Monthly State Let Construction Report For San Antonio District As Of Nov 9, 2016 Page 2 Of 5

Last Update: Wednesday, November 9, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyBEXAR
Highway IH 10
From IH 10 EB AT AMANDA STREET
To .
CSJ 0025-02-210
Proj ID BR 1602(546)
Work Type GRAD, STRUC, BASE, SURF, CLEAN & PAINT
 
0.834 2671455.16 0.00 0.00 0.0
CountyBEXAR
Highway IH 10
From IH 10 WB AT AMANDA STREET
To .
CSJ 0025-02-211
Proj ID BR 1602(546)
Work Type GRAD, BSE, STRUCTURE, SURF, CLN & PAINT
 
0.834 2026497.49 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-26-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 304
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
J3 COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-210
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08163034
Totals 4697952.65 0.00 0.00 0.0

CountyBEXAR
Highway FM 78
From AT LP 1604
To .
CSJ 0025-09-076
Proj ID STP 2015(580)HES
Work Type GR, BASE, SURF, PAVMT MRKRS, SIGNALS
 
0.106 2187618.06 20924.20 1641566.59 76.6
Work Order 03-20-15
Work Began 00-00-00
Work Completed  
Time Computed 06-18-15
Contract Working Days 212
Addl Days Granted 0
Working Days Charged 214
Percent Time Used 100
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0025-09-076
E-Z BEL CONSTRUCTION, LLC(7.29%)
RICE ENVIRONMENTAL SERVICES(2.09%)
INTERSTATE BARRICADES & MARKINGS, INC. (3.08%)
FLASHER EQUIPMENT COMPANY(0.54%)
LONE STAR PAVING ( 29.07%)
Contract # 02153004
Totals 2187618.06 20924.20 1641566.59 76.6

CountyGUADALUPE
Highway FM 78
From SANTA CLARA CREEK, WEST OF MARION
To SANTA CLARA CREEK, EAST OF MARION
CSJ 0025-10-073
Proj ID STP 2013(348)
Work Type GRAD, STRS, BASE & SURF
 
1.080 4136146.75 1220.43 4695058.62 99.9
Work Order 07-16-13
Work Began 11-11-13
Work Completed  
Time Computed 11-11-13
Contract Working Days 203
Addl Days Granted 0
Working Days Charged 245
Percent Time Used 120
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0025-10-073
FLASHER EQUIPMENT COMPANY(0.31%)
LANDSCAPE CONTRACTING AND IRRIGATION, INC. (2.51%)
E-Z BEL CONSTRUCTION, LLC(1.02%)
MURRAY CONSTRUCTION(0.53%)
RICE ENVIRONMENTAL SERVICES(0.56%)
C & C ALCOSER TRUCKING (0.00%)
PROFESSIONAL TRAFFIC CONTROL, LLC(1.53%)
VEGETATION MANAGEMENT SERVICES, LLC(0.00%)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.26%)
FUQUAY, INC. (0.14%)
Contract # 01133220
Totals 4136146.75 1220.43 4695058.62 99.9

CountyUVALDE
Highway US 83 ETC
From 1.0 MI SOUTH OF SH 127
To SH 127
CSJ 0036-07-032
Proj ID STP 2016(861)HES
Work Type TEXTURIZE SHOULDERS
 
61.202 620124.44 0.00 634450.42 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-21-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 86
Addl Days Granted 0
Working Days Charged 30
Percent Time Used 34
Contractor(s)
L&L COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0036-07-032
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03163023
Totals 620124.44 0.00 634450.42 99.9

CountyUVALDE
Highway US 83
From AT SH 127
To .
CSJ 0036-07-033
Proj ID STP 2017(093)HES
Work Type GRD, BSE, SURF, PAV'T MRK
 
0.227 1056313.61 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-13-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 78
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0036-07-033
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09163222
Totals 1056313.61 0.00 0.00 0.0

CountyUVALDE
Highway US 83 ETC
From 0.031 MI N OF PR 29A
To 0.271 MI S OF PR 29A
CSJ 0036-07-036
Proj ID STP 2017(277)HES
Work Type BASE, SURF, GRADE & PVMT MARKINGS
 
24.018 1559435.35 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 123
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC
SUBCONTRACTOR(S) FOR CCSJ: 0036-07-036
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11163210
Totals 1559435.35 0.00 0.00 0.0

CountyUVALDE
Highway US 83
From SH 55
To 0.2 MI N OF FM 1051
CSJ 0036-08-051
Proj ID STP 1502(265)HES
Work Type INSTALL INTERC FLASHING BEACON
 
17.800 1685720.93 85335.98 910645.45 54.0
CountyUVALDE
Highway FM 140
From 1.2 MI E FM 117
To 1.6 MI E FM 117
CSJ 0875-01-017
Proj ID STP 1502(264)HRR
Work Type GRD, BSE, SURF, SIGNALS, PAV'T MRK
 
0.400 480173.38 0.00 0.00 0.0
Work Order 07-30-15
Work Began 00-00-00
Work Completed  
Time Computed 10-28-15
Contract Working Days 308
Addl Days Granted 21
Working Days Charged 218
Percent Time Used 66
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0036-08-051
LONE STAR PAVING ( 13.63%)
E-Z BEL CONSTRUCTION, LLC(4.24%)
FLASHER EQUIPMENT COMPANY(2.64%)
Contract # 06153041
Totals 2165894.31 85335.98 910645.45 42.0

CountyKENDALL
Highway IH 10
From SH 46
To 0.4 MI WEST OF US 87
CSJ 0072-06-071
Proj ID NH 2015(020)
Work Type BASE, GR, STR, SURF, SIGN & PAV MRK
 
1.044 3536440.57 0.00 2184980.70 63.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-30-15
Work Began 00-00-00
Work Completed  
Time Computed 04-27-15
Contract Working Days 136
Addl Days Granted 0
Working Days Charged 200
Percent Time Used 147
Contractor(s)
THE HANOVER INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0072-06-071
DOUBLE S PAVING, INC.( 25.74%)
DRILL TECH DRILLING & SHORING, INC.(5.25%)
SAECO ELECTRIC & UTILITY, LTD. (4.55%)
ENVIRONMENTAL SAFETY SERVICES, INC.(2.82%)
FLASHER EQUIPMENT COMPANY(1.06%)
ZIMMERMAN CONSTRUCTION CO., INC. (0.00%)
Contract # 09143211
Totals 3536440.57 0.00 2184980.70 63.5

CountyKENDALL
Highway IH 10
From AT SCENIC LOOP ROAD
To .
CSJ 0072-06-072
Proj ID STP 1502(610)MM
Work Type GRD, BSE, STR, SURF, PAV'T MRK, SIG
 
0.835 11578717.70 0.00 4525285.60 39.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-28-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 416
Addl Days Granted 0
Working Days Charged 200
Percent Time Used 48
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0072-06-072
RAMMING PAVING COMPANY ( 17.34%)
E-Z BEL CONSTRUCTION, LLC(4.79%)
OSCAR ORDUNO, INC. (1.98%)
BRADCO, LLC(1.73%)
FLASHER EQUIPMENT COMPANY(1.69%)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (1.23%)
PRESIDIO CONTRACTING, LLC(0.90%)
WIMMS ENVIRONMENTAL, INC.(1.00%)
VOGES DRILLING CO. (0.59%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.41%)
MCL CONTRACTING, LLC (0.37%)
DU-MOR ENTERPRISES_INC.(0.26%)
S & S BRIDGE PAINTING, INC.(0.05%)
HOUSTON SAWING & DRILLING(0.04%)
TEXAS CUTTING & CORING, INC. (0.26%)
Contract # 08153017
Totals 11578717.70 0.00 4525285.60 39.0

CountyKENDALL
Highway IH 10 ETC
From RANGER CREEK ROAD
To BEXAR/KENDALL C/L
CSJ 0072-06-073
Proj ID NH 2016(300)
Work Type SEAL COAT AND PAVEMENT MARKINGS
 
188.603 6910844.54 430628.14 7058408.05 99.9
Work Order 01-29-16
Work Began 04-18-16
Work Completed  
Time Computed 04-18-16
Contract Working Days 53
Addl Days Granted 0
Working Days Charged 61
Percent Time Used 115
Contractor(s)
RONALD R. WAGNER & CO., LP
SUBCONTRACTOR(S) FOR CCSJ: 0072-06-073
VIZCAINO, INC. ( 21.81%)
FLASHER EQUIPMENT COMPANY(1.38%)
Contract # 11153025
Totals 6910844.54 430628.14 7058408.05 99.9

CountyBEXAR
Highway IH 10
From FM 3351
To DOMINION DRIVE
CSJ 0072-07-059
Proj ID IM 4104(382)
Work Type SC, STRIPING, BASE
 
7.406 18426875.59 605107.43 14721580.19 80.0
CountyBEXAR
Highway IH 10
From FM 3351
To DOMINION DRIVE
CSJ 0072-07-065
Proj ID RW 72-7-65
Work Type ADJUSTMENT OF UTILITIES
 
7.406 915396.00 0.00 950330.00 99.9
Work Order 10-02-14
Work Began 03-10-15
Work Completed  
Time Computed 03-10-15
Contract Working Days 376
Addl Days Granted 0
Working Days Charged 405
Percent Time Used 107
Contractor(s)
STERLING DELAWARE HOLDING COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0072-07-059
FUQUAY, INC. (0.61%)
RELMCO, INC. (4.88%)
BADECO, INC(0.66%)
THE LEVY COMPANY, L.P. (6.41%)
K.L. DURHAM CONSTRUCTION, LLC(0.28%)
ROADWAY SPECIALTIES, INC.(2.51%)
VINSON CONSTRUCTION, LLC.(0.79%)
GOSNEY BROTHERS, LLC.(4.16%)
OSCAR ORDUNO, INC. (3.00%)
FLASHER EQUIPMENT COMPANY(0.66%)
MICKIE SERVICE, INC. (0.06%)
MCL CONTRACTING, LLC (0.14%)
BROWN EXCAVATION & UTILITIES, LLC(0.67%)
RAMMING PAVING COMPANY (1.00%)
RDI FOUNDATION DRILLING(1.43%)
LONE STAR PAVING (0.01%)
HUNTER DEMOLITION & WRECKING CORPORATION (0.41%)
PRIMATE CONSTRUCTION, INC. (0.07%)
S & S BRIDGE PAINTING, INC.(0.05%)
Contract # 07143204
Totals 19342271.59 605107.43 15671910.19 81.2

CountyBEXAR
Highway IH 10
From FAIR OAKS
To FM 3351
CSJ 0072-07-066
Proj ID C 72-7-66
Work Type GRAD, BS, STR, PVMT MRKG
 
3.390 31088816.81 0.00 11328330.62 36.8
CountyBEXAR
Highway IH 10
From FAIR OAKS
To FM 3351
CSJ 0072-07-071
Proj ID ROW 72-7-71
Work Type UTILITIES
 
3.390 70302.50 0.00 43602.50 62.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-24-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 793
Addl Days Granted 0
Working Days Charged 205
Percent Time Used 25
Contractor(s)
SUNDT CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0072-07-066
AUSTIN MATERIALS, LLC( 18.99%)
ROADWAY SPECIALTIES, INC.(1.55%)
FLASHER EQUIPMENT COMPANY(1.06%)
PANTHER CREEK TRANSPORTATION, INC. (3.16%)
OSCAR ORDUNO, INC. (0.84%)
STRAIGHT LINE SAWING & SEALING (0.06%)
MELENDREZ BROTHERS TRUCKING, INC.(0.61%)
THE LEVY COMPANY, L.P. (4.54%)
BEAIRD DRILLING(0.27%)
PRESIDIO CONTRACTING, LLC(3.71%)
LIGHT IT UP ELECTRIC (0.02%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.30%)
WILLIAMS CONSTRUCTION(0.07%)
PERFORMANCE EQUIPMENT(0.15%)
BREDA COMPANY, INC.(0.41%)
Contract # 07153205
Totals 31159119.31 0.00 11371933.12 36.8

CountyBEXAR
Highway IH 10
From AT FAIR OAKS PARKWAY
To .
CSJ 0072-07-068
Proj ID STP 1602(184)MM
Work Type GRD, BSE, STR, SURF, PAV'T MRK, SIG
 
0.267 7586328.53 0.00 480180.93 6.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-04-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 387
Addl Days Granted 0
Working Days Charged 17
Percent Time Used 4
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0072-07-068
AUSTIN MATERIALS, LLC( 15.96%)
ROADWAY SPECIALTIES, INC.(3.43%)
E-Z BEL CONSTRUCTION, LLC(2.31%)
W. W. FOUNDATION DRILLING, LTD.(2.12%)
INTERSTATE BARRICADES & MARKINGS, INC. (1.14%)
J.R. RAMON & SONS, INC.(0.48%)
S & S BRIDGE PAINTING, INC.(0.13%)
Contract # 06163016
Totals 7586328.53 0.00 480180.93 6.3

CountyBEXAR
Highway IH 10
From LP 1604
To 1.0 MI N OF HUEBNER RD
CSJ 0072-08-120
Proj ID STP 1102(442)MM
Work Type GRAD, BASE, SC, OV & PAV'T MRKNGS
 
2.513 25923457.53 18610.86 31026449.48 99.9
CountyBEXAR
Highway IH 10
From LP 1604
To 1.0 MI N OF HUEBNER RD
CSJ 0072-08-125
Proj ID NH 1102(524)
Work Type UTIL & UTIL IN CONSTR CONTRACT
 
3.980 408971.75 0.00 364462.91 89.1
CountyBEXAR
Highway IH 10
From 1.0 MI N OF HUEBNER RD
To S. OF HUEBNER RD
CSJ 0072-12-179
Proj ID STP 1102(442)MM
Work Type GRAD, BASE, SC, OV & PAV'T MRKNGS
 
1.464 9635856.12 0.00 9975942.14 99.9
Work Order 10-19-11
Work Began 01-02-12
Work Completed  
Time Computed 11-03-11
Contract Working Days 698
Addl Days Granted 312
Working Days Charged 1,031
Percent Time Used 102
Contractor(s)
LIBERTY MUTUAL INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0072-08-120
LONE STAR TRAFFIC SERVICE, INC.(0.20%)
FUQUAY, INC. (0.07%)
ROADWAY SPECIALTIES, INC.(0.69%)
SITESAFE PRODUCTS TEXAS(0.99%)
PRIMATE CONSTRUCTION, INC. (0.03%)
J. R. (JOE) RAMON & SONS, INC. (0.60%)
GEOSOURCE, INC.(0.50%)
FARR FOUNDATION, INC.(1.09%)
DUSTROL, INC.(0.20%)
BEAIRD DRILLING(0.37%)
CP REBAR AND PT INSTALLATION (0.25%)
COLLECTIVE CONTRACTING (1.01%)
FLASHER EQUIPMENT COMPANY(1.35%)
STAR OPERATIONS, INC.( 15.22%)
S & S BRIDGE PAINTING, INC.(0.16%)
A & L UNDERGROUND, INC.(0.03%)
DU-MOR ENTERPRISES_INC.(0.55%)
DRILL TECH DRILLING & SHORING, INC.(2.82%)
T & D SOLUTIONS, LTD (1.55%)
WEBBER, LLC(113.75%)
FARR FOUNDATION, INC.(1.25%)
TEXAS HIGHWAY WALLS(2.73%)
BEAIRD DRILLING(0.35%)
FLASHER EQUIPMENT COMPANY(1.25%)
STAR OPERATIONS, INC.( 10.80%)
GIBSON & ASSOCIATES, INC.(0.13%)
HOLES OF SAN ANTONIO (0.01%)
M & M CONTRACTING, LTD.(1.04%)
TEXAS CURB CUT, LP (0.07%)
ANGEL BROTHERS ENTERPRISES, LTD. ( 36.16%)
WEBBER BARRIER SERVICES, LLC.(2.34%)
HOUSTON SAWING & DRILLING(0.02%)
CP REBAR AND PT INSTALLATION (0.14%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (5.48%)
CRAIG OLDEN, INC.(0.99%)
PENHALL COMPANY (AUSTIN) (0.00%)
SAECO ELECTRIC & UTILITY, LTD. (0.03%)
DCCS, LLC(5.49%)
RDI FOUNDATION DRILLING(0.13%)
ROADWAY SPECIALTIES, INC.(0.35%)
GEOSOURCE, INC.(1.07%)
M & M STRIPING & POWER WASHING, LLC(0.36%)
ODUM SERVICES, L.P.(0.10%)
SAN ANTONIO TELEPHONE COMPANY INC. (0.39%)
METALINK CORPORATION (0.02%)
SCOTT DERR PAINTING CO, LLC(0.18%)
SWAF, DBA AQUALOGIC(0.36%)
THE LEVY COMPANY, L.P. (0.00%)
LIGHT IT UP ELECTRIC (0.00%)
Contract # 08113003
Totals 35968285.40 18610.86 41366854.53 99.9

CountyBEXAR
Highway US 281
From 0.2 MI N OF STADIUM DR
To N ST MARY'S ST
CSJ 0073-08-173
Proj ID NH 2013(708)
Work Type LANDSCAPE DEVELOPMENT
 
0.600 143550.00 1000.00 141267.16 98.4
Work Order 08-12-13
Work Began 09-09-13
Work Completed  
Time Computed 09-09-13
Contract Working Days 46
Addl Days Granted 0
Working Days Charged 23
Percent Time Used 50
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0073-08-173
N-LINE TRAFFIC MAINTENANCE, L.P. (4.33%)
Contract # 05133004
Totals 143550.00 1000.00 141267.16 98.4

CountyBEXAR
Highway IH 37
From S HACKBERRY STREET
To E CESAR E CHAVEZ BLVD
CSJ 0073-08-180
Proj ID NH 2015(581)
Work Type LANDSCAPE DEVELOPMENT
 
1.950 973428.36 3200.00 915485.88 94.0
Work Order 03-26-15
Work Began 00-00-00
Work Completed  
Time Computed 04-06-15
Contract Working Days 130
Addl Days Granted 0
Working Days Charged 111
Percent Time Used 85
Contractor(s)
LANDSCAPE CONTRACTING AND IRRIGATION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0073-08-180
ABM UNDERGROUND UTILITY CONSTRUCTION COMPANY (1.95%)
O & S TRAFFIC SUPPLIES (0.91%)
JTEX CONTRACTING, INC(4.27%)
Contract # 02153205
Totals 973428.36 3200.00 915485.88 94.0

CountyBEXAR
Highway US 281
From IH 35
To IH 410
CSJ 0073-08-181
Proj ID NH 2016(872)
Work Type MILL, SC, PFC OV & PAVMENT MARKINGS
 
6.199 8673181.42 2085936.00 4249655.16 48.9
Work Order 04-19-16
Work Began 07-05-16
Work Completed  
Time Computed 05-19-16
Contract Working Days 333
Addl Days Granted 20
Working Days Charged 97
Percent Time Used 27
Contractor(s)
LONE STAR PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0073-08-181
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.82%)
PRIMATE CONSTRUCTION, INC. ( 12.09%)
RPV CONSTRUCTION (5.74%)
CRG( 16.72%)
FLASHER EQUIPMENT COMPANY(4.27%)
GREEN MILLING GROUP(3.80%)
Contract # 02163205
Totals 8673181.42 2085936.00 4249655.16 48.9

CountyBEXAR
Highway IH 37
From IH 10
To IH 35
CSJ 0073-08-186
Proj ID NH 2017(155)
Work Type BSE, SC, SURF, PAV'T MRKNGS
 
3.129 6072878.92 0.00 0.00 0.0
CountyBEXAR
Highway IH 37
From FAIR AVENUE
To IH 10
CSJ 0073-08-187
Proj ID NH 2017(155)
Work Type BSE, SC, SURF, PAV'T MRKNGS
 
0.925 1972515.91 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 132
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0073-08-186
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10163006
Totals 8045394.83 0.00 0.00 0.0

CountyBEXAR
Highway US 281
From 0.6 MI SOUTH OF NAKOMA
To LOOP 410
CSJ 0073-08-188
Proj ID NH 1602(385)
Work Type MILL, SURF & PVMT MRKS
 
1.893 1963890.85 0.00 167269.00 8.5
CountyBEXAR
Highway US 281
From 0.4 MI SOUTH OF NAKOMA
To 0.6 MI SOUTH OF NAKOMA
CSJ 0253-04-154
Proj ID NH 1602(385)
Work Type MILL, SURF & PVMT MRKS
 
0.147 167835.45 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-18-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 64
Addl Days Granted 0
Working Days Charged 21
Percent Time Used 32
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0073-08-188
CHEROKEE SERVICES(4.25%)
FLASHER EQUIPMENT COMPANY(5.92%)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (2.79%)
Contract # 07163008
Totals 2131726.30 0.00 167269.00 7.8

CountyWILSON
Highway US 181
From 0.1 MI NORTH OF FM 541
To KARNES/WILSON COUNTY LINE
CSJ 0100-04-038
Proj ID NH 2016(748)
Work Type GRAD, BSE, SURF, PAVMT MRK
 
5.992 9084167.29 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-31-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 289
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0100-04-038
COWBELL TRAFFIC SERVICES, INC. (0.24%)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (4.11%)
FLASHER EQUIPMENT COMPANY(2.68%)
LONE STAR EROSION CONTROL(1.37%)
Contract # 02163208
Totals 9084167.29 0.00 0.00 0.0