Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 1.000 22,000.00000 25.000 249,171.85480 25
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 10,000.00000 195.000 4,767.02564 25
508 2002 CONSTRUCTING DETOURS SY     6,943.000 52.89731 4
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF     270.000 15.00000 1
512 2013 PORT CTB (DES SOURCE) (SNGL SLP) (TY 1) LF     3,120.000 12.07500 2
512 2014 PORT CTB (DES SOURCE) (SNGL SLP) (TY 2) LF     1,590.000 7.90000 1
512 2017 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF     4,220.000 11.91517 4
512 2018 PORT CTB (DES SOURCE) (LOW PROF) (TY 2) LF     420.000 17.23571 4
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     270.000 12.00000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     1,670.000 5.30000 1
512 2023 PORT CTB (MOVE) (SNGL SLP) (TY 2) LF     1,090.000 7.45000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF     1,820.000 10.01758 3
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF     220.000 12.91818 3
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF     270.000 15.00000 1
512 2031 PORT CTB (STKPL) (SNGL SLP) (TY 1) LF     3,120.000 11.28750 2
512 2032 PORT CTB (STKPL) (SNGL SLP) (TY 2) LF     1,590.000 7.65000 1
512 2035 PORT CTB (STKPL) (LOW PROF) (TY 1) LF     4,220.000 9.20403 4
512 2036 PORT CTB (STKPL) (LOW PROF) (TY 2) LF     420.000 12.63333 4
512 2049 PORT CTB (DES SOURCE) (F - SHAPE) (TY 1) LF     420.000 35.00000 1
512 2050 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     420.000 12.00000 1
512 2051 PORT CTB (STOCKPILE) (F - SHAPE) (TY 1) LF     420.000 35.00000 1
512 2093 PORT CBR (DES SOURCE) LF     840.000 15.00000 1
512 2094 PORT CBR (MOVE) LF     6,090.000 7.00000 1
512 2095 PORT CBR (STOCKPILE) LF     840.000 10.00000 1
528 2004 LANDSCAPE PAVERS SY     2,767.000 59.75410 3
529 2001 CONC CURB (TY I) LF     37.000 55.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     1,071.000 33.02988 2
529 2006 CONC CURB (MONO) (TY II) LF     19,889.000 1.28000 1
529 2009 CONCRETE CURB (SPECIAL) LF     1,344.000 34.00000 1
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF     5,646.000 14.56181 2
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF     1,563.000 12.00000 1
529 2026 CONC CURB (ARMOR CURB SLOT) LF     65.000 210.00000 1
529 2061 CONC CURB (TY C1) LF     90.000 70.00000 1
529 2095 CONC CURB (MONO) (TY II) (DOWEL) (SAWTOOTH LF     27.000 40.00000 1
530 2005 INTERSECTIONS (ACP) SY     7,824.000 19.06109 3
530 2006 INTERSECTIONS (SURF TREAT) SY     1,965.000 30.00000 1
530 2010 DRIVEWAYS (CONC) SY     5,300.000 59.86309 5
530 2011 DRIVEWAYS (ACP) SY     15,734.000 27.83236 5
530 2012 DRIVEWAYS (SURF TREAT) SY     57.000 45.00000 1
530 2014 TURNOUTS (ACP) EA     14.000 900.00000 1
530 2017 TURNOUTS (ACP) SY     97.000 32.58763 2
530 2018 TURNOUTS (SURF TREAT) SY     736.000 25.00000 1
530 2030 DRIVEWAYS (ACP) (TYPE 1) SY     8,148.000 20.00000 1
530 2031 DRIVEWAYS (ACP) (TYPE 2) SY     98.000 40.00000 1
530 2036 DRIVEWAYS (CONC) (TYPE 2) SY     186.000 65.00000 1
530 2037 DRIVEWAYS (CONC) (TYPE 1) SY     67.000 70.00000 1
530 2038 DRIVEWAYS (CONC) (HES) SY     223.000 90.00000 1
531 2004 CONC SIDEWALKS (6") SY     8.000 80.00000 1
531 2005 CURB RAMPS (TY 1) EA 1.000 2,000.00000 78.000 1,296.61436 3
531 2006 CURB RAMPS (TY 2) EA     21.000 1,376.19048 2
531 2007 CURB RAMPS (TY 3) EA     58.000 1,300.00000 1
531 2008 CURB RAMPS (TY 4) EA     5.000 1,333.33000 1
531 2009 CURB RAMPS (TY 6) EA     119.000 1,300.00000 1
531 2010 CURB RAMPS (TY 7) EA 2.000 2,000.00000 241.000 1,305.80913 2
531 2014 CURB RAMPS (TY 22) EA     8.000 1,783.75000 2
531 2015 CONC SIDEWALKS (4") SY     13,236.000 52.86939 3
531 2017 CURB RAMPS (TY 21) EA     9.000 2,243.81778 3
531 2038 CONC SIDEWALKS (STEPS) SY     80.000 120.00000 1
531 2041 CURB RAMPS (TY 10) EA     15.000 1,300.00000 1
531 2044 CURB RAMPS (TY 10) EA     8.000 1,435.90000 1
531 2076 CONC SIDEWALK (5') (1'3") (BRIDGE) LF     70.000 300.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     140,520.000 .15000 1
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     9,170.000 20.83297 14
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     66.000 1,369.16833 6
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     2.000 725.00000 1
540 2020 MTL BEAM GD FEN TRANS (TL2) (STL POST) EA     16.000 687.75000 4
540 2036 DRIVEWAY TERMINAL ANCHOR SECTION EA     2.000 800.00000 1
540 2037 MTL W - BEAM GD FEN (CRT POST) (SHRT RAD LF     50.000 20.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     19.000 869.47368 6
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     18.000 513.00000 5
542 2001 REMOVING METAL BEAM GUARD FENCE LF     9,848.000 1.62757 8
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     22.000 140.66591 3
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     4.000 200.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     11.000 2,255.94364 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     59.000 250.80881 6
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA     96.000 2,138.28583 12
545 2001 CRASH CUSH ATTEN (INSTL) EA     4.000 5,027.88250 2
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     9.000 1,851.28111 3
545 2003 CRASH CUSH ATTEN (REMOVE) EA     7.000 1,030.76857 3
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA     2.000 12,230.77000 1
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA     26.000 1,633.13615 3
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA     6.000 923.07667 3
552 2003 WIRE FENCE (TY C) LF     3,439.000 9.35737 5
556 2008 PIPE UNDERDRAINS (TY 8) (6") LF     780.000 22.00000 1
560 2004 MAILBOX INSTALL - S (WC - POST) TY 3 FND EA     80.000 135.31250 4
560 2005 MAILBOX INSTALL - D (WC - POST) TY 3 FND EA     3.000 200.00000 1
560 2006 MAILBOX INSTALL - S (RR - POST) TY 4 FND - T EA     5.000 190.00000 1
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     3.000 254.00000 1
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA     2.000 495.00000 2
560 2009 MAILBOX INSTALL - M (TWG - POST) TY 1 FND EA     2.000 350.00000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     18.000 205.00000 1