MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 01 AS OF JAN 11, 2017 PAGE 1 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ DELTA ETC @ BRUSHY CREEK | 0.678 | 4,018,602.90| 53,438.68| 3,574,961.31| 88.9| SH 19 ETC . | | | | | | 0525-01-020 | | | | | | BR 1502(141) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 06-30-15 WORK BEGAN- 09-22-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-30-15 | | | | | | CONTRACT WORKING DAYS- 348 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 228 PERCENT TIME USED- 65 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0525-01-020 | | | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.71 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.43 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 4.08 | | | | DUSTIN ALLEN, INC. | |SUB %: 3.15 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 4.02 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.08 | | | | PENHALL COMPANY | |SUB %: 0.23 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.62 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 0.79 | | | | MCL CONTRACTING, LLC | |SUB %: 0.30 | | | | | | | | | | CONTRACT 05153217 | TOTALS | 4,018,602.90| 53,438.68| 3,574,961.31| 88.9| ************************************************************************************************************************************ DELTA FM 904 | 10.955 | 39,277,746.71| 332,616.97| 25,601,720.54| 65.1| SH 24 FM 64 | | | | | | 0136-03-044 | | | | | | TCSP 2010(387) GR, STRS BS, & SURF | | | | | | | | | | | | WORK ORDER- 02-18-14 WORK BEGAN- 08-20-14 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-01-14 | | | | | | CONTRACT WORKING DAYS- 598 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 430 PERCENT TIME USED- 71 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0136-03-044 | | | | | | MOORE CONSTRUCTION, INC. | |SUB %: 0.34 | | | | LYON BARRICADE AND CONSTRUCTION CO. | |SUB %: 0.20 | | | | DUSTROL, INC. | |SUB %: 0.04 | | | | HIGHWAY 19 CONSTRUCTION, LLC | |SUB %: 6.50 | | | | FLAT LINE, INC. | |SUB %: 0.80 | | | | NORTH TEXAS HYDRA-HAMMER, INC. | |SUB %: 0.05 | | | | RK HALL, LLC | |SUB %: 29.02 | | | | SAMMY G. SMALLWOOD | |SUB %: 0.83 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.15 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.19 | | | | LONGVIEW BRIDGE AND ROAD, LTD. | |SUB %: 16.25 | | | | RED SIXTEEN CONSTRUCTION, INC | |SUB %: 0.34 | | | | MCL CONTRACTING, LLC | |SUB %: 0.08 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.19 | | | | | | | | | | CONTRACT 12133002 | TOTALS | 39,277,746.71| 332,616.97| 25,601,720.54| 65.1| ************************************************************************************************************************************ FANNIN US 82 | 1.863 | 6,855,007.15| 475,790.33| 6,340,680.75| 99.0| SH 121 SH 56 | | | | | | 0549-01-029 | | | | | | STP 2012(575) UPGRADE TO NON-FREEWAY STANDARDS | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 03-11-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-22-13 | | | | | | CONTRACT WORKING DAYS- 284 ADDL DAYS GRANTED- 36 | | | | | | WORKING DAYS CHARGED- 719 PERCENT TIME USED- 224 | | | | | | | | | | | | RK HALL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0549-01-029 | | | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 12.74 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.70 | | | | NE-TEX CONSTRUCTION, LTD. | |SUB %: 37.43 | | | | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | |SUB %: 4.64 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.16 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.16 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.69 | | | | ALVARENGA UNDERGROUND CONSTRUCTION, L.L.C. | |SUB %: 0.13 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.04 | | | | | | | | | | CONTRACT 08123015 | TOTALS | 6,855,007.15| 475,790.33| 6,340,680.75| 99.0| ************************************************************************************************************************************ FANNIN AT FM 898 | 0.759 | 2,147,616.85| 262,070.50| 262,070.50| 12.2| US 82 . | | | | | | 0045-20-019 | | | | | | STP 1602(438) INTERCHANGE IMPROVEMENT | | | | | | | | | | | | FANNIN @ US 82 | 0.500 | 4,699,617.76| 63,214.75| 63,214.75| 1.3| FM 898 . | | | | | | 0510-05-015 | | | | | | STP 1602(438) INTERCHANGE MODIFICATION | | | | | | | | | | | | WORK ORDER- 10-05-16 WORK BEGAN- 11-08-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-04-16 | | | | | | CONTRACT WORKING DAYS- 223 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 21 PERCENT TIME USED- 9 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0045-20-019 | | | | | | A.E. MOORE CONSTRUCTION, INC. DBA | |SUB %: 3.28 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 2.10 | | | | TEXOP CONSTRUCTION | |SUB %: 1.10 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.05 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 11.39 | | | | TEXAS HIGHWAY MAINTENANCE, LLC | |SUB %: 1.09 | | | | MORRIS COUNTY CONTRACTORS, L.L.C. | |SUB %: 0.69 | | | | AARON CONCRETE CONTRACTORS, L.P. | |SUB %: 0.95 | | | | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | |SUB %: 4.13 | | | | | | | | | | CONTRACT 08163223 | TOTALS | 6,847,234.61| 325,285.25| 325,285.25| 4.7| ************************************************************************************************************************************ FANNIN SH 11 | 23.870 | 2,675,061.25| 0.00| 0.00| 0.0| SH 78 0.68 MI S OF SH 56 | | | | | | 0279-03-035 | | | | | | STP 2017(188)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 12-06-16 WORK BEGAN- 01-09-17 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 159 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | EAST TEXAS BRIDGE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0279-03-035 | | | | | | HIGHWAY TRAFFIC CONTROL & SERVICES, LLC | |SUB %: 0.76 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 1.32 | | | | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | |SUB %: 0.36 | | | | MORRIS COUNTY CONTRACTORS, L.L.C. | |SUB %: 13.21 | | | | | | | | | | CONTRACT 10163212 | TOTALS | 2,675,061.25| 0.00| 0.00| 0.0| ************************************************************************************************************************************ FRANKLIN FM 21 | 13.258 | 20,387,243.98| 386,476.82| 7,114,591.18| 34.8| SH 37 WOOD C/L | | | | | | 0190-01-021 | | | | | | NH 1502(556) RECONST & ADD 10' SHLDRS | | | | | | | | | | | | WORK ORDER- 03-08-16 WORK BEGAN- 03-23-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-06-16 | | | | | | CONTRACT WORKING DAYS- 457 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 158 PERCENT TIME USED- 34 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0190-01-021 | | | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.18 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 1.65 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 0.99 | | | | MORRIS COUNTY CONTRACTORS, L.L.C. | |SUB %: 0.33 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.74 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.18 | | | | TX TINMAN ENTERPRISES, LLC. | |SUB %: 1.85 | | | | WOLFE CONSTRUCTION GROUP, INC. | |SUB %: 0.57 | | | | KLP COMMERCIAL, LLC | |SUB %: 0.00 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.04 | | | | DFW REBAR, INC. | |SUB %: 0.02 | | | | ISAACS CONSTRUCTION SERVICES, LLC. | |SUB %: 1.65 | | | | | | | | | | CONTRACT 01163001 | TOTALS | 20,387,243.98| 386,476.82| 7,114,591.18| 34.8| ************************************************************************************************************************************ FRANKLIN HOPKINS COUNTY LINE (EB) | 10.722 | 9,114,259.96| 39,447.80| 8,533,463.92| 93.6| IH 30 TITUS COUNTY LINE | | | | | | 0610-02-052 | | | | | | NH 2016(100) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | FRANKLIN HOPKINS COUNTY LINE (WB) | 10.722 | 7,316,744.76| 17,628.84| 7,063,301.77| 96.5| IH 30 TITUS COUNTY LINE | | | | | | 0610-02-053 | | | | | | NH 2016(100) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 10-22-15 WORK BEGAN- 03-02-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-21-15 | | | | | | CONTRACT WORKING DAYS- 223 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 173 PERCENT TIME USED- 77 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD SERVICES, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0610-02-052 | | | | | | A BROTHERS MILLING, LLC | |SUB %: 2.54 | | | | CDM HOLDINGS, LLC | |SUB %: 7.36 | | | | STRAIGHT LINE SAWING & SEALING | |SUB %: 0.20 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 1.04 | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 0.15 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.10 | | | | MARTIN MARIETTA MATERIALS (POWDERLY) | |SUB %: 0.00 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.03 | | | | JM YANEZ CONSTRUCTION | |SUB %: 0.15 | | | | | | | | | | CONTRACT 09153003 | TOTALS | 16,431,004.72| 57,076.64| 15,596,765.69| 94.9| ************************************************************************************************************************************ GRAYSON 564 FT E OF S BINKLEY PK DR | 5.944 | 2,250,480.47| 0.00| 0.00| 0.0| SH 56 ETC TOLBERT AVE | | | | | | 0045-03-048 | | | | | | STP 2016(996) OVERLAY | | | | | | | | | | | | WORK ORDER- 01-03-17 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | RK HALL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0045-03-048 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04163014 | TOTALS | 2,250,480.47| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GRAYSON AT WEST FORK OF PILOT GROVE CREEK | 0.193 | 1,590,415.60| 20,607.00| 1,267,277.60| 79.6| FM 121 . | | | | | | 0729-02-026 | | | | | | BR 1502(261) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 07-30-15 WORK BEGAN- 10-20-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-31-15 | | | | | | CONTRACT WORKING DAYS- 234 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 205 PERCENT TIME USED- 87 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0729-02-026 | | | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 1.30 | | | | STRIPE-A-ZONE, INC. | |SUB %: 1.56 | | | | A.E. MOORE CONSTRUCTION, INC. DBA | |SUB %: 1.83 | | | | ODUM SERVICES, L.P. | |SUB %: 2.63 | | | | PENHALL COMPANY | |SUB %: 0.22 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 3.38 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 5.36 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 4.13 | | | | | | | | | | CONTRACT 06153031 | TOTALS | 1,590,415.60| 20,607.00| 1,267,277.60| 79.6| ************************************************************************************************************************************ GRAYSON US 75 | 12.309 | 19,817,292.16| 0.00| 108,794.00| 0.5| FM 1417 FM 691 | | | | | | 2455-01-032 | | | | | | STP 2016(841)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 08-19-16 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-19-16 | | | | | | CONTRACT WORKING DAYS- 424 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2455-01-032 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06163004 | TOTALS | 19,817,292.16| 0.00| 108,794.00| 0.5| ************************************************************************************************************************************ GRAYSON CR 202-2 | 0.197 | 931,194.17| 43,920.00| 380,033.90| 40.8| CR AT ELBA CREEK | | | | | | 0901-19-182 | | | | | | BR 2016(436) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 08-08-16 WORK BEGAN- 09-09-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-07-16 | | | | | | CONTRACT WORKING DAYS- 125 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 56 PERCENT TIME USED- 44 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0901-19-182 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.67 | | | | PENHALL COMPANY | |SUB %: 0.64 | | | | WOLFE CONSTRUCTION GROUP, INC. | |SUB %: 0.46 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 6.78 | | | | ODUM SERVICES, L.P. | |SUB %: 5.31 | | | | | | | | | | CONTRACT 06163029 | TOTALS | 931,194.17| 43,920.00| 380,033.90| 40.8| ************************************************************************************************************************************ GRAYSON AT FM 120, US 75 NORTH BOUND FR | 1.340 | 4,673,413.96| 289,183.31| 870,940.81| 18.6| US 75 AT FM 120, US 75 SOUTH BOUND FR | | | | | | 0047-18-074 | | | | | | NH 1602(183) MISCELLANEOUS CONSTRUCTION | | | | | | | | | | | | WORK ORDER- 08-19-16 WORK BEGAN- 10-26-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-19-16 | | | | | | CONTRACT WORKING DAYS- 130 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 39 PERCENT TIME USED- 30 | | | | | | | | | | | | RAGLE CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-18-074 | | | | | | MORRIS COUNTY CONTRACTORS, L.L.C. | |SUB %: 2.70 | | | | RPM XCONSTRUCTION, LLC | |SUB %: 5.86 | | | | SOUTHERN CROSS CONTRACTORS, LLC | |SUB %: 0.86 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 5.37 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 1.57 | | | | DIAMOND SURFACE, INC. | |SUB %: 0.17 | | | | BOWMAN ENGINEERING & CONSULTING, INC | |SUB %: 0.60 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.60 | | | | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | |SUB %: 4.18 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.29 | | | | USA SWPPP INSPECTIONS, INC.DBA USA EROSION | |SUB %: 1.71 | | | | | | | | | | CONTRACT 06163211 | TOTALS | 4,673,413.96| 289,183.31| 870,940.81| 18.6| ************************************************************************************************************************************ GRAYSON FRISCO ROAD (SHERMAN) | 1.617 | 12,500,127.04| 236,439.87| 7,356,531.89| 58.8| US 82 FM 1417 EAST | | | | | | 0045-19-050 | | | | | | C 45-19-50 WIDEN NON-FREEWAY | | | | | | | | | | | | WORK ORDER- 11-10-15 WORK BEGAN- 01-20-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-11-16 | | | | | | CONTRACT WORKING DAYS- 350 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 203 PERCENT TIME USED- 58 | | | | | | | | | | | | RAGLE CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0045-19-050 | | | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 0.25 | | | | LONE STAR BARRIER SERVICES, LLC | |SUB %: 0.77 | | | | WOLFE CONSTRUCTION GROUP, INC. | |SUB %: 0.79 | | | | DIAMOND SURFACE, INC. | |SUB %: 0.08 | | | | OVERLAND CORPORATION | |SUB %: 23.31 | | | | EROSION CONTROL MANAGEMENT SERVICES | |SUB %: 0.26 | | | | RPM XCONSTRUCTION, LLC | |SUB %: 29.70 | | | | FARR FOUNDATION, INC. | |SUB %: 0.22 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.52 | | | | VENUS CONSTRUCTION | |SUB %: 5.39 | | | | KMB TRUCKING LLC | |SUB %: 0.00 | | | | TEXOP CONSTRUCTION | |SUB %: 0.29 | | | | | | | | | | CONTRACT 07153207 | TOTALS | 12,500,127.04| 236,439.87| 7,356,531.89| 58.8| ************************************************************************************************************************************ GRAYSON ETC US 82 | 212.898 | 1,372,921.84| 71,527.22| 299,620.82| 21.8| US 377 ETC DENTON COUNTY LINE | | | | | | 0081-07-023 | | | | | | STP 1602(331)HESG HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 08-11-16 WORK BEGAN- 09-27-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-12-16 | | | | | | CONTRACT WORKING DAYS- 70 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 54 PERCENT TIME USED- 77 | | | | | | | | | | | | STRIPE-A-ZONE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0081-07-023 | | | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 14.93 | | | | | | | | | | CONTRACT 07163218 | TOTALS | 1,372,921.84| 71,527.22| 299,620.82| 21.8| ************************************************************************************************************************************ GRAYSON CENTER AVE | 6.486 | 2,460,214.08| 19,521.85| 1,751,680.66| 71.6| FM 120 OKLAHOMA STATE LINE | | | | | | 0728-02-029 | | | | | | STP 1502(558)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 10-22-15 WORK BEGAN- 02-08-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-21-15 | | | | | | CONTRACT WORKING DAYS- 116 ADDL DAYS GRANTED- 14 | | | | | | WORKING DAYS CHARGED- 143 PERCENT TIME USED- 110 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0728-02-029 | | | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 0.51 | | | | SAMMY GIST ENTERPRISES, INC. | |SUB %: 1.96 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 19.32 | | | | WIMMS ENVIRONMENTAL, INC. | |SUB %: 0.73 | | | | DUSTIN ALLEN, INC. | |SUB %: 8.13 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 2.20 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.78 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 4.14 | | | | TEXANA LAND & ASPHALT, INC. | |SUB %: 4.39 | | | | | | | | | | CONTRACT 08153225 | TOTALS | 2,460,214.08| 19,521.85| 1,751,680.66| 71.6| ************************************************************************************************************************************ GRAYSON COLLIN COUNTY LINE | 9.575 | 3,711,917.79| 29,660.00| 3,903,373.77| 99.9| SH 5 US 75 | | | | | | 0047-03-075 | | | | | | STP 1402(084) MISCELLANEOUS CONSTRUCTION | | | | | | | | | | | | WORK ORDER- 11-12-14 WORK BEGAN- 12-02-14 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-10-15 | | | | | | CONTRACT WORKING DAYS- 107 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 251 PERCENT TIME USED- 230 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-03-075 | | | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 0.69 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 0.26 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 2.37 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 9.12 | | | | LONE STAR BARRIER SERVICES, LLC | |SUB %: 0.77 | | | | TEXANA LAND & ASPHALT, INC. | |SUB %: 10.26 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.61 | | | | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | |SUB %: 0.33 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.88 | | | | SAMMY GIST ENTERPRISES, INC. | |SUB %: 0.00 | | | | FARR FOUNDATION, INC. | |SUB %: 1.93 | | | | | | | | | | CONTRACT 09143041 | TOTALS | 3,711,917.79| 29,660.00| 3,903,373.77| 99.9| ************************************************************************************************************************************ GRAYSON ETC US 82 | 242.218 | 8,437,785.28| 682.73| 8,376,473.14| 99.6| US 377 ETC FM 901 | | | | | | 0081-10-042 | | | | | | STP 2016(186) SEAL COAT | | | | | | | | | | | | WORK ORDER- 01-26-16 WORK BEGAN- 06-04-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-16-16 | | | | | | CONTRACT WORKING DAYS- 70 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 96 PERCENT TIME USED- 137 | | | | | | | | | | | | CDM HOLDINGS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0081-10-042 | | | | | | STRIPE-A-ZONE, INC. | |SUB %: 16.29 | | | | | | | | | | CONTRACT 10153216 | TOTALS | 8,437,785.28| 682.73| 8,376,473.14| 99.6| ************************************************************************************************************************************ GRAYSON SH 289 | 6.958 | 4,609,064.06| 125,985.21| 2,628,553.98| 57.0| FM 121 1200 FT WEST OF FM 3356 | | | | | | 0729-01-037 | | | | | | STP 1502(559)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 01-29-16 WORK BEGAN- 03-16-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-28-16 | | | | | | CONTRACT WORKING DAYS- 272 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 159 PERCENT TIME USED- 58 | | | | | | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0729-01-037 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.49 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.18 | | | | CATACON, INC. | |SUB %: 1.41 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.88 | | | | LONE STAR BARRIER SERVICES, LLC | |SUB %: 4.24 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 15.72 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.00 | | | | DUSTIN ALLEN, INC. | |SUB %: 3.33 | | | | | | | | | | CONTRACT 10153228 | TOTALS | 4,609,064.06| 125,985.21| 2,628,553.98| 57.0| ************************************************************************************************************************************ GRAYSON US 377 | 14.427 | 7,337,375.52| 80,517.01| 5,627,053.43| 77.0| FM 902 SH 289 | | | | | | 0510-01-026 | | | | | | STP 2015(309) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 01-02-15 WORK BEGAN- 09-28-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-02-15 | | | | | | CONTRACT WORKING DAYS- 304 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 327 PERCENT TIME USED- 107 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0510-01-026 | | | | | | TEXOP CONSTRUCTION | |SUB %: 0.05 | | | | CATOCON, INC. | |SUB %: 1.83 | | | | FARR FOUNDATION, INC. | |SUB %: 4.74 | | | | LYON BARRICADE AND CONSTRUCTION CO. | |SUB %: 0.46 | | | | MURRAY CONSTRUCTION | |SUB %: 1.26 | | | | SAMMY G. SMALLWOOD | |SUB %: 1.75 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.54 | | | | TEXANA LAND & ASPHALT, INC. | |SUB %: 2.35 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 14.62 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.15 | | | | | | | | | | CONTRACT 11143220 | TOTALS | 7,337,375.52| 80,517.01| 5,627,053.43| 77.0| ************************************************************************************************************************************ HOPKINS 0.08 MI SE OF COUNTY LINE | 3.157 | 5,504,239.11| 0.00| 0.00| 0.0| SH 11 3.03 MI W OF FM 2653 S | | | | | | 0083-02-048 | | | | | | STP 1502(554)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 06-28-16 WORK BEGAN- 01-03-17 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-01-16 | | | | | | CONTRACT WORKING DAYS- 231 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0083-02-048 | | | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 7.91 | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.27 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.99 | | | | CATOCON, INC. | |SUB %: 0.66 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.29 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 0.57 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.98 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 21.55 | | | | TEXOP CONSTRUCTION | |SUB %: 0.76 | | | | OLDEN, INC. | |SUB %: 1.30 | | | | | | | | | | CONTRACT 01163041 | TOTALS | 5,504,239.11| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HOPKINS 0.315 MILES NORTH OF FM 1567 EAST | 4.973 | 6,591,501.99| 0.00| 8,106,460.58| 99.9| SH 154 0.195 MILES SOUTH OF CR 1104 | | | | | | 0401-01-022 | | | | | | STP 2013(464) UPGRADE TO NON-FREEWAY STANDARDS | | | | | | | | | | | | WORK ORDER- 05-13-13 WORK BEGAN- 08-01-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-01-13 | | | | | | CONTRACT WORKING DAYS- 457 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 451 PERCENT TIME USED- 98 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0401-01-022 | | | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 0.54 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 9.56 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.24 | | | | FORTSON CONTRACTING, INC. | |SUB %: 4.14 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.24 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 0.57 | | | | TEXANA LAND & ASPHALT, INC. | |SUB %: 0.57 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 27.89 | | | | | | | | | | CONTRACT 03133219 | TOTALS | 6,591,501.99| 0.00| 8,106,460.58| 99.9| ************************************************************************************************************************************ HOPKINS AT W GREENWOOD CREEK | 0.220 | 1,570,944.58| 85,906.67| 1,433,381.04| 91.2| FM 900 . | | | | | | 0680-05-008 | | | | | | BR 0090(264) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 04-20-15 WORK BEGAN- 06-24-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-20-15 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 247 PERCENT TIME USED- 91 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0680-05-008 | | | | | | N LINE TRAFFIC CONTROL | |SUB %: 1.15 | | | | SAMMY G. SMALLWOOD | |SUB %: 6.27 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 4.21 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.32 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.19 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.80 | | | | | | | | | | CONTRACT 03153019 | TOTALS | 1,570,944.58| 85,906.67| 1,433,381.04| 91.2| ************************************************************************************************************************************ HOPKINS 0.436 MI W OF SH 19 OVERPASS (NFR) | 11.427 | 2,403,661.81| 0.00| 2,382,825.21| 99.1| IH 30 TEXAS AVE IN SULPHUR SPRINGS | | | | | | 0009-09-101 | | | | | | NH 2016(821) OVERLAY | | | | | | | | | | | | WORK ORDER- 07-11-16 WORK BEGAN- 08-11-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-10-16 | | | | | | CONTRACT WORKING DAYS- 62 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 48 PERCENT TIME USED- 77 | | | | | | | | | | | | RK HALL, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-09-101 | | | | | | STRIPE-A-ZONE, INC. | |SUB %: 3.55 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.67 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.78 | | | | SCR CIVIL CONSTRUCTION, LLC | |SUB %: 3.87 | | | | DUSTROL, INC. | |SUB %: 5.52 | | | | ISAACS CONSTRUCTION SERVICES, LLC. | |SUB %: 0.46 | | | | | | | | | | CONTRACT 03163014 | TOTALS | 2,403,661.81| 0.00| 2,382,825.21| 99.1| ************************************************************************************************************************************ HOPKINS ON IH 30, 1 MILE EAST OF CUMBY | 1.363 | 23,690,539.51| 457,726.40| 4,641,642.16| 19.5| IH 30 . | | | | | | 0009-09-081 | | | | | | STP 2000(825)TE MISCELLANEOUS CONSTRUCTION | | | | | | | | | | | | WORK ORDER- 07-01-16 WORK BEGAN- 08-08-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-01-16 | | | | | | CONTRACT WORKING DAYS- 368 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 96 PERCENT TIME USED- 26 | | | | | | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-09-081 | | | | | | EROSION CONTROL MANAGEMENT SERVICES | |SUB %: 0.47 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.54 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.53 | | | | GAY AND SONS MASONRY | |SUB %: 3.79 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.39 | | | | PREMIER PAVING, LTD. | |SUB %: 6.51 | | | | RK HALL, LLC | |SUB %: 2.28 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.21 | | | | J.R. POPE COMPANY, INC. | |SUB %: 5.91 | | | | TEXOP CONSTRUCTION | |SUB %: 0.30 | | | | PANTHER CREEK TRANSPORTATION, INC. | |SUB %: 0.00 | | | | TEXAS YARD PRO INC. | |SUB %: 0.77 | | | | K & A STEEL, LLC | |SUB %: 0.46 | | | | CHIENER, LLC | |SUB %: 0.76 | | | | RELIANCE PLUMBING GROUP, INC. DBA RELIANCE MECHANICAL CONTR | |SUB %: 3.72 | | | | HUMPHREY & ASSOCIATES, INC. | |SUB %: 4.32 | | | | PEST FORCE | |SUB %: 0.01 | | | | SYNERGY SIGNS & SERVICES, LLC | |SUB %: 0.35 | | | | BECO METAL WORKS | |SUB %: 4.03 | | | | CNC CONSTRUCTION | |SUB %: 0.59 | | | | F&P CONSTRUCTION, LLC | |SUB %: 2.86 | | | | | | | | | | CONTRACT 04163201 | TOTALS | 23,690,539.51| 457,726.40| 4,641,642.16| 19.5| ************************************************************************************************************************************ HOPKINS DELTA COUNTY LINE | 12.204 | 1,267,814.14| 0.00| 1,359,457.94| 99.9| SH 19 LOOP 301 | | | | | | 0400-02-048 | | | | | | STP 1502(137) OVERLAY | | | | | | | | | | | | WORK ORDER- 06-15-15 WORK BEGAN- 08-24-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-16-15 | | | | | | CONTRACT WORKING DAYS- 48 ADDL DAYS GRANTED- 18 | | | | | | WORKING DAYS CHARGED- 62 PERCENT TIME USED- 93 | | | | | | | | | | | | NY-MAC ENTERPRISES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0400-02-048 | | | | | | FLEX SUPPLY, LLC | |SUB %: 0.60 | | | | JOHN MILLSAP | |SUB %: 5.23 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 6.43 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.81 | | | | | | | | | | CONTRACT 05153032 | TOTALS | 1,267,814.14| 0.00| 1,359,457.94| 99.9| ************************************************************************************************************************************ HOPKINS CR 361-4 | 0.133 | 565,395.05| 90,562.53| 383,380.90| 67.8| CR AT BIG CREEK | | | | | | 0901-28-088 | | | | | | BR 2016(209) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 08-19-16 WORK BEGAN- 09-19-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-19-16 | | | | | | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 44 PERCENT TIME USED- 34 | | | | | | | | | | | | CDM HOLDINGS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0901-28-088 | | | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 1.26 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.88 | | | | DUSTIN ALLEN, INC. | |SUB %: 5.08 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 6.29 | | | | | | | | | | CONTRACT 07163019 | TOTALS | 565,395.05| 90,562.53| 383,380.90| 67.8| ************************************************************************************************************************************ HOPKINS SH 11 | 3.815 | 1,161,897.12| 19,168.80| 1,123,353.07| 96.6| FM 1870 CR 2309 | | | | | | 0735-05-017 | | | | | | STP 2016(101) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | HOPKINS SH 11 | 3.819 | 542,959.77| 1,638.00| 519,647.33| 95.7| FM 1870 CR 2309 | | | | | | 0735-05-020 | | | | | | STP 2016(102)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 01-29-16 WORK BEGAN- 03-28-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-29-16 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 120 PERCENT TIME USED- 100 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0735-05-017 | | | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.64 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 3.73 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.49 | | | | CATACON, INC. | |SUB %: 1.45 | | | | SCOTT PAVING, INC. | |SUB %: 24.79 | | | | SAMMY G. SMALLWOOD | |SUB %: 1.27 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.05 | | | | | | | | | | CONTRACT 09153218 | TOTALS | 1,704,856.89| 20,806.80| 1,643,000.40| 96.3| ************************************************************************************************************************************ HUNT SS 118 | 5.410 | 2,470,540.21| 0.00| 2,308,054.22| 93.6| FM 118 FM 512 | | | | | | 1725-01-011 | | | | | | STP 2015(620) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 03-26-15 WORK BEGAN- 06-26-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-24-15 | | | | | | CONTRACT WORKING DAYS- 144 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 150 PERCENT TIME USED- 104 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1725-01-011 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.44 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 1.23 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 4.01 | | | | SCOTT PAVING, INC. | |SUB %: 23.52 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.10 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 4.31 | | | | | | | | | | CONTRACT 02153032 | TOTALS | 2,470,540.21| 0.00| 2,308,054.22| 93.6| ************************************************************************************************************************************ HUNT FM 2101 | 5.999 | 2,207,943.10| 0.00| 2,319,763.24| 99.9| FM 1570 SH 34 | | | | | | 0692-01-017 | | | | | | STP 2016(743) OVERLAY | | | | | | | | | | | | WORK ORDER- 03-16-16 WORK BEGAN- 04-28-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 58 ADDL DAYS GRANTED- 9 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 58 PERCENT TIME USED- 86 | |**************************************************| | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0692-01-017 | | | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 0.47 | | | | J & M CONTRACTING, COMPANY | |SUB %: 5.37 | | | | DUSTROL, INC. | |SUB %: 2.80 | | | | SAMMY G. SMALLWOOD | |SUB %: 3.73 | | | | WOLFE CONSTRUCTION GROUP, INC. | |SUB %: 0.41 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.26 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.01 | | | | | | | | | | CONTRACT 02163218 | TOTALS | 2,207,943.10| 0.00| 2,319,763.24| 99.9| ************************************************************************************************************************************ HUNT 5.92 MILES EAST OF FM 751 | 2.803 | 47,845,878.71| 107,164.77| 47,311,485.09| 98.8| SH 276 0.17 MILES EAST OF FM 513 | | | | | | 0641-01-033 | | | | | | C 641-1-33 BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 08-28-12 WORK BEGAN- 09-25-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-25-13 | | | | | | CONTRACT WORKING DAYS- 671 ADDL DAYS GRANTED- 225 | | | | | | WORKING DAYS CHARGED- 855 PERCENT TIME USED- 95 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0641-01-033 | | | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.03 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.58 | | | | SAMMY G. SMALLWOOD | |SUB %: 0.21 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 7.04 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 0.15 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.21 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 1.37 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 0.13 | | | | BOWMAN ENGINEERING & CONSULTING, INC. | |SUB %: 5.78 | | | | ROADWAY CONSTRUCTION, LLC | |SUB %: 0.82 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.30 | | | | | | | | | | CONTRACT 07123202 | TOTALS | 47,845,878.71| 107,164.77| 47,311,485.09| 98.8| ************************************************************************************************************************************ HUNT US 69 | 6.088 | 3,455,817.18| 201,346.42| 1,031,828.72| 29.8| FM 272 FM 816 | | | | | | 0764-02-011 | | | | | | C 764-2-11 REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 09-20-16 WORK BEGAN- 10-07-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-20-16 | | | | | | CONTRACT WORKING DAYS- 202 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 40 PERCENT TIME USED- 19 | | | | | | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0764-02-011 | | | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.50 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.47 | | | | CATOCON, INC. | |SUB %: 2.46 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 3.34 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 4.09 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 5.44 | | | | MURRAY CONSTRUCTION | |SUB %: 1.38 | | | | DUSTROL, INC. | |SUB %: 0.33 | | | | | | | | | | CONTRACT 07163021 | TOTALS | 3,455,817.18| 201,346.42| 1,031,828.72| 29.8| ************************************************************************************************************************************ HUNT IH 30 | 8.630 | 2,623,426.37| 83,538.00| 2,935,262.70| 99.9| FM 36 SH 276 | | | | | | 0642-03-022 | | | | | | STP 1502(557)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 11-02-15 WORK BEGAN- 11-09-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-01-16 | | | | | | CONTRACT WORKING DAYS- 112 ADDL DAYS GRANTED- 3 | | | | | | WORKING DAYS CHARGED- 120 PERCENT TIME USED- 104 | | | | | | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0642-03-022 | | | | | | LYON BARRICADE AND CONSTRUCTION CO. | |SUB %: 0.26 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 1.78 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 3.09 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 2.19 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 0.91 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 27.82 | | | | GIST ENTERPRISES, INC. | |SUB %: 5.98 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 5.53 | | | | | | | | | | CONTRACT 08153031 | TOTALS | 2,623,426.37| 83,538.00| 2,935,262.70| 99.9| ************************************************************************************************************************************ HUNT ROCKWALL COUNTY LINE | 5.778 | 22,304,844.44| 0.00| 0.00| 0.0| IH 30 FM 1565 NORTH | | | | | | 0009-13-159 | | | | | | BR 1602(330) BRIDGE REPLACEMENT | | | | | | | | | | | | HUNT IH 30 EASTBOUND FRONTAGE ROAD | 1.249 | 859,715.87| 0.00| 0.00| 0.0| CR FM 2642 | | | | | | 0901-22-115 | | | | | | CC 901-22-115 REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 10-26-16 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 493 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD SERVICES, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-13-159 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08163005 | TOTALS | 23,164,560.31| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HUNT CR 137-1 | 0.113 | 520,226.20| 0.00| 0.00| 0.0| CR COWLEECH FORK SABINE RIVER | | | | | | 0901-22-107 | | | | | | BR 2015(643) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 11-29-16 WORK BEGAN- 01-03-17 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 122 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | STATELINE CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0901-22-107 | | | | | | WOLFE CONSTRUCTION GROUP, INC. | |SUB %: 0.65 | | | | PANOLA LIGHT & SIGN | |SUB %: 1.71 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 8.68 | | | | DFW REBAR, INC. | |SUB %: 0.31 | | | | MORRIS COUNTY CONTRACTORS, L.L.C. | |SUB %: 4.75 | | | | | | | | | | CONTRACT 09163018 | TOTALS | 520,226.20| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HUNT INTERSECTION OF SH 276/SH 34 | 0.100 | 39,179.00| 1,000.00| 39,333.00| 99.9| SH 34 . | | | | | | 0173-06-044 | | | | | | STP 1502(639) LANDSCAPE AND SCENIC ENHANCEMENT | | | | | | | | | | | | WORK ORDER- 01-29-16 WORK BEGAN- 03-14-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-29-16 | | | | | | CONTRACT WORKING DAYS- 14 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 13 PERCENT TIME USED- 92 | | | | | | | | | | | | TIGHT LINE CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0173-06-044 | | | | | | TX DOWN UNDER CONSTRUCTION, LLC | |SUB %: 12.01 | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 3.34 | | | | MABAK DIRECTIONAL DRILLING | |SUB %: 7.65 | | | | | | | | | | CONTRACT 11153215 | TOTALS | 39,179.00| 1,000.00| 39,333.00| 99.9| ************************************************************************************************************************************ HUNT SH 66 | 1.860 | 7,109,675.99| 0.00| 0.00| 0.0| SS 1570 US 380 | | | | | | 2659-02-001 | | | | | | STP 1602(136)MM CONSTRUCT ROADWAY | | | | | | | | | | | | WORK ORDER- 12-28-16 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 300 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2659-02-001 | | | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.33 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 0.52 | | | | HIGHWAY 19 CONSTRUCTION, LLC | |SUB %: 16.54 | | | | COMEN ENTERPRISE LLC | |SUB %: 0.71 | | | | CATOCON, INC. | |SUB %: 0.14 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.76 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 8.72 | | | | TEXOP CONSTRUCTION | |SUB %: 0.12 | | | | | | | | | | CONTRACT 11163031 | TOTALS | 7,109,675.99| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HUNT ETC SS 302; SFR | 230.447 | 8,807,758.17| 0.00| 0.00| 0.0| IH 30 ETC SH 24 | | | | | | 0009-13-163 | | | | | | NH 2017(352) SEAL COAT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 65 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BRANNAN PAVING CO., LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-13-163 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12163010 | TOTALS | 8,807,758.17| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LAMAR CR 45030 | 10.655 | 4,368,067.41| 92,440.01| 545,455.18| 12.4| FM 906 CR 47400 | | | | | | 0769-02-028 | | | | | | STP 2016(189) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | LAMAR FM 197 | 4.454 | 1,549,596.88| 3,000.00| 695,788.57| 44.9| FM 906 US 271 | | | | | | 0769-02-030 | | | | | | STP 2016(190)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 06-23-16 WORK BEGAN- 09-21-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-25-16 | | | | | | CONTRACT WORKING DAYS- 345 ADDL DAYS GRANTED- 4 | | | | | | WORKING DAYS CHARGED- 78 PERCENT TIME USED- 22 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0769-02-028 | | | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 8.59 | | | | DUSTIN ALLEN, INC. | |SUB %: 6.76 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.89 | | | | RK HALL, LLC | |SUB %: 13.56 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.46 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.82 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 2.12 | | | | LYON BARRICADE AND CONSTRUCTION CO. | |SUB %: 0.56 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.00 | | | | TEXOP CONSTRUCTION | |SUB %: 1.20 | | | | SAMMY GIST ENTERPRISES, INC. | |SUB %: 0.31 | | | | | | | | | | CONTRACT 01163215 | TOTALS | 5,917,664.29| 95,440.01| 1,241,243.75| 20.9| ************************************************************************************************************************************ LAMAR 1.067 MI S OF FM 1506 | 1.797 | 507,596.00| 0.00| 490,906.00| 98.9| FM 2122 2.864 MI S OF FM 1506 | | | | | | 2003-01-008 | | | | | | STP 2016(839)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | LAMAR 1.067 MI S OF FM 1506 | 1.797 | 256,258.27| 0.00| 250,873.23| 97.8| FM 2122 2.864 MI S OF FM 1506 | | | | | | 2003-01-009 | | | | | | STP 2016(838) SEAL COAT | | | | | | | | | | | | WORK ORDER- 04-21-16 WORK BEGAN- 05-25-16 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-23-16 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 38 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 57 PERCENT TIME USED- 150 | |**************************************************| | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2003-01-008 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.13 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 4.53 | | | | SAMMY GIST ENTERPRISES, INC. | |SUB %: 5.03 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 2.69 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.95 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 1.38 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.12 | | | | | | | | | | CONTRACT 03163217 | TOTALS | 763,854.27| 0.00| 741,779.23| 98.6| ************************************************************************************************************************************ LAMAR AT CANE CREEK | 0.136 | 656,785.40| 69,420.00| 548,689.00| 83.5| CR CR 510-1 | | | | | | 0901-29-065 | | | | | | BR 2014(599) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 09-09-15 WORK BEGAN- 11-06-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-09-15 | | | | | | CONTRACT WORKING DAYS- 209 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 179 PERCENT TIME USED- 85 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0901-29-065 | | | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.18 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 8.12 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 6.83 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 1.45 | | | | | | | | | | CONTRACT 07153047 | TOTALS | 656,785.40| 69,420.00| 548,689.00| 83.5| ************************************************************************************************************************************ LAMAR FM 38 | 8.998 | 3,768,340.10| 0.00| 3,444,312.07| 91.5| FM 137 US 82 | | | | | | 0435-01-068 | | | | | | STP 2016(099) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 11-13-15 WORK BEGAN- 12-09-15 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-12-16 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 171 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 175 PERCENT TIME USED- 102 | |**************************************************| | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0435-01-068 | | | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.72 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 3.34 | | | | CATOCON, INC. | |SUB %: 1.79 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 1.99 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 4.58 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 1.46 | | | | MURRAY CONSTRUCTION | |SUB %: 1.48 | | | | ACU CONSTRUCTION LLC | |SUB %: 0.65 | | | | ANCHOR CONTRACTING, LLC | |SUB %: 0.43 | | | | MORRIS COUNTY CONTRACTORS, L.L.C. | |SUB %: 1.49 | | | | | | | | | | CONTRACT 09153025 | TOTALS | 3,768,340.10| 0.00| 3,444,312.07| 91.5| ************************************************************************************************************************************ LAMAR US 271 | 4.806 | 2,490,743.37| 0.00| 0.00| 0.0| FM 196 FM 1501 | | | | | | 0680-01-015 | | | | | | STP 2017(086) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 11-15-16 WORK BEGAN- 01-03-17 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-15-16 | | | | | | CONTRACT WORKING DAYS- 144 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 4 PERCENT TIME USED- 2 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0680-01-015 | | | | | | CATACON, INC. | |SUB %: 1.92 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 2.36 | | | | SCOTT PAVING, INC. | |SUB %: 17.51 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.83 | | | | | | | | | | CONTRACT 09163221 | TOTALS | 2,490,743.37| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LAMAR CR 430-1 | 0.145 | 724,233.90| 0.00| 0.00| 0.0| CR AT BIG SANDY CREEK | | | | | | 0901-29-084 | | | | | | BR 2016(888) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 11-22-16 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 213 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HODGES AND SON CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0901-29-084 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.14 | | | | COMEN ENTERPRISE LLC | |SUB %: 5.40 | | | | WOLFE CONSTRUCTION GROUP, INC. | |SUB %: 1.19 | | | | | | | | | | CONTRACT 10163222 | TOTALS | 724,233.90| 0.00| 0.00| 0.0| ************************************************************************************************************************************ RAINS HOPKINS COUNTY LINE | 7.724 | 8,460,153.96| 228,448.36| 950,420.12| 11.2| SH 19 US 69 | | | | | | 0108-10-024 | | | | | | STP 1602(125) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 07-11-16 WORK BEGAN- 10-10-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-10-16 | | | | | | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 3 | | | | | | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 27 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0108-10-024 | | | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 10.61 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.63 | | | | TEXANA LAND & ASPHALT, INC. | |SUB %: 2.66 | | | | CATOCON, INC. | |SUB %: 1.47 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.19 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.00 | | | | FLEX SUPPLY, LLC | |SUB %: 0.17 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 31.04 | | | | USA SWPPP INSPECTIONS, INC.DBA USA EROSION | |SUB %: 0.73 | | | | SAMMY G. SMALLWOOD | |SUB %: 2.11 | | | | DUSTROL, INC. | |SUB %: 0.79 | | | | SURFACE PREPARATION TECHNOLOGIES, LLC | |SUB %: 0.07 | | | | | | | | | | CONTRACT 05163202 | TOTALS | 8,460,153.96| 228,448.36| 950,420.12| 11.2| ************************************************************************************************************************************ RAINS SH 19 | 3.240 | 4,635,055.96| 0.00| 4,394,268.13| 95.3| US 69 586 NORTH OF FM 3299 INTERSECTION | | | | | | 0203-03-044 | | | | | | STP 1402(093) MISCELLANEOUS CONSTRUCTION | | | | | | | | | | | | WORK ORDER- 11-12-14 WORK BEGAN- 02-26-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-10-15 | | | | | | CONTRACT WORKING DAYS- 159 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 183 PERCENT TIME USED- 115 | | | | | | | | | | | | D. L. LENNON INCORPORATED - CONTRACTOR | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0203-03-044 | | | | | | ALTUS TRAFFIC MANAGEMENT LLC | |SUB %: 0.27 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 13.11 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 0.76 | | | | RK HALL, LLC | |SUB %: 38.07 | | | | SAMMY G. SMALLWOOD | |SUB %: 0.30 | | | | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | |SUB %: 0.69 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.35 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 0.37 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.77 | | | | | | | | | | CONTRACT 09143209 | TOTALS | 4,635,055.96| 0.00| 4,394,268.13| 95.3| ************************************************************************************************************************************ RED RIVER ON PECAN STREET IN CLARKSVILLE | 0.171 | 1,506,400.30| 276,383.63| 1,151,374.75| 76.4| CS @ DELAWARE CREEK | | | | | | 0901-27-029 | | | | | | BR 2008(634) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 03-16-16 WORK BEGAN- 04-14-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-15-16 | | | | | | CONTRACT WORKING DAYS- 190 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 156 PERCENT TIME USED- 82 | | | | | | | | | | | | 3LW MANAGEMENT, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0901-27-029 | | | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 5.50 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 2.15 | | | | BLASTCO TEXAS INC. | |SUB %: 6.29 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.44 | | | | | | | | | | CONTRACT 01163036 | TOTALS | 1,506,400.30| 276,383.63| 1,151,374.75| 76.4| ************************************************************************************************************************************ RED RIVER FM 412 | 10.363 | 4,617,291.24| 33,245.33| 2,831,556.92| 61.3| FM 44 FM 911 | | | | | | 0427-01-037 | | | | | | STP 2016(363) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | WORK ORDER- 03-15-16 WORK BEGAN- 04-25-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-16-16 | | | | | | CONTRACT WORKING DAYS- 222 ADDL DAYS GRANTED- 4 | | | | | | WORKING DAYS CHARGED- 143 PERCENT TIME USED- 63 | | | | | | | | | | | | A. K. GILLIS & SONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0427-01-037 | | | | | | HIGHWAY 19 CONSTRUCTION, LLC | |SUB %: 1.62 | | | | LYON BARRICADE AND CONSTRUCTION CO. | |SUB %: 0.52 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 2.23 | | | | MOORE CONSTRUCTION CO. | |SUB %: 2.98 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 2.37 | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 11.37 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.15 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.84 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.02 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 2.98 | | | | | | | | | | CONTRACT 02163241 | TOTALS | 4,617,291.24| 33,245.33| 2,831,556.92| 61.3| ************************************************************************************************************************************ RED RIVER @ KICKAPOO CREEK | 0.515 | 2,651,371.11| 0.00| 1,812,074.53| 68.3| US 82 . | | | | | | 0046-01-061 | | | | | | BR 1502(210) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 07-31-15 WORK BEGAN- 10-02-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-30-15 | | | | | | CONTRACT WORKING DAYS- 200 ADDL DAYS GRANTED- 11 | | | | | | WORKING DAYS CHARGED- 120 PERCENT TIME USED- 56 | | | | | | | | | | | | HIGHWAY 19 CONSTRUCTION LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0046-01-061 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.34 | | | | RK HALL, LLC | |SUB %: 8.77 | | | | DUSTIN ALLEN, INC. | |SUB %: 1.93 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 2.23 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.66 | | | | PENHALL COMPANY | |SUB %: 0.24 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 3.03 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 0.16 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.36 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.22 | | | | MCL CONTRACTING, LLC | |SUB %: 0.17 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 06153246 | TOTALS | 2,651,371.11| 0.00| 1,812,074.53| 68.3| ************************************************************************************************************************************ RED RIVER FM 1487 | 5.378 | 2,784,332.41| 155,556.55| 772,978.92| 27.7| FM 412 FM 44 | | | | | | 0773-01-018 | | | | | | STP 1602(357) REHABILITATION OF EXISTING ROAD | | | | | | | | | | | | RED RIVER 0.97 MI SW OF INTERSECTION FM 44 | 0.092 | 100,550.00| 0.00| 90,350.00| 89.8| FM 412 . | | | | | | 0773-01-019 | | | | | | ER 2016(876) MISCELLANEOUS CONSTRUCTION | | | | | | | | | | | | WORK ORDER- 09-15-16 WORK BEGAN- 10-11-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-20-16 | | | | | | CONTRACT WORKING DAYS- 162 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 40 PERCENT TIME USED- 24 | | | | | | | | | | | | SAMMY GIST ENTERPRISES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0773-01-018 | | | | | | CHEROKEE SERVICES | |SUB %: 0.29 | | | | DUSTIN ALLEN, INC. | |SUB %: 4.73 | | | | HIGHWAY 19 CONSTRUCTION, LLC | |SUB %: 12.35 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 4.07 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.41 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.88 | | | | WITHERS CONSTRUCTION, LLC | |SUB %: 2.74 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 0.79 | | | | | | | | | | CONTRACT 07163027 | TOTALS | 2,884,882.41| 155,556.55| 863,328.92| 29.9| ************************************************************************************************************************************ RED RIVER AT BURKHAND BRANCH | 0.079 | 298,222.05| 2,000.00| 290,092.30| 97.2| FM 3390 . | | | | | | 3371-01-009 | | | | | | BR 1602(358) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 08-16-16 WORK BEGAN- 09-21-16 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-15-16 | | | | | | CONTRACT WORKING DAYS- 50 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 48 PERCENT TIME USED- 96 | | | | | | | | | | | | 3LW MANAGEMENT, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3371-01-009 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.00 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 13.52 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.62 | | | | | | | | | | CONTRACT 07163235 | TOTALS | 298,222.05| 2,000.00| 290,092.30| 97.2| ************************************************************************************************************************************ RED RIVER AT RED RIVER | 0.570 | 11,302,230.33| 0.00| 10,917,039.71| 96.5| SH 37 . | | | | | | 0189-01-007 | | | | | | BR 2012(716) BRIDGE REPLACEMENT | | | | | | | | | | | | RED RIVER AT RED RIVER | 0.360 | 1,517,866.78| 0.00| 1,500,485.67| 98.8| SH 37 . | | | | | | 0189-01-009 | | | | | | BR 2012(792) BRIDGE REPLACEMENT | | | | | | | | | | | | RED RIVER AT RED RIVER | 0.360 | 1,759,959.64| 0.00| 1,756,100.40| 99.7| SH 37 . | | | | | | 0189-01-010 | | | | | | CC 189-1-10 BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 10-24-12 WORK BEGAN- 02-05-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-22-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 495 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 488 PERCENT TIME USED- 98 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD SERVICES, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0189-01-007 | | | | | | ATS DRILLING, INC. | |SUB %: 14.68 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.91 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.20 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.22 | | | | RK HALL, LLC | |SUB %: 12.53 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.09 | | | | MCL CONTRACTING, LLC | |SUB %: 0.96 | | | | LYON BARRICADE AND CONSTRUCTION CO. | |SUB %: 0.11 | | | | CF SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 0.08 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.14 | | | | MCL CONTRACTING, LLC | |SUB %: 2.18 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.39 | | | | DUSTROL, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 08123208 | TOTALS | 14,580,056.75| 0.00| 14,173,625.78| 97.2| ************************************************************************************************************************************ RED RIVER 0.285 MI WEST OF FM 114 | 1.251 | 795,946.99| 0.00| 794,630.33| 99.9| US 82 0.185 MI EAST OF FM 412 | | | | | | 0046-01-062 | | | | | | STP 1502(550)HES HAZARD ELIMINATION & SAFETY | | | | | | | | | | | | WORK ORDER- 10-30-15 WORK BEGAN- 12-08-15 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-29-15 | | | | | | CONTRACT WORKING DAYS- 66 ADDL DAYS GRANTED- 6 | | | | | | WORKING DAYS CHARGED- 98 PERCENT TIME USED- 136 | | | | | | | | | | | | SAMMY GIST ENTERPRISES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0046-01-062 | | | | | | BAHENA CONSTRUCTION CO.,INC. | |SUB %: 10.99 | | | | MOORE CONSTRUCTION, INC. | |SUB %: 2.40 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.36 | | | | SAMMY SMALLWOOD COMPANY | |SUB %: 3.28 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.80 | | | | STRIPING SYSTEMS, INC. | |SUB %: 0.11 | | | | TEXANA LAND & ASPHALT, INC. | |SUB %: 0.75 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 3.01 | | | | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | |SUB %: 3.93 | | | | | | | | | | CONTRACT 08153240 | TOTALS | 795,946.99| 0.00| 794,630.33| 99.9| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 362,479,063.71 DISTRICT ESTIMATES THIS MONTH 4,457,274.36 DISTRICT TOTAL ESTIMATES PAID TO DATE 200,257,609.75