AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - PHARR DISTRICT

Last Update: Wednesday, July 2, 2014
ITEMS 100 2002 TO 192 2055
Items Items Bid Code Range
0100 - 0192
0204 - 0275
0305 - 0356
0400 - 0496
0500 - 0560
0610 - 0690
1012 - 1122
2145 - 2215
3249 - 3271
4035 - 4642
5086 - 5926
6007 - 6834
8260 - 8941
9012 - 9012
100 2002 - 192 2055
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA 121.000 830.00000 1,088.910 3,020.05579 11
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     11.000 600.00000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     1.000 500.00000 1
104 2009 REMOVING CONC (RIPRAP) SY 8,968.500 8.25000 17,096.600 7.06563 6
104 2011 REMOVING CONC (MEDIANS) SY 1,142.400 11.00000 2,145.400 15.20761 2
104 2013 REMOVING CONC (FOUNDATIONS) SY     24.000 23.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     1,071.000 11.59897 3
104 2017 REMOVING CONC (DRIVEWAYS) SY 122.000 15.00000 2,467.900 11.26577 7
104 2021 REMOVING CONC (CURB) LF 5,685.570 3.50000 16,256.570 3.82602 3
104 2022 REMOVING CONC (CURB AND GUTTER) LF 322.000 7.50000 13,599.000 4.80752 4
104 2026 REMOVE CONC (GUTTER) LF     250.000 8.60000 1
104 2028 REMOVING CONC (MISC) SY 72.000 18.00000 122.000 19.22951 2
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     84.200 8.00000 1
104 2034 REMOVING CONC (COPING) LF 600.000 43.00000 600.000 43.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY 77.000 35.00000 392.000 15.51339 2
104 2037 REMOVE CONC (RAIL) LF 905.000 30.00000 905.000 30.00000 1
104 2045 REMOVE CONC (MISC) EA     3.000 353.57000 1
104 2049 REMOVE CONCRETE (MSE PANELS) SF 800.000 30.00000 800.000 30.00000 1
105 2010 REMOVING STAB BASE AND ASPH PAV (2" - 6" STA     6.200 1,031.60000 1
106 2002 OBLITERATING ABANDONED ROAD SY 7,208.500 7.00000 7,427.500 7.14743 2
110 2001 EXCAVATION (ROADWAY) CY 6,141.000 7.50000 301,565.000 5.92892 9
110 2002 EXCAVATION (CHANNEL) CY     4,041.000 8.81632 5
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 10,861.000 8.25000 186,514.000 8.14333 10
134 2001 BACKFILL (TY A) STA     1,988.000 190.40744 2
150 2001 BLADING STA     9.400 321.55957 2
160 2005 FURNISHING AND PLACING TOPSOIL CY 100.000 70.00000 2,135.000 34.01897 13
162 2002 BLOCK SODDING SY     312.000 9.00000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY     7,000.000 .30000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     14,119.000 .50000 1
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     82,133.000 .25000 1
164 2028 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) AC 5.430 2,000.00000 32.310 966.01671 3
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     96,252.000 .24521 2
164 2030 CELL FBR MLCH SEED (TEMP) (WARM) AC 5.350 2,000.00000 30.950 899.90307 2
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     309,421.200 .22000 1
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     20.080 1,346.36454 2
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     11,734.000 .55893 2
164 2036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC     15.620 1,400.00000 1
164 2041 DRILL SEEDING (TEMP) (WARM) SY     321,160.200 .18392 3
164 2042 DRILL SEEDING (TEMP) (WARM) AC     21.120 701.30208 2
168 2001 VEGETATIVE WATERING MG 1,003.000 20.00000 2,515.050 23.82420 7
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     917.000 1.50000 1
170 2001 IRRIGATION SYSTEM LS     2.000 38,350.00000 2
192 2002 PLANT MATERIAL (1 - GAL) EA     4,360.000 8.00000 1
192 2016 PLANT BED PREPARATION SY     11,576.000 5.00000 1
192 2023 PLANT MATERIAL (15 GAL) (TREE) EA     136.000 100.00000 1
192 2024 PLANT MATERIAL (30 GAL) (TREE) EA     9.000 200.00000 1
192 2031 PLANT MATERIAL (5 GAL) (SHRUB) EA     345.000 30.00000 1
192 2032 PLANT MATERIAL (10 GAL) (SHRUB) EA     64.000 100.00000 1
192 2034 PLANT MATERIAL (MIN 3' HT) (B & B) EA     308.000 200.00000 1
192 2045 PLANT MATERIAL (MIN 2 1 / 2" CAL) (B & B) EA     68.000 200.00000 1
192 2049 PLANT MATERIAL (MIN 4' TRNK HT) (PALM) EA     125.000 400.00000 1
192 2055 PLANT MATERIAL (MIN 4'HT) (BARE ROOT) EA     51.000 200.00000 1