AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PHARR DISTRICT

Last Update: Monday, August 14, 2017
ITEMS 100 6001 TO 193 6007
ItemsItemsBid Code Range
0100 - 0193
0204 - 0292
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0752 - 0780
1003 - 1008
2000 - 2004
3012 - 3012
4002 - 4026
5001 - 5054
6001 - 6062
7016 - 7112
100 6001 - 193 6007
Item NoDescriptionUnitsJuly 31, 2017Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
100 6001PREPARING ROWAC  .02910,000.000001
100 6002PREPARING ROWSTA  872.700677.498796
100 6004PREPARING ROW(TREE)(12" TO 24" DIA)EA  2.000700.500002
104 6001REMOVING CONC (PAV)SY  18,249.0004.651383
104 6009REMOVING CONC (RIPRAP)SY  1,382.40010.360875
104 6011REMOVING CONC (MEDIANS)SY  1.00040.000001
104 6014REMOVING CONC (FOUNDATIONS)CY  1.50093.000001
104 6015REMOVING CONC (SIDEWALKS)SY  333.0008.837842
104 6017REMOVING CONC (DRIVEWAYS)SY  5,686.00011.071686
104 6021REMOVING CONC (CURB)LF  63.00015.000001
104 6022REMOVING CONC (CURB AND GUTTER)LF  6,995.0003.972844
104 6029REMOVING CONC (CURB OR CURB & GUTTER)LF  3,656.0007.000001
104 6032REMOVING CONC (WHEELCHAIR RAMP)SY  117.00018.376072
104 6036REMOVING CONC (SIDEWALK OR RAMP)SY  725.0009.500001
105 6011REMOVING STAB BASE AND ASPH PAV (2"-6"SY  28,882.0002.435433
105 6014REMOVING STAB BASE & ASPH PAV (7"-12")SY  12,684.00010.250001
105 6020REMOVING STAB BASE & ASPH PAV (12")SY  20,499.0005.000001
105 6022REMOVING STAB BASE AND ASPH PAV (13")SY  25,050.0006.000001
105 6026REMOVE STAB BASE & ASPH PAV (13"-18")SY  940.00014.500001
105 6037REMOVING STAB BASE AND ASPH PAV(0"-16"SY  414.00016.400001
105 6043REMOVING STAB BASE & ASPH PAV (0-6")SY  938.00010.000001
105 6049REMOVING STAB BASE & ASPH PAV (4"-22")SY  195,070.000.800001
105 6069REMOVING STAB BASE & ASPH PAV (4" - 6"SY  17,401.0001.500001
105 6108RMV STAB BASE & ASPH PV (17")SY  17,866.0007.000001
105 6111REMOVE STAB BASE & ASPH (8")CY  1,749.0002.250001
105 6118REMOVE TRTD BASE & ASPH (11 )CY  260.0005.000001
110 6001EXCAVATION (ROADWAY)CY  154,613.0003.827727
110 6002EXCAVATION (CHANNEL)CY  25,399.2005.016792
110 6003EXCAVATION (SPECIAL)CY  23.70046.800001
132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY  305.30011.000001
132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY  2,170.00035.500001
132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY  109,153.6005.380846
134 6001BACKFILL (TY A)STA  940.00070.000001
160 6003FURNISHING AND PLACING TOPSOIL (4")SY  205.0006.200001
160 6005FURNISHING AND PLACING TOPSOILCY  1,330.00027.483087
162 6002BLOCK SODDINGSY  7,977.0004.773132
164 6005BROADCAST SEED (PERM) (URBAN) (SANDY)SY  1,517.0001.000001
164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY  15,205.000.550001
164 6024CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)AC  19.0001,150.000001
164 6025CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)SY  7,039.000.450001
164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY  44,287.000.331353
164 6030CELL FBR MLCH SEED(TEMP)(WARM)AC  19.000825.000001
164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY  22,043.000.200001
164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY  212,045.000.240001
164 6036DRILL SEEDING (PERM) (RURAL) (CLAY)AC  6.440685.000001
164 6041DRILL SEEDING (TEMP) (WARM)SY  212,045.000.130001
164 6042DRILL SEEDING (TEMP) (WARM)AC  6.440685.000001
168 6001VEGETATIVE WATERINGMG  8,357.80318.136738
169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY  554.0002.850001
169 6003SOIL RETENTION BLANKETS (CL 1) (TY C)SY  6,315.0001.841452
170 6001IRRIGATION SYSTEMLS  3.00066,500.000003
192 6002PLANT MATERIAL (1-GAL)EA  11,033.00012.439592
192 6003PLANT MATERIAL (3-GAL)EA  4,700.00024.500001
192 6013MULCHSY  3,035.00010.250001
192 6016PLANT BED PREPARATIONSY  7,020.00011.891032
192 6017VEGETATION BARRIERSY  152.00089.840001
192 6023PLANT MATERIAL (15 GAL) (TREE)EA  68.000160.000001
192 6024PLANT MATERIAL (30 GAL) (TREE)EA  53.000300.000001
192 6031PLANT MATERIAL (5 GAL) (SHRUB)EA  64.00030.000001
192 6045PLANT MATERIAL (MIN 2 1/2" CAL) (B&B)EA  36.000275.000001
193 6001PLANT MAINTENANCEMO  12.0002,250.000001
193 6007IRRIGATION SYSTEM OPER AND MAINTMO  24.0001,400.000002