Monthly State Let Construction Report For Tyler District As Of Mar 13, 2024 Page 4 Of 6

Last Update: Wednesday, March 13, 2024
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyCHEROKEE
HighwayFM 22
FromCR 1512 (OLD FREIGHT), GALLATIN C/L, E
ToSH110 NEAR ELM GROVE
CSJ0634-01-014
Proj IDSTP 2021(318)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
4.8313505113.383053817.1591.4
CountyCHEROKEE
HighwayFM 22
FromAT SANDY CREEK, 0.9 MI W OF SH 110
ToSTR #003, NEAR ELM GROVE
CSJ0634-01-015
Proj IDBR 2021(319)
Work TypeBRIDGE REPLACEMENT
 
712211.32719664.7699.9
CountyCHEROKEE
HighwayFM 22
FromAT TURNPIKE CREEK
ToSTR #004, IN GALATIN
CSJ0634-01-016
Proj IDBR 2021(320)
Work TypeBRIDGE REPLACEMENT
 
717940.42702453.7297.8
CountyCHEROKEE
HighwayFM 22
FromAT LITTLE TURNPIKE CREEK
ToSTR #005, IN GALATIN
CSJ0634-01-017
Proj IDBR 2021(321)
Work TypeBRIDGE REPLACEMENT
 
598440.72589992.7598.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-12-21
Work Began05-21-21
Work Completed
Time Computed00-00-00
Contract Working Days249
Addl Days Granted0
Working Days Charged383
Percent Time Used153
Contractor(s)
STATELINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0634-01-014
FOUTSCO PAVING COMPANY, LLC (13.31)
HODGES AND SON CONSTRUCTION COMPANY, INC. (4.14)
PANOLA SIGN & BARRICADE, INC. (0.49)
R & G CONSTRUCTION, LLC (8.78)
STRIPING TECHNOLOGY, L.P. (1.22)
WEST TEXAS ROCK RESOURCES, LLC (0.15)
ISAACS CONSTRUCTION SERVICES LLC (1.51)
MORRIS COUNTY CONTRACTORS, L.L.C. (1.07)
TORO BRAVO CONSTRUCTION, LLC (0.92)
MADDEN CONTRACTING COMPANY, LLC. (12.96)
Contract #02213206
Totals5533705.840.005065928.3894.2

CountyVAN ZANDT ETC
HighwayFM 47 ETC
FromUS80 IN WILLS POINT, S
ToSH 243
CSJ0646-02-029
Proj IDSTP 2020(329)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
35.6664537223.823650404.8080.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-24-20
Work Began04-13-20
Work Completed
Time Computed00-00-00
Contract Working Days338
Addl Days Granted0
Working Days Charged354
Percent Time Used104
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0646-02-029
TOTAL HIGHWAY MAINTENANCE, LLC (1.26)
A. E. MOORE CONSTRUCTION, INC. (7.51)
DUSTIN ALLEN, INC. (6.69)
Contract #12193018
Totals4537223.820.003650404.8080.7

CountyHENDERSON
HighwaySH 198
FromAT CLEAR CRK BR, 1 MI N OF RM 3054
ToSTR #026, NEAR LOG CABIN
CSJ0646-05-027
Proj IDBR 2021(213)
Work TypeBRIDGE REPLACEMENT
 
1.19530355868.3126706682.3687.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-05-21
Work Began05-26-21
Work Completed
Time Computed00-00-00
Contract Working Days738
Addl Days Granted48
Working Days Charged727
Percent Time Used92
Contractor(s)
COPASA INC
SUBCONTRACTOR(S) FOR CCSJ: 0646-05-027
AREA WIDE PROTECTIVE, INC. (0.15)
ATS DRILLING, INC. (23.49)
JE CASEY, LLC (4.30)
J & M CONTRACTING, COMPANY (0.79)
ROYAL REBAR (0.91)
SIOUX EROSION CONTROL, INC. (0.32)
TOTAL HIGHWAY MAINTENANCE, LLC (0.17)
TEXAS MATERIALS GROUP, INC. (4.63)
BROCK CONSTRUCTION, LLC (0.03)
PEACHTREE CONSTRUCTION, LTD. (0.09)
ASE CONTRACTORS LLC (0.44)
ANCORTEX, INC. (0.87)
ADVANCED EXCAVATION SOLUTIONS LLC (3.08)
BRAZOS RIVER CONTRACTORS LLC (2.47)
DARKHORSE INDUSTRIES, L.L.C. (0.05)
BRAUN INTERTEC CORPORATION (0.00)
SCOTT DERR PAINTING CO, LLC (0.01)
DAVIS MOTOR CRANE SERVICE, INC. (0.16)
CRANE MASTERS, INC. (0.14)
SUN CRANE & HOIST, INC. (0.05)
LUCKETT CRANE SERVICE (0.00)
TNT CRANE & RIGGING, INC. (0.00)
JB PINNACLE GROUP, LLC (2.47)
HERMANOS STEEL, LLC (0.11)
HOUSTON SAWING & DRILLING (0.13)
TRAFFIC SIGNS & LINES, LLC (0.44)
CURB PLANET INC. (0.02)
EPCS ENVIRONMENTAL LLC (3.62)
LA GRANDE CONSTRUCTION COMPANY LLC (2.38)
FLEX SUPPLY, LLC (0.16)
ROLL-LIFT USA, INC. (0.00)
A-CORE CONCRETE CUTTING OF TEXAS, INC. (0.63)
SPARTAN DIVERS (0.29)
STRAIGHT LINE SAWING & SEALING, INC. (0.18)
Contract #01213002
Totals30355868.31738065.5826706682.3687.9

CountyHENDERSON
HighwayFM 316
FromVAN ZANDT C/L (FM 1861)
ToUS 175
CSJ0646-07-009
Proj IDF 2023(136)
Work TypeREHABILITATION OF EXISTING ROAD
 
7938413.553259121.7641.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order01-04-23
Work Began03-09-23
Work Completed
Time Computed00-00-00
Contract Working Days261
Addl Days Granted0
Working Days Charged117
Percent Time Used44
Contractor(s)
BAKER & COMPANY CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0646-07-009
CHEROKEE SERVICES (0.10)
DUSTROL, INC. (0.34)
NEED GRASS NOW LLC (2.06)
PROFESSIONAL TRAFFIC CONTROL LLC (0.22)
REYNOLDS & KAY, LTD. (5.16)
STRIPING TECHNOLOGY, L.P. (1.04)
TEXANA LAND & ASPHALT, INC. (51.21)
TEXOP CONSTRUCTION (1.23)
TRAFFIC HIGHWAY MAINTENANCE, LLC (0.22)
TRAFFIC SIGNS & LINES, LLC (0.83)
JM YANEZ CONSTRUCTION, INC. (2.10)
ISAACS CONSTRUCTION SERVICES LLC (1.83)
COLD CREEK CONSTRUCTION, LTD (0.64)
Contract #12223214
Totals7938413.5521095.683259121.7641.0

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToTHE TYLER DISTRICT
CSJ0910-00-122
Proj IDF 2023(724)
Work TypeTRAFFIC CONTROL DEVICES
 
1.0001698784.981468827.9888.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-07-23
Work Began09-08-23
Work Completed
Time Computed00-00-00
Contract Working Days51
Addl Days Granted0
Working Days Charged84
Percent Time Used164
Contractor(s)
INTERSTATE BARRICADES & MARKINGS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-122
STRIPING TECHNOLOGY, L.P. (51.35)
SURFACE PREPARATION TECHNOLOGIES, LLC (4.57)
AREA WIDE PROTECTIVE, INC. (0.47)
BLASTERS, INC. (7.00)
L. S. EQUIPMENT CO., INC. (0.25)
Contract #05233229
Totals1698784.98151356.381468827.9888.0

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS
ToIN TYLER DISTRICT
CSJ0910-00-131
Proj IDC 910-00-131
Work TypePEDESTRIAN, SIDEWALKS & CURB RAMPS
 
2538364.002191663.6886.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-21-22
Work Began11-01-22
Work Completed
Time Computed00-00-00
Contract Working Days196
Addl Days Granted1
Working Days Charged163
Percent Time Used82
Contractor(s)
CROSS PLUS CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-131
STRIPING TECHNOLOGY, L.P. (5.39)
STATEWIDE SAFETY SYSTEMS (0.75)
Contract #08223265
Totals2538364.000.002191663.6886.3

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToTHE TYLER DISTRICT
CSJ0910-00-133
Proj IDF 2022(963)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
548791.16527841.6896.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-15-22
Work Began12-05-22
Work Completed
Time Computed00-00-00
Contract Working Days105
Addl Days Granted24
Working Days Charged84
Percent Time Used65
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-133
CLASSIC TEJAS CONSTRUCTION, INC. (2.91)
GRADY CRAWFORD CONSTRUCTION COMPANY, INC. (0.87)
Contract #08223059
Totals548791.1634005.02527841.6896.1

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToGREGG AND RUSK COUNTIES
CSJ0910-00-135
Proj IDF 2022(965)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
783827.95752517.5696.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-15-22
Work Began11-16-22
Work Completed
Time Computed00-00-00
Contract Working Days105
Addl Days Granted1
Working Days Charged102
Percent Time Used96
Contractor(s)
REYNOLDS & KAY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-135
FLEX SUPPLY, LLC (1.75)
STRIPING TECHNOLOGY, L.P. (29.10)
Contract #08223061
Totals783827.950.00752517.5696.0

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToANDERSON, HENDERSON, AND VAN ZANDT COUNT
CSJ0910-00-136
Proj IDSTP 2023(518)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
932150.00915950.0098.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-12-23
Work Began10-10-23
Work Completed
Time Computed00-00-00
Contract Working Days38
Addl Days Granted0
Working Days Charged27
Percent Time Used71
Contractor(s)
VACA UNDERGROUND UTILITIES INC
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-136
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03233028
Totals932150.000.00915950.0098.2

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN CHEROKEE
ToGREGG, RUSK, SMITH AND WOOD
CSJ0910-00-137
Proj IDSTP 2024(629)VRU
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1755175.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-02-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days76
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS TRAFFIC CONTROL SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-137
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01243230
Totals1755175.000.000.000.0

CountyGREGG
HighwayCS
FromAT UPRR AND SABINE ST
ToSTR #001, IN LONGVIEW
CSJ0910-07-072
Proj IDBR 2018(505)
Work TypeBRIDGE REPLACEMENT
 
9313027.965400453.6157.9
Work Order09-29-22
Work Began01-23-23
Work Completed
Time Computed10-21-22
Contract Working Days357
Addl Days Granted0
Working Days Charged194
Percent Time Used54
Contractor(s)
RAGLE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-072
CAP RIVER LLC (0.13)
FARR FOUNDATION, INC. (15.04)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.05)
HODGES AND SON CONSTRUCTION COMPANY, INC. (3.05)
J. H. ODEN CONTRACTING COMPANY (0.40)
ODUM SERVICES, LLC (0.30)
PEACHTREE CONSTRUCTION, LTD. (2.63)
S&S BRIDGE PAINTING (0.20)
STRIPE-A-ZONE, LLC (0.42)
SNOWHILL CONTRACTING LLC (1.58)
ACT SAW CUTTING & REMOVAL (0.32)
FLEX SUPPLY, LLC (0.33)
TRUE ROADS CONSTRUCTION, LLC (1.32)
TEX OP CONSTRUCTION, LP (0.14)
TRENDSETTER CONSTRUCTION, INC. (0.08)
JOYCE STEEL ERECTION, LLC (0.14)
TORO BRAVO CONSTRUCTION, LLC (0.14)
G & L REBAR (1.25)
Contract #03223006
Totals9313027.96671263.225400453.6157.9

CountyGREGG
HighwayCS
FromAT BIG HEAD CREEK
ToSTR #001, IN KILGORE
CSJ0910-07-078
Proj IDBR 2020(894)
Work TypeBRIDGE REPLACEMENT
 
638112.63727863.3099.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-11-22
Work Began05-04-22
Work Completed
Time Computed00-00-00
Contract Working Days58
Addl Days Granted39
Working Days Charged97
Percent Time Used100
Contractor(s)
SOUTH TEXAS ILLUMINATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-078
JML CONSTRUCTION & SERVICES, LLC (46.98)
MORRIS COUNTY CONTRACTORS, L.L.C. (4.56)
CAP RIVER LLC (0.33)
Contract #02223229
Totals638112.630.00727863.3099.9

CountyGREGG
HighwayCS
FromSTADIUM DR
ToRESTVIEW ST.
CSJ0910-07-082
Proj IDSTP 2B23(062)HESG
Work TypeSAFETY IMPROVEMENT PROJECTS
 
90510.0088304.4297.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-06-23
Work Began10-25-23
Work Completed
Time Computed00-00-00
Contract Working Days23
Addl Days Granted0
Working Days Charged15
Percent Time Used65
Contractor(s)
3LW CIVIL LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-082
FLEX SUPPLY, LLC (5.19)
Contract #08233066
Totals90510.000.0088304.4297.5

CountyGREGG
HighwayVA
FromVARIOUS ROADWAYS IN
ToGREGG AND RUSK COUNTIES
CSJ0910-07-084
Proj IDSTP 2023(371)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
224591.52244515.5299.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-15-23
Work Began10-02-23
Work Completed
Time Computed00-00-00
Contract Working Days17
Addl Days Granted0
Working Days Charged11
Percent Time Used64
Contractor(s)
H. V. CAVER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-084
FLEX SUPPLY, LLC (4.13)
JOSH & ERICA ENTERPRISES LLC (8.45)
Contract #01233035
Totals224591.520.00244515.5299.9

CountyGREGG
HighwayCS
FromYOUNG ST
ToHUGHES ST
CSJ0910-07-086
Proj IDSTP 2024(809)VRU
Work TypeSAFETY IMPROVEMENT PROJECTS
 
439360.250.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days62
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
REYNOLDS & KAY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-086
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03243231
Totals439360.250.000.000.0

CountyANDERSON
HighwayPW
FromVARIOUS LOCATIONS
ToWITHIN GUS ENGLING WMA
CSJ0910-08-064
Proj IDC 910-8-64
Work TypeTEXAS PARK AND WILDLIFE
 
1.000170873.750.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days26
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
REYNOLDS & KAY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-064
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03243234
Totals170873.750.000.000.0

CountyANDERSON
HighwayVA
FromVARIOUS LOCATION WITHIN
ToGUS ENGELING WMA
CSJ0910-08-080
Proj IDC 910-8-80
Work TypeTEXAS PARK AND WILDLIFE
 
958749.251044632.9599.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-13-23
Work Began04-17-23
Work Completed
Time Computed00-00-00
Contract Working Days63
Addl Days Granted0
Working Days Charged30
Percent Time Used47
Contractor(s)
BAKER & COMPANY CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-080
REYNOLDS & KAY, LTD. (10.99)
Contract #02233034
Totals958749.250.001044632.9599.9

CountyANDERSON
HighwayVA
FromVARIOUS LOCATIONS IN
ToANDERSON CO
CSJ0910-08-081
Proj IDSTP 2022(533)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
340109.00356353.0099.9
CountyHENDERSON
HighwayVA
FromVARIOUS LOCATIONS
ToIN HENDERSON CO
CSJ0910-34-034
Proj IDSTP 2022(533)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.001416986.00414518.0099.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-16-22
Work Began10-10-22
Work Completed
Time Computed00-00-00
Contract Working Days47
Addl Days Granted0
Working Days Charged45
Percent Time Used95
Contractor(s)
MARCOM'S MOWING SERVICE, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-081
CATOCON, INC. (1.44)
STATEWIDE SAFETY SYSTEMS (0.43)
Contract #05223017
Totals757095.000.00770871.0099.9

CountyVAN ZANDT
HighwayCR
FromSTR NO 101, CR 1102, BUFFALO CREEK
To.
CSJ0910-12-139
Proj IDBR 2023(449)
Work TypeBRIDGE REPLACEMENT
 
1393629.501143846.1682.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-26-23
Work Began09-12-23
Work Completed
Time Computed00-00-00
Contract Working Days120
Addl Days Granted0
Working Days Charged76
Percent Time Used63
Contractor(s)
TRUE ROADS CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-12-139
AWP SAFETY (0.46)
DUSTIN ALLEN, INC. (3.84)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.25)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (7.06)
ISAACS CONSTRUCTION SERVICES LLC (0.72)
RAYFORD"S TRUCK & TRACTOR (0.97)
Contract #06233433
Totals1393629.5060732.211143846.1682.0

CountyVAN ZANDT
HighwayVA
FromVARIOUS LOCATIONS IN
ToVAN ZANDT CO
CSJ0910-12-140
Proj IDSTP 2B23(065)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
671280.00364682.0054.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-06-23
Work Began02-01-24
Work Completed
Time Computed00-00-00
Contract Working Days43
Addl Days Granted0
Working Days Charged17
Percent Time Used39
Contractor(s)
MARCOM'S MOWING SERVICE, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-12-140
BUSHWACKERS CONTRACTING, LLC (11.17)
AWP SAFETY (1.46)
Contract #08233047
Totals671280.00127388.00364682.0054.3

page 1 | page 2 | page 3 | page 4 | page 5 | page 6