| Item No |
Description |
Units |
Septembe 30, 2009 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 700 2003 |
POTHOLE REPAIR (STANDARD) |
TON |
|
|
1,016.000 |
125.00000 |
2 |
| 712 2002 |
JT / CRCK SEAL (POLY MOD ASPH EMULSION) |
LMI |
|
|
255.664 |
925.43260 |
2 |
| 712 2005 |
JT / CRCK SEAL (RUBBER - ASPHALT) |
LMI |
377.960 |
625.00000 |
827.263 |
583.91756 |
3 |
| 720 2003 |
SPALLING REPAIR (POLYMERIC) (SEMIRIGID) |
GAL |
|
|
392.000 |
30.17000 |
1 |
| 730 2002 |
FULL - WIDTH MOWING |
AC |
|
|
68,943.800 |
18.52708 |
13 |
| 730 2003 |
SPOT MOWING |
AC |
|
|
462.000 |
14.89026 |
5 |
| 730 2056 |
FULL - WIDTH MOWING - TRACT (1) |
AC |
|
|
1,376.000 |
20.95000 |
1 |
| 735 2001 |
DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES |
CYC |
|
|
572.000 |
78.25000 |
2 |
| 735 2003 |
DEBRIS REMOVAL (FRONTAGE ROADS) |
CYC |
|
|
312.000 |
45.00000 |
1 |
| 735 2005 |
DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) |
CYC |
|
|
416.000 |
71.25000 |
2 |
| 735 2068 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) |
CYC |
|
|
52.000 |
262.69000 |
1 |
| 735 2069 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) |
CYC |
|
|
52.000 |
262.69000 |
1 |
| 735 2070 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) |
CYC |
|
|
52.000 |
262.69000 |
1 |
| 735 2071 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) |
CYC |
|
|
52.000 |
262.69000 |
1 |
| 735 2072 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (5) |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2073 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (6) |
CYC |
|
|
26.000 |
211.50000 |
1 |
| 735 2074 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (7) |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2075 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (8) |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2076 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (9) |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2077 |
DEBRIS - CNTR MEDIANS / MAINLANES - AREA (10 |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2088 |
DEBRIS - FRONTAGE ROADS - AREA (1) |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2089 |
DEBRIS - FRONTAGE ROADS - AREA (2) |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2090 |
DEBRIS - FRONTAGE ROADS - AREA (3) |
CYC |
|
|
12.000 |
135.42000 |
1 |
| 735 2108 |
DEBRIS - ENTRANCE / EXIT RAMPS - AREA (1) |
CYC |
|
|
12.000 |
113.92000 |
1 |
| 735 2109 |
DEBRIS - ENTRANCE / EXIT RAMPS - AREA (2) |
CYC |
|
|
12.000 |
113.92000 |
1 |
| 735 2110 |
DEBRIS - ENTRANCE / EXIT RAMPS - AREA (3) |
CYC |
|
|
12.000 |
113.92000 |
1 |
| 738 2001 |
CLEANING / SWEEPING (CENTER MEDIAN) |
CYC |
|
|
102.000 |
808.82353 |
2 |
| 738 2003 |
CLEANING / SWEEPING (OUTSIDE MAIN LANE) |
CYC |
|
|
108.000 |
805.55556 |
2 |
| 738 2005 |
CLEANING / SWEEPING (FRONTAGE ROAD) |
CYC |
|
|
72.000 |
833.33333 |
2 |
| 738 2007 |
CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) |
CYC |
|
|
78.000 |
826.92308 |
2 |
| 738 2009 |
CLEANING / SWEEPING (AGGREGATE REMOVAL) |
MI |
|
|
192.000 |
31.00000 |
1 |
| 738 2010 |
CLEANING / SWEEPING (SPOT) |
MI |
|
|
180.000 |
27.08333 |
2 |
| 738 2011 |
CLEANING / SWEEPING (HANDWORK) |
SY |
|
|
6,900.000 |
0.32000 |
1 |
| 745 2007 |
GROUNDS MAINT (MOWING / TRIMMING) |
CYC |
|
|
30.000 |
332.00000 |
1 |
| 751 2005 |
LITTER PICKUP (SITE A) |
CYC |
|
|
128.000 |
92.50000 |
2 |
| 751 2006 |
MOWING, TRIMMING, AND EDGING (SITE A) |
CYC |
|
|
24.000 |
1,705.00000 |
1 |
| 751 2008 |
PLANT BED MAINTENANCE (SITE A) |
CYC |
|
|
24.000 |
100.00000 |
1 |
| 751 2009 |
PRUNING (SITE A) |
CYC |
|
|
2.000 |
870.00000 |
1 |
| 751 2025 |
LITTER PICKUP |
CYC |
|
|
24.000 |
20.00000 |
1 |
| 751 2027 |
MOWING, TRIMMING, AND EDGING |
CYC |
|
|
12.000 |
900.00000 |
1 |
| 751 2030 |
PLANT BED MAINTENANCE |
CYC |
|
|
1.000 |
500.00000 |
1 |
| 751 2031 |
PRUNING |
CYC |
|
|
1.000 |
1,000.00000 |
1 |
| 752 2020 |
TREE TRIMMING / BRUSH REMOVAL |
MI |
|
|
128.366 |
1,350.78167 |
5 |
| 752 2021 |
TREE TRIMMING / BRUSH REMOVAL (CHANNELS) |
AC |
|
|
20.400 |
147.00000 |
1 |
| 752 2022 |
TREE REMOVAL (4" - 12" DIA) |
EA |
|
|
987.000 |
25.87639 |
3 |
| 752 2023 |
TREE REMOVAL (12" - 18" DIA) |
EA |
|
|
378.000 |
48.92063 |
2 |
| 752 2024 |
TREE REMOVAL (18" - 24" DIA) |
EA |
|
|
232.000 |
87.18966 |
2 |
| 752 2025 |
TREE REMOVAL (24" - 30" DIA) |
EA |
|
|
126.000 |
127.41270 |
2 |
| 752 2026 |
TREE REMOVAL (30" - 36" DIA) |
EA |
|
|
50.000 |
150.00000 |
2 |
| 752 2027 |
TREE REMOVAL (36" - 42" DIA) |
EA |
|
|
33.000 |
163.63636 |
2 |
| 752 2028 |
TREE REMOVAL (42" - 48" DIA) |
EA |
|
|
29.000 |
232.06897 |
2 |
| 752 2029 |
TREE REMOVAL (48" - 60" DIA) |
EA |
|
|
12.000 |
354.16667 |
2 |
| 752 2030 |
TREE REMOVAL (60" - 72" DIA) |
EA |
|
|
2.000 |
155.00000 |
1 |
| 752 2045 |
STUMP REMOVAL |
EA |
|
|
20.000 |
15.00000 |
1 |
| 760 2001 |
DITCH CLEANING AND RESHAPING (FOOT) |
LF |
|
|
6,220.000 |
0.25000 |
1 |
| 770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
170.500 |
26.07038 |
4 |
| 770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
278.250 |
27.92453 |
4 |
| 770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
450.000 |
48.88889 |
2 |
| 770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
9.000 |
40.00000 |
1 |
| 770 2006 |
REALIGN POSTS |
EA |
|
|
235.000 |
35.74468 |
3 |
| 770 2008 |
REPLACE TERMINAL ANCHOR POSTS |
EA |
|
|
4.000 |
112.50000 |
3 |
| 770 2009 |
REMOVE GDRAIL END TRT / REPL WITH SGT |
EA |
|
|
32.000 |
900.00000 |
1 |
| 770 2010 |
REPL SINGLE GDRAIL TERM IMPACT HEAD |
EA |
|
|
24.000 |
800.00000 |
3 |
| 770 2011 |
REPLACE SINGLE GDRAIL TERMINAL RAIL |
LF |
|
|
2,850.000 |
24.57895 |
4 |
| 770 2012 |
REPLACE SINGLE GDRAIL TERMINAL POST |
EA |
|
|
378.000 |
57.52646 |
4 |
| 770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
18.000 |
80.00000 |
3 |
| 770 2015 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
EA |
|
|
1.000 |
200.00000 |
1 |
| 770 2018 |
REM / REPL TIMBER POST W / O CONC FND |
EA |
|
|
30.000 |
40.00000 |
1 |
| 770 2019 |
REM / REPL STEEL POST W / O CONC FND |
EA |
|
|
15.000 |
80.00000 |
1 |
| 770 2020 |
REM / REPL TIMBER POST W / CONC FND |
EA |
|
|
10.000 |
40.00000 |
1 |
| 770 2021 |
REM / REPL STEEL POST W / CONC FND |
EA |
|
|
10.000 |
80.00000 |
1 |
| 770 2024 |
REPLACE SGT CABLE ANCHOR |
EA |
|
|
16.000 |
65.00000 |
1 |
| 770 2026 |
REPLACE SGT STRUT |
EA |
|
|
3.000 |
50.00000 |
1 |
| 770 2027 |
REMOVE & REPLACE BLOCKOUT |
EA |
|
|
200.000 |
12.00000 |
1 |
| 770 2028 |
REPLACE HINGED TOP SGT STEEL POST |
EA |
|
|
4.000 |
80.00000 |
1 |
| 770 2029 |
REPAIR RAIL ELEMENT (W - BEAM FURNISHED) |
LF |
|
|
6,000.000 |
9.16667 |
2 |
| 770 2030 |
REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED |
LF |
|
|
2,750.000 |
7.54545 |
2 |
| 770 2032 |
REMOVE AND RESET SGT IMPACT HEAD |
EA |
|
|
12.000 |
75.00000 |
1 |
| 770 2036 |
REPL SGT IMPACT HEAD (FURNISHED) |
EA |
|
|
5.000 |
250.00000 |
1 |
| 770 2037 |
REM / REPL TIM POST W / O CONC FND (FURN) |
EA |
|
|
775.000 |
32.00000 |
1 |
| 770 2038 |
INSTALL BLOCKOUTS (FURNISHED) |
EA |
|
|
300.000 |
8.00000 |
1 |
| 774 2007 |
REPAIR (TRACC) |
LF |
|
|
48.000 |
250.00000 |
1 |
| 774 2018 |
REPAIR (CATGR - FRONT SECTION) |
EA |
|
|
2.000 |
4,300.00000 |
2 |
| 774 2019 |
REPAIR (CATGR - END SECTION) |
EA |
|
|
2.000 |
1,262.50000 |
2 |
| 780 2001 |
EPOXY INJECTION (TY IX) |
LF |
|
|
160.000 |
42.00000 |
1 |
| 788 2001 |
CONCRETE BEAM REPAIR |
EA |
|
|
34.000 |
1,900.00000 |
1 |