Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | CHEROKEE |
Highway | FM 22 |
From | CR 1512 (OLD FREIGHT), GALLATIN C/L, E |
To | SH110 NEAR ELM GROVE |
CSJ | 0634-01-014 |
Proj ID | STP 2021(318)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 4.831 | 3505113.38 | | 3053817.15 | 91.4 |
County | CHEROKEE |
Highway | FM 22 |
From | AT SANDY CREEK, 0.9 MI W OF SH 110 |
To | STR #003, NEAR ELM GROVE |
CSJ | 0634-01-015 |
Proj ID | BR 2021(319) |
Work Type | BRIDGE REPLACEMENT |
|
| | 712211.32 | | 719664.76 | 99.9 |
County | CHEROKEE |
Highway | FM 22 |
From | AT TURNPIKE CREEK |
To | STR #004, IN GALATIN |
CSJ | 0634-01-016 |
Proj ID | BR 2021(320) |
Work Type | BRIDGE REPLACEMENT |
|
| | 717940.42 | | 702453.72 | 97.8 |
County | CHEROKEE |
Highway | FM 22 |
From | AT LITTLE TURNPIKE CREEK |
To | STR #005, IN GALATIN |
CSJ | 0634-01-017 |
Proj ID | BR 2021(321) |
Work Type | BRIDGE REPLACEMENT |
|
| | 598440.72 | | 589992.75 | 98.5 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 03-12-21 |
Work Began | 05-21-21 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 249 |
Addl Days Granted | 0 |
Working Days Charged | 383 |
Percent Time Used | 153 |
Contractor(s) |
STATELINE CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0634-01-014 FOUTSCO PAVING COMPANY, LLC (13.31) HODGES AND SON CONSTRUCTION COMPANY, INC. (4.14) PANOLA SIGN & BARRICADE, INC. (0.49) R & G CONSTRUCTION, LLC (8.78) STRIPING TECHNOLOGY, L.P. (1.22) WEST TEXAS ROCK RESOURCES, LLC (0.15) ISAACS CONSTRUCTION SERVICES LLC (1.51) MORRIS COUNTY CONTRACTORS, L.L.C. (1.07) TORO BRAVO CONSTRUCTION, LLC (0.92) MADDEN CONTRACTING COMPANY, LLC. (12.96)
|
Contract # | 02213206 |
| Totals | 5533705.84 | 0.00 | 5065928.38 | 94.2 |
|
County | VAN ZANDT ETC |
Highway | FM 47 ETC |
From | US80 IN WILLS POINT, S |
To | SH 243 |
CSJ | 0646-02-029 |
Proj ID | STP 2020(329)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 35.666 | 4537223.82 | | 3650404.80 | 80.7 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 02-24-20 |
Work Began | 04-13-20 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 338 |
Addl Days Granted | 0 |
Working Days Charged | 354 |
Percent Time Used | 104 |
Contractor(s) |
HIGHWAY 19 CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0646-02-029 TOTAL HIGHWAY MAINTENANCE, LLC (1.26) A. E. MOORE CONSTRUCTION, INC. (7.51) DUSTIN ALLEN, INC. (6.69)
|
Contract # | 12193018 |
| Totals | 4537223.82 | 0.00 | 3650404.80 | 80.7 |
|
County | HENDERSON |
Highway | SH 198 |
From | AT CLEAR CRK BR, 1 MI N OF RM 3054 |
To | STR #026, NEAR LOG CABIN |
CSJ | 0646-05-027 |
Proj ID | BR 2021(213) |
Work Type | BRIDGE REPLACEMENT |
|
| 1.195 | 30355868.31 | | 26706682.36 | 87.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 03-05-21 |
Work Began | 05-26-21 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 738 |
Addl Days Granted | 48 |
Working Days Charged | 727 |
Percent Time Used | 92 |
Contractor(s) |
COPASA INC |
SUBCONTRACTOR(S) FOR CCSJ: 0646-05-027 AREA WIDE PROTECTIVE, INC. (0.15) ATS DRILLING, INC. (23.49) JE CASEY, LLC (4.30) J & M CONTRACTING, COMPANY (0.79) ROYAL REBAR (0.91) SIOUX EROSION CONTROL, INC. (0.32) TOTAL HIGHWAY MAINTENANCE, LLC (0.17) TEXAS MATERIALS GROUP, INC. (4.63) BROCK CONSTRUCTION, LLC (0.03) PEACHTREE CONSTRUCTION, LTD. (0.09) ASE CONTRACTORS LLC (0.44) ANCORTEX, INC. (0.87) ADVANCED EXCAVATION SOLUTIONS LLC (3.08) BRAZOS RIVER CONTRACTORS LLC (2.47) DARKHORSE INDUSTRIES, L.L.C. (0.05) BRAUN INTERTEC CORPORATION (0.00) SCOTT DERR PAINTING CO, LLC (0.01) DAVIS MOTOR CRANE SERVICE, INC. (0.16) CRANE MASTERS, INC. (0.14) SUN CRANE & HOIST, INC. (0.05) LUCKETT CRANE SERVICE (0.00) TNT CRANE & RIGGING, INC. (0.00) JB PINNACLE GROUP, LLC (2.47) HERMANOS STEEL, LLC (0.11) HOUSTON SAWING & DRILLING (0.13) TRAFFIC SIGNS & LINES, LLC (0.44) CURB PLANET INC. (0.02) EPCS ENVIRONMENTAL LLC (3.62) LA GRANDE CONSTRUCTION COMPANY LLC (2.38) FLEX SUPPLY, LLC (0.16) ROLL-LIFT USA, INC. (0.00) A-CORE CONCRETE CUTTING OF TEXAS, INC. (0.63) SPARTAN DIVERS (0.29) STRAIGHT LINE SAWING & SEALING, INC. (0.18)
|
Contract # | 01213002 |
| Totals | 30355868.31 | 738065.58 | 26706682.36 | 87.9 |
|
County | HENDERSON |
Highway | FM 316 |
From | VAN ZANDT C/L (FM 1861) |
To | US 175 |
CSJ | 0646-07-009 |
Proj ID | F 2023(136) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| | 7938413.55 | | 3259121.76 | 41.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 01-04-23 |
Work Began | 03-09-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 261 |
Addl Days Granted | 0 |
Working Days Charged | 117 |
Percent Time Used | 44 |
Contractor(s) |
BAKER & COMPANY CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0646-07-009 CHEROKEE SERVICES (0.10) DUSTROL, INC. (0.34) NEED GRASS NOW LLC (2.06) PROFESSIONAL TRAFFIC CONTROL LLC (0.22) REYNOLDS & KAY, LTD. (5.16) STRIPING TECHNOLOGY, L.P. (1.04) TEXANA LAND & ASPHALT, INC. (51.21) TEXOP CONSTRUCTION (1.23) TRAFFIC HIGHWAY MAINTENANCE, LLC (0.22) TRAFFIC SIGNS & LINES, LLC (0.83) JM YANEZ CONSTRUCTION, INC. (2.10) ISAACS CONSTRUCTION SERVICES LLC (1.83) COLD CREEK CONSTRUCTION, LTD (0.64)
|
Contract # | 12223214 |
| Totals | 7938413.55 | 21095.68 | 3259121.76 | 41.0 |
|
County | SMITH |
Highway | VA |
From | VARIOUS LOCATIONS IN |
To | THE TYLER DISTRICT |
CSJ | 0910-00-122 |
Proj ID | F 2023(724) |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 1.000 | 1698784.98 | | 1468827.98 | 88.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 06-07-23 |
Work Began | 09-08-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 51 |
Addl Days Granted | 0 |
Working Days Charged | 84 |
Percent Time Used | 164 |
Contractor(s) |
INTERSTATE BARRICADES & MARKINGS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-122 STRIPING TECHNOLOGY, L.P. (51.35) SURFACE PREPARATION TECHNOLOGIES, LLC (4.57) AREA WIDE PROTECTIVE, INC. (0.47) BLASTERS, INC. (7.00) L. S. EQUIPMENT CO., INC. (0.25)
|
Contract # | 05233229 |
| Totals | 1698784.98 | 151356.38 | 1468827.98 | 88.0 |
|
County | SMITH |
Highway | VA |
From | VARIOUS LOCATIONS |
To | IN TYLER DISTRICT |
CSJ | 0910-00-131 |
Proj ID | C 910-00-131 |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| | 2538364.00 | | 2191663.68 | 86.3 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-21-22 |
Work Began | 11-01-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 196 |
Addl Days Granted | 1 |
Working Days Charged | 163 |
Percent Time Used | 82 |
Contractor(s) |
CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-131 STRIPING TECHNOLOGY, L.P. (5.39) STATEWIDE SAFETY SYSTEMS (0.75)
|
Contract # | 08223265 |
| Totals | 2538364.00 | 0.00 | 2191663.68 | 86.3 |
|
County | SMITH |
Highway | VA |
From | VARIOUS LOCATIONS IN |
To | THE TYLER DISTRICT |
CSJ | 0910-00-133 |
Proj ID | F 2022(963) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 548791.16 | | 527841.68 | 96.1 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-15-22 |
Work Began | 12-05-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 105 |
Addl Days Granted | 24 |
Working Days Charged | 84 |
Percent Time Used | 65 |
Contractor(s) |
ENCINO LANDSCAPE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-133 CLASSIC TEJAS CONSTRUCTION, INC. (2.91) GRADY CRAWFORD CONSTRUCTION COMPANY, INC. (0.87)
|
Contract # | 08223059 |
| Totals | 548791.16 | 34005.02 | 527841.68 | 96.1 |
|
County | SMITH |
Highway | VA |
From | VARIOUS LOCATIONS IN |
To | GREGG AND RUSK COUNTIES |
CSJ | 0910-00-135 |
Proj ID | F 2022(965) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 783827.95 | | 752517.56 | 96.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-15-22 |
Work Began | 11-16-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 105 |
Addl Days Granted | 1 |
Working Days Charged | 102 |
Percent Time Used | 96 |
Contractor(s) |
REYNOLDS & KAY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-135 FLEX SUPPLY, LLC (1.75) STRIPING TECHNOLOGY, L.P. (29.10)
|
Contract # | 08223061 |
| Totals | 783827.95 | 0.00 | 752517.56 | 96.0 |
|
County | SMITH |
Highway | VA |
From | VARIOUS LOCATIONS IN |
To | ANDERSON, HENDERSON, AND VAN ZANDT COUNT |
CSJ | 0910-00-136 |
Proj ID | STP 2023(518)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 932150.00 | | 915950.00 | 98.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 04-12-23 |
Work Began | 10-10-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 38 |
Addl Days Granted | 0 |
Working Days Charged | 27 |
Percent Time Used | 71 |
Contractor(s) |
VACA UNDERGROUND UTILITIES INC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-136 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03233028 |
| Totals | 932150.00 | 0.00 | 915950.00 | 98.2 |
|
County | SMITH |
Highway | VA |
From | VARIOUS LOCATIONS IN CHEROKEE |
To | GREGG, RUSK, SMITH AND WOOD |
CSJ | 0910-00-137 |
Proj ID | STP 2024(629)VRU |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 1755175.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 02-02-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 76 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
TEXAS TRAFFIC CONTROL SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-137 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01243230 |
| Totals | 1755175.00 | 0.00 | 0.00 | 0.0 |
|
County | GREGG |
Highway | CS |
From | AT UPRR AND SABINE ST |
To | STR #001, IN LONGVIEW |
CSJ | 0910-07-072 |
Proj ID | BR 2018(505) |
Work Type | BRIDGE REPLACEMENT |
|
| | 9313027.96 | | 5400453.61 | 57.9 |
Work Order | 09-29-22 |
Work Began | 01-23-23 |
Work Completed | |
Time Computed | 10-21-22 |
Contract Working Days | 357 |
Addl Days Granted | 0 |
Working Days Charged | 194 |
Percent Time Used | 54 |
Contractor(s) |
RAGLE CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-072 CAP RIVER LLC (0.13) FARR FOUNDATION, INC. (15.04) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.05) HODGES AND SON CONSTRUCTION COMPANY, INC. (3.05) J. H. ODEN CONTRACTING COMPANY (0.40) ODUM SERVICES, LLC (0.30) PEACHTREE CONSTRUCTION, LTD. (2.63) S&S BRIDGE PAINTING (0.20) STRIPE-A-ZONE, LLC (0.42) SNOWHILL CONTRACTING LLC (1.58) ACT SAW CUTTING & REMOVAL (0.32) FLEX SUPPLY, LLC (0.33) TRUE ROADS CONSTRUCTION, LLC (1.32) TEX OP CONSTRUCTION, LP (0.14) TRENDSETTER CONSTRUCTION, INC. (0.08) JOYCE STEEL ERECTION, LLC (0.14) TORO BRAVO CONSTRUCTION, LLC (0.14) G & L REBAR (1.25)
|
Contract # | 03223006 |
| Totals | 9313027.96 | 671263.22 | 5400453.61 | 57.9 |
|
County | GREGG |
Highway | CS |
From | AT BIG HEAD CREEK |
To | STR #001, IN KILGORE |
CSJ | 0910-07-078 |
Proj ID | BR 2020(894) |
Work Type | BRIDGE REPLACEMENT |
|
| | 638112.63 | | 727863.30 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 03-11-22 |
Work Began | 05-04-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 58 |
Addl Days Granted | 39 |
Working Days Charged | 97 |
Percent Time Used | 100 |
Contractor(s) |
SOUTH TEXAS ILLUMINATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-078 JML CONSTRUCTION & SERVICES, LLC (46.98) MORRIS COUNTY CONTRACTORS, L.L.C. (4.56) CAP RIVER LLC (0.33)
|
Contract # | 02223229 |
| Totals | 638112.63 | 0.00 | 727863.30 | 99.9 |
|
County | GREGG |
Highway | CS |
From | STADIUM DR |
To | RESTVIEW ST. |
CSJ | 0910-07-082 |
Proj ID | STP 2B23(062)HESG |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 90510.00 | | 88304.42 | 97.5 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-06-23 |
Work Began | 10-25-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 23 |
Addl Days Granted | 0 |
Working Days Charged | 15 |
Percent Time Used | 65 |
Contractor(s) |
3LW CIVIL LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-082 FLEX SUPPLY, LLC (5.19)
|
Contract # | 08233066 |
| Totals | 90510.00 | 0.00 | 88304.42 | 97.5 |
|
County | GREGG |
Highway | VA |
From | VARIOUS ROADWAYS IN |
To | GREGG AND RUSK COUNTIES |
CSJ | 0910-07-084 |
Proj ID | STP 2023(371)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 224591.52 | | 244515.52 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 02-15-23 |
Work Began | 10-02-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 17 |
Addl Days Granted | 0 |
Working Days Charged | 11 |
Percent Time Used | 64 |
Contractor(s) |
H. V. CAVER, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-084 FLEX SUPPLY, LLC (4.13) JOSH & ERICA ENTERPRISES LLC (8.45)
|
Contract # | 01233035 |
| Totals | 224591.52 | 0.00 | 244515.52 | 99.9 |
|
County | GREGG |
Highway | CS |
From | YOUNG ST |
To | HUGHES ST |
CSJ | 0910-07-086 |
Proj ID | STP 2024(809)VRU |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 439360.25 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 62 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
REYNOLDS & KAY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-086 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03243231 |
| Totals | 439360.25 | 0.00 | 0.00 | 0.0 |
|
County | ANDERSON |
Highway | PW |
From | VARIOUS LOCATIONS |
To | WITHIN GUS ENGLING WMA |
CSJ | 0910-08-064 |
Proj ID | C 910-8-64 |
Work Type | TEXAS PARK AND WILDLIFE |
|
| 1.000 | 170873.75 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 26 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
REYNOLDS & KAY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-064 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03243234 |
| Totals | 170873.75 | 0.00 | 0.00 | 0.0 |
|
County | ANDERSON |
Highway | VA |
From | VARIOUS LOCATION WITHIN |
To | GUS ENGELING WMA |
CSJ | 0910-08-080 |
Proj ID | C 910-8-80 |
Work Type | TEXAS PARK AND WILDLIFE |
|
| | 958749.25 | | 1044632.95 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 03-13-23 |
Work Began | 04-17-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 63 |
Addl Days Granted | 0 |
Working Days Charged | 30 |
Percent Time Used | 47 |
Contractor(s) |
BAKER & COMPANY CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-080 REYNOLDS & KAY, LTD. (10.99)
|
Contract # | 02233034 |
| Totals | 958749.25 | 0.00 | 1044632.95 | 99.9 |
|
County | ANDERSON |
Highway | VA |
From | VARIOUS LOCATIONS IN |
To | ANDERSON CO |
CSJ | 0910-08-081 |
Proj ID | STP 2022(533)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 340109.00 | | 356353.00 | 99.9 |
County | HENDERSON |
Highway | VA |
From | VARIOUS LOCATIONS |
To | IN HENDERSON CO |
CSJ | 0910-34-034 |
Proj ID | STP 2022(533)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 0.001 | 416986.00 | | 414518.00 | 99.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 06-16-22 |
Work Began | 10-10-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 47 |
Addl Days Granted | 0 |
Working Days Charged | 45 |
Percent Time Used | 95 |
Contractor(s) |
MARCOM'S MOWING SERVICE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-081 CATOCON, INC. (1.44) STATEWIDE SAFETY SYSTEMS (0.43)
|
Contract # | 05223017 |
| Totals | 757095.00 | 0.00 | 770871.00 | 99.9 |
|
County | VAN ZANDT |
Highway | CR |
From | STR NO 101, CR 1102, BUFFALO CREEK |
To | . |
CSJ | 0910-12-139 |
Proj ID | BR 2023(449) |
Work Type | BRIDGE REPLACEMENT |
|
| | 1393629.50 | | 1143846.16 | 82.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 07-26-23 |
Work Began | 09-12-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 120 |
Addl Days Granted | 0 |
Working Days Charged | 76 |
Percent Time Used | 63 |
Contractor(s) |
TRUE ROADS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-12-139 AWP SAFETY (0.46) DUSTIN ALLEN, INC. (3.84) SOUTHWEST ENVIRONMENT SERVICES LLC (0.25) M & D FOUNDATION DRILLING INDUSTRIES, INC. (7.06) ISAACS CONSTRUCTION SERVICES LLC (0.72) RAYFORD"S TRUCK & TRACTOR (0.97)
|
Contract # | 06233433 |
| Totals | 1393629.50 | 60732.21 | 1143846.16 | 82.0 |
|
County | VAN ZANDT |
Highway | VA |
From | VARIOUS LOCATIONS IN |
To | VAN ZANDT CO |
CSJ | 0910-12-140 |
Proj ID | STP 2B23(065)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 671280.00 | | 364682.00 | 54.3 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-06-23 |
Work Began | 02-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 43 |
Addl Days Granted | 0 |
Working Days Charged | 17 |
Percent Time Used | 39 |
Contractor(s) |
MARCOM'S MOWING SERVICE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0910-12-140 BUSHWACKERS CONTRACTING, LLC (11.17) AWP SAFETY (1.46)
|
Contract # | 08233047 |
| Totals | 671280.00 | 127388.00 | 364682.00 | 54.3 |
|