AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WACO DISTRICT

Last Update: Friday, March 27, 2015
ITEMS 100 2001 TO 169 2004
Items Items Bid Code Range
0100 - 0169
0216 - 0292
0310 - 0354
0400 - 0497
0500 - 0560
0618 - 0690
0752 - 0752
1122 - 1122
2147 - 2147
3233 - 3271
5369 - 5946
6006 - 6834
8206 - 8999
100 2001 - 169 2004
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     .500 25,000.00000 1
100 2002 PREPARING ROW STA     150.910 1,962.48923 8
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     10.000 800.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     1,974.000 14.60233 4
104 2011 REMOVING CONC (MEDIANS) SY     193.000 12.00000 1
104 2013 REMOVING CONC (FOUNDATIONS) SY     8.000 30.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     300.000 9.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     1,915.000 10.32428 3
104 2021 REMOVING CONC (CURB) LF     680.000 5.58824 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     1,996.000 6.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     2,115.000 5.07565 2
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     818.000 12.00000 2
104 2054 REMOVING CONCRETE (MOW STRIP) LF     531.000 10.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     229.000 15.00000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     1,625.000 5.00000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     2,272.000 4.99384 2
105 2057 REMOVE STAB BS & ASPH PAV (5" - 10") SY     4,472.000 6.00000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     6,020.000 2.50000 1
105 2063 REMOVE STAB BASE AND ASPH PAV (1" - 3") SY     3,873.000 2.00000 1
110 2001 EXCAVATION (ROADWAY) CY     124,061.000 7.13773 17
110 2002 EXCAVATION (CHANNEL) CY     1,980.000 11.80000 7
110 2003 EXCAVATION (SPECIAL) CY     23,104.000 5.11621 2
112 2001 SUBGRADE WIDENING (ORD COMP) STA     285.000 323.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     493.000 10.00000 1
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     93,536.000 5.82369 15
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     325.000 10.00000 1
132 2020 EMBANKMENT (VEHICLE) (DENS CONT) (TY B) CY     62,458.000 .56404 2
134 2001 BACKFILL (TY A) STA     21.000 300.00000 1
134 2004 BACKFILL (TY A OR B) STA     509.000 100.00000 1
152 2003 ROAD GRADER WORK (DENS CONT) STA     1,034.500 529.40068 2
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     410.000 20.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     152,352.000 .91412 7
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     545,431.000 .23550 2
162 2002 BLOCK SODDING SY     55,851.000 2.72199 4
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     40,893.000 .19640 4
164 2009 BROADCAST SEED (TEMP) (WARM) SY     77,655.000 .08576 6
164 2011 BROADCAST SEED (TEMP) (COOL) SY     77,655.000 .08576 6
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     620,918.000 .05000 1
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     719,279.000 .11270 11
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     46.250 352.81081 2
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     7,934.000 .20000 1
164 2041 DRILL SEEDING (TEMP) (WARM) SY     628,692.000 .06378 12
164 2042 DRILL SEEDING (TEMP) (WARM) AC     23.630 282.40584 2
164 2043 DRILL SEEDING (TEMP) (COOL) SY     628,692.000 .06391 12
164 2044 DRILL SEEDING (TEMP) (COOL) AC     23.630 303.51883 2
168 2001 VEGETATIVE WATERING MG     26,781.000 4.07902 19
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     26,824.000 1.08962 5
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     600.000 3.10000 1
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     15,117.000 1.27288 8
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     1,460.000 1.50000 1