Monthly Local Let Maintenance Report For Tyler District As Of Oct 14, 2014 Page 3 Of 4

Last Update: Tuesday, October 14, 2014
FTP Icon
page 1 | page 2 | page 3 | page 4

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyGREGG
Highway SH0031
From VARIOUS ROADWAYS
To IN THE LONGVIEW MAINTENANCE SECTION
CSJ 6264-68-001
Proj ID RMC - 626468001
Work Type TREE REMOVAL
 
0.001 68875.00 8110.00 55060.00 79.9
Work Order 01-13-14
Work Began 00-00-00
Work Completed  
Time Computed 02-10-14
Contract Working Days 255
Addl Days Granted 0
Working Days Charged 142
Percent Time Used 55
Contractor(s)
3 FARMER ENTERPRISES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 6264-68-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11131001
Totals 68875.00 8110.00 55060.00 79.9

CountyHENDERSON
Highway US0175
From VARIOUS LOCATIONS
To IN HENDERSON COUNTY
CSJ 6266-47-001
Proj ID RMC - 626647001
Work Type DEBRIS REMOVAL
 
0.010 20988.00 2571.00 7713.00 36.7
Work Order 06-12-14
Work Began 06-16-14
Work Completed  
Time Computed 06-23-14
Contract Working Days 255
Addl Days Granted 0
Working Days Charged 48
Percent Time Used 18
Contractor(s)
TEXAS TREE & LANDSCAPE, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 6266-47-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03141003
Totals 20988.00 2571.00 7713.00 36.7

CountyHENDERSON
Highway US0175
From VARIOUS ROADWAYS IN
To THE ATHENS MAINTENANCE SECTION
CSJ 6270-69-001
Proj ID RMC - 627069001
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 37924.93 554.20 33558.55 88.4
CountyVAN ZANDT
Highway SH0019
From VARIOUS ROADWAYS IN THE
To CANTON MAINTENANCE SECTION
CSJ 6270-69-002
Proj ID RMC - 627069002
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 65016.35 0.00 0.00 0.0
CountyRUSK
Highway US0259
From VARIOUS ROADWAYS IN THE
To HENDERSON MAINTENANCE SECTION
CSJ 6270-69-003
Proj ID RMC - 627069003
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 34667.33 0.00 8432.25 24.3
CountyCHEROKEE
Highway US0079
From VARIOUS ROADWAYS IN THE
To JACKSONVILLE MAINTENANCE SECTION
CSJ 6270-69-004
Proj ID RMC - 627069004
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 24216.16 0.00 0.00 0.0
CountyGREGG
Highway US0259
From VARIOUS ROADWAYS IN THE
To LONGVIEW MAINTENANCE SECTION
CSJ 6270-69-005
Proj ID RMC - 627069005
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 18769.93 0.00 0.00 0.0
CountyWOOD
Highway US0080
From VARIOUS ROADWAYS IN THE
To MINEOLA MAINTENANCE SECTION
CSJ 6270-69-006
Proj ID RMC - 627069006
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 42534.38 19419.00 19419.00 45.6
CountyANDERSON
Highway US0079
From VARIOUS ROADWAYS IN THE
To PALESTINE MAINTENANCE SECTION
CSJ 6270-69-007
Proj ID RMC - 627069007
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 12891.27 0.00 0.00 0.0
CountySMITH
Highway SH0031
From VARIOUS ROADWAYS IN THE
To TYLER MAINTENANCE SECTION
CSJ 6270-69-008
Proj ID RMC - 627069008
Work Type SHORTLINE THERMOPLASTIC STRIPING
 
0.010 46191.79 0.00 0.00 0.0
Work Order 06-18-14
Work Began 07-15-14
Work Completed  
Time Computed 07-14-14
Contract Working Days 255
Addl Days Granted 0
Working Days Charged 36
Percent Time Used 14
Contractor(s)
STRIPING TECHNOLOGY, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 6270-69-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05141001
Totals 282212.14 19973.20 61409.80 21.7

CountyHENDERSON
Highway FM3441
From VARIOUS ROADWAYS IN THE
To ATHENS MAINTENANCE SECTION
CSJ 6272-04-001
Proj ID RMC - 627204001
Work Type CRACKSEAL
 
294.560 24653.00 0.00 0.00 0.0
CountyGREGG
Highway US0259
From VARIOUS ROADWAYS IN THE
To LONGVIEW MAINTENANCE SECTION
CSJ 6272-04-002
Proj ID RMC - 627204002
Work Type CRACKSEAL
 
294.560 53065.00 0.00 0.00 0.0
CountyWOOD
Highway US0069
From VARIOUS ROADWAYS IN THE
To MINEOLA MAINTENANCE SECTION
CSJ 6272-04-003
Proj ID RMC - 627204003
Work Type CRACKSEAL
 
294.560 32873.20 0.00 0.00 0.0
CountySMITH
Highway FM0346
From VARIOUS ROADWAYS IN THE
To TYLER MAINTENANCE SECTION
CSJ 6272-04-004
Proj ID RMC - 627204004
Work Type CRACKSEAL
 
294.560 13224.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TEXAS ROAD MAINTENANCE
SUBCONTRACTOR(S) FOR CCSJ: 6272-04-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06141003
Totals 123815.20 0.00 0.00 0.0

CountyHENDERSON
Highway US0175
From VARIOUS ROADWAYS IN THE
To ATHENS MAINTENANCE SECTION
CSJ 6272-05-001
Proj ID RMC - 627205001
Work Type PAINT
 
0.010 23318.75 0.00 0.00 0.0
CountyVAN ZANDT
Highway SH0019
From VARIOUS ROADWAYS IN
To THE CANTON MAINTENANCE SECTION
CSJ 6272-05-002
Proj ID RMC - 627205002
Work Type PAINT
 
0.010 23318.75 0.00 0.00 0.0
CountyRUSK
Highway US0259
From VARIOUS ROADWAYS IN THE
To HENDERSON MAINTENANCE SECTIONN
CSJ 6272-05-003
Proj ID RMC - 627205003
Work Type PAINT
 
0.010 23318.75 0.00 0.00 0.0
CountyCHEROKEE
Highway US0079
From VARIOUS ROADWAYS IN THE
To JACKSONVILLE MAINTENANCE SECTION
CSJ 6272-05-004
Proj ID RMC - 627205004
Work Type PAINT
 
0.010 12009.38 0.00 0.00 0.0
CountyGREGG
Highway SH0031
From VARIOUS ROADWAYS IN THE
To LONGVIEW MAINTENANCE SECTION
CSJ 6272-05-005
Proj ID RMC - 627205005
Work Type PAINT
 
0.010 23318.75 0.00 0.00 0.0
CountyWOOD
Highway US0080
From VARIOUS ROADWAYS IN THE
To MINEOLA MAINTENACE SECTION
CSJ 6272-05-006
Proj ID RMC - 627205006
Work Type PAINT
 
0.010 23318.75 0.00 0.00 0.0
CountyANDERSON
Highway US0287
From VARIOUS ROADWAYS IN THE
To PALESINE MAINTENANCE SECTION
CSJ 6272-05-007
Proj ID RMC - 627205007
Work Type PAINT
 
0.010 23318.75 0.00 0.00 0.0
CountySMITH
Highway SH0110
From VARIOUS ROADWAYS IN THE
To TYLER MAINTENANCE SECTION
CSJ 6272-05-008
Proj ID RMC - 627205008
Work Type PAINT
 
0.010 23318.75 0.00 0.00 0.0
CountyCHEROKEE
Highway US0069
From VARIOUS ROADWAYS IN THE
To RUSK MAINTENANCE SECTION
CSJ 6272-05-009
Proj ID RMC - 627205009
Work Type PAINT
 
0.010 12009.38 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-25-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 255
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
STRIPING TECHNOLOGY, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 6272-05-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06141001
Totals 187250.01 0.00 0.00 0.0

CountyVAN ZANDT
Highway SH0019
From VARIOUS ROADWAYS IN THE
To CANTON MAINTENANCE SECTION
CSJ 6272-10-001
Proj ID RMC - 627210001
Work Type TREE TRIMMING & BRUSH REMOVAL
 
120.640 144515.74 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 121
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
FOWLER CONSTRUCTION
SUBCONTRACTOR(S) FOR CCSJ: 6272-10-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08141001
Totals 144515.74 0.00 0.00 0.0

CountyCHEROKEE
Highway US0069
From VARIOUS ROADWAYS IN THE
To JACKSONVILLE/RUSK MTCE. SECTION
CSJ 6272-11-001
Proj ID RMC - 627211001
Work Type TREE TRIMMING & BRUSH REMOVAL
 
137.650 180807.35 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 138
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TERRY ENTERPRISES
SUBCONTRACTOR(S) FOR CCSJ: 6272-11-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08141002
Totals 180807.35 0.00 0.00 0.0

CountyGREGG
Highway FM2906
From VARIOUS LOCATIONS IN THE
To LONGVIEW MAINTENANCE SECTION
CSJ 6272-12-001
Proj ID RMC - 627212001
Work Type TREE TRIMMING & BRUSH REMOVAL
 
19.990 42981.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 20
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
L&S EXCAVATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 6272-12-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08141003
Totals 42981.00 0.00 0.00 0.0

CountyANDERSON
Highway FM0323
From VARIOUS LOCATIONS IN THE
To PALESTINE MAINTENANCE SECTION
CSJ 6272-13-001
Proj ID RMC - 627213001
Work Type TREE TRIMMING & BRUSH REMOVAL
 
27.700 79464.74 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 48
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TERRY ENTERPRISES
SUBCONTRACTOR(S) FOR CCSJ: 6272-13-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08141004
Totals 79464.74 0.00 0.00 0.0

CountySMITH
Highway SH0031
From VARIOUS LOCATIONS IN THE
To TYLER MAINTENANCE SECTION
CSJ 6272-14-001
Proj ID RMC - 627214001
Work Type TREE REMOVAL
 
0.010 166050.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 255
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DRC EMERGENCY SERVICES, LLC
SUBCONTRACTOR(S) FOR CCSJ: 6272-14-001
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08141005
Totals 166050.00 0.00 0.00 0.0

CountyHENDERSON
Highway SH0031
From ATHENS MTCE. SECTION
To HENDERSON CO.
CSJ 6272-95-001
Proj ID SUP - 627295001
Work Type LANDSCAPE ROW MTCE.
 
0.010 17100.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
ANDREWS DIVERSIFIED INDUSTRIES
SUBCONTRACTOR(S) FOR CCSJ: 6272-95-001
ANDREWS DIVERSIFIED INDUSTRIES (100.00%)
Contract # 07141032
Totals 17100.00 0.00 0.00 0.0

CountyHENDERSON
Highway SH0031
From ATHENS MTCE. OFFICE
To HENDERSON CO.
CSJ 6272-96-001
Proj ID SUP - 627296001
Work Type LAWN MTCE.
 
0.010 16782.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
ANDREWS DIVERSIFIED INDUSTRIES
SUBCONTRACTOR(S) FOR CCSJ: 6272-96-001
ANDREWS DIVERSIFIED INDUSTRIES (100.00%)
Contract # 07141033
Totals 16782.00 0.00 0.00 0.0

CountyGREGG
Highway SL0281
From LONGVIEW MTCE. OFFICE
To GREGG CO.
CSJ 6272-97-001
Proj ID SUP - 627297001
Work Type LAWN MTCE.
 
0.010 37260.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
ANDREWS DIVERSIFIED INDUSTRIES
SUBCONTRACTOR(S) FOR CCSJ: 6272-97-001
ANDREWS DIVERSIFIED INDUSTRIES (100.00%)
Contract # 07141034
Totals 37260.00 0.00 0.00 0.0

CountySMITH
Highway IH0020
From IH 20 EAST & WEST DERRICK PARK
To SH 31 @ FM 2661
CSJ 6272-98-001
Proj ID SUP - 627298001
Work Type PICNIC AREA MTCE.
 
0.010 124980.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
ANDREWS DIVERSIFIED INDUSTRIES
SUBCONTRACTOR(S) FOR CCSJ: 6272-98-001
ANDREWS DIVERSIFIED INDUSTRIES (100.00%)
Contract # 07141035
Totals 124980.00 0.00 0.00 0.0

CountySMITH
Highway IH0020
From IH 20 @ US 69 &
To IH 20 @ US 271
CSJ 6272-99-001
Proj ID SUP - 627299001
Work Type TRAFFIC ISLAND LANDSCAPE MTCE.
 
0.010 22158.24 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
WOODCREEK OUTREACH REHABILITATION DEVELOPMENT
SUBCONTRACTOR(S) FOR CCSJ: 6272-99-001
WOODCREEK OUTREACH REHABILITATION DEVELOPMENT(100.00%)
Contract # 07141036
Totals 22158.24 0.00 0.00 0.0

CountyWOOD
Highway US0080
From US 80(2), US 69, FM 2088
To SH 37(2)
CSJ 6273-00-001
Proj ID SUP - 627300001
Work Type PICNIC AREA MTCE.
 
0.010 122429.04 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
WOODCREEK OUTREACH REHABILITATION DEVELOPMENT
SUBCONTRACTOR(S) FOR CCSJ: 6273-00-001
WOODCREEK OUTREACH REHABILITATION DEVELOPMENT(100.00%)
Contract # 07141037
Totals 122429.04 0.00 0.00 0.0

CountyWOOD
Highway SL0564
From MINEOLA AO & MTCE. OFFICE
To SL 564, WOOD CO.
CSJ 6273-01-001
Proj ID SUP - 627301001
Work Type LAWN MTCE.
 
0.010 31945.70 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-14-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
WOODCREEK OUTREACH REHABILITATION DEVELOPMENT
SUBCONTRACTOR(S) FOR CCSJ: 6273-01-001
WOODCREEK OUTREACH REHABILITATION DEVELOPMENT(100.00%)
Contract # 07141038
Totals 31945.70 0.00 0.00 0.0

CountySMITH
Highway SH0155
From TYLER AO & MTCE. OFFICE
To SH 155 S IN NOONDAY
CSJ 6273-02-001
Proj ID SUP - 627302001
Work Type JANITORIAL MTCE.
 
0.001 42749.92 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-15-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
WORLD TECHNICAL SERVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 6273-02-001
WORLD TECHNICAL SERVICES, INC. (100.00%)
Contract # 07141039
Totals 42749.92 0.00 0.00 0.0

CountyANDERSON
Highway SH0019
From PALESTINE MTCE. OFFICE
To ANDERSON CO.
CSJ 6273-03-001
Proj ID SUP - 627303001
Work Type JANITORIAL MTCE.
 
0.010 24599.52 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-31-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
WORLD TECHNICAL SERVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 6273-03-001
WORLD TECHNICAL SERVICES, INC. (100.00%)
Contract # 07141040
Totals 24599.52 0.00 0.00 0.0

CountyCHEROKEE
Highway LP0456
From JACKSONVILLE MTCE. OFFICE
To LP 456
CSJ 6273-04-001
Proj ID SUP - 627304001
Work Type LAWN MTCE.
 
0.010 18465.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-15-14
Work Began 09-02-14
Work Completed  
Time Computed 09-01-14
Contract Working Days 730
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TIBH INDUSTRIES, INC.
GATEWAY COMMUNITY PARTNERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 6273-04-001
GATEWAY COMMUNITY PARTNERS, INC. (100.00%)
Contract # 07141041
Totals 18465.00 0.00 0.00 0.0

page 1 | page 2 | page 3 | page 4