MIS.CIS.19 MONTHLY LOCAL LET MAINTENANCE REPORT DISTRICT 10 AS OF JAN 11, 2017 PAGE 30 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ ANDERSON VARIOUS ROADWAYS IN | 0.001 | 205,450.00| 0.00| 141,250.00| 68.7| SH0019 ANDERSON COUNTY | | | | | | 6299-59-001 | | | | | | RMC - 629959001 TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-12-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 79 PERCENT TIME USED- 30 | |**************************************************| | | | | | | | PLANT FUEL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6299-59-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04161001 | TOTALS | 205,450.00| 0.00| 141,250.00| 68.7| ************************************************************************************************************************************ ANDERSON PALESTINE MTCE OFFICE | 0.010 | 22,127.04| 0.00| 3,998.58| 18.0| SH0019 ANDERSON CO | | | | | | 6303-79-001 | | | | | | SUP - 630379001 JANITORIAL MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WORLD TECHNICAL SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-79-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161038 | TOTALS | 22,127.04| 0.00| 3,998.58| 18.0| ************************************************************************************************************************************ ANDERSON PALESTINE MAINTENANCE OFFICE | 0.010 | 32,250.00| 0.00| 10,625.00| 32.9| SH0019 PALESTINE MAINTENANCE OFFICE | | | | | | 6286-13-001 | | | | | | SUP - 628613001 LAWN MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-13-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151038 | TOTALS | 32,250.00| 0.00| 10,625.00| 32.9| ************************************************************************************************************************************ ANDERSON JCT SL 256 | 0.001 | 15,390.00| 0.00| 5,130.00| 33.3| SL0256 & OLD ELKHART RD | | | | | | 6286-14-001 | | | | | | SUP - 628614001 LANDSCAPE ROW MTCE. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-14-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151039 | TOTALS | 15,390.00| 0.00| 5,130.00| 33.3| ************************************************************************************************************************************ ANDERSON PALESTINE MAINTENANCE SECTION | 0.001 | 148,058.79| 0.00| 93,322.70| 63.0| US0084 ANDERSON COUNTY | | | | | | 6286-24-001 | | | | | | SUP - 628624001 LITTER PICK-UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-24-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151049 | TOTALS | 148,058.79| 0.00| 93,322.70| 63.0| ************************************************************************************************************************************ ANDERSON VARIOUS ROADWAYS | 73.260 | 138,031.00| 0.00| 30,370.00| 22.0| FM0315 IN ANDERSON COUNTY | | | | | | 6307-35-001 | | | | | | RMC - 630735001 TREE TRIMMING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 12-12-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 74 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 15 PERCENT TIME USED- 20 | |**************************************************| | | | | | | | TERRY ENTERPRISES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6307-35-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09161004 | TOTALS | 138,031.00| 0.00| 30,370.00| 22.0| ************************************************************************************************************************************ ANDERSON VARIOUS ROADWAYS IN | 0.001 | 200,539.92| 0.00| 0.00| 0.0| US0079 ANDERSON COUNTY | | | | | | 6308-84-001 | | | | | | RMC - 630884001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 49 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LAZER CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-84-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161002 | TOTALS | 200,539.92| 0.00| 0.00| 0.0| ************************************************************************************************************************************ CHEROKEE JACKSONVILLE MTCE OFFICE | 0.010 | 12,060.00| 0.00| 1,162.50| 9.6| SL0456 SL 456 | | | | | | 6303-80-001 | | | | | | SUP - 630380001 LAWN MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | GATEWAY COMMUNITY PARTNERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-80-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161039 | TOTALS | 12,060.00| 0.00| 1,162.50| 9.6| ************************************************************************************************************************************ CHEROKEE RUSK MTCE OFFICE | 0.010 | 14,160.00| 0.00| 1,310.00| 9.2| US0069 US 69 | | | | | | 6303-81-001 | | | | | | SUP - 630381001 LAWN MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | GATEWAY COMMUNITY PARTNERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-81-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161040 | TOTALS | 14,160.00| 0.00| 1,310.00| 9.2| ************************************************************************************************************************************ CHEROKEE JVILLE/RUSK MTCE SECTIONS | 0.010 | 18,052.66| 0.00| 1,900.28| 10.5| US0069 CHEROKEE CO | | | | | | 6303-82-001 | | | | | | SUP - 630382001 LANDSCAPE ISLAND MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | GATEWAY COMMUNITY PARTNERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-82-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161041 | TOTALS | 18,052.66| 0.00| 1,900.28| 10.5| ************************************************************************************************************************************ CHEROKEE JACKSONVILLE OFFICE | 0.001 | 52,047.36| 0.00| 31,792.12| 61.0| SL0456 JACKSONVILLE OFFICE | | | | | | 6286-20-001 | | | | | | SUP - 628620001 JANITORIAL MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WORLD TECHNICAL SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-20-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151045 | TOTALS | 52,047.36| 0.00| 31,792.12| 61.0| ************************************************************************************************************************************ CHEROKEE VARIOUS PARKS IN THE JACKSONVILLE & | 0.010 | 82,953.12| 0.00| 46,262.08| 55.7| US0069 RUSK MAINTENANCE SECTIONS | | | | | | 6286-21-001 | | | | | | SUP - 628621001 PICNIC AREA MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | GATEWAY COMMUNITY PARTNERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-21-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151046 | TOTALS | 82,953.12| 0.00| 46,262.08| 55.7| ************************************************************************************************************************************ CHEROKEE JACKSONVILLE/RUSK MAINTENANCE SECTION | 0.001 | 288,378.50| 0.00| 201,929.62| 70.0| US0069 CHEROKEE COUNTY | | | | | | 6286-22-001 | | | | | | SUP - 628622001 LITTER PICK-UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-22-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151047 | TOTALS | 288,378.50| 0.00| 201,929.62| 70.0| ************************************************************************************************************************************ CHEROKEE VARIOUS ROADWAYS IN | 0.001 | 215,004.00| 0.00| 0.00| 0.0| US0079 CHEROKEE COUNTY | | | | | | 6307-34-001 | | | | | | RMC - 630734001 TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SG COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6307-34-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09161003 | TOTALS | 215,004.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ CHEROKEE VARIOUS ROADWAYS | 121.340 | 192,010.00| 0.00| 0.00| 0.0| SH0135 IN CHEROKEE COUNTY | | | | | | 6307-98-001 | | | | | | RMC - 630798001 TREE TRIMMING & BRUSH REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 122 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | WEST TEXAS REBAR PLACERS INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6307-98-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10161003 | TOTALS | 192,010.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ CHEROKEE VARIOUS ROADWAYS IN | 0.001 | 175,752.89| 0.00| 0.00| 0.0| US0069 CHEROKEE COUNTY | | | | | | 6308-81-001 | | | | | | RMC - 630881001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 51 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SG COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-81-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161005 | TOTALS | 175,752.89| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GREGG VARIOUS BRIDGES ON IH-20 | 0.001 | 207,500.00| 0.00| 370,379.24| 99.9| IH0020 IN THE TYLER DISTRICT | | | | | | 6298-22-001 | | | | | | RMC - 629822001 BRIDGE DECK/RAIL REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 07-18-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 27 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | RED BARON BUILDING COMPANY, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6298-22-001 | | | | | | FLEX SUPPLY, LLC | |SUB %: 2.82 | | | | | | | | | | CONTRACT 05161001 | TOTALS | 207,500.00| 0.00| 370,379.24| 99.9| ************************************************************************************************************************************ GREGG VARIOUS LOCATIONS IN THE | 0.010 | 107,213.00| 0.00| 255,426.50| 99.9| US0259 LONGVIEW AND HENDERSON SECTIONS | | | | | | 6285-91-001 | | | | | | RMC - 628591001 GUARDRAIL REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 339 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | CATOCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6285-91-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06151003 | TOTALS | 107,213.00| 0.00| 255,426.50| 99.9| ************************************************************************************************************************************ GREGG LONGVIEW MTCE. OFFICE | 0.010 | 31,110.00| 0.00| 3,690.00| 11.8| SL0281 GREGG CO | | | | | | 6303-72-001 | | | | | | SUP - 630372001 LAWN MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-72-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161032 | TOTALS | 31,110.00| 0.00| 3,690.00| 11.8| ************************************************************************************************************************************ GREGG LONGVIEW MAINTENANCE SECTION | 0.001 | 120,414.10| 0.00| 77,550.31| 64.4| US0259 GREGG COUNTY | | | | | | 6286-12-001 | | | | | | SUP - 628612001 LITTER PICK-UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-12-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151037 | TOTALS | 120,414.10| 0.00| 77,550.31| 64.4| ************************************************************************************************************************************ GREGG VARIOUS ROADWAYS IN | 57.930 | 98,482.00| 0.00| 32,198.00| 32.6| SH0135 GREGG COUNTY | | | | | | 6307-99-001 | | | | | | RMC - 630799001 TREE TRIMMING & BRUSH REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 12-07-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 58 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 15 PERCENT TIME USED- 25 | |**************************************************| | | | | | | | FOWLER CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6307-99-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10161004 | TOTALS | 98,482.00| 0.00| 32,198.00| 32.6| ************************************************************************************************************************************ GREGG VARIOUS ROADWAYS IN | 0.001 | 159,225.00| 0.00| 148,590.00| 93.3| SH0031 GREGG COUNTY | | | | | | 6294-86-001 | | | | | | RMC - 629486001 TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 05-16-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 161 PERCENT TIME USED- 63 | |**************************************************| | | | | | | | DREWERY CONSTRUCTION COMPANY, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6294-86-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11151001 | TOTALS | 159,225.00| 0.00| 148,590.00| 93.3| ************************************************************************************************************************************ GREGG LONGVIEW MTCE. | 0.001 | 56,956.86| 1,875.10| 1,875.10| 3.2| SL0281 LONGVIEW AO OFFICE | | | | | | 6311-52-001 | | | | | | SUP - 631152001 JANITORIAL MTCE. | | | | | | | | | | | | WORK ORDER- 11-30-16 WORK BEGAN- 12-01-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-01-16 | | | | | | CONTRACT WORKING DAYS- 639 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 31 PERCENT TIME USED- 4 | | | | | | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WOODCREEK OUTREACH REHABILITATION DEVELOPMENT | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6311-52-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11161030 | TOTALS | 56,956.86| 1,875.10| 1,875.10| 3.2| ************************************************************************************************************************************ GREGG VARIOUS ROADWAYS IN | 0.001 | 93,307.62| 0.00| 0.00| 0.0| US0259 GREGG COUNTY | | | | | | 6308-82-001 | | | | | | RMC - 630882001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 33 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LAZER CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-82-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161004 | TOTALS | 93,307.62| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HENDERSON VARIOUS ROADWAYS IN | 0.001 | 239,245.00| 0.00| 159,180.76| 66.5| SH0019 THE TYLER DISTRICT | | | | | | 6300-22-001 | | | | | | RMC - 630022001 PAINT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-22-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 73 PERCENT TIME USED- 28 | |**************************************************| | | | | | | | STRIPING TECHNOLOGY, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6300-22-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04161003 | TOTALS | 239,245.00| 0.00| 159,180.76| 66.5| ************************************************************************************************************************************ HENDERSON VARIOUS ROADWAYS IN THE | 129.000 | 24,028.00| 0.00| 72,029.00| 99.9| SH0031 ATHENS MAINTENANCE SECTION | | | | | | 6284-74-001 | | | | | | RMC - 628474001 DEBRIS REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 07-30-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 374 PERCENT TIME USED- 73 | |**************************************************| | | | | | | | TEXAS TREE & LANDSCAPE, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6284-74-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05151002 | TOTALS | 24,028.00| 0.00| 72,029.00| 99.9| ************************************************************************************************************************************ HENDERSON VARIOUS LOCATIONS | 0.001 | 288,607.50| 0.00| 51,429.00| 17.8| SH0031 IN THE TYLER DISTRICT | | | | | | 6299-58-001 | | | | | | RMC - 629958001 SHORT LINE THERMO | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-13-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 110 PERCENT TIME USED- 43 | |**************************************************| | | | | | | | STRIPING TECHNOLOGY, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6299-58-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05161002 | TOTALS | 288,607.50| 0.00| 51,429.00| 17.8| ************************************************************************************************************************************ HENDERSON VARIOUS ROADWAYS IN THE | 0.010 | 23,318.75| 0.00| 379,608.72| 99.9| US0175 ATHENS MAINTENANCE SECTION | | | | | | 6272-05-001 | | | | | | RMC - 627205001 PAINT | | | | | | | | | | | | VAN ZANDT VARIOUS ROADWAYS IN | 0.010 | 23,318.75| 0.00| 59,964.01| 99.9| SH0019 THE CANTON MAINTENANCE SECTION | | | | | | 6272-05-002 | | | | | | RMC - 627205002 PAINT | | | | | | | | | | | | RUSK VARIOUS ROADWAYS IN THE | 0.010 | 23,318.75| 0.00| 60,837.79| 99.9| US0259 HENDERSON MAINTENANCE SECTIONN | | | | | | 6272-05-003 | | | | | | RMC - 627205003 PAINT | | | | | | | | | | | | CHEROKEE VARIOUS ROADWAYS IN THE | 0.010 | 12,009.38| 0.00| 66,767.05| 99.9| US0079 JACKSONVILLE MAINTENANCE SECTION | | | | | | 6272-05-004 | | | | | | RMC - 627205004 PAINT | | | | | | | | | | | | GREGG VARIOUS ROADWAYS IN THE | 0.010 | 23,318.75| 0.00| 49,248.01| 99.9| SH0031 LONGVIEW MAINTENANCE SECTION | | | | | | 6272-05-005 | | | | | | RMC - 627205005 PAINT | | | | | | | | | | | | WOOD VARIOUS ROADWAYS IN THE | 0.010 | 23,318.75| 0.00| 35,210.94| 99.9| US0080 MINEOLA MAINTENACE SECTION | | | | | | 6272-05-006 | | | | | | RMC - 627205006 PAINT | | | | | | | | | | | | ANDERSON VARIOUS ROADWAYS IN THE | 0.010 | 23,318.75| 0.00| 8,365.21| 35.8| US0287 PALESINE MAINTENANCE SECTION | | | | | | 6272-05-007 | | | | | | RMC - 627205007 PAINT | | | | | | | | | | | | SMITH VARIOUS ROADWAYS IN THE | 0.010 | 23,318.75| 0.00| 48,327.90| 99.9| SH0110 TYLER MAINTENANCE SECTION | | | | | | 6272-05-008 | | | | | | RMC - 627205008 PAINT | | | | | | | | | | | | CHEROKEE VARIOUS ROADWAYS IN THE | 0.010 | 12,009.38| 0.00| 34,335.47| 99.9| US0069 RUSK MAINTENANCE SECTION | | | | | | 6272-05-009 | | | | | | RMC - 627205009 PAINT | | | | | | | | | | | | WORK ORDER- 08-14-14 WORK BEGAN- 09-25-14 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-01-14 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 509 PERCENT TIME USED- 99 | |**************************************************| | | | | | | | STRIPING TECHNOLOGY, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6272-05-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06141001 | TOTALS | 187,250.01| 0.00| 742,665.10| 99.9| ************************************************************************************************************************************ HENDERSON VARIOUS LOCATIONS IN_THE | 0.010 | 123,362.00| 0.00| 173,564.00| 99.9| SH0031 ATHENS AND PALESTINE SECTIONS | | | | | | 6285-89-001 | | | | | | RMC - 628589001 GUARDRAIL REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 333 PERCENT TIME USED- 65 | |**************************************************| | | | | | | | CATOCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6285-89-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06151001 | TOTALS | 123,362.00| 0.00| 173,564.00| 99.9| ************************************************************************************************************************************ HENDERSON VARIOUS ROADWAYS IN | 0.001 | 259,388.00| 0.00| 314,645.00| 99.9| SH0031 THE TYLER DISTRICT | | | | | | 6299-18-001 | | | | | | RMC - 629918001 RAISED PAVEMENT MARKERS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-08-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 116 PERCENT TIME USED- 31 | |**************************************************| | | | | | | | BRYDL CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6299-18-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06161001 | TOTALS | 259,388.00| 0.00| 314,645.00| 99.9| ************************************************************************************************************************************ HENDERSON ATHENS MTCE. SECTION | 0.010 | 14,898.00| 0.00| 3,438.00| 23.0| SH0031 HENDERSON CO. | | | | | | 6303-70-001 | | | | | | SUP - 630370001 LANDSCAPE ROW MTCE. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-70-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161030 | TOTALS | 14,898.00| 0.00| 3,438.00| 23.0| ************************************************************************************************************************************ HENDERSON ATHENS MTCE. OFFICE | 0.010 | 16,782.00| 0.00| 2,343.00| 13.9| SH0031 HENDERSON CO | | | | | | 6303-71-001 | | | | | | SUP - 630371001 LAWN MTCE. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-71-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161031 | TOTALS | 16,782.00| 0.00| 2,343.00| 13.9| ************************************************************************************************************************************ HENDERSON ATHENS MAINTENANCE SECTION | 0.001 | 41,786.00| 0.00| 27,309.00| 65.3| US0175 VARIOUS LOCATIONS | | | | | | 6286-10-001 | | | | | | SUP - 628610001 PICNIC AREA MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-10-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151035 | TOTALS | 41,786.00| 0.00| 27,309.00| 65.3| ************************************************************************************************************************************ HENDERSON ATHENS MAINTENANCE_SECTION | 0.001 | 138,559.95| 0.00| 95,787.55| 69.1| SH0019 HENDERSON COUNTY | | | | | | 6286-11-001 | | | | | | SUP - 628611001 LITTER PICK-UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-11-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151036 | TOTALS | 138,559.95| 0.00| 95,787.55| 69.1| ************************************************************************************************************************************ HENDERSON ATHENS MTCE OFFICE | 0.001 | 118,864.00| 0.00| 78,076.00| 65.6| SL0007 ATHENS AREA OFFICE | | | | | | 6286-16-001 | | | | | | SUP - 628616001 JANITORIAL MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WOODCREEK OUTREACH REHABILITATION DEVELOPMENT | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-16-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151041 | TOTALS | 118,864.00| 0.00| 78,076.00| 65.6| ************************************************************************************************************************************ HENDERSON VARIOUS ROADWAYS IN THE | 0.001 | 172,950.00| 0.00| 134,103.00| 77.5| SH0031 ATHENS MAINTENANCE SECTION | | | | | | 6288-60-001 | | | | | | RMC - 628860001 TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 270 PERCENT TIME USED- 52 | |**************************************************| | | | | | | | PATTERSON'S COMPLETE TREE SERVICE LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6288-60-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09151005 | TOTALS | 172,950.00| 0.00| 134,103.00| 77.5| ************************************************************************************************************************************ HENDERSON VARIOUS ROADWAYS IN | 69.500 | 111,201.00| 0.00| 0.00| 0.0| FM1615 HENDERSON COUNTY | | | | | | 6308-00-001 | | | | | | RMC - 630800001 TREE TRIMMING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 70 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | FOWLER CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-00-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11161002 | TOTALS | 111,201.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HENDERSON VARIOUS ROADWAYS IN | 0.001 | 244,421.32| 0.00| 0.00| 0.0| SH0031 HENDERSON COUNTY | | | | | | 6308-78-001 | | | | | | RMC - 630878001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 55 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LAZER CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-78-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161008 | TOTALS | 244,421.32| 0.00| 0.00| 0.0| ************************************************************************************************************************************ RUSK VARIOUS LOCATIONS IN RUSK, | 0.010 | 160,589.00| 0.00| 157,106.00| 99.9| US0259 GREGG & ANDERSON CO. | | | | | | 6290-07-001 | | | | | | BPM - 629007001 BRIDGE PREVENTIVE MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 04-12-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 78 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 155 PERCENT TIME USED- 198 | |**************************************************| | | | | | | | DEANGELO BROTHERS LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6290-07-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01161005 | TOTALS | 160,589.00| 0.00| 157,106.00| 99.9| ************************************************************************************************************************************ RUSK VARIOUS ROADWAYS IN | 49.100 | 74,650.00| 0.00| 0.00| 0.0| FM0782 RUSK COUNTY | | | | | | 6308-86-001 | | | | | | RMC - 630886001 TREE TRIMMING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 50 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | PLANT FUEL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-86-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01171001 | TOTALS | 74,650.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ RUSK VARIOUS ROADWAYS IN | 0.010 | 435,655.00| 0.00| 3,070,764.75| 99.9| US0079 RUSK AND CHEROKEE COUNTIES | | | | | | 6290-48-001 | | | | | | EMC - 629048001 EMERGENCY DEBRIS & TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 06-26-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 52 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 33 PERCENT TIME USED- 63 | |**************************************************| | | | | | | | DREWERY CONSTRUCTION COMPANY, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6290-48-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06151044 | TOTALS | 435,655.00| 0.00| 3,070,764.75| 99.9| ************************************************************************************************************************************ RUSK HENDERSON MTCE. SECTION | 0.001 | 373,499.73| 0.00| 26,336.18| 7.0| SH0064 RUSK CO. | | | | | | 6303-86-001 | | | | | | SUP - 630386001 LITTER PICK UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 1,095 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 11 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-86-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161045 | TOTALS | 373,499.73| 0.00| 26,336.18| 7.0| ************************************************************************************************************************************ RUSK VARIOUS ROADWAYS IN THE | 0.001 | 213,375.00| 0.00| 200,030.00| 93.7| US0079 HENDERSON MAINTENANCE SECTION | | | | | | 6288-62-001 | | | | | | RMC - 628862001 TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 10-26-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 297 PERCENT TIME USED- 58 | |**************************************************| | | | | | | | PATTERSON'S COMPLETE TREE SERVICE LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6288-62-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09151002 | TOTALS | 213,375.00| 0.00| 200,030.00| 93.7| ************************************************************************************************************************************ RUSK HENDERSON MTCE SECTION OFFICE | 0.010 | 10,352.36| 0.00| 560.06| 5.4| FM0225 FM 225 RUSK CO | | | | | | 6311-48-001 | | | | | | SUP - 631148001 LAWN MTCE. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 11-02-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 669 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 9 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6311-48-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10161030 | TOTALS | 10,352.36| 0.00| 560.06| 5.4| ************************************************************************************************************************************ RUSK US 259 AND SH 79 | 0.001 | 39,600.00| 0.00| 0.00| 0.0| US0259 US 259 AND SH 322 | | | | | | 6311-49-001 | | | | | | SUP - 631149001 LANDSCAPE MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 12-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 669 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 9 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6311-49-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10161031 | TOTALS | 39,600.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ RUSK SH 64W, US 259N, US 259S, SH 43N | 0.010 | 53,472.00| 0.00| 5,578.88| 10.4| SH0064 HENDERSON MTCE SECTION | | | | | | 6311-50-001 | | | | | | SUP - 631150001 PICNIC AREA MTCE. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 11-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 669 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 9 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6311-50-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10161032 | TOTALS | 53,472.00| 0.00| 5,578.88| 10.4| ************************************************************************************************************************************ RUSK HENDERSON MTCE. OFFICE | 0.010 | 19,113.72| 641.40| 641.40| 3.3| FM0225 RUSK CO | | | | | | 6311-51-001 | | | | | | SUP - 631151001 JANITORIAL MTCE. | | | | | | | | | | | | WORK ORDER- 11-30-16 WORK BEGAN- 12-01-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-01-16 | | | | | | CONTRACT WORKING DAYS- 639 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 31 PERCENT TIME USED- 4 | | | | | | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WOODCREEK OUTREACH REHABILITATION DEVELOPMENT | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6311-51-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11161031 | TOTALS | 19,113.72| 641.40| 641.40| 3.3| ************************************************************************************************************************************ RUSK VARIOUS ROADWAYS IN | 0.001 | 221,390.06| 0.00| 0.00| 0.0| US0259 RUSK COUNTY | | | | | | 6308-80-001 | | | | | | RMC - 630880001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 55 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LAZER CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-80-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161006 | TOTALS | 221,390.06| 0.00| 0.00| 0.0| ************************************************************************************************************************************ RUSK VARIOUS LOCATIONS IN HENDERSON MTCE. | 0.001 | 212,350.00| 0.00| 0.00| 0.0| FM2276 IN RUSK COUNTY | | | | | | 6301-85-001 | | | | | | BPM - 630185001 BRIDGE PREVENTIVE MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 82 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | IIPL USA LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6301-85-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161013 | TOTALS | 212,350.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH FM 757 AND SL 323 | 0.001 | 174,696.00| 0.00| 53,542.50| 53.6| FM0757 IN SMITH COUNTY | | | | | | 6288-59-001 | | | | | | RMC - 628859001 CULVERT REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-12-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 34 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 102 PERCENT TIME USED- 300 | |**************************************************| | | | | | | | DEANGELO BROTHERS LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6288-59-001 | | | | | | NORTH TEXAS MAINTENANCE, INC. | |SUB %: 100.00 | | | | | | | | | | CONTRACT 01161002 | TOTALS | 174,696.00| 0.00| 53,542.50| 53.6| ************************************************************************************************************************************ SMITH VARIOUS LOCATIONS IN THE | 0.010 | 105,963.00| 0.00| 314,304.00| 99.9| US0069 TYLER AND JACKSONVILLE SECTIONS | | | | | | 6285-92-001 | | | | | | RMC - 628592001 GUARDRAIL REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 331 PERCENT TIME USED- 64 | |**************************************************| | | | | | | | CATOCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6285-92-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06151004 | TOTALS | 105,963.00| 0.00| 314,304.00| 99.9| ************************************************************************************************************************************ SMITH IH 20 EAST & WEST DERRICK PARK | 0.010 | 124,980.00| 0.00| 19,992.00| 15.9| IH0020 SH 31 @ FM 2661 | | | | | | 6303-73-001 | | | | | | SUP - 630373001 PICNIC AREA MTCE. | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-73-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161033 | TOTALS | 124,980.00| 0.00| 19,992.00| 15.9| ************************************************************************************************************************************ SMITH IH 20 @ US 69 & | 0.010 | 29,450.00| 0.00| 3,875.00| 13.1| IH0020 IH 20 @ US 271 | | | | | | 6303-74-001 | | | | | | SUP - 630374001 TRAFFIC ISLAND LANDSCAPE MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-74-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161034 | TOTALS | 29,450.00| 0.00| 3,875.00| 13.1| ************************************************************************************************************************************ SMITH TYLER AO & MTCE OFFICE | 0.001 | 43,605.04| 0.00| 6,890.13| 15.8| SH0155 SH 155 S IN NOONDAY | | | | | | 6303-78-001 | | | | | | SUP - 630378001 JANITORIAL MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WORLD TECHNICAL SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-78-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161037 | TOTALS | 43,605.04| 0.00| 6,890.13| 15.8| ************************************************************************************************************************************ SMITH SPECIAL CREWS OFFICE-FORMERLY N TYLER | 0.001 | 15,200.00| 0.00| 6,150.00| 40.4| SL0323 SPECIAL CREWS OFFICE | | | | | | 6286-05-001 | | | | | | SUP - 628605001 LAWN MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-05-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151030 | TOTALS | 15,200.00| 0.00| 6,150.00| 40.4| ************************************************************************************************************************************ SMITH VAN ZANDT/KAUFMAN CL TO | 0.001 | 183,894.56| 0.00| 109,375.68| 59.4| IH0020 GREGG/HARRISON CL IH 20 | | | | | | 6286-06-001 | | | | | | SUP - 628606001 LITTER REMOVAL ON IH 20 | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-06-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151031 | TOTALS | 183,894.56| 0.00| 109,375.68| 59.4| ************************************************************************************************************************************ SMITH SOUTH TYLER MTCE OFFICE | 0.001 | 23,800.00| 0.00| 9,825.00| 41.2| SH0155 SOUTH TYLER AREA OFFICE | | | | | | 6286-15-001 | | | | | | SUP - 628615001 LAWN MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-15-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151040 | TOTALS | 23,800.00| 0.00| 9,825.00| 41.2| ************************************************************************************************************************************ SMITH TYLER MAINTENACE SECTION | 0.001 | 366,042.98| 0.00| 257,790.73| 70.4| US0069 SMITH COUNTY | | | | | | 6286-23-001 | | | | | | SUP - 628623001 LITTER PICK-UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-23-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151048 | TOTALS | 366,042.98| 0.00| 257,790.73| 70.4| ************************************************************************************************************************************ SMITH SL 323 IN | 0.100 | 182,290.00| 0.00| 27,510.00| 15.0| SL0323 SMITH COUNTY | | | | | | 6303-40-001 | | | | | | RMC - 630340001 SLOPE FAILURE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 9 PERCENT TIME USED- 22 | |**************************************************| | | | | | | | FNH CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-40-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08161001 | TOTALS | 182,290.00| 0.00| 27,510.00| 15.0| ************************************************************************************************************************************ SMITH TYLER DISTRICT HEADQUARTERS COMPLEX | 0.010 | 248,874.20| 0.00| 141,310.42| 56.7| SH0031 FRONT ST. | | | | | | 6296-27-001 | | | | | | SUP - 629627001 JANITORIAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 10-15-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 685 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 444 PERCENT TIME USED- 64 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WOODCREEK OUTREACH REHABILITATION DEVELOPMENT | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6296-27-001 | | | | | | WOODCREEK OUTREACH REHABILITATION DEVELOPMENT | |SUB %: 82.99 | | | | | | | | | | CONTRACT 10151030 | TOTALS | 248,874.20| 0.00| 141,310.42| 56.7| ************************************************************************************************************************************ SMITH VARIOUS LOCATIONS IN | 0.001 | 77,577.75| 0.00| 0.00| 0.0| US0069 THE TYLER DISTRICT | | | | | | 6307-37-001 | | | | | | RMC - 630737001 ILLUMINATION MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6307-37-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10161001 | TOTALS | 77,577.75| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH VARIOUS ROADWAYS IN | 0.001 | 61,860.00| 0.00| 373,864.42| 99.9| SH0031 THE TYLER DISTRICT | | | | | | 6278-31-001 | | | | | | RMC - 627831001 ILLUMINATION MAINTENANCE | | | | | | | | | | | | WORK ORDER- 01-09-15 WORK BEGAN- 01-29-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-28-15 | | | | | | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | | | | | | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 95 | | | | | | | | | | | | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6278-31-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11141004 | TOTALS | 61,860.00| 0.00| 373,864.42| 99.9| ************************************************************************************************************************************ SMITH VARIOUS ROADWAYS IN THE | 0.001 | 253,570.00| 51,150.50| 384,597.10| 99.9| SH0031 TYLER DISTRICT | | | | | | 6278-30-001 | | | | | | RMC - 627830001 SIGNAL MAINTENANCE | | | | | | | | | | | | WORK ORDER- 01-09-15 WORK BEGAN- 01-27-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-19-15 | | | | | | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | | | | | | WORKING DAYS CHARGED- 495 PERCENT TIME USED- 97 | | | | | | | | | | | | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6278-30-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11141005 | TOTALS | 253,570.00| 51,150.50| 384,597.10| 99.9| ************************************************************************************************************************************ SMITH VARIOUS ROADWAYS IN THE | 97.380 | 126,417.34| 0.00| 0.00| 0.0| FM2767 SMITH COUNTY | | | | | | 6294-77-001 | | | | | | RMC - 629477001 TREE TRIMMING & BRUSH REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 98 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DRC EMERGENCY SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6294-77-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12151001 | TOTALS | 126,417.34| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH VARIOUS ROADWAYS | 0.001 | 201,465.23| 0.00| 0.00| 0.0| SH0110 IN SMITH COUNTY | | | | | | 6308-85-001 | | | | | | RMC - 630885001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 51 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LAZER CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-85-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161001 | TOTALS | 201,465.23| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH .041 MILES NORTH OF FM 14 | 0.040 | 126,538.22| 0.00| 0.00| 0.0| US0271 US 271 | | | | | | 6308-56-001 | | | | | | RMC - 630856001 HEADWALL EXTENSION | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 64 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | WEST TEXAS REBAR PLACERS INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-56-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161010 | TOTALS | 126,538.22| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH VARIOUS LOCATIONS IN | 0.001 | 172,719.00| 0.00| 0.00| 0.0| SH0031 SMITH AND CHEROKEE COUNTIES | | | | | | 6309-40-001 | | | | | | RMC - 630940001 CURB INLET REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 84 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | IIPL USA LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6309-40-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161014 | TOTALS | 172,719.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VAN ZANDT CANTON MAINTENANCE SECTION | 0.001 | 27,600.00| 0.00| 9,500.00| 34.4| FM1255 CANTON MAINTENANCE SECTION | | | | | | 6286-07-001 | | | | | | SUP - 628607001 LAWN MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-07-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151032 | TOTALS | 27,600.00| 0.00| 9,500.00| 34.4| ************************************************************************************************************************************ VAN ZANDT PICNIC AREA ON SH 64 | 0.001 | 25,220.00| 0.00| 13,935.00| 55.2| SH0064 EAST OF CANTON | | | | | | 6286-08-001 | | | | | | SUP - 628608001 PICNIC AREA MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-08-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151033 | TOTALS | 25,220.00| 0.00| 13,935.00| 55.2| ************************************************************************************************************************************ VAN ZANDT CANTON MAINTENANCE SECTION | 0.001 | 146,763.20| 0.00| 91,852.94| 62.5| SH0019 VAN ZANDT COUNTY | | | | | | 6286-09-001 | | | | | | SUP - 628609001 LITTER PICK UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | ANDREWS DIVERSIFIED INDUSTRIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-09-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151034 | TOTALS | 146,763.20| 0.00| 91,852.94| 62.5| ************************************************************************************************************************************ VAN ZANDT VARIOUS ROADWAYS IN THE | 0.001 | 218,554.00| 0.00| 227,224.00| 99.9| SH0064 CANTON MAINTENANCE SECTION | | | | | | 6288-61-001 | | | | | | RMC - 628861001 TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 01-25-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 241 PERCENT TIME USED- 94 | |**************************************************| | | | | | | | BRYDL CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6288-61-001 | | | | | | CATOCON, INC. | |SUB %: 19.16 | | | | | | | | | | CONTRACT 09151004 | TOTALS | 218,554.00| 0.00| 227,224.00| 99.9| ************************************************************************************************************************************ VAN ZANDT US 80 NEAR THE UNION | 0.001 | 65,000.00| 0.00| 74,106.34| 99.9| US0080 PACIFIC RAILROAD | | | | | | 6305-75-001 | | | | | | RMC - 630575001 REPAIR OF RETAINING WALL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 10-31-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 31 ADDL DAYS GRANTED- 10 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 30 PERCENT TIME USED- 73 | |**************************************************| | | | | | | | RED BARON BUILDING COMPANY, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6305-75-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09161001 | TOTALS | 65,000.00| 0.00| 74,106.34| 99.9| ************************************************************************************************************************************ VAN ZANDT VARIOUS LOCATIONS IN | 0.001 | 209,992.00| 0.00| 0.00| 0.0| SH0064 VAN ZANDT COUNTY | | | | | | 6307-33-001 | | | | | | RMC - 630733001 TREE REMOVAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | CATOCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6307-33-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09161002 | TOTALS | 209,992.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VAN ZANDT VARIOUS ROADWAYS IN | 111.840 | 134,209.00| 0.00| 0.00| 0.0| SH0064 VAN ZANDT COUNTY | | | | | | 6307-97-001 | | | | | | RMC - 630797001 TREE TRIMMING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 112 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | FOWLER CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6307-97-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11161001 | TOTALS | 134,209.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VAN ZANDT VARIOUS ROADWAYS IN | 0.001 | 217,348.82| 0.00| 0.00| 0.0| SH0064 VAN ZANDT COUNTY | | | | | | 6308-79-001 | | | | | | RMC - 630879001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 49 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | C & C MOWING CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-79-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161007 | TOTALS | 217,348.82| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VAN ZANDT AT GRANDE SALINE CREEK | 0.010 | 68,598.58| 0.00| 0.00| 0.0| FM0857 IN VAN ZANDT COUNTY | | | | | | 6310-12-001 | | | | | | RMC - 631012001 CONCRETE RIPRAP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 20 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | RED BARON BUILDING COMPANY, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6310-12-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161009 | TOTALS | 68,598.58| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VAN ZANDT IH-20 VARIOUS LOCATIONS | 0.001 | 171,979.00| 0.00| 0.00| 0.0| IH0020 IN VAN ZANDT COUNTY | | | | | | 6301-83-001 | | | | | | BPM - 630183001 BRIDGE PREVENTIVE MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 82 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | RED BARON BUILDING COMPANY, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6301-83-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161011 | TOTALS | 171,979.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VAN ZANDT VARIOUS LOCATIONS CANTON MTCE. | 0.001 | 223,998.91| 0.00| 0.00| 0.0| SH0110 IN VAN ZANDT COUNTY | | | | | | 6301-84-001 | | | | | | BPM - 630184001 BRIDGE PREVENTIVE MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 82 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | RED BARON BUILDING COMPANY, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6301-84-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161012 | TOTALS | 223,998.91| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WOOD VARIOUS LOCATIONS IN THE | 0.010 | 107,563.00| 0.00| 80,735.00| 75.0| US0080 MINEOLA AND CANTON SECTIONS | | | | | | 6285-90-001 | | | | | | RMC - 628590001 GUARDRAIL REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-10-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 255 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 335 PERCENT TIME USED- 65 | |**************************************************| | | | | | | | CATOCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6285-90-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06151002 | TOTALS | 107,563.00| 0.00| 80,735.00| 75.0| ************************************************************************************************************************************ WOOD US 80(2), US 69, FM 2088 | 0.010 | 122,429.04| 0.00| 20,955.93| 17.1| US0080 SH 37(2) | | | | | | 6303-75-001 | | | | | | SUP - 630375001 PICNIC AREA MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WOODCREEK OUTREACH REHABILITATION DEVELOPMENT | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-75-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161035 | TOTALS | 122,429.04| 0.00| 20,955.93| 17.1| ************************************************************************************************************************************ WOOD MINEOLA AO & MTCE OFFICE | 0.010 | 26,367.00| 0.00| 3,968.16| 15.0| SL0564 SL 564, WOOD CO | | | | | | 6303-76-001 | | | | | | SUP - 630376001 LAWN MTCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 122 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WOODCREEK OUTREACH REHABILITATION DEVELOPMENT | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6303-76-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07161036 | TOTALS | 26,367.00| 0.00| 3,968.16| 15.0| ************************************************************************************************************************************ WOOD MINEOLA MTCE OFFICE | 0.001 | 35,884.90| 0.00| 21,152.99| 58.9| SL0564 MINEOLA AREA OFFICE | | | | | | 6286-19-001 | | | | | | SUP - 628619001 JANITORIAL MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | WORLD TECHNICAL SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-19-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151044 | TOTALS | 35,884.90| 0.00| 21,152.99| 58.9| ************************************************************************************************************************************ WOOD MINEOLA MAINTENANCE SECTION | 0.001 | 136,055.08| 0.00| 89,822.01| 66.0| US0069 WOOD COUNTY | | | | | | 6286-25-001 | | | | | | SUP - 628625001 LITTER PICK UP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 09-01-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TIBH INDUSTRIES, INC. | | | | | | RUCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6286-25-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08151050 | TOTALS | 136,055.08| 0.00| 89,822.01| 66.0| ************************************************************************************************************************************ WOOD VARIOUS ROADWAYS | 93.040 | 125,511.96| 0.00| 0.00| 0.0| SH0154 IN WOOD COUNTY | | | | | | 6308-01-001 | | | | | | RMC - 630801001 TREE TRIMMING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 94 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | EASTGATE SERVICES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-01-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11161003 | TOTALS | 125,511.96| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WOOD VARIOUS ROADWAYS IN | 0.001 | 236,945.79| 0.00| 0.00| 0.0| US0080 WOOD COUNTY | | | | | | 6308-83-001 | | | | | | RMC - 630883001 ROW MOWING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 53 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | C & C MOWING CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6308-83-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12161003 | TOTALS | 236,945.79| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 11,300,827.11 DISTRICT ESTIMATES THIS MONTH 53,667.00 DISTRICT TOTAL ESTIMATES PAID TO DATE 9,116,628.06