AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WACO DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 100 2001 TO 180 2001
Items Items Bid Code Range
0100 - 0180
0216 - 0275
0310 - 0360
0400 - 0497
0500 - 0560
0610 - 0685
0730 - 0738
1122 - 1122
3233 - 3269
4013 - 4013
5369 - 5997
6055 - 6834
8020 - 8730
100 2001 - 180 2001
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     3.000 9,500.00000 1
100 2002 PREPARING ROW STA 47.800 7,100.00000 350.800 1,492.10376 10
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA 3.000 3,500.00000 3.000 3,500.00000 1
100 2013 PREP ROW (TREE) (2" TO 12" DIA) EA     7.000 1,500.00000 1
104 2001 REMOVING CONC (PAV) SY 26,657.000 6.00000 26,657.000 6.00000 1
104 2009 REMOVING CONC (RIPRAP) SY 264.000 25.00000 3,423.000 7.51183 3
104 2015 REMOVING CONC (SIDEWALKS) SY     5.000 30.00000 1
104 2021 REMOVING CONC (CURB) LF     400.000 8.62500 2
104 2044 REMOVING CONC (FLUME) SY     138.000 9.80000 1
105 2057 REMOVE STAB BS & ASPH PAV (5" - 10") SY     1,650.000 5.12000 1
105 2076 REMOV STAB BASE AND ASPH PAV (2" - 15") SY     1,892.000 12.00000 1
106 2001 OBLITERATING ABANDONED ROAD STA     1.000 2,500.00000 1
110 2001 EXCAVATION (ROADWAY) CY 25,141.000 5.45300 52,806.000 7.54058 9
110 2002 EXCAVATION (CHANNEL) CY     6,981.000 7.45440 4
110 2003 EXCAVATION (SPECIAL) CY     494.000 20.00000 1
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY     950.000 17.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     3,412.000 8.83939 3
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY 3,089.000 8.50000 55,500.000 9.32675 6
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     54.000 29.50000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 244,151.000 8.00000 245,489.000 8.01919 2
132 2020 EMBANKMENT (VEHICLE) (DENS CONT) (TY B) CY     21,692.000 5.13830 3
132 2022 EMBANKMENT (VEHICLE) (DENS CONT) (TY C) CY     5,700.000 5.00000 1
134 2001 BACKFILL (TY A) STA 653.000 50.00000 653.000 50.00000 1
134 2002 BACKFILL (TY B) STA     1.200 500.00000 1
134 2004 BACKFILL (TY A OR B) STA     1,367.300 30.00000 1
152 2003 ROAD GRADER WORK (DENS CONT) STA     2,134.040 423.18794 4
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 79,497.000 1.30000 219,675.000 1.24745 4
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     120,000.000 .40000 1
162 2002 BLOCK SODDING SY 4,526.000 3.21000 4,526.000 3.21000 1
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     169.000 2.00000 1
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 7,497.000 .15000 7,497.000 .15000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY 3,749.000 .20000 15,045.000 .25639 4
164 2010 BROADCAST SEED (TEMP) (WARM) AC     2.000 1,000.00000 1
164 2011 BROADCAST SEED (TEMP) (COOL) SY 3,749.000 .20000 14,876.000 .23659 3
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     681,591.000 .08812 10
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 8.200 485.00000 145.760 324.56367 2
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 67,474.000 .10000 81,189.000 .09493 2
164 2041 DRILL SEEDING (TEMP) (WARM) SY 33,739.000 .10000 370,264.500 .07172 9
164 2042 DRILL SEEDING (TEMP) (WARM) AC 4.100 385.00000 72.880 227.39490 2
164 2043 DRILL SEEDING (TEMP) (COOL) SY 33,739.000 .10000 370,264.500 .06851 9
164 2044 DRILL SEEDING (TEMP) (COOL) AC 4.100 385.00000 72.880 257.59468 2
168 2001 VEGETATIVE WATERING MG 1,947.000 12.98035 24,177.100 2.73787 15
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     12,180.000 1.08365 5
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 79,497.000 1.00000 80,197.000 1.01327 5
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     48.000 3.00000 1
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     800.000 4.18125 2
180 2001 WILDFLOWER SEEDING AC 16.430 1,301.01948 16.430 1,301.01948 1