MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 10 AS OF JUN 11, 2013 PAGE 28 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ ANDERSON 0.8 MI S OF US 79 (REAGAN ST), S | 2.009 | 1,122,811.60| 0.00| 0.00| 0.0| US 84 US 287/US 84 SPLIT IN PALESTINE | | | | | | 0109-01-056 | | | | | | STP 2013(396) PLANING, OCST, ACP SURF, PVMT MRKG | | | | | | | | | | | | WORK ORDER- 05-23-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0109-01-056 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.30 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.26 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.40 | | | | | | | | | | CONTRACT 02133205 | TOTALS | 1,122,811.60| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ANDERSON US 79 IN PALESTINE, SE & S | 1.574 | 7,615,569.93| 0.00| 7,704,294.49| 99.9| LP 256 US 84 | | | | | | 0520-09-031 | | | | | | STP 2009(955) RECONSTR GR, STRS, BS, SURF & PAV M | | | | | | | | | | | | WORK ORDER- 11-02-09 WORK BEGAN- 12-02-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-18-09 | | | | | | CONTRACT WORKING DAYS- 394 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 508 PERCENT TIME USED- 128 | | | | | | | | | | | | SAFECO INSURANCE COMPANIES | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0520-09-031 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.28 | | | | MURRAY CONSTRUCTION | |SUB %: 0.30 | | | | A & R DEMOLITION | |SUB %: 0.78 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 1.18 | | | | J.D. RAMMING PAVING CO., LTD. | |SUB %: 0.00 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 5.72 | | | | TREVCON, INC. | |SUB %: 0.95 | | | | ALLIED FENCE COMPANY | |SUB %: 0.00 | | | | CENTRAL TEXAS REINFORCEMENT | |SUB %: 0.48 | | | | APAC-TEXAS, INC. | |SUB %: 23.00 | | | | HAYWARD BAKER, INC. | |SUB %: 2.79 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.12 | | | | SCR CONSTRUCTION CO., INC. | |SUB %: 0.73 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.05 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 0.92 | | | | AAA FENCE COMPANY OF AUSTIN, INC. | |SUB %: 0.21 | | | | EAST TEXAS BRIDGE, INC. | |SUB %: 40.77 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.11 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.25 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.31 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.05 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.67 | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 0.14 | | | | | | | | | | CONTRACT 09093201 | TOTALS | 7,615,569.93| 0.00| 7,704,294.49| 99.9| ************************************************************************************************************************************ ANDERSON 1.6 MI SW OF LP 256 IN PALESTINE, S | 8.601 | 41,986,850.19| 1,033,932.91| 7,505,577.54| 17.8| US 79 0.4 MI SW OF FM 645 | | | | | | 0205-07-043 | | | | | | NH 2008(510) GR,BS,ASPH PVT, SIGS, ILLUM,SIGNS | | | | | | | | | | | | WORK ORDER- 10-24-12 WORK BEGAN- 11-12-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-09-12 | | | | | | CONTRACT WORKING DAYS- 880 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 127 PERCENT TIME USED- 14 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0205-07-043 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.34 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.65 | | | | MAC TRANSPORTATION, LTD, L.L.P. | |SUB %: 3.12 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 0.39 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.53 | | | | DANRIDGE CONSTRUCTION, LLC. | |SUB %: 0.30 | | | | DUSTROL, INC. | |SUB %: 0.20 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.05 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.30 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.02 | | | | | | | | | | CONTRACT 09123003 | TOTALS | 41,986,850.19| 1,033,932.91| 7,505,577.54| 17.8| ************************************************************************************************************************************ CHEROKEE .9 MI E OF FM 23,E | 19.881 | 6,037,332.46| 900,356.70| 5,219,906.75| 86.4| SH 294 3 MI W OF FM 752 (CR 2326) | | | | | | 0058-04-018 | | | | | | STP 2013(241)HES SBGR WDN,LVL-UP,OCST,STRS,OCST,MBGF | | | | | | | | | | | | WORK ORDER- 01-18-13 WORK BEGAN- 02-22-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-03-13 | | | | | | CONTRACT WORKING DAYS- 170 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 68 PERCENT TIME USED- 40 | | | | | | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0058-04-018 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.58 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.25 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.51 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.56 | | | | J. M. CONSTRUCTION | |SUB %: 0.00 | | | | J & M CONSTRUCTION | |SUB %: 0.00 | | | | HIGHWAY 19 CONSTRUCTION, LLC | |SUB %: 3.94 | | | | | | | | | | CONTRACT 12123012 | TOTALS | 6,037,332.46| 900,356.70| 5,219,906.75| 86.4| ************************************************************************************************************************************ GREGG SH 31 IN LONGVIEW, S | 1.680 | 13,235,356.95| 42,839.21| 1,092,876.37| 8.2| LP 281 0.42 MI S OF FM 2087 | | | | | | 1763-03-029 | | | | | | STP 1102(227)RGS GR,STRS,HMAC BS,CONC PVT,C&G,SIGNLS | | | | | | | | | | | | WORK ORDER- 09-27-11 WORK BEGAN- 03-18-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-01-12 | | | | | | CONTRACT WORKING DAYS- 575 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 5 PERCENT TIME USED- 0 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1763-03-029 | | | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.27 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.97 | | | | MAC TRANSPORTATION, LTD, L.L.P. | |SUB %: 3.61 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.04 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 5.45 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.16 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.53 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.76 | | | | DUKE IRRIGATION | |SUB %: 0.17 | | | | DIAMOND H SERVICES, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 08113205 | TOTALS | 13,235,356.95| 42,839.21| 1,092,876.37| 8.2| ************************************************************************************************************************************ GREGG SH 31, IN SW LONGVIEW, N & W | 7.159 | 516,574.00| 0.00| 0.00| 0.0| LP 281 ETC 0.3 MI E OF FM 2206 (ENTERPRISE) | | | | | | 1763-02-028 | | | | | | NH 2013(205) INTERCONNECT SIGNALS | | | | | | | | | | | | WORK ORDER- 03-21-13 WORK BEGAN- 06-05-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-06-13 | | | | | | CONTRACT WORKING DAYS- 67 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1763-02-028 | | | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 1.82 | | | | GREEN LIGHT IN THE GROUND | |SUB %: 22.05 | | | | | | | | | | CONTRACT 12123017 | TOTALS | 516,574.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GREGG 0.35 MI E OF SH 42 IN WHITE OAK, E | 1.558 | 3,482,669.95| 181,801.06| 997,272.59| 28.6| US 80 1.4 MI W OF SL 281(FISHER RD)IN LVW | | | | | | 0096-04-065 | | | | | | STP 2013(206) GR,BS,HMAC SURF,STRM SWR,C&G,SIGNS | | | | | | | | | | | | WORK ORDER- 01-31-13 WORK BEGAN- 02-18-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-16-13 | | | | | | CONTRACT WORKING DAYS- 221 ADDL DAYS GRANTED- 3 | | | | | | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 32 | | | | | | | | | | | | REYNOLDS & KAY, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0096-04-065 | | | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 1.23 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.38 | | | | DUSTROL, INC. | |SUB %: 1.15 | | | | G & L FLOWERS TRUCKING | |SUB %: 2.00 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.14 | | | | | | | | | | CONTRACT 12123218 | TOTALS | 3,482,669.95| 181,801.06| 997,272.59| 28.6| ************************************************************************************************************************************ HENDERSON 1.4 MI S OF FM 3225 (AVANT RD), S | 8.100 | 3,239,483.87| 12,070.00| 12,070.00| 0.3| SH 274 SH 31 IN TRINIDAD | | | | | | 0561-02-035 | | | | | | STP 2013(397)HES SUBGRADE WIDEN, LEVEL-UP, OCST | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 05-21-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-26-13 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 11 PERCENT TIME USED- 7 | | | | | | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0561-02-035 | | | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.68 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 9.77 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.71 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.55 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.76 | | | | USA EROSION, INC. | |SUB %: 0.83 | | | | | | | | | | CONTRACT 02133018 | TOTALS | 3,239,483.87| 12,070.00| 12,070.00| 0.3| ************************************************************************************************************************************ HENDERSON 0.5 MI S OF US175/LP7 (PATTERSON),S | 0.087 | 125,575.00| 500.00| 129,621.85| 99.9| BU 175G 0.6 MI S OF US175/LP7 IN ATHENS | | | | | | 0197-06-049 | | | | | | NH 2011(838) STRUCTURE,IRRIG SYST, SOD, PLANTS | | | | | | | | | | | | WORK ORDER- 04-19-11 WORK BEGAN- 05-24-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-05-11 | | | | | | CONTRACT WORKING DAYS- 36 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 35 PERCENT TIME USED- 97 | | | | | | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0197-06-049 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.99 | | | | | | | | | | CONTRACT 03113205 | TOTALS | 125,575.00| 500.00| 129,621.85| 99.9| ************************************************************************************************************************************ HENDERSON 0.34 MI W OF FM 773 (BEG C&G), E | 7.862 | 4,945,961.90| 0.00| 0.00| 0.0| SH 31 1.1 MI W OF FM 1803(W) IN MURCHISON | | | | | | 0164-01-068 | | | | | | STP 2013(549) PVMT RPR,PLNG,CAM,OCST,HARST,HMAC | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 52 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0164-01-068 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133218 | TOTALS | 4,945,961.90| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HENDERSON 4.1 MI N OF FM 837 (CR 468N), N | 4.636 | 6,385,017.81| 187,820.91| 1,543,452.33| 24.1| SH 19 3.5 MI S OF FM 1615 (COON CRK BRG) | | | | | | 0108-05-014 | | | | | | C 108-5-14 GR,STRS,HMA BS & SURF,OCST,LVL-UP | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 11-19-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-03-12 | | | | | | CONTRACT WORKING DAYS- 265 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 99 PERCENT TIME USED- 37 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0108-05-014 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.29 | | | | COX PAVING COMPANY, L.P. | |SUB %: 4.37 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 1.01 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.50 | | | | 3LW MANAGEMENT, LLC | |SUB %: 9.06 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.51 | | | | | | | | | | CONTRACT 08123224 | TOTALS | 6,385,017.81| 187,820.91| 1,543,452.33| 24.1| ************************************************************************************************************************************ HENDERSON 1.4 MI NW OF OF SL 60(N), SE | 8.556 | 3,425,092.38| 34,304.92| 2,417,542.89| 72.3| US 175 1.4 MI SE OF SL 60(S) (CR 4403) | | | | | | 0198-02-032 | | | | | | STP 2012(147)HES SBGR WDN,ACP BS,OCST,SURF,STRS,PVMK | | | | | | | | | | | | HENDERSON 0.2 MI S OF FM2339(VAN ZANDT C/L),S | 6.660 | 306,620.16| 187,824.40| 231,965.40| 75.6| FM 773 SH 31 IN MURCHISON | | | | | | 1099-02-015 | | | | | | STP 2012(146) SEAL COAT & PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 01-24-12 WORK BEGAN- 03-19-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-09-12 | | | | | | CONTRACT WORKING DAYS- 162 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 224 PERCENT TIME USED- 138 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0198-02-032 | | | | | | J & M CONTRACTING, COMPANY | |SUB %: 13.83 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.96 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.68 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.66 | | | | | | | | | | CONTRACT 12113016 | TOTALS | 3,731,712.54| 222,129.32| 2,649,508.29| 72.6| ************************************************************************************************************************************ RUSK 1.7 MI SE OF SH 42 (CR 4137A), SE | 13.607 | 2,078,750.32| 306,561.55| 1,866,912.18| 90.3| SH 323 2.4 MI N OF SL 571 (CR 427D) | | | | | | 0592-01-013 | | | | | | STP 2012(299)HES SUBGRADE WIDEN, LEVEL-UP, OCST | | | | | | | | | | | | WORK ORDER- 03-06-12 WORK BEGAN- 03-26-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-22-12 | | | | | | CONTRACT WORKING DAYS- 70 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 85 PERCENT TIME USED- 121 | | | | | | | | | | | | REYNOLDS & KAY, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0592-01-013 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.73 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 6.07 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.94 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.49 | | | | | | | | | | CONTRACT 02123023 | TOTALS | 2,078,750.32| 306,561.55| 1,866,912.18| 90.3| ************************************************************************************************************************************ RUSK 1 MI SE OF US 79 (PECAN CRK DR), SE | 13.186 | 3,692,047.24| 60,253.87| 2,520,008.86| 68.2| FM 840 FM 2867 | | | | | | 0592-02-014 | | | | | | STP 2012(300)HES SUBGRADE WIDEN, LEVEL-UP, OCST | | | | | | | | | | | | WORK ORDER- 04-05-12 WORK BEGAN- 04-30-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-21-12 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 145 PERCENT TIME USED- 80 | | | | | | | | | | | | L. S. EQUIPMENT CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0592-02-014 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.21 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.41 | | | | ODUM SERVICES, L.P. | |SUB %: 2.70 | | | | ROBINSON CONSTRUCTION | |SUB %: 9.56 | | | | | | | | | | CONTRACT 02123224 | TOTALS | 3,692,047.24| 60,253.87| 2,520,008.86| 68.2| ************************************************************************************************************************************ RUSK AT FM 1798, NEAR MINDEN | 0.766 | 5,497,236.41| 456,120.43| 4,587,916.55| 83.4| US 259 . | | | | | | 0138-05-052 | | | | | | STP 1102(218)SB GR,STRS,FLX&ACP BS,SURF,SIGN,ILUMTN | | | | | | | | | | | | WORK ORDER- 08-11-11 WORK BEGAN- 06-04-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-02-12 | | | | | | CONTRACT WORKING DAYS- 263 ADDL DAYS GRANTED- 60 | | | | | | WORKING DAYS CHARGED- 281 PERCENT TIME USED- 86 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0138-05-052 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 2.06 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.83 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.09 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.05 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.10 | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.23 | | | | MAC TRANSPORTATION, LTD, L.L.P. | |SUB %: 3.32 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.07 | | | | R & R TELCO ENTERPRISES, INC. | |SUB %: 0.12 | | | | | | | | | | CONTRACT 06113241 | TOTALS | 5,497,236.41| 456,120.43| 4,587,916.55| 83.4| ************************************************************************************************************************************ SMITH SH 110, E | 22.879 | 2,357,887.20| -4,856.63| 759,595.66| 32.2| FM 16 SH 155 | | | | | | 0522-04-028 | | | | | | STP 2012(297) OCST, HMAC SURF, PVT MRKG | | | | | | | | | | | | SMITH SH 110, NR GARDEN VALLEY, E | 47.953 | 4,533,012.78| 41,354.62| 3,677,326.85| 81.1| FM 16 SH 155, IN WINONA | | | | | | 0522-04-029 | | | | | | STP 2012(296)HES PROFILE MARKING CNTRLN RMBL STRIPS | | | | | | | | | | | | WORK ORDER- 03-19-12 WORK BEGAN- 04-11-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-04-12 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 6 | | | | | | WORKING DAYS CHARGED- 110 PERCENT TIME USED- 87 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0522-04-028 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 5.11 | | | | DUSTIN ALLEN, INC. | |SUB %: 1.38 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.31 | | | | MAC TRANSPORTATION, LTD, L.L.P. | |SUB %: 1.75 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.37 | | | | | | | | | | CONTRACT 02123203 | TOTALS | 6,890,899.98| 36,497.99| 4,436,922.51| 64.3| ************************************************************************************************************************************ SMITH CR 2115 AT BOWLES CREEK | 0.140 | 422,632.92| 0.00| 0.00| 0.0| CR STR#AA21-15-001,0.1 MI W OF RUSK CL | | | | | | 0910-16-112 | | | | | | BR 2012(185) RPLC BRG&APPR,GRDG,ACP BS&SURF,MBGF | | | | | | | | | | | | WORK ORDER- 05-13-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-29-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 92 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | EAST TEXAS BRIDGE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0910-16-112 | | | | | | JUST GROOVING, LTD. | |SUB %: 0.29 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 9.06 | | | | CF SOUTHWEST ENVIRONMENT SERVICES, LLC(USE 23616) | |SUB %: 2.21 | | | | FORTSON CONTRACTING, INC. | |SUB %: 3.75 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.24 | | | | | | | | | | CONTRACT 03133029 | TOTALS | 422,632.92| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH US 69 (N) IN TYLER, E | 3.985 | 1,965,643.25| 0.00| 0.00| 0.0| LP 323 LP323,.5 MI E OF US271(AMER LEG RD) | | | | | | 2075-01-053 | | | | | | NH 2013(466) OCST, 2" OVERLAY | | | | | | | | | | | | SMITH US 69 (N) IN TYLER, E | 3.985 | 1,828,463.02| 0.00| 0.00| 0.0| LP 323 LP323,.5 MI E OF US271(AMER LEG RD) | | | | | | 2075-01-056 | | | | | | NH 2013(466) OCST, 2" OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 50 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REYNOLDS & KAY, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2075-01-053 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133207 | TOTALS | 3,794,106.27| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH CR 1141 AT INDIAN CR & SO.PAC R/R | 0.181 | 1,048,288.84| 0.00| 0.00| 0.0| CR STR# AA01-29-001 & 2, W OF TYLER | | | | | | 0910-16-066 | | | | | | BR 96(534) RPLC BRGS&APPRS,GR,ACP BS&SURF,MBGF | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 165 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | EAST TEXAS BRIDGE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0910-16-066 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133232 | TOTALS | 1,048,288.84| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH 2.4 MI S OF IH 20(CR329/FORD RD), S | 0.856 | 931,556.38| 0.00| 0.00| 0.0| FM 14 1.2 MI N OF LP 323 (CR3154/HOYT RD) | | | | | | 0492-01-039 | | | | | | STP 2013(550) SBGRD WDN,ACP BS,OCST, HMAC, PVT MK | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0492-01-039 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133026 | TOTALS | 931,556.38| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH FM 16 AT RED SPRINGS, S | 5.578 | 2,193,886.50| 523,634.11| 1,251,297.81| 57.0| FM 14 IH 20 | | | | | | 0492-01-033 | | | | | | STP 2012(500) SBGR WDN,BS,OCST,HMAC SURF,STRS | | | | | | | | | | | | WORK ORDER- 06-28-12 WORK BEGAN- 01-03-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-02-13 | | | | | | CONTRACT WORKING DAYS- 78 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 92 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0492-01-033 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.27 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 1.53 | | | | MAC TRANSPORTATION, LTD, L.L.P. | |SUB %: 2.28 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.20 | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.33 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.36 | | | | | | | | | | CONTRACT 05123045 | TOTALS | 2,193,886.50| 523,634.11| 1,251,297.81| 57.0| ************************************************************************************************************************************ SMITH 0.1 MI W OF FM 2661, E | 1.191 | 2,387,571.56| 0.00| 0.00| 0.0| SH 64 0.6 MI W OF FM 724 (NEAR CR 1184) | | | | | | 0245-05-046 | | | | | | STP 2013(225) GR, SURF, BASE, ACP, PVT MRKG | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 106 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0245-05-046 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133033 | TOTALS | 2,387,571.56| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH VARIOUS LOCATIONS IN HENDERSON | 1.000 | 1,347,171.00| 0.00| 0.00| 0.0| VA WOOD, VAN ZANDT & ANDERSON COUNTIES | | | | | | 0910-00-095 | | | | | | STP 2013(682) ADA CURB RAMPS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 218 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HIGHWAY 19 CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0910-00-095 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133034 | TOTALS | 1,347,171.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ SMITH SH 31, SE | 6.922 | 2,870,170.33| 0.00| 0.00| 0.0| SP 364 SL 323 IN TYLER | | | | | | 2833-01-011 | | | | | | STP 2013(683) 2" MILL, OCST, 2' INLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2833-01-011 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133236 | TOTALS | 2,870,170.33| 0.00| 0.00| 0.0| ************************************************************************************************************************************ VAN ZANDT 3.0 MI S OF SH 110 (CR 1226), S | 7.459 | 3,737,909.64| 277,286.00| 1,763,938.18| 47.1| FM 17 IH 20 | | | | | | 0443-03-017 | | | | | | STP 2012(424) WDN & CMT TRT SBGD,FLX BS,TCST,STRS | | | | | | | | | | | | WORK ORDER- 04-11-12 WORK BEGAN- 04-30-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-27-12 | | | | | | CONTRACT WORKING DAYS- 160 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 116 PERCENT TIME USED- 72 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0443-03-017 | | | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.42 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 7.87 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 0.70 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.37 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.89 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.46 | | | | RK HALL, LLC | |SUB %: 6.35 | | | | | | | | | | CONTRACT 03123024 | TOTALS | 3,737,909.64| 277,286.00| 1,763,938.18| 47.1| ************************************************************************************************************************************ VAN ZANDT FM 1861, E | 4.329 | 1,705,832.33| 208,362.72| 1,390,841.61| 81.8| FM 2339 FM 773, NR HENDERSON C/L | | | | | | 2265-01-014 | | | | | | STP 2012(369) GRD, STRS, BS, SURF TRT,MBFG,PV MRK | | | | | | | | | | | | WORK ORDER- 04-11-12 WORK BEGAN- 04-23-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-27-12 | | | | | | CONTRACT WORKING DAYS- 55 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 110 | | | | | | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2265-01-014 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.17 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 8.56 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.41 | | | | CATACON, INC. | |SUB %: 1.91 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.44 | | | | | | | | | | CONTRACT 03123224 | TOTALS | 1,705,832.33| 208,362.72| 1,390,841.61| 81.8| ************************************************************************************************************************************ VAN ZANDT 0.1 MI SE OF FM 314, SE | 21.135 | 6,387,594.18| 868,901.24| 5,840,299.76| 92.6| SH 64 4.1 MI. NW OF FM 279 IN REDLAND | | | | | | 0245-19-019 | | | | | | STP 1102(345) GRD, FLX BS, HMAC SURF, STRS, PV MK | | | | | | | | | | | | WORK ORDER- 08-15-11 WORK BEGAN- 10-11-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-31-11 | | | | | | CONTRACT WORKING DAYS- 203 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 275 PERCENT TIME USED- 135 | | | | | | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0245-19-019 | | | | | | COLD CREEK CONSTRUCTION, LTD | |SUB %: 1.71 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 4.61 | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.30 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.41 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.51 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.24 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 2.23 | | | | A. L. HELMCAMP, INC. | |SUB %: 0.51 | | | | | | | | | | CONTRACT 06113250 | TOTALS | 6,387,594.18| 868,901.24| 5,840,299.76| 92.6| ************************************************************************************************************************************ VAN ZANDT FM 858 NR BEN WHEELER, SE | 6.920 | 7,358,629.82| 116,040.22| 1,805,301.36| 24.5| SH 64 0.1 MI SE OF FM 314 | | | | | | 0245-19-022 | | | | | | STP 2012(765) GR, FLX BS. LVL-UP, HMAC SURF, STRS | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 12-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-03-12 | | | | | | CONTRACT WORKING DAYS- 172 ADDL DAYS GRANTED- 16 | | | | | | WORKING DAYS CHARGED- 88 PERCENT TIME USED- 46 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0245-19-022 | | | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.91 | | | | J. M. CONSTRUCTION | |SUB %: 1.74 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.74 | | | | HIGHWAY 19 CONSTRUCTION, LLC | |SUB %: 4.68 | | | | | | | | | | CONTRACT 08123040 | TOTALS | 7,358,629.82| 116,040.22| 1,805,301.36| 24.5| ************************************************************************************************************************************ VAN ZANDT ETC .4 MI W OF FM1504(EDGWD W CTY LIM)E | 196.928 | 8,515,839.36| 0.00| 1,949,620.67| 22.8| US 80 ETC SH 19 | | | | | | 0095-06-066 | | | | | | STP 2013(165) SEAL COAT & PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 01-04-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 91 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BRANNAN PAVING CO., LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-06-066 | | | | | | STRIPE-A-ZONE, INC. | |SUB %: 12.68 | | | | BRYDL CONTRACTING, INC. | |SUB %: 0.91 | | | | | | | | | | CONTRACT 11123222 | TOTALS | 8,515,839.36| 0.00| 1,949,620.67| 22.8| ************************************************************************************************************************************ WOOD SH 37 IN QUITMAN, SE | 14.738 | 2,178,792.43| 162,731.86| 2,092,624.93| 96.3| FM 778 FM 49 IN HAINESVILLE | | | | | | 0429-02-008 | | | | | | STP 2012(368)HES SBGRD WDN,HOTMIX BS,OCST,STRS,PV MK | | | | | | | | | | | | WORK ORDER- 04-16-12 WORK BEGAN- 05-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-02-12 | | | | | | CONTRACT WORKING DAYS- 70 ADDL DAYS GRANTED- 14 | | | | | | WORKING DAYS CHARGED- 93 PERCENT TIME USED- 110 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0429-02-008 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.54 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.85 | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.24 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.57 | | | | MAC TRANSPORTATION, LTD, L.L.P. | |SUB %: 2.47 | | | | | | | | | | CONTRACT 03123028 | TOTALS | 2,178,792.43| 162,731.86| 2,092,624.93| 96.3| ************************************************************************************************************************************ WOOD 0.6 MI NW OF FM 779 IN GOLDEN, SE | 4.207 | 2,817,127.02| 0.00| 0.00| 0.0| US 69 SL 564 IN MINEOLA | | | | | | 0203-05-037 | | | | | | C 203-5-37 GR,STRS,ACP BS & SURF,PVT MRK | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 84 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0203-05-037 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06133223 | TOTALS | 2,817,127.02| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WOOD AT DRY CREEK, 0.7 MI W OF SH 37 | 0.492 | 2,484,893.73| 133,598.26| 1,509,935.34| 60.7| SH 154 STR #004, W OF QUITMAN | | | | | | 0401-02-031 | | | | | | BR 2012(719) RPLC BR&APPR,GRDG,OCST,ACP BS&SURF | | | | | | | | | | | | WORK ORDER- 09-17-12 WORK BEGAN- 10-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-03-12 | | | | | | CONTRACT WORKING DAYS- 145 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 114 PERCENT TIME USED- 78 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0401-02-031 | | | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.33 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.18 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.12 | | | | FORTSON CONTRACTING, INC. | |SUB %: 2.25 | | | | MAC TRANSPORTATION, LTD, L.L.P. | |SUB %: 2.51 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.68 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 4.91 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.65 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.38 | | | | | | | | | | CONTRACT 08123044 | TOTALS | 2,484,893.73| 133,598.26| 1,509,935.34| 60.7| ************************************************************************************************************************************ WOOD 1 MI N OF FM 288(LAKE FORK RES BR)S | 5.626 | 5,801,592.45| 405,403.08| 1,592,095.16| 27.4| SH 154 SH 37 (MAIN ST) IN QUITMAN | | | | | | 0401-02-026 | | | | | | STP 2013(118) WDN GR,STRS,REPL BR,ACP BS & SURF,P | | | | | | | | | | | | WORK ORDER- 11-30-12 WORK BEGAN- 03-04-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-01-13 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 49 PERCENT TIME USED- 40 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0401-02-026 | | | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 1.80 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 7.81 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.03 | | | | BLACKTOPPER TECHNOLOGY, INC. | |SUB %: 1.52 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.14 | | | | RK HALL, LLC | |SUB %: 40.26 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.24 | | | | COX PAVING COMPANY, L.P. | |SUB %: 2.53 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.31 | | | | FARR FOUNDATION, INC. | |SUB %: 0.71 | | | | | | | | | | CONTRACT 10123007 | TOTALS | 5,801,592.45| 405,403.08| 1,592,095.16| 27.4| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 166,567,444.91 DISTRICT ESTIMATES THIS MONTH 6,136,841.44 DISTRICT TOTAL ESTIMATES PAID TO DATE 59,462,295.13