| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | RUSK |
| Highway |
US0259 |
| From |
US 259 AND SH 79 |
| To |
US 259 AND SH 322 |
| CSJ |
6224-43-001 |
| Proj ID |
RMC - 622443001 |
| Work Type |
LANDSCAPE MAINTENANCE |
| |
|
0.010 |
33600.00 |
1800.00 |
14400.00 |
42.8 |
| Work Order |
06-03-11 |
| Work Began |
06-24-11 |
| Work Completed |
|
| Time Computed |
06-10-11 |
| Contract Working Days |
510 |
| Addl Days Granted |
0 |
| Working Days Charged |
477 |
| Percent Time Used |
93 |
| Contractor(s) |
| L & M CLEANING SERVICE |
SUBCONTRACTOR(S) FOR CCSJ: 6224-43-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04111008 |
|
Totals |
33600.00 |
1800.00 |
14400.00 |
42.8 |
|
| County | VAN ZANDT |
| Highway |
SH0064 |
| From |
PICNIC AREA ON SH 64 |
| To |
EAST OF CANTON |
| CSJ |
6228-28-001 |
| Proj ID |
SUP - 622828001 |
| Work Type |
PICNIC AREA MTCE. |
| |
|
0.010 |
29885.00 |
1005.00 |
19815.00 |
66.3 |
| Work Order |
05-30-11 |
| Work Began |
06-03-11 |
| Work Completed |
|
| Time Computed |
06-01-11 |
| Contract Working Days |
822 |
| Addl Days Granted |
0 |
| Working Days Charged |
696 |
| Percent Time Used |
84 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-28-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06111041 |
|
Totals |
29885.00 |
1005.00 |
19815.00 |
66.3 |
|
| County | SMITH |
| Highway |
SH0155 |
| From |
SOUTH TYLER AREA OFFICE |
| To |
SOUTH TYLER AREA OFFICE |
| CSJ |
6228-29-001 |
| Proj ID |
SUP - 622829001 |
| Work Type |
SOUTH TYLER LAWN |
| |
|
0.001 |
31000.00 |
1250.00 |
14350.00 |
46.2 |
| Work Order |
08-15-11 |
| Work Began |
09-06-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-29-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07111041 |
|
Totals |
31000.00 |
1250.00 |
14350.00 |
46.2 |
|
| County | ANDERSON |
| Highway |
LP0256 |
| From |
INTERSECTION OF LP 256 |
| To |
AND OLD ELKHART RD |
| CSJ |
6228-30-001 |
| Proj ID |
SUP - 622830001 |
| Work Type |
LANDSCAPE ROW |
| |
|
0.001 |
15390.00 |
285.00 |
9405.00 |
61.1 |
| Work Order |
08-15-11 |
| Work Began |
09-01-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-30-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07111040 |
|
Totals |
15390.00 |
285.00 |
9405.00 |
61.1 |
|
| County | SMITH |
| Highway |
IH0020 |
| From |
VAN ZANDT/KAUFMAN CL TO GREGG/HARRISON |
| To |
CL |
| CSJ |
6228-31-001 |
| Proj ID |
SUP - 622831001 |
| Work Type |
LITTER REMOVAL ON IH20 |
| |
|
0.010 |
169543.58 |
0.00 |
127168.39 |
75.0 |
| Work Order |
08-15-11 |
| Work Began |
10-03-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
606 |
| Percent Time Used |
83 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-31-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06111043 |
|
Totals |
169543.58 |
0.00 |
127168.39 |
75.0 |
|
| County | GREGG |
| Highway |
US0259 |
| From |
LONGVIEW MAINTENANCE SECTION |
| To |
LONGVIEW MAINTENANCE SECTION |
| CSJ |
6228-32-001 |
| Proj ID |
SUP - 622832001 |
| Work Type |
LITTER REMOVAL |
| |
|
0.010 |
138234.00 |
7888.08 |
115593.14 |
83.6 |
| Work Order |
08-15-11 |
| Work Began |
09-01-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08111041 |
|
Totals |
138234.00 |
7888.08 |
115593.14 |
83.6 |
|
| County | GREGG |
| Highway |
SH0031 |
| From |
SH 31 |
| To |
LP 281, GREGG CO. |
| CSJ |
6228-33-001 |
| Proj ID |
SUP - 622833001 |
| Work Type |
LANDSCAPE ROW |
| |
|
0.010 |
51200.00 |
1600.00 |
27200.00 |
53.1 |
| Work Order |
08-16-11 |
| Work Began |
09-15-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-33-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08111042 |
|
Totals |
51200.00 |
1600.00 |
27200.00 |
53.1 |
|
| County | VAN ZANDT |
| Highway |
FM1255 |
| From |
CANTON MTCE. SECTION |
| To |
CANTON MTCE. SECTION |
| CSJ |
6228-34-001 |
| Proj ID |
SUP - 622834001 |
| Work Type |
LAWN MTCE. |
| |
|
0.001 |
42200.00 |
950.00 |
9550.00 |
22.6 |
| Work Order |
08-16-11 |
| Work Began |
09-12-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-34-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08111043 |
|
Totals |
42200.00 |
950.00 |
9550.00 |
22.6 |
|
| County | VAN ZANDT |
| Highway |
SH0019 |
| From |
CANTON MAINTENANCE SECTION |
| To |
CANTON MAINTENANCE SECTION |
| CSJ |
6228-35-001 |
| Proj ID |
SUP - 622835001 |
| Work Type |
LITTER REMOVAL |
| |
|
0.010 |
82780.00 |
3352.45 |
69559.78 |
84.0 |
| Work Order |
08-16-11 |
| Work Began |
09-01-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-35-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08111040 |
|
Totals |
82780.00 |
3352.45 |
69559.78 |
84.0 |
|
| County | HENDERSON |
| Highway |
SH0019 |
| From |
ATHENS MAINTENANCE SECTION |
| To |
ATHENS MAINTENANCE SECTION |
| CSJ |
6228-36-001 |
| Proj ID |
SUP - 622836001 |
| Work Type |
________LITTER REMOVAL |
| |
|
0.010 |
106233.44 |
8020.48 |
76639.19 |
72.1 |
| Work Order |
08-16-11 |
| Work Began |
09-01-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-36-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08111044 |
|
Totals |
106233.44 |
8020.48 |
76639.19 |
72.1 |
|
| County | HENDERSON |
| Highway |
US0175 |
| From |
ATHENS MAINTENANCE SECTION |
| To |
VARIOUS LOCATIONS |
| CSJ |
6228-37-001 |
| Proj ID |
SUP - 622837001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
0.001 |
62320.00 |
2065.00 |
41480.00 |
66.5 |
| Work Order |
08-16-11 |
| Work Began |
09-01-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
604 |
| Percent Time Used |
82 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6228-37-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08111045 |
|
Totals |
62320.00 |
2065.00 |
41480.00 |
66.5 |
|
| County | SMITH |
| Highway |
US0069 |
| From |
VARIOUS LOCATIONS IN |
| To |
THE TYLER DISTRICT |
| CSJ |
6230-68-001 |
| Proj ID |
RMC - 623068001 |
| Work Type |
MAINTENANCE OF ILLUMINATION |
| |
|
1.000 |
80796.00 |
1045.00 |
83038.55 |
99.9 |
| Work Order |
01-17-12 |
| Work Began |
01-17-12 |
| Work Completed |
|
| Time Computed |
01-17-12 |
| Contract Working Days |
255 |
| Addl Days Granted |
255 |
| Working Days Charged |
325 |
| Percent Time Used |
63 |
| Contractor(s) |
| JASCO |
SUBCONTRACTOR(S) FOR CCSJ: 6230-68-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11111001 |
|
Totals |
80796.00 |
1045.00 |
83038.55 |
99.9 |
|
| County | SMITH |
| Highway |
US0069 |
| From |
VARIOUS LOCATIONS |
| To |
IN THE TYLER DISTRICT |
| CSJ |
6230-70-001 |
| Proj ID |
RMC - 623070001 |
| Work Type |
SIGNAL MAINTENANCE |
| |
|
1.000 |
272735.00 |
14667.75 |
371893.90 |
99.9 |
| Work Order |
11-17-11 |
| Work Began |
01-04-12 |
| Work Completed |
|
| Time Computed |
12-12-11 |
| Contract Working Days |
255 |
| Addl Days Granted |
255 |
| Working Days Charged |
350 |
| Percent Time Used |
68 |
| Contractor(s) |
| TEXAS TRAFFIC CONTROL SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6230-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10111004 |
|
Totals |
272735.00 |
14667.75 |
371893.90 |
99.9 |
|
| County | ANDERSON |
| Highway |
US0084 |
| From |
PALESTINE MTCE. SECTION |
| To |
ANDERSON COUNTY, ETC. |
| CSJ |
6236-55-001 |
| Proj ID |
SUP - 623655001 |
| Work Type |
LITTER PICK UP |
| |
|
0.010 |
69911.77 |
9839.97 |
57841.24 |
82.7 |
| Work Order |
03-21-12 |
| Work Began |
04-25-12 |
| Work Completed |
|
| Time Computed |
04-01-12 |
| Contract Working Days |
518 |
| Addl Days Granted |
0 |
| Working Days Charged |
395 |
| Percent Time Used |
76 |
| Contractor(s) |
TIBH INDUSTRIES, INC. RUCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6236-55-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01121041 |
|
Totals |
69911.77 |
9839.97 |
57841.24 |
82.7 |
|
| County | CHEROKEE |
| Highway |
US0069 |
| From |
JACKSONVILLE/RUSK MTCE. SECTIONS |
| To |
CHEROKEE COUNTY, ETC. |
| CSJ |
6236-56-001 |
| Proj ID |
SUP - 623656001 |
| Work Type |
LITTER PICK UP |
| |
|
0.010 |
101201.47 |
13740.61 |
70973.03 |
70.1 |
| Work Order |
03-21-12 |
| Work Began |
04-18-12 |
| Work Completed |
|
| Time Computed |
04-01-12 |
| Contract Working Days |
518 |
| Addl Days Granted |
0 |
| Working Days Charged |
395 |
| Percent Time Used |
76 |
| Contractor(s) |
TIBH INDUSTRIES, INC. RUCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6236-56-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12111042 |
|
Totals |
101201.47 |
13740.61 |
70973.03 |
70.1 |
|
| County | CHEROKEE |
| Highway |
LP0456 |
| From |
JACKSONVILLE COMPLEX |
| To |
JACKSONVILLE COMPLEX |
| CSJ |
6236-57-001 |
| Proj ID |
SUP - 623657001 |
| Work Type |
JANITORIAL MTCE |
| |
|
0.010 |
37282.04 |
1753.48 |
25286.20 |
67.8 |
| Work Order |
03-21-12 |
| Work Began |
04-02-12 |
| Work Completed |
|
| Time Computed |
04-01-12 |
| Contract Working Days |
518 |
| Addl Days Granted |
0 |
| Working Days Charged |
395 |
| Percent Time Used |
76 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6236-57-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12111040 |
|
Totals |
37282.04 |
1753.48 |
25286.20 |
67.8 |
|
| County | WOOD |
| Highway |
SL0564 |
| From |
MINEOLA COMPLEX |
| To |
MINEOLA COMPLEX |
| CSJ |
6236-70-001 |
| Proj ID |
SUP - 623670001 |
| Work Type |
JANITORIAL MTCE |
| |
|
0.010 |
26866.57 |
1180.40 |
17504.49 |
65.5 |
| Work Order |
03-21-12 |
| Work Began |
04-02-12 |
| Work Completed |
|
| Time Computed |
04-01-12 |
| Contract Working Days |
518 |
| Addl Days Granted |
0 |
| Working Days Charged |
395 |
| Percent Time Used |
76 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6236-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11111040 |
|
Totals |
26866.57 |
1180.40 |
17504.49 |
65.5 |
|
| County | SMITH |
| Highway |
SL0323 |
| From |
SPECIAL CREWS OFFICE-FORMERLY N TYLER |
| To |
SPECIAL CREWS OFFICE- |
| CSJ |
6242-19-001 |
| Proj ID |
SUP - 624219001 |
| Work Type |
LAWN MAINTENANCE |
| |
|
0.001 |
15300.00 |
675.00 |
6525.00 |
42.6 |
| Work Order |
04-12-12 |
| Work Began |
04-13-12 |
| Work Completed |
|
| Time Computed |
04-13-12 |
| Contract Working Days |
518 |
| Addl Days Granted |
0 |
| Working Days Charged |
383 |
| Percent Time Used |
73 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6242-19-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04121031 |
|
Totals |
15300.00 |
675.00 |
6525.00 |
42.6 |
|
| County | SMITH |
| Highway |
US0069 |
| From |
TYLER MTCE. SECTION |
| To |
SMITH CO., ETC. |
| CSJ |
6242-65-001 |
| Proj ID |
SUP - 624265001 |
| Work Type |
LITTER PICK UP |
| |
|
0.010 |
263171.20 |
15351.15 |
176755.31 |
67.1 |
| Work Order |
04-30-12 |
| Work Began |
05-21-12 |
| Work Completed |
|
| Time Computed |
05-01-12 |
| Contract Working Days |
488 |
| Addl Days Granted |
0 |
| Working Days Charged |
365 |
| Percent Time Used |
74 |
| Contractor(s) |
TIBH INDUSTRIES, INC. RUCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6242-65-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04121030 |
|
Totals |
263171.20 |
15351.15 |
176755.31 |
67.1 |
|
| County | HENDERSON |
| Highway |
SH0031 |
| From |
ATHENS MAINTENANCE OFFICE |
| To |
HENDERSON COUNTY |
| CSJ |
6243-58-001 |
| Proj ID |
SUP - 624358001 |
| Work Type |
LAWN MAINTENANCE |
| |
|
0.010 |
22245.00 |
628.00 |
3357.50 |
15.0 |
| Work Order |
08-22-12 |
| Work Began |
09-01-12 |
| Work Completed |
|
| Time Computed |
09-01-12 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
242 |
| Percent Time Used |
33 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ANDREWS DIVERSIFIED INDUSTRIES |
SUBCONTRACTOR(S) FOR CCSJ: 6243-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07121030 |
|
Totals |
22245.00 |
628.00 |
3357.50 |
15.0 |
|