AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PHARR DISTRICT

Last Update: Friday, May 27, 2016
ITEMS 100 6001 TO 193 6036
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0360
0400 - 0497
0500 - 0560
0610 - 0688
0730 - 0784
1003 - 1011
4014 - 4035
5001 - 5038
6000 - 6162
7041 - 7041
100 6001 - 193 6036
Item No Description Units May 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6001 PREPARING ROW AC 1.000 1,000.00000 1.000 1,000.00000 1
100 6002 PREPARING ROW STA     2,133.630 1,032.46404 13
104 6001 REMOVING CONC (PAV) SY     24,552.000 4.00196 2
104 6009 REMOVING CONC (RIPRAP) SY 6.000 25.00000 11,200.600 14.80171 8
104 6010 REMOVING CONC (RIPRAP) CY     62.000 54.51613 2
104 6011 REMOVING CONC (MEDIANS) SY     510.600 13.54798 3
104 6015 REMOVING CONC (SIDEWALKS) SY     7,037.000 9.95865 5
104 6017 REMOVING CONC (DRIVEWAYS) SY 6.000 25.00000 6,888.000 13.71545 8
104 6021 REMOVING CONC (CURB) LF     21,675.000 2.44226 4
104 6022 REMOVING CONC (CURB AND GUTTER) LF     21,261.000 3.05343 6
104 6023 REMOVING CONC (CTB) LF     17,802.000 14.12066 3
104 6027 REMOVING CONC (APPR SLAB) SY     581.000 14.00000 1
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY     109.000 17.00000 1
104 6034 REMOVING CONC (COPING) LF     5,801.000 9.00000 1
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY     203.000 11.37931 2
104 6040 REMOVING CONC (PAVERS) SY     292.000 8.00000 1
104 6049 REMOVE CONCRETE (MSE PANELS) SF     53,500.000 3.90000 1
104 6054 REMOVING CONCRETE (MOW STRIP) LF     325.000 25.00000 1
105 6019 REMOVING STAB BASE & ASPH PAV (14") SY     27,933.000 5.75000 1
105 6037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     36.000 10.00000 1
105 6043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY     37.000 10.00000 1
105 6110 REMOVE STAB BASE & ASPH (11.5") CY     1,876.000 8.20000 1
105 6111 REMOVE STAB BASE & ASPH (8") CY     22,211.000 8.50000 1
105 6112 REMOVE STAB BASE & ASPH (22") CY     12,906.000 4.80000 1
106 6002 OBLITERATING ABANDONED ROAD SY     461.000 3.10000 1
110 6001 EXCAVATION (ROADWAY) CY     702,287.300 4.17837 12
110 6002 EXCAVATION (CHANNEL) CY     162,425.000 4.18202 7
110 6004 EXCAVATION (ROADWAY AND CHANNEL) CY     43.420 650.00000 1
132 6001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     11,791.000 7.26276 2
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 20.000 15.00000 20.000 15.00000 1
132 6005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     900.000 25.00000 1
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     1,197,751.260 5.83735 10
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY     15,064.000 25.00000 1
134 6001 BACKFILL (TY A) STA     3,034.130 123.70938 6
152 6001 ROAD GRADER WORK (ORD COMP) STA     212.570 806.35452 3
160 6001 FURNISHING AND PLACING TOPSOIL (4") STA     326.000 1,400.00000 1
160 6005 FURNISHING AND PLACING TOPSOIL CY     2,055.000 36.04234 16
161 6017 COMPOST MANUF TOPSOIL (4") SY     51,545.000 1.52220 2
161 6018 COMPOST MANUF TOPSOIL CY     167.000 35.00000 1
162 6002 BLOCK SODDING SY     989.000 4.27503 2
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     55,462.000 .17000 1
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     4,869.000 .39806 2
164 6007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     1,339.000 1.45000 1
164 6009 BROADCAST SEED (TEMP) (WARM) SY     2,617.000 .35317 2
164 6011 BROADCAST SEED (TEMP) (COOL) SY     2,257.000 .25000 1
164 6022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC     4.650 1,700.00000 1
164 6025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     176,667.000 .23000 1
164 6026 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) AC     6.530 2,068.05666 2
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY     313,929.000 .17000 2
164 6030 CELL FBR MLCH SEED (TEMP) (WARM) AC     8.830 1,839.68403 2
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     274,524.000 .26000 1
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     1,442,354.650 .28130 3
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     85.640 1,339.79449 3
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     50,501.000 .50000 1
164 6041 DRILL SEEDING (TEMP) (WARM) SY     1,442,354.650 .17235 3
164 6042 DRILL SEEDING (TEMP) (WARM) AC     85.640 1,090.20318 3
168 6001 VEGETATIVE WATERING MG     39,310.400 17.89886 12
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     1,681.000 2.01457 2
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 20.000 10.00000 404.000 3.74109 3
169 6006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     6,731.000 2.32700 2
169 6008 SOIL RETENTION BLANKETS (CL 2) (TY H) SY     18,234.000 4.55000 1
170 6001 IRRIGATION SYSTEM LS     5.000 50,240.00000 5
170 6006 IRRIGATION SYSTEM LOCATION A LS     2.000 22,000.00000 2
170 6007 IRRIGATION SYSTEM LOCATION B LS     2.000 16,750.00000 2
192 6002 PLANT MATERIAL (1 - GAL) EA     2,788.000 12.13809 4
192 6003 PLANT MATERIAL (3 - GAL) EA     116.000 26.00000 1
192 6004 PLANT MATERIAL (5 - GAL) EA     181.000 29.35912 3
192 6005 PLANT MATERIAL (15 - GAL) EA     434.000 150.00000 1
192 6007 PLANT MATERIAL (45 - GAL) EA     37.000 365.00000 1
192 6028 PLANT MATERIAL (1 GAL) (SHRUB) EA     1,590.000 13.00000 1
192 6031 PLANT MATERIAL (5 GAL) (SHRUB) EA     46.000 35.00000 1
192 6042 PLANT MATERIAL (MIN 1" CAL) (B & B) EA     2.000 95.00000 1
192 6045 PLANT MATERIAL (MIN 2 1 / 2" CAL) (B & B) EA     196.000 189.95408 2
192 6049 PLANT MATERIAL (MIN 4' TRNK HT) (PALM) EA     104.000 300.00000 1
192 6051 PLANT MATERIAL (MIN 8' TRNK HT) (PALM) EA     72.000 300.00000 1
192 6055 PLANT MATERIAL (MIN 4'HT) (BARE ROOT) EA     43.000 140.00000 1
192 6058 PLANT MATERIAL (20 GAL) (TREE) EA     44.000 195.00000 1
193 6003 PLANT REPLACEMENT (1 - GAL) EA     65.000 11.38462 2
193 6005 PLANT REPLACEMENT (5 - GAL) EA     15.000 30.33333 2
193 6006 VEGETATIVE WATERING MG     800.000 32.00000 1
193 6021 PLANT MAINTENANCE LOCATION A MO     9.000 500.00000 1
193 6022 PLANT MAINTENANCE LOCATION B MO     9.000 500.00000 1
193 6034 IRR SYS OP AND MNT LOC A MO     18.000 255.50000 2
193 6036 IRR SYS OP AND MNT LOC B MO     18.000 255.50000 2