Monthly State Let Construction Report For Tyler District As Of Jan 11, 2017 Page 2 Of 3

Last Update: Thursday, January 12, 2017
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyWOOD ETC
HighwaySH 182 ETC
From0.89 MI E OF US 69, E
ToSH 154
CSJ0429-01-023
Proj IDSTP 2017(358)HES
Work TypeSAFETY TREAT FIXED OBJECTS
 
27.8643239526.940.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days387
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0429-01-023
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173007
Totals3239526.940.000.000.0

CountyVAN ZANDT
HighwaySH 198
FromSH 243, IN CANTON, SW
To0.4 MI NE OF FM 316 NEAR PHALBA
CSJ0443-01-028
Proj IDSTP 2014(415)HES
Work TypeSBGR WDN,ACP BS,OCST,STRS,PFL PV MK
 
27.2375034636.874969758.4799.9
Work Order03-18-14
Work Began04-08-14
Work Completed
Time Computed04-03-14
Contract Working Days227
Addl Days Granted54
Working Days Charged362
Percent Time Used128
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0443-01-028
PANOLA SIGN & BARRICADE, INC. (1.18)
STRIPING TECHNOLOGY, L.P. (4.35)
BAHENA CONSTRUCTION CO.,INC. (11.46)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.48)
FORTSON CONTRACTING, INC. (0.35)
NIXON ENGINEERING (0.00)
Contract #02143224
Totals5034636.877.914969758.4799.9

CountyVAN ZANDT
HighwayIH 20
FromAT FM 314 WB EXIT RAMP
To.
CSJ0495-03-061
Proj IDNH 1602(360)
Work TypeGR,CMT TR SBGR,CONC PVT,STRS,ILLUM
 
1.1304570487.36879625.3919.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-19-16
Work Began10-13-16
Work Completed
Time Computed00-00-00
Contract Working Days215
Addl Days Granted0
Working Days Charged62
Percent Time Used28
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0495-03-061
PANOLA SIGN & BARRICADE, INC. (0.81)
ISAACS CONSTRUCTION SERVICES, LLC. (0.97)
TEXOP CONSTRUCTION (1.28)
WEST TEXAS RUMBLE STRIP (0.08)
ODUM SERVICES, L.P. (0.66)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.23)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.44)
STRIPING TECHNOLOGY, L.P. (3.52)
JEFF WILSON BORING (0.02)
CARTHAGE DRILLING, INC. (0.31)
Contract #07163232
Totals4570487.360.00879625.3919.2

CountySMITH
HighwaySH 155
From2 MI S OF US 80 (UPSHUR C/L), S
ToIH 20
CSJ0520-01-021
Proj IDSTP 2017(087)
Work TypePLNG, ACP,OCST,PFC SURF,PVT MRKG
 
7.9785534730.860.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-16-16
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days76
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0520-01-021
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #09163224
Totals5534730.860.000.000.0

CountyHENDERSON
HighwayFM 315
FromFM 314, S
ToCR 4325/4224 (END C-S)
CSJ0559-02-034
Proj IDSTP 1502(282)HES
Work TypeSUBGRADE WIDEN, LEVEL-UP, OCST
 
5.7063079333.983572355.0699.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-24-15
Work Began10-19-15
Work Completed
Time Computed00-00-00
Contract Working Days175
Addl Days Granted3
Working Days Charged173
Percent Time Used97
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0559-02-034
COLD CREEK CONSTRUCTION, LTD (1.97)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.79)
SAMMY G. SMALLWOOD (1.20)
STRIPING TECHNOLOGY, L.P. (1.64)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (4.49)
STRIPING SYSTEMS, INC. (0.04)
NIXON ENGINEERING (0.00)
Contract #06153229
Totals3079333.980.003572355.0699.9

CountyCHEROKEE
HighwayFM 22
FromUS 69 S OF JACKSONVILLE, SW
To1.5 MI W OF FM 768(N)(GAL'N CTY LM)
CSJ0634-01-011
Proj IDSSW 634-01-011
Work TypeSBGR WDN,ACP BS&SURF,OCST,STRS,SIGN
 
14.2567730087.277431217.0496.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-13-15
Work Began12-15-15
Work Completed
Time Computed00-00-00
Contract Working Days138
Addl Days Granted1
Working Days Charged191
Percent Time Used137
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0634-01-011
DUSTIN ALLEN, INC. (1.90)
HEMPHILL PILE DRIVING CO., A CORP. (0.42)
STRIPE-A-ZONE, INC. (2.41)
SOUTHWEST ENVIRONMENT SERVICES LLC (7.81)
PANOLA SIGN & BARRICADE, INC. (0.47)
BAHENA CONSTRUCTION CO.,INC. (10.90)
UNIVERSAL LAND CLEARING (1.42)
B & E CONSTRUCTION INC. (6.05)
Contract #06153215
Totals7730087.270.007431217.0496.8

CountyCHEROKEE
HighwayFM 22
From1.5 MI W OF FM 768, (CR 1512), E
ToSH 110
CSJ0634-01-012
Proj IDSTP 2017(363)HES
Work TypeSAFETY TREAT FIXED OBJECTS
 
4.8311037127.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days110
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0634-01-012
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173012
Totals1037127.000.000.000.0

CountyGREGG
HighwayFM 449
FromUS 259 N OF LONGVIEW, E
ToFM 2751
CSJ0640-07-005
Proj IDSTP 1502(284)HES
Work TypeSUBGR WDN,ACP LVL-UP,STRS,OCST,PVMK
 
8.0124436875.013987391.2989.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-13-15
Work Began10-12-15
Work Completed
Time Computed00-00-00
Contract Working Days284
Addl Days Granted9
Working Days Charged243
Percent Time Used82
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0640-07-005
BAHENA CONSTRUCTION CO.,INC. (9.52)
COWBELL TRAFFIC SERVICES, INC. (0.26)
PANOLA SIGN & BARRICADE, INC. (0.60)
SOUTHWEST ENVIRONMENT SERVICES LLC (6.94)
STRIPE-A-ZONE, INC. (2.47)
B & E CONSTRUCTION INC. (3.23)
DUSTIN ALLEN, INC. (0.47)
Contract #06153032
Totals4436875.010.003987391.2989.8

CountyVAN ZANDT
HighwayFM 314
From2.3 MI N OF SH 64(CR 4907),S
ToFM 279 (E) IN EDOM
CSJ0745-01-015
Proj IDSTP 2014(634)
Work TypeSCAR,RESHAPE,FLX BS,SURF TRT,STRS
 
11.71211961746.066390875.9153.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-08-14
Work Began11-07-14
Work Completed
Time Computed00-00-00
Contract Working Days486
Addl Days Granted0
Working Days Charged332
Percent Time Used68
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0745-01-015
STRIPING TECHNOLOGY, L.P. (1.40)
DUSTIN ALLEN, INC. (0.74)
KENSAR LLC DBA S & S TRUCKING (4.64)
Contract #05143203
Totals11961746.060.006390875.9153.4

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToTHE TYLER DISTRICT
CSJ0910-00-100
Proj IDSTP 2017(230)
Work TypeTHERMOPLASTIC MARKINGS
 
1.000209929.700.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days26
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-100
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173027
Totals209929.700.000.000.0

CountySMITH
HighwayVA
FromVAR LOCS IN GREGG & RUSK COUNTIES
ToCITIES OF LONGVIEW,KILGORE,HENDERSN
CSJ0910-00-105
Proj IDSTP 2016(366)
Work TypeCURB RAMPS
 
0.1001419691.250.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days145
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TI-ZACK CONCRETE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-105
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12163035
Totals1419691.250.000.000.0

CountyGREGG
HighwayVA
FromVARIOUS LOCATIONS IN KILGORE,
ToGLADEWATER & LONGVIEW
CSJ0910-07-068
Proj IDSTP 1602(646)
Work TypePLANT TREES & SHRUBS, IRRIGATION
 
1.000254158.620.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-20-16
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days92
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
AALC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-068
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08163052
Totals254158.620.000.000.0

CountyANDERSON
HighwayCR
FromCR 471 AT BOX CREEK
ToSTR # AA04-71-101
CSJ0910-08-040
Proj IDBR 2000(274)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.161817412.15837129.8499.9
Work Order04-27-15
Work Began06-18-15
Work Completed
Time Computed05-13-15
Contract Working Days177
Addl Days Granted0
Working Days Charged177
Percent Time Used100
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-040
AMERICAN REMEDIATION OPTIONS, INC. (5.72)
PANOLA SIGN & BARRICADE, INC. (1.06)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (9.81)
MESA ROD BUSTERS, INC. (0.37)
Contract #03153203
Totals817412.150.00837129.8499.9

CountyANDERSON
HighwayPW
FromVARIOUS LOCATIONS
ToWITHIN GUS ENGLING WMA
CSJ0910-08-063
Proj IDC 910-8-63
Work TypeBRIDGE & CULVERT REPAIR
 
1.000446429.76365300.4284.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-21-16
Work Began07-22-16
Work Completed
Time Computed00-00-00
Contract Working Days62
Addl Days Granted0
Working Days Charged80
Percent Time Used129
Contractor(s)
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-063
MHB CONSTRUCTION, INC. (64.01)
Contract #03163030
Totals446429.760.00365300.4284.2

CountyANDERSON
HighwayCR
FromCR 2133 AT MACK CREEK
ToSTR#AA2133101, BTWN US 79 & FM 1990
CSJ0910-08-069
Proj IDBR 2015(260)
Work TypeREPLACE BRIDGE AND APPROACHES
 
1.000499832.22302579.9860.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-27-16
Work Began09-19-16
Work Completed
Time Computed00-00-00
Contract Working Days60
Addl Days Granted0
Working Days Charged37
Percent Time Used61
Contractor(s)
FRITCHER CONSTRUCTION SERVICES
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-069
FLEX SUPPLY, LLC (0.70)
JM YANEZ CONSTRUCTION, INC. (31.12)
SOUTHWEST ENVIRONMENT SERVICES LLC (3.35)
SHINN & GREGORY, INC. (11.36)
MORRIS COUNTY CONTRACTORS, L.L.C. (2.43)
Contract #04163005
Totals499832.220.00302579.9860.5

CountyVAN ZANDT
HighwayCR
FromCR 3105 AT CROOKED CREEK
ToSTR # AA01-19-002
CSJ0910-12-034
Proj IDBR 1502(662)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.4001432779.00667910.0246.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-10-16
Work Began06-13-16
Work Completed
Time Computed00-00-00
Contract Working Days272
Addl Days Granted0
Working Days Charged99
Percent Time Used36
Contractor(s)
STATELINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-12-034
PANOLA SIGN & BARRICADE, INC. (1.08)
SOUTHWEST ENVIRONMENT SERVICES LLC (3.28)
PEACHTREE CONSTRUCTION, LTD. (9.24)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (5.50)
ODUM SERVICES, L.P. (3.37)
Contract #03163024
Totals1432779.000.00667910.0246.6

CountySMITH
HighwayCR
FromCR 2138 AT BLACKHAWK CR
ToSTR# AA2138101, S OF WHITEHOUSE
CSJ0910-16-131
Proj IDBR 2016(206)
Work TypeREPLACE BRIDGE & APPROACHES
 
0.300947499.80846815.0489.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-02-16
Work Began05-24-16
Work Completed
Time Computed00-00-00
Contract Working Days183
Addl Days Granted0
Working Days Charged140
Percent Time Used76
Contractor(s)
PIERCE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-16-131
SOUTHWEST ENVIRONMENT SERVICES LLC (3.21)
FORTSON CONTRACTING, INC. (3.89)
PEACHTREE CONSTRUCTION, LTD. (12.05)
PANOLA SIGN & BARRICADE, INC. (1.09)
MCL CONTRACTING, LLC (0.90)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (11.21)
Contract #03163206
Totals947499.800.00846815.0489.3

CountyCHEROKEE
HighwayCR
FromCR 1707 AT ONE ARM CRK, N OF US 84
ToBTWN FM 347 & 2138, STR #AA0488001
CSJ0910-36-127
Proj IDBR 1502(633)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.200699993.90663009.7794.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-22-16
Work Began07-19-16
Work Completed
Time Computed00-00-00
Contract Working Days105
Addl Days Granted0
Working Days Charged99
Percent Time Used94
Contractor(s)
STATELINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-36-127
SOUTHWEST ENVIRONMENT SERVICES LLC (3.01)
DALLAS LITE AND BARRICADE INC. (0.88)
DUSTIN ALLEN, INC. (4.05)
PEACHTREE CONSTRUCTION, LTD. (11.45)
HEMPHILL WBE PILE DRIVING CO. (2.95)
Contract #05163024
Totals699993.900.00663009.7794.7

CountyRUSK
HighwayVA
FromVARIOUS LOCATIONS IN THE
ToCITY OF HENDERSON
CSJ0910-42-041
Proj IDSTP 2017(245)
Work TypePLANT TREES, HARDSCAPE
 
1.000145279.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order12-12-16
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days38
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TIGHT LINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-42-041
TOTAL HIGHWAY MAINTENANCE, LLC (3.13)
Contract #11163009
Totals145279.000.000.000.0

CountyVAN ZANDT
HighwayFM 1256
FromFM 316, E
ToSH 19
CSJ1172-01-007
Proj IDSSW 1172-1-7
Work TypeGR, FLEX BS, TCST, STRS, PV MK
 
7.9545779955.801112553.3619.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-02-16
Work Began07-08-16
Work Completed
Time Computed00-00-00
Contract Working Days206
Addl Days Granted0
Working Days Charged37
Percent Time Used17
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1172-01-007
ODUM SERVICES, L.P. (0.69)
STRIPING TECHNOLOGY, L.P. (1.35)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (1.68)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.40)
PANOLA SIGN & BARRICADE, INC. (0.50)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.73)
STRIPING SYSTEMS, INC. (0.02)
MAC TRANSPORTATION, LTD, L.L.P. (0.87)
KENSAR LLC DBA S & S TRUCKING (1.49)
Contract #04163210
Totals5779955.800.001112553.3619.2