| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | GUADALUPE |
| Highway |
IH 35 |
| From |
BEXAR / GUADALUPE COUNTY LINE |
| To |
FM 3009 |
| CSJ |
0016-06-046 |
| Proj ID |
C 16-6-46 |
| Work Type |
GR, BS, STR, SURF, OVERLAY |
| |
|
2.076 |
9163402.10 |
756718.11 |
4793864.79 |
52.3 |
| County | BEXAR |
| Highway |
IH 35 |
| From |
JUDSON ROAD |
| To |
GUADALUPE / BEXAR COUNTY LINE |
| CSJ |
0016-07-129 |
| Proj ID |
C 16-7-129 |
| Work Type |
GR, BS, STR, SURF, OVERLAY |
| |
|
3.719 |
12427317.34 |
115847.50 |
2305526.92 |
18.5 |
| Work Order |
09-18-12 |
| Work Began |
10-08-12 |
| Work Completed |
|
| Time Computed |
10-08-12 |
| Contract Working Days |
321 |
| Addl Days Granted |
0 |
| Working Days Charged |
138 |
| Percent Time Used |
42 |
| Contractor(s) |
| DAN WILLIAMS COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0016-06-046 JUST GROOVING, LTD.(0.04%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.15%) VOGES DRILLING CO. (0.48%) SCOTT DERR PAINTING CO, LLC(0.11%) GK CONSTRUCTION, LLC (0.26%) ENVIRONMENTAL SAFETY SERVICES, INC.(1.05%) FLASHER EQUIPMENT COMPANY(2.33%) THE LEVY COMPANY, L.P. (5.67%) INTERSTATE BARRICADES & MARKINGS, INC. (1.10%) ANGEL BROTHERS ENTERPRISES, LTD. ( 42.24%)
|
| Contract # |
08123037 |
|
Totals |
21590719.44 |
872565.61 |
7099391.71 |
32.8 |
|
| County | BEXAR |
| Highway |
IH 35 |
| From |
0.2 MI N OF TOEPPERWEIN RD |
| To |
0.2 MI S OF LOOP 1604 |
| CSJ |
0016-07-132 |
| Proj ID |
IM 0352(341) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
0.800 |
287874.50 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-13-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
57 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ALTEX LANDSCAPE CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0016-07-132 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133206 |
|
Totals |
287874.50 |
0.00 |
0.00 |
0.0 |
|
| County | COMAL |
| Highway |
BS 46-C |
| From |
IN NEW BRAUNFELS FROM KESSLER ST |
| To |
HAMPE ST AT UP RR |
| CSJ |
0016-10-022 |
| Proj ID |
C 16-10-22 |
| Work Type |
GR, STRS, BASE & SURF |
| |
|
0.324 |
9677386.78 |
214815.26 |
1997908.46 |
20.6 |
| Work Order |
11-09-12 |
| Work Began |
01-07-13 |
| Work Completed |
|
| Time Computed |
01-07-13 |
| Contract Working Days |
243 |
| Addl Days Granted |
62 |
| Working Days Charged |
60 |
| Percent Time Used |
19 |
| Contractor(s) |
| AUSTIN BRIDGE & ROAD, LP |
SUBCONTRACTOR(S) FOR CCSJ: 0016-10-022 VOGES DRILLING CO. (4.47%) ROADWAY SPECIALTIES, INC.(2.22%) THE LEVY COMPANY, L.P. (2.92%) R K STEPHENS CONSTRUCTION, LLC (2.70%) HIGHWAY TECHNOLOGIES, INC. (0.64%)
|
| Contract # |
08123009 |
|
Totals |
9677386.78 |
214815.26 |
1997908.46 |
20.6 |
|
| County | COMAL |
| Highway |
FM 482 |
| From |
0.4 MI SW OF KRUEGER CANYON RD. |
| To |
FM 2252 |
| CSJ |
0016-19-021 |
| Proj ID |
STP 2012(584) |
| Work Type |
GR, BS, STR, SURF, & PAV MRK |
| |
|
4.218 |
1787412.00 |
2586.01 |
1913562.94 |
99.9 |
| County | COMAL |
| Highway |
FM 482 |
| From |
0.4 MI SW OF KRUEGER CANYON RD. |
| To |
FM 2252 |
| CSJ |
0016-19-023 |
| Proj ID |
STP 2012(583)SB |
| Work Type |
GRAD, BSE, SURF, PAV'T MRKINGS |
| |
|
4.218 |
2095211.18 |
59238.74 |
1932744.68 |
92.2 |
| Work Order |
00-00-00 |
| Work Began |
09-24-12 |
| Work Completed |
|
| Time Computed |
08-20-12 |
| Contract Working Days |
341 |
| Addl Days Granted |
0 |
| Working Days Charged |
152 |
| Percent Time Used |
44 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0016-19-023 HIGHWAY TECHNOLOGIES, INC. (2.21%) ROADWAY SPECIALTIES, INC.(8.71%)
|
| Contract # |
04123033 |
|
Totals |
3882623.18 |
61824.75 |
3846307.62 |
99.0 |
|
| County | BEXAR |
| Highway |
IH 35 |
| From |
IH 35S |
| To |
@ IH 410 |
| CSJ |
0017-02-068 |
| Proj ID |
IM 0352(323) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
0.600 |
331759.14 |
0.00 |
314202.97 |
95.0 |
| Work Order |
10-18-07 |
| Work Began |
01-07-08 |
| Work Completed |
|
| Time Computed |
11-05-07 |
| Contract Working Days |
72 |
| Addl Days Granted |
0 |
| Working Days Charged |
74 |
| Percent Time Used |
102 |
| Contractor(s) |
| SURETEC INSURANCE COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0017-02-068 LONE STAR TRAFFIC SERVICE, INC.(1.65%) CAL-PERK UNDERGROUND UTILITIES (0.96%) POENITZSCH BACKHOE SERVICE, INC. (3.01%) GREEN GRASS, INC.( 15.19%) GREATER TEXAS LANDSCAPES, INC. (0.36%) LEGENDS LANDSCAPES LLC (0.00%)
|
| Contract # |
09073018 |
|
Totals |
331759.14 |
0.00 |
314202.97 |
95.0 |
|
| County | BEXAR |
| Highway |
IH 35 |
| From |
AT MEDINA RIVER (NB) |
| To |
. |
| CSJ |
0017-02-075 |
| Proj ID |
BR 2013(030) |
| Work Type |
GRAD, BSE, STR, SURFACE, PAV'T MRK |
| |
|
0.294 |
6192762.50 |
0.00 |
1642612.60 |
26.5 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-01-12 |
| Work Began |
01-02-13 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
190 |
| Addl Days Granted |
4 |
| Working Days Charged |
85 |
| Percent Time Used |
43 |
| Contractor(s) |
| AUSTIN BRIDGE & ROAD, LP |
SUBCONTRACTOR(S) FOR CCSJ: 0017-02-075 F & W ELECTRICAL CONTRACTORS, INC. (0.62%) RAMMING PAVING COMPANY (9.87%) FARR FOUNDATION, INC.(3.34%) ROADWAY SPECIALTIES, INC.(1.03%) VOGES DRILLING CO. (3.55%) HIGHWAY TECHNOLOGIES, INC. (0.69%) GK CONSTRUCTION, LLC (3.36%) HOUSTON SAWING & DRILLING(0.09%)
|
| Contract # |
09123205 |
|
Totals |
6192762.50 |
0.00 |
1642612.60 |
26.5 |
|
| County | BEXAR |
| Highway |
IH 35 |
| From |
US 90 |
| To |
THEO/MALONE |
| CSJ |
0017-09-094 |
| Proj ID |
IM 0352(338) |
| Work Type |
OVERLAY AND PAVEMENT MARKINGS |
| |
|
0.821 |
493221.29 |
0.00 |
0.00 |
0.0 |
| County | BEXAR |
| Highway |
IH 35 |
| From |
0 .25 MI N OF LP 353 NOGALITOS |
| To |
US 90 |
| CSJ |
0017-10-256 |
| Proj ID |
IM 0352(338) |
| Work Type |
MILL, OVERLAY AND PAVEMENT MARKINGS |
| |
|
0.515 |
586215.45 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-22-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
74 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0017-09-094 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12123207 |
|
Totals |
1079436.74 |
0.00 |
0.00 |
0.0 |
|
| County | FRIO |
| Highway |
BI 35-E ETC |
| From |
FM 140 |
| To |
IH 35 NB FR (S SIDE OF PEARSALL) |
| CSJ |
0017-15-021 |
| Proj ID |
STP 2013(171) |
| Work Type |
SEAL COAT AND PAVEMENT MARKINGS |
| |
|
111.482 |
4655959.93 |
0.00 |
730857.80 |
15.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
12-07-12 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
146 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CLARK CONSTRUCTION OF TEXAS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0017-15-021 INTERSTATE BARRICADES & MARKINGS, INC. ( 14.52%)
|
| Contract # |
11123212 |
|
Totals |
4655959.93 |
0.00 |
730857.80 |
15.6 |
|
| County | BEXAR |
| Highway |
IH 10 |
| From |
IH 10E |
| To |
@IH 410 |
| CSJ |
0025-02-175 |
| Proj ID |
IM 0104(361) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
0.001 |
440483.00 |
2050.00 |
415663.56 |
94.3 |
| Work Order |
06-15-10 |
| Work Began |
07-15-10 |
| Work Completed |
|
| Time Computed |
07-15-10 |
| Contract Working Days |
75 |
| Addl Days Granted |
0 |
| Working Days Charged |
63 |
| Percent Time Used |
84 |
| Contractor(s) |
| LEGENDS LANDSCAPES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-175 FLASHER EQUIPMENT COMPANY(0.85%) GREATER TEXAS LANDSCAPES, INC. ( 10.89%)
|
| Contract # |
05103216 |
|
Totals |
440483.00 |
2050.00 |
415663.56 |
94.3 |
|
| County | BEXAR |
| Highway |
IH 10 |
| From |
FOSTER ROAD |
| To |
LOOP 1604 |
| CSJ |
0025-02-190 |
| Proj ID |
IM 0104(376) |
| Work Type |
BSE REPAIR, SC, SURF & PAV'T MRKNGS |
| |
|
4.286 |
2561313.80 |
0.00 |
2523323.14 |
99.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-24-12 |
| Work Began |
09-16-12 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
67 |
| Addl Days Granted |
0 |
| Working Days Charged |
105 |
| Percent Time Used |
156 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-190 DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (3.51%) HIGHWAY TECHNOLOGIES, INC. (2.89%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.48%) CPAVE, INC.(2.61%) R.P.V. CONSTRUCTION(0.03%)
|
| Contract # |
12113004 |
|
Totals |
2561313.80 |
0.00 |
2523323.14 |
99.6 |
|
| County | BEXAR |
| Highway |
IH 10 |
| From |
AT HOUSTON STREET |
| To |
. |
| CSJ |
0025-02-192 |
| Proj ID |
IM 0352(339) |
| Work Type |
GRAD, BASE, STR, SURF & PAV'T MRKNG |
| |
|
0.317 |
1073789.27 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-22-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
06-03-13 |
| Contract Working Days |
97 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SALINAS CONSTRUCTION TECHNOLOGIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-192 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12123008 |
|
Totals |
1073789.27 |
0.00 |
0.00 |
0.0 |
|
| County | BEXAR |
| Highway |
IH 10 |
| From |
S PINE STREET |
| To |
ROLAND AVENUE |
| CSJ |
0025-02-194 |
| Proj ID |
C 25-2-194 |
| Work Type |
MILL, RETAINING WALL, SURFACE |
| |
|
0.800 |
12027793.24 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
349 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| AUSTIN BRIDGE & ROAD, LP |
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-194 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133217 |
|
Totals |
12027793.24 |
0.00 |
0.00 |
0.0 |
|
| County | GUADALUPE |
| Highway |
US 90 |
| From |
AT GUADALUPE RIVER |
| To |
. |
| CSJ |
0025-03-092 |
| Proj ID |
BR 2013(707) |
| Work Type |
SCOUR REPAIR |
| |
|
0.398 |
3965069.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
09-09-13 |
| Contract Working Days |
117 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ATS DRILLING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0025-03-092 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133216 |
|
Totals |
3965069.00 |
0.00 |
0.00 |
0.0 |
|
| County | GUADALUPE |
| Highway |
IH 10 ETC |
| From |
CIBILO CREEK |
| To |
US 90 (WEST OF SEGUIN) |
| CSJ |
0025-03-095 |
| Proj ID |
IM 4104(380) |
| Work Type |
SEAL COAT AND PAVEMENT MARKINGS |
| |
|
78.069 |
2745224.97 |
29451.37 |
353311.24 |
12.8 |
| Work Order |
12-11-12 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
04-29-13 |
| Contract Working Days |
146 |
| Addl Days Granted |
0 |
| Working Days Charged |
2 |
| Percent Time Used |
1 |
| Contractor(s) |
| RONALD R. WAGNER & CO., LP |
SUBCONTRACTOR(S) FOR CCSJ: 0025-03-095 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11123214 |
|
Totals |
2745224.97 |
29451.37 |
353311.24 |
12.8 |
|
| County | GUADALUPE |
| Highway |
FM 78 |
| From |
SANTA CLARA CREEK, WEST OF MARION |
| To |
SANTA CLARA CREEK, EAST OF MARION |
| CSJ |
0025-10-073 |
| Proj ID |
STP 2013(348) |
| Work Type |
GRAD, STRS, BASE & SURF |
| |
|
1.080 |
4136146.75 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
203 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| DEAN WORD COMPANY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0025-10-073 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01133220 |
|
Totals |
4136146.75 |
0.00 |
0.00 |
0.0 |
|
| County | KENDALL |
| Highway |
IH 10 |
| From |
1.95 MI S OF KENDALL/KERR CL |
| To |
16.08 MI S OF KENDALL/KERR CL |
| CSJ |
0072-05-082 |
| Proj ID |
IM 0104(348) |
| Work Type |
MICRO - SURFACING & PAVEMENT MARKINGS |
| |
|
14.129 |
1993387.64 |
0.00 |
2263423.46 |
99.9 |
| County | KENDALL |
| Highway |
IH 10 |
| From |
16.08 MI S OF KENDALL/KERR CL |
| To |
KENDALL/BEXAR CL |
| CSJ |
0072-06-068 |
| Proj ID |
IM 0104(348) |
| Work Type |
MICRO - SURFACING & PAVMT MARKINGS |
| |
|
6.892 |
873063.60 |
0.00 |
964391.99 |
99.9 |
| County | KENDALL |
| Highway |
IH 10 |
| From |
KENDALL/KERR COUNTY LINE |
| To |
1.95 MI S KENDALL/KERR COUNTY LINE |
| CSJ |
0142-15-023 |
| Proj ID |
IM 0104(348) |
| Work Type |
MICRO - SURFACING & PAVEMENT MARKINGS |
| |
|
1.948 |
231415.60 |
0.00 |
277504.97 |
99.9 |
| Work Order |
01-11-12 |
| Work Began |
04-30-12 |
| Work Completed |
|
| Time Computed |
01-27-12 |
| Contract Working Days |
37 |
| Addl Days Granted |
18 |
| Working Days Charged |
51 |
| Percent Time Used |
92 |
| Contractor(s) |
| VIKING CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0072-05-082 D. I. J. CONSTRUCTION, INC.(8.66%) DUSTROL, INC.(7.00%) FLASHER EQUIPMENT COMPANY(0.22%) FUQUAY, INC. (0.07%) MPB, INC.(3.29%) RONALD R. WAGNER & CO., LP ( 30.57%) RAMMING PAVING COMPANY (4.40%)
|
| Contract # |
12113022 |
|
Totals |
3097866.84 |
0.00 |
3505320.42 |
99.9 |
|
| County | BEXAR |
| Highway |
IH 10 |
| From |
LP 1604 |
| To |
1.0 MI N OF HUEBNER RD |
| CSJ |
0072-08-120 |
| Proj ID |
STP 1102(442)MM |
| Work Type |
GRAD, BASE, SC, OV & PAV'T MRKNGS |
| |
|
2.513 |
25923457.53 |
0.00 |
5648837.29 |
22.0 |
| County | BEXAR |
| Highway |
IH 10 |
| From |
LP 1604 |
| To |
1.0 MI N OF HUEBNER RD |
| CSJ |
0072-08-125 |
| Proj ID |
NH 1102(524) |
| Work Type |
UTIL & UTIL IN CONSTR CONTRACT |
| |
|
3.980 |
408971.75 |
0.00 |
359720.81 |
87.9 |
| County | BEXAR |
| Highway |
IH 10 |
| From |
1.0 MI N OF HUEBNER RD |
| To |
S. OF HUEBNER RD |
| CSJ |
0072-12-179 |
| Proj ID |
STP 1102(442)MM |
| Work Type |
GRAD, BASE, SC, OV & PAV'T MRKNGS |
| |
|
1.464 |
9635856.12 |
0.00 |
1838118.54 |
19.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-19-11 |
| Work Began |
01-02-12 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
698 |
| Addl Days Granted |
0 |
| Working Days Charged |
334 |
| Percent Time Used |
47 |
| Contractor(s) |
| LIBERTY MUTUAL INSURANCE COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0072-08-120 LONE STAR TRAFFIC SERVICE, INC.(0.20%) FUQUAY, INC. (0.07%) ROADWAY SPECIALTIES, INC.(0.69%) SITESAFE PRODUCTS TEXAS(0.99%) PRIMATE CONSTRUCTION, INC. (0.03%) J. R. (JOE) RAMON & SONS, INC. (0.60%) GEOSOURCE, INC.(0.50%) FARR FOUNDATION, INC.(1.09%) DUSTROL, INC.(0.20%) BEAIRD DRILLING(0.37%) CP REBAR AND PT INSTALLATION (0.25%) COLLECTIVE CONTRACTING (1.01%) FLASHER EQUIPMENT COMPANY(1.35%) STAR OPERATIONS, INC.( 15.22%) S & S BRIDGE PAINTING, INC.(0.16%) A & L UNDERGROUND, INC.(0.03%) DU-MOR ENTERPRISES_INC.(0.55%) DRILL TECH DRILLING & SHORING, INC.(2.82%) T & D SOLUTIONS, LTD (1.55%) WEBBER, LLC(105.70%) FARR FOUNDATION, INC.(1.25%) TEXAS HIGHWAY WALLS(2.73%) BEAIRD DRILLING(0.35%) FLASHER EQUIPMENT COMPANY(1.25%) STAR OPERATIONS, INC.( 10.76%)
|
| Contract # |
08113003 |
|
Totals |
35968285.40 |
0.00 |
7846676.64 |
21.9 |
|
| County | BEXAR |
| Highway |
LP 345 |
| From |
AT MEDICAL DRIVE |
| To |
. |
| CSJ |
0072-08-122 |
| Proj ID |
HP 1102(265) |
| Work Type |
GRAD, BASE, STR, SURF & PAV'T MRKNG |
| |
|
0.150 |
10850899.11 |
0.00 |
110203.70 |
1.0 |
| County | BEXAR |
| Highway |
LP 345 |
| From |
AT MEDICAL DRIVE |
| To |
. |
| CSJ |
0072-08-134 |
| Proj ID |
RW 72-8-134 |
| Work Type |
UTILITY ADJUSTMENTS |
| |
|
0.150 |
1291148.18 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-19-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
382 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| LIBERTY MUTUAL INSURANCE COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0072-08-122 C-3 ENVIRONMENTAL SPECIALTIES, LP(0.10%) BADECO, INC(0.53%) FUQUAY, INC. (0.19%) AUSTIN WOOD RECYCLING(0.40%) FLASHER EQUIPMENT COMPANY(0.66%) PRIMATE CONSTRUCTION, INC. (0.02%) COLLECTIVE CONTRACTING (7.78%) DU-MOR ENTERPRISES_INC.(1.58%) SITE-SAFE PRODUCTS OF TEXAS, L.P.(0.60%) DUSTROL, INC.(0.44%) F & W ELECTRICAL CONTRACTORS, INC. (3.25%) CERTIFIED PLACERS LLC(2.14%)
|
| Contract # |
08113201 |
|
Totals |
12142047.29 |
0.00 |
110203.70 |
0.9 |
|
| County | BEXAR |
| Highway |
LP 345 |
| From |
AT MEDICAL DRIVE |
| To |
. |
| CSJ |
0072-08-134 |
| Proj ID |
RW 72-8-134 |
| Work Type |
ROW UTL. ADJ. |
| |
|
0.150 |
1621558.09 |
0.00 |
0.00 |
0.0 |
| County | BEXAR |
| Highway |
LP 345 |
| From |
AT MEDICAL DRIVE |
| To |
. |
| CSJ |
0072-08-136 |
| Proj ID |
HP 1102(265) |
| Work Type |
GRAD, BASE, STR, SURF & PAV'T MRKNG |
| |
|
0.150 |
12261538.68 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
400 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| TEXAS STERLING CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 0072-08-136 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133032 |
|
Totals |
13883096.77 |
0.00 |
0.00 |
0.0 |
|
| County | BEXAR |
| Highway |
IH 10 |
| From |
S. OF HUEBNER RD |
| To |
IH 410 |
| CSJ |
0072-12-190 |
| Proj ID |
IM 0352(340) |
| Work Type |
SURF, PAV MRK, BASE REPAIR |
| |
|
2.892 |
3140320.00 |
0.00 |
19307.04 |
0.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-29-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
65 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CLARK CONSTRUCTION OF TEXAS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0072-12-190 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12123215 |
|
Totals |
3140320.00 |
0.00 |
19307.04 |
0.6 |
|