| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | COMAL |
| Highway |
0000000 |
| From |
BETWEEN IH-35 & HWY 81 N OF SOLMS RD. |
| To |
BETWEEN IH-35 & HWY 81 N OF SOLMS RD. |
| CSJ |
4704-00-656 |
| Proj ID |
CBC - 470400656 |
| Work Type |
NEW CONSTRUCTION |
| |
|
0.001 |
3594000.00 |
193815.55 |
3107186.83 |
92.6 |
| Work Order |
07-13-07 |
| Work Began |
07-30-07 |
| Work Completed |
|
| Time Computed |
07-29-07 |
| Contract Working Days |
360 |
| Addl Days Granted |
0 |
| Working Days Charged |
430 |
| Percent Time Used |
119 |
| Contractor(s) |
| GALAXY BUILDERS, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 4704-00-656 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06074025 |
|
Totals |
3594000.00 |
193815.55 |
3107186.83 |
92.6 |
|
| County | ATASCOSA |
| Highway |
IH0037 |
| From |
VARIOUS HIGHWAYS IN |
| To |
ATASCOSA COUNTY |
| CSJ |
6003-23-001 |
| Proj ID |
RMC - 600323001 |
| Work Type |
HIGHWAY MOWING |
| |
|
0.001 |
215865.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
1,095 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| FRANK'S MOWING & CONST CO. |
SUBCONTRACTOR(S) FOR CCSJ: 6003-23-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10964016 |
|
Totals |
215865.00 |
0.00 |
0.00 |
0.0 |
|
| County | BEXAR |
| Highway |
IH0010 |
| From |
VARIOUS HIGHWAYS IN |
| To |
SAN ANTONIO DISTRICT AND LASALLE CO. |
| CSJ |
6003-38-001 |
| Proj ID |
RMC - 600338001 |
| Work Type |
CONSTRUCT AND INSTALL SIGNS |
| |
|
0.001 |
231461.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-04-97 |
| Work Began |
05-20-97 |
| Work Completed |
|
| Time Computed |
05-01-97 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| MICA CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 6003-38-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02974001 |
|
Totals |
231461.00 |
0.00 |
0.00 |
0.0 |
|
| County | KERR |
| Highway |
US0083 |
| From |
VARIOUS HIGHWAYS |
| To |
IN KERR COUNTY |
| CSJ |
6003-70-001 |
| Proj ID |
RMC - 600370001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
217968.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
06-25-97 |
| Work Began |
06-30-97 |
| Work Completed |
|
| Time Computed |
06-27-97 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| FRED J. WHITEWOOD, JR. |
SUBCONTRACTOR(S) FOR CCSJ: 6003-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11964011 |
|
Totals |
217968.00 |
0.00 |
0.00 |
0.0 |
|
| County | MCMULLEN |
| Highway |
SH0016 |
| From |
VARIOUS LOCATIONS |
| To |
IN MCMULLEN COUNTY |
| CSJ |
6004-96-001 |
| Proj ID |
RMC - 600496001 |
| Work Type |
MOWING RIGHT - OF - WAY |
| |
|
0.001 |
101934.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
1,095 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| FRANK'S MOWING & CONST CO. |
SUBCONTRACTOR(S) FOR CCSJ: 6004-96-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11964013 |
|
Totals |
101934.00 |
0.00 |
0.00 |
0.0 |
|
| County | FRIO |
| Highway |
FM0472 |
| From |
VARIOUS LOCATIONS |
| To |
ATASCOSA, FRIO AND MEDINA COUNTIES |
| CSJ |
6009-38-001 |
| Proj ID |
RMC - 600938001 |
| Work Type |
PAVEMENT REHAB |
| |
|
0.001 |
435636.20 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
75 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| COX PAVING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6009-38-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02974029 |
|
Totals |
435636.20 |
0.00 |
0.00 |
0.0 |
|
| County | MCMULLEN |
| Highway |
SH0016 |
| From |
VARIOUS HIGHWAYS IN MCMULLEN, ATASCOSA, |
| To |
AND LASALLE COUNTIES |
| CSJ |
6072-39-001 |
| Proj ID |
RMC - 607239001 |
| Work Type |
MOWING HIGHWAY RIGHT - OF - WAY |
| |
|
0.001 |
148335.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
98 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HERNANDEZ CUSTOM FARM SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6072-39-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12014017 |
|
Totals |
148335.00 |
0.00 |
0.00 |
0.0 |
|
| County | BEXAR |
| Highway |
IH0010 |
| From |
VARIOUS HIGHWAYS IN |
| To |
BEXAR, COMAL AND GUADALUPE COUNTIES |
| CSJ |
6144-09-001 |
| Proj ID |
RMC - 614409001 |
| Work Type |
PERFORMANCE BASED PAVEMENT MARKINGS |
| |
|
0.001 |
23381391.32 |
419536.16 |
10092672.08 |
47.8 |
| Work Order |
08-17-06 |
| Work Began |
09-01-06 |
| Work Completed |
|
| Time Computed |
09-01-06 |
| Contract Working Days |
1,825 |
| Addl Days Granted |
0 |
| Working Days Charged |
792 |
| Percent Time Used |
43 |
| Contractor(s) |
| FLASHER EQUIPMENT COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6144-09-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05064008 |
|
Totals |
23381391.32 |
419536.16 |
10092672.08 |
47.8 |
|
| County | BEXAR |
| Highway |
IH0010 |
| From |
VARIOUS HIGHWAYS |
| To |
WITHIN THE SAN ANTONIO DISTRICT |
| CSJ |
6145-88-001 |
| Proj ID |
RMC - 614588001 |
| Work Type |
TRAFFIC SIGNAL MAINTENANCE AND REPAIR |
| |
|
0.001 |
605151.38 |
15662.97 |
522081.97 |
86.2 |
| Work Order |
12-06-06 |
| Work Began |
12-14-06 |
| Work Completed |
|
| Time Computed |
12-13-06 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
689 |
| Percent Time Used |
94 |
| Contractor(s) |
| SAECO ELECTRIC & UTILITY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6145-88-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10064010 |
|
Totals |
605151.38 |
15662.97 |
522081.97 |
86.2 |
|
| County | UVALDE |
| Highway |
US0090 |
| From |
VARIOUS ROADWAYS IN UVALDE COUNTY |
| To |
. |
| CSJ |
6146-65-001 |
| Proj ID |
RMC - 614665001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
442980.36 |
0.00 |
375144.21 |
84.6 |
| Work Order |
05-07-07 |
| Work Began |
06-09-07 |
| Work Completed |
|
| Time Computed |
06-01-07 |
| Contract Working Days |
170 |
| Addl Days Granted |
0 |
| Working Days Charged |
81 |
| Percent Time Used |
47 |
| Contractor(s) |
| MISSOURI-TEXAS FARMS, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6146-65-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12064009 |
|
Totals |
442980.36 |
0.00 |
375144.21 |
84.6 |
|
| County | KERR |
| Highway |
IH0010 |
| From |
VARIOUS LOCATIONS |
| To |
IN KERR COUNTY |
| CSJ |
6154-20-001 |
| Proj ID |
RMC - 615420001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
445549.00 |
26668.00 |
246856.00 |
55.4 |
| Work Order |
07-25-07 |
| Work Began |
08-01-07 |
| Work Completed |
|
| Time Computed |
08-01-07 |
| Contract Working Days |
173 |
| Addl Days Granted |
0 |
| Working Days Charged |
45 |
| Percent Time Used |
26 |
| Contractor(s) |
| SOUTH TEXAS MAINTENANCE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-20-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12064018 |
|
Totals |
445549.00 |
26668.00 |
246856.00 |
55.4 |
|
| County | KENDALL |
| Highway |
IH0010 |
| From |
VARIOUS ROADWAYS IN KENDALL COUNTY |
| To |
. |
| CSJ |
6154-22-001 |
| Proj ID |
RMC - 615422001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
410463.00 |
0.00 |
232873.50 |
56.7 |
| Work Order |
06-15-07 |
| Work Began |
07-10-07 |
| Work Completed |
|
| Time Computed |
06-25-07 |
| Contract Working Days |
163 |
| Addl Days Granted |
0 |
| Working Days Charged |
61 |
| Percent Time Used |
37 |
| Contractor(s) |
| SOUTH TEXAS MAINTENANCE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-22-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12064008 |
|
Totals |
410463.00 |
0.00 |
232873.50 |
56.7 |
|
| County | GUADALUPE |
| Highway |
IH0010 |
| From |
VARIOUS LOCATIONS IN |
| To |
GUADALUPE COUNTY |
| CSJ |
6154-42-001 |
| Proj ID |
RMC - 615442001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
641192.00 |
16016.00 |
415604.00 |
64.8 |
| Work Order |
05-15-07 |
| Work Began |
05-21-07 |
| Work Completed |
|
| Time Computed |
05-28-07 |
| Contract Working Days |
256 |
| Addl Days Granted |
0 |
| Working Days Charged |
97 |
| Percent Time Used |
37 |
| Contractor(s) |
| SOUTH TEXAS MAINTENANCE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-42-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12064019 |
|
Totals |
641192.00 |
16016.00 |
415604.00 |
64.8 |
|
| County | WILSON |
| Highway |
US0181 |
| From |
VARIOUS LOCATIONS IN |
| To |
WILSON COUNTY |
| CSJ |
6154-46-001 |
| Proj ID |
RMC - 615446001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
389568.40 |
9633.00 |
266834.10 |
68.4 |
| Work Order |
05-31-07 |
| Work Began |
06-04-07 |
| Work Completed |
|
| Time Computed |
06-11-07 |
| Contract Working Days |
182 |
| Addl Days Granted |
0 |
| Working Days Charged |
53 |
| Percent Time Used |
29 |
| Contractor(s) |
| MISSOURI-TEXAS FARMS, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6154-46-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12064020 |
|
Totals |
389568.40 |
9633.00 |
266834.10 |
68.4 |
|
| County | MEDINA |
| Highway |
IH0035 |
| From |
VARIOUS HIGHWAYS IN MEDINA, ATASCOSA |
| To |
AND FRIO COUNTIES |
| CSJ |
6154-49-001 |
| Proj ID |
RMC - 615449001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
335610.00 |
0.00 |
256095.00 |
76.3 |
| Work Order |
05-31-07 |
| Work Began |
06-06-07 |
| Work Completed |
|
| Time Computed |
06-11-07 |
| Contract Working Days |
148 |
| Addl Days Granted |
0 |
| Working Days Charged |
63 |
| Percent Time Used |
42 |
| Contractor(s) |
| WALLA BROTHERS |
SUBCONTRACTOR(S) FOR CCSJ: 6154-49-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12064010 |
|
Totals |
335610.00 |
0.00 |
256095.00 |
76.3 |
|
| County | BEXAR |
| Highway |
IH0035 |
| From |
VARIOUS LOCATIONS IN BEXAR COUNTY |
| To |
VARIOUS LOCATIONS IN BEXAR COUNTY |
| CSJ |
6156-23-001 |
| Proj ID |
RMC - 615623001 |
| Work Type |
CLEANING PUMPHOUSE, STORM SEWER, & INLET |
| |
|
0.010 |
597703.00 |
28900.00 |
274171.00 |
45.8 |
| Work Order |
08-24-07 |
| Work Began |
09-09-07 |
| Work Completed |
|
| Time Computed |
09-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
427 |
| Percent Time Used |
58 |
| Contractor(s) |
| ALL POINTS INSPECTION SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6156-23-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07074018 |
|
Totals |
597703.00 |
28900.00 |
274171.00 |
45.8 |
|
| County | BEXAR |
| Highway |
IH0035 |
| From |
VARIOUS LOCATIONS |
| To |
IN BEXAR COUNTY |
| CSJ |
6160-65-001 |
| Proj ID |
RMC - 616065001 |
| Work Type |
GUARDRAIL REPAIR |
| |
|
0.001 |
2043775.00 |
26327.00 |
1397406.00 |
68.6 |
| Work Order |
08-24-07 |
| Work Began |
09-10-07 |
| Work Completed |
|
| Time Computed |
09-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
427 |
| Percent Time Used |
58 |
| Contractor(s) |
| K-BAR SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6160-65-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05074021 |
|
Totals |
2043775.00 |
26327.00 |
1397406.00 |
68.6 |
|
| County | BEXAR |
| Highway |
IH0010 |
| From |
VARIOUS LOCATIONS |
| To |
IN BEXAR COUNTY |
| CSJ |
6160-66-001 |
| Proj ID |
RMC - 616066001 |
| Work Type |
GUARDRAIL REPAIR |
| |
|
0.001 |
1612075.00 |
55692.00 |
1067135.00 |
66.2 |
| Work Order |
08-24-07 |
| Work Began |
09-07-07 |
| Work Completed |
|
| Time Computed |
09-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
427 |
| Percent Time Used |
58 |
| Contractor(s) |
| K-BAR SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6160-66-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05074011 |
|
Totals |
1612075.00 |
55692.00 |
1067135.00 |
66.2 |
|
| County | BEXAR |
| Highway |
IH0035 |
| From |
VARIOUS LOCATIONS |
| To |
IN BEXAR COUNTY |
| CSJ |
6160-67-001 |
| Proj ID |
RMC - 616067001 |
| Work Type |
MOWING, LITTER PICKUP AND SWEEPING |
| |
|
0.001 |
3479946.50 |
143264.73 |
1561248.96 |
45.6 |
| Work Order |
08-24-07 |
| Work Began |
09-05-07 |
| Work Completed |
|
| Time Computed |
09-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
427 |
| Percent Time Used |
58 |
| Contractor(s) |
| FLASHER EQUIPMENT COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6160-67-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05074010 |
|
Totals |
3479946.50 |
143264.73 |
1561248.96 |
45.6 |
|
| County | BEXAR |
| Highway |
IH0010 |
| From |
VARIOUS LOCATIONS |
| To |
IN BEXAR COUNTY |
| CSJ |
6160-68-001 |
| Proj ID |
RMC - 616068001 |
| Work Type |
MOWING , LITTER PICKUP AND SWEEPING |
| |
|
0.001 |
2274786.00 |
96204.92 |
1137608.52 |
50.4 |
| Work Order |
08-24-07 |
| Work Began |
09-05-07 |
| Work Completed |
|
| Time Computed |
09-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
427 |
| Percent Time Used |
58 |
| Contractor(s) |
| BRAZOS VALLEY TOUCH-UP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6160-68-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05074022 |
|
Totals |
2274786.00 |
96204.92 |
1137608.52 |
50.4 |
|