230.000 8.08878 2
552 2004 WIRE FENCE (TY D) LF     32.000 25.00000 1
552 2007 GATE (TY 3) EA     1.000 400.00000 1
556 2008 PIPE UNDERDRAINS (TY 8) (6") LF 780.000 22.00000 31,860.000 11.75706 2
556 2011 PIPE UNDERDRAINS (TY 6) (4") LF     7,459.000 12.50000 1
560 2004 MAILBOX INSTALL - S (WC - POST) TY 3 FND EA     100.000 145.84000 3
560 2005 MAILBOX INSTALL - D (WC - POST) TY 3 FND EA     9.000 166.66667 3
560 2006 MAILBOX INSTALL - S (RR - POST) TY 4 FND - T EA 5.000 190.00000 64.000 178.93750 2
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     7.000 217.00000 1
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA 1.000 450.00000 6.000 502.50000 2
560 2009 MAILBOX INSTALL - M (TWG - POST) TY 1 FND EA     1.000 582.00000 1
560 2020 MAILBOX INSTALL - M (WC - POST) TY 3FND - AB EA     2.000 600.00000 1
560 2021 MAILBOX INSTALL - S (TWG - POST) TY 2 FND - TB EA     33.000 125.00000 1
560 2022 MAILBOX INSTALL - D (TWG - POST) TY 2 FND - TB EA     5.000 150.00000 1