| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | CONCHO |
| Highway |
US0087 |
| From |
VARIOUS ROADS IN CONCHO AND MENARD |
| To |
VARIOUS ROADS IN CONCHO AND MENARD |
| CSJ |
6009-47-001 |
| Proj ID |
RMC - 600947001 |
| Work Type |
MOWING ROW IN CONCHO AND MENARD COUNTY |
| |
|
0.001 |
152665.57 |
0.00 |
113267.04 |
74.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-14-12 |
| Work Began |
12-10-12 |
| Work Completed |
|
| Time Computed |
12-10-12 |
| Contract Working Days |
52 |
| Addl Days Granted |
0 |
| Working Days Charged |
20 |
| Percent Time Used |
38 |
| Contractor(s) |
| EGGEMEYER MOWING & CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6009-47-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124006 |
|
Totals |
152665.57 |
0.00 |
113267.04 |
74.1 |
|
| County | KIMBLE |
| Highway |
US0083 |
| From |
VARIOUS ROADS IN KIMBLE COUNTY |
| To |
VARIOUS ROADS IN KIMBLE COUNTY |
| CSJ |
6070-32-001 |
| Proj ID |
RMC - 607032001 |
| Work Type |
MOWING RIGHT OF WAY IN KIMBLE COUNTY |
| |
|
0.001 |
142165.16 |
0.00 |
80016.62 |
56.2 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-15-12 |
| Work Began |
12-10-12 |
| Work Completed |
|
| Time Computed |
12-01-12 |
| Contract Working Days |
48 |
| Addl Days Granted |
0 |
| Working Days Charged |
10 |
| Percent Time Used |
20 |
| Contractor(s) |
| R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6070-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124026 |
|
Totals |
142165.16 |
0.00 |
80016.62 |
56.2 |
|
| County | CROCKETT |
| Highway |
SH0163 |
| From |
VARIOUS ROADS IN CROCKETT COUNTY |
| To |
VARIOUS ROADS IN CROCKETT COUNTY |
| CSJ |
6082-61-001 |
| Proj ID |
RMC - 608261001 |
| Work Type |
MOWING RIGHT OF WAY IN CROCKETT COUNTY |
| |
|
0.001 |
118237.72 |
0.00 |
52824.93 |
44.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-31-12 |
| Work Began |
11-15-12 |
| Work Completed |
|
| Time Computed |
11-15-12 |
| Contract Working Days |
49 |
| Addl Days Granted |
0 |
| Working Days Charged |
8 |
| Percent Time Used |
16 |
| Contractor(s) |
| SQUARE G, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6082-61-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124007 |
|
Totals |
118237.72 |
0.00 |
52824.93 |
44.6 |
|
| County | REAGAN |
| Highway |
US0067 |
| From |
VARIOUS ROADS IN REAGAN/IRION COUNTIES |
| To |
VARIOUS ROADS IN REAGAN/IRION COUNTIES |
| CSJ |
6082-98-001 |
| Proj ID |
RMC - 608298001 |
| Work Type |
MOWING RIGHT OF WAY IN REAGAN AND IRION |
| |
|
1.000 |
82892.00 |
0.00 |
56649.00 |
68.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-24-12 |
| Work Began |
11-01-12 |
| Work Completed |
|
| Time Computed |
11-01-12 |
| Contract Working Days |
26 |
| Addl Days Granted |
0 |
| Working Days Charged |
8 |
| Percent Time Used |
30 |
| Contractor(s) |
| L&L COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6082-98-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124027 |
|
Totals |
82892.00 |
0.00 |
56649.00 |
68.3 |
|
| County | REAL |
| Highway |
SH0041 |
| From |
VARIOUS ROADS IN REAL ETC COUNTY |
| To |
VARIOUS ROADS IN REAL ETC COUNTY |
| CSJ |
6084-43-001 |
| Proj ID |
RMC - 608443001 |
| Work Type |
RIGHT OF WAY MOWING IN REAL ETC COUNTY |
| |
|
0.001 |
61702.50 |
0.00 |
8977.50 |
28.4 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-31-12 |
| Work Began |
11-12-12 |
| Work Completed |
|
| Time Computed |
11-12-12 |
| Contract Working Days |
27 |
| Addl Days Granted |
0 |
| Working Days Charged |
42 |
| Percent Time Used |
155 |
| Contractor(s) |
| DE WALT CONSTRUCTION COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6084-43-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124008 |
|
Totals |
61702.50 |
0.00 |
8977.50 |
28.4 |
|
| County | RUNNELS |
| Highway |
SH0158 |
| From |
VARIOUS ROADS IN RUNNELS COUNTY |
| To |
VARIOUS ROADS IN RUNNELS COUNTY |
| CSJ |
6088-99-001 |
| Proj ID |
RMC - 608899001 |
| Work Type |
RIGHT OF WAY MOWING IN RUNNELS COUNTY |
| |
|
1.000 |
119820.06 |
0.00 |
82867.05 |
69.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-23-12 |
| Work Began |
11-01-12 |
| Work Completed |
|
| Time Computed |
11-01-12 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
16 |
| Percent Time Used |
35 |
| Contractor(s) |
| EGGEMEYER MOWING & CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6088-99-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124028 |
|
Totals |
119820.06 |
0.00 |
82867.05 |
69.1 |
|
| County | STERLING |
| Highway |
US0087 |
| From |
VARIOUS ROADS IN STERLING GLASSCOCK |
| To |
VARIOUS ROADS IN STERLING GLASSCOCK |
| CSJ |
6101-63-001 |
| Proj ID |
RMC - 610163001 |
| Work Type |
MOWING RIGHT OF WAY STERLING & GLASSCOCK |
| |
|
1.000 |
111271.44 |
0.00 |
63797.85 |
58.4 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-22-12 |
| Work Began |
11-26-12 |
| Work Completed |
|
| Time Computed |
12-01-12 |
| Contract Working Days |
54 |
| Addl Days Granted |
0 |
| Working Days Charged |
23 |
| Percent Time Used |
42 |
| Contractor(s) |
| G.K.C., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6101-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124009 |
|
Totals |
111271.44 |
0.00 |
63797.85 |
58.4 |
|
| County | SUTTON |
| Highway |
US0277 |
| From |
VARIOUS ROADS IN SUTTON/SCHLEICHER |
| To |
VARIOUS ROADS IN SUTTON/SCHLEICHER |
| CSJ |
6106-58-001 |
| Proj ID |
RMC - 610658001 |
| Work Type |
MOWING RIGHT OF WAY SUTTON / SCHLEICHER |
| |
|
0.001 |
140563.13 |
0.00 |
104485.16 |
74.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-19-12 |
| Work Began |
11-26-12 |
| Work Completed |
|
| Time Computed |
11-26-12 |
| Contract Working Days |
58 |
| Addl Days Granted |
0 |
| Working Days Charged |
11 |
| Percent Time Used |
18 |
| Contractor(s) |
| SQUARE G, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6106-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124029 |
|
Totals |
140563.13 |
0.00 |
104485.16 |
74.3 |
|
| County | TOM GREEN |
| Highway |
US0277 |
| From |
VARIOUS ROADS IN TOM GREEN RURAL |
| To |
VARIOUS ROADS IN TOM GREEN RURAL |
| CSJ |
6110-55-001 |
| Proj ID |
RMC - 611055001 |
| Work Type |
RIGHT OF WAY MOWING IN TOM GREEN RURAL |
| |
|
0.001 |
115483.88 |
0.00 |
80459.63 |
69.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-19-12 |
| Work Began |
11-20-12 |
| Work Completed |
|
| Time Computed |
11-20-12 |
| Contract Working Days |
47 |
| Addl Days Granted |
0 |
| Working Days Charged |
16 |
| Percent Time Used |
34 |
| Contractor(s) |
| EGGEMEYER MOWING & CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6110-55-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124010 |
|
Totals |
115483.88 |
0.00 |
80459.63 |
69.6 |
|
| County | EDWARDS |
| Highway |
SH0041 |
| From |
VARIOUS ROADS IN EDWARDS COUNTY |
| To |
VARIOUS ROADS IN EDWARDS COUNTY |
| CSJ |
6116-69-001 |
| Proj ID |
RMC - 611669001 |
| Work Type |
MOWING RIGHT OF WAY IN EDWARDS COUNTY |
| |
|
0.001 |
61096.51 |
0.00 |
41149.53 |
67.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
12-03-12 |
| Work Began |
12-15-12 |
| Work Completed |
|
| Time Computed |
12-15-12 |
| Contract Working Days |
37 |
| Addl Days Granted |
0 |
| Working Days Charged |
6 |
| Percent Time Used |
16 |
| Contractor(s) |
| R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6116-69-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124030 |
|
Totals |
61096.51 |
0.00 |
41149.53 |
67.3 |
|
| County | SUTTON |
| Highway |
RM1312 |
| From |
IRION COUNTY |
| To |
SUTTON COUNTY |
| CSJ |
6205-40-001 |
| Proj ID |
RMC - 620540001 |
| Work Type |
INSTALL BRIDGE RAIL & GUARD RAIL END TRE |
| |
|
0.001 |
308769.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
70 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| K-BAR SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6205-40-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04104022 |
|
Totals |
308769.00 |
0.00 |
0.00 |
0.0 |
|
| County | CROCKETT |
| Highway |
SH0163 |
| From |
VARIOUS LOCATIONS IN CROCKETT COUNTY |
| To |
VARIOUS LOCATIONS IN CROCKETT COUNTY |
| CSJ |
6232-09-001 |
| Proj ID |
RMC - 623209001 |
| Work Type |
STRIP MOWING OF RIGHT OF WAY CROCKETT CO |
| |
|
0.001 |
103536.00 |
0.00 |
51768.00 |
50.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-07-12 |
| Work Began |
06-01-12 |
| Work Completed |
|
| Time Computed |
06-01-12 |
| Contract Working Days |
44 |
| Addl Days Granted |
0 |
| Working Days Charged |
9 |
| Percent Time Used |
20 |
| Contractor(s) |
| SPARKLES TRUCKING |
SUBCONTRACTOR(S) FOR CCSJ: 6232-09-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10114005 |
|
Totals |
103536.00 |
0.00 |
51768.00 |
50.0 |
|
| County | REAGAN |
| Highway |
US0067 |
| From |
VARIOUS LOCATIONS IN REAGAN COUNTY |
| To |
VARIOUS LOCATIONS IN REAGAN COUNTY |
| CSJ |
6232-10-001 |
| Proj ID |
RMC - 623210001 |
| Work Type |
STRIP MOWING OF RIGHT OF WAY REAGAN ETC |
| |
|
0.001 |
48551.40 |
0.00 |
24275.70 |
50.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-15-12 |
| Work Began |
06-04-12 |
| Work Completed |
|
| Time Computed |
06-04-12 |
| Contract Working Days |
22 |
| Addl Days Granted |
0 |
| Working Days Charged |
9 |
| Percent Time Used |
40 |
| Contractor(s) |
| G.K.C., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6232-10-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10114021 |
|
Totals |
48551.40 |
0.00 |
24275.70 |
50.0 |
|
| County | TOM GREEN |
| Highway |
US0087 |
| From |
TOM GREEN,RUNNELS AND COKE COUNTIES |
| To |
STERLING AND GLASSCOCK COUNTIES |
| CSJ |
6237-05-001 |
| Proj ID |
RMC - 623705001 |
| Work Type |
UPGRADE & REPAIRS METALBEAM GUARDFENCE |
| |
|
0.001 |
142663.75 |
0.00 |
72080.00 |
81.5 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-28-12 |
| Work Began |
09-01-12 |
| Work Completed |
|
| Time Computed |
09-01-12 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
273 |
| Percent Time Used |
74 |
| Contractor(s) |
| HJC FARMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6237-05-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06124038 |
|
Totals |
142663.75 |
0.00 |
72080.00 |
81.5 |
|
| County | MENARD |
| Highway |
RM0864 |
| From |
0.76 MILES EAST OF RM 1674 |
| To |
2.10 MILES EAST |
| CSJ |
6238-32-001 |
| Proj ID |
RMC - 623832001 |
| Work Type |
SUBGRADE WIDENING WITH CEMENT TREAT |
| |
|
2.100 |
658938.29 |
166354.53 |
347972.35 |
52.8 |
| Work Order |
03-07-13 |
| Work Began |
03-18-13 |
| Work Completed |
|
| Time Computed |
03-18-13 |
| Contract Working Days |
70 |
| Addl Days Granted |
0 |
| Working Days Charged |
29 |
| Percent Time Used |
41 |
| Contractor(s) |
| ALLEN KELLER COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6238-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11124016 |
|
Totals |
658938.29 |
166354.53 |
347972.35 |
52.8 |
|
| County | RUNNELS |
| Highway |
FM2111 |
| From |
SH 158 IN RUNNELS COUNTY |
| To |
4 MILES NORTH OF SH 158 |
| CSJ |
6243-74-001 |
| Proj ID |
RMC - 624374001 |
| Work Type |
ADDING / WIDENING PAVEMENT |
| |
|
4.000 |
645686.20 |
101456.52 |
573562.42 |
94.0 |
| Work Order |
10-01-12 |
| Work Began |
10-03-12 |
| Work Completed |
|
| Time Computed |
10-03-12 |
| Contract Working Days |
49 |
| Addl Days Granted |
25 |
| Working Days Charged |
129 |
| Percent Time Used |
174 |
| Contractor(s) |
| LONE WOLF CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6243-74-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07124011 |
|
Totals |
645686.20 |
101456.52 |
573562.42 |
94.0 |
|
| County | TOM GREEN |
| Highway |
US0087 |
| From |
SAN ANGELO STATE SUPPORTED LIVING CENTER |
| To |
RIVER ROAD AND WATER WELL ROADS |
| CSJ |
6243-93-001 |
| Proj ID |
RMC - 624393001 |
| Work Type |
REHABILATE ROADS |
| |
|
1.159 |
254445.92 |
75705.42 |
190264.85 |
74.7 |
| Work Order |
03-01-13 |
| Work Began |
03-04-13 |
| Work Completed |
|
| Time Computed |
03-04-13 |
| Contract Working Days |
40 |
| Addl Days Granted |
0 |
| Working Days Charged |
40 |
| Percent Time Used |
100 |
| Contractor(s) |
| REECE ALBERT, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6243-93-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10124022 |
|
Totals |
254445.92 |
75705.42 |
190264.85 |
74.7 |
|
| County | KIMBLE |
| Highway |
IH0010 |
| From |
VARIOUS LOCATIONS IN KIMBLE,CONCHO,REAL |
| To |
MENARD AND EDWARDS COUNTIES |
| CSJ |
6243-94-001 |
| Proj ID |
RMC - 624394001 |
| Work Type |
METAL BEAM GUARD FENCE REPAIR |
| |
|
0.001 |
133340.00 |
21296.00 |
57609.00 |
43.2 |
| Work Order |
11-07-12 |
| Work Began |
11-07-12 |
| Work Completed |
|
| Time Computed |
11-07-12 |
| Contract Working Days |
360 |
| Addl Days Granted |
0 |
| Working Days Charged |
21 |
| Percent Time Used |
5 |
| Contractor(s) |
| T & L CLEANING SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6243-94-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07124019 |
|
Totals |
133340.00 |
21296.00 |
57609.00 |
43.2 |
|
| County | COKE |
| Highway |
US0277 |
| From |
VARIOUS LOCATIONS IN COKE COUNTY |
| To |
VARIOUS LOCATIONS IN COKE COUNTY |
| CSJ |
6245-30-001 |
| Proj ID |
RMC - 624530001 |
| Work Type |
MOWING RIGHT OF WAY COKE COUNTY |
| |
|
0.001 |
95556.32 |
0.00 |
65146.72 |
68.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
12-05-12 |
| Work Began |
12-07-12 |
| Work Completed |
|
| Time Computed |
12-07-12 |
| Contract Working Days |
34 |
| Addl Days Granted |
0 |
| Working Days Charged |
12 |
| Percent Time Used |
35 |
| Contractor(s) |
| EGGEMEYER MOWING & CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6245-30-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124011 |
|
Totals |
95556.32 |
0.00 |
65146.72 |
68.1 |
|
| County | TOM GREEN |
| Highway |
US0067 |
| From |
VARIOUS LOCATIONS IN TOM GREEN URBAN |
| To |
VARIOUS LOCATIONS IN TOM GREEN URBAN |
| CSJ |
6245-64-001 |
| Proj ID |
RMC - 624564001 |
| Work Type |
RIGHT OF WAY MOWING FOR TOM GREEN URBAN |
| |
|
0.001 |
167384.88 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
24 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SQUARE G, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6245-64-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08124031 |
|
Totals |
167384.88 |
0.00 |
0.00 |
0.0 |
|