AVERAGE LOW BID UNIT PRICE - MAINTENANCE - PARIS DISTRICT

Last Update: Friday, August 21, 2015
ITEMS 712 2002 TO 788 2003
Items Items Bid Code Range
0100 - 0168
0247 - 0260
0316 - 0361
0400 - 0496
0500 - 0560
0610 - 0672
0712 - 0788
1122 - 1122
3004 - 3267
4002 - 4002
6000 - 6834
7126 - 7224
8251 - 8251
712 2002 - 788 2003
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     572.000 600.00000 2
721 6001 FIBER REINFORCED PATCHING MATERIALS LB 10,000.000 12.50000 14,486.000 13.13794 3
730 6002 FULL - WIDTH MOWING AC     64,912.000 24.09799 11
730 6003 SPOT MOWING AC     1,032.000 21.01357 8
734 6001 LITTER REMOVAL AC     22,682.000 11.28437 11
735 2068 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) CYC     208.000 136.16000 2
735 2069 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) CYC     208.000 136.16000 2
735 2070 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) CYC     208.000 136.16000 2
735 2088 DEBRIS - FRONTAGE ROADS - AREA (1) CYC     208.000 136.16000 2
735 2089 DEBRIS - FRONTAGE ROADS - AREA (2) CYC     208.000 136.16000 2
735 2090 DEBRIS - FRONTAGE ROADS - AREA (3) CYC     208.000 136.16000 2
735 2108 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (1) CYC     208.000 136.16000 2
735 2109 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (2) CYC     208.000 136.16000 2
735 2110 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (3) CYC     208.000 136.16000 2
735 6068 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) CYC     104.000 526.00000 1
735 6069 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) CYC     104.000 526.00000 1
735 6070 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) CYC     104.000 526.00000 1
735 6088 DEBRIS - FRONTAGE ROADS - AREA (1) CYC     104.000 250.00000 1
735 6089 DEBRIS - FRONTAGE ROADS - AREA (2) CYC     104.000 250.00000 1
735 6090 DEBRIS - FRONTAGE ROADS - AREA (3) CYC     104.000 250.00000 1
735 6108 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (1) CYC     104.000 97.00000 1
735 6109 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (2) CYC     104.000 97.00000 1
735 6110 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (3) CYC     104.000 97.00000 1
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     44.000 675.00000 1
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     68.000 675.00000 1
738 2005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC     32.000 675.00000 1
738 2007 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) CYC     36.000 675.00000 1
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     214.000 50.00000 1
738 2010 CLEANING / SWEEPING (SPOT) MI     70.000 20.00000 1
738 2011 CLEANING / SWEEPING (HANDWORK) SY     6,900.000 0.30000 1
745 2006 JANITORIAL MAINT (PICNIC AREAS) CYC     234.000 300.00000 2
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC     32.000 225.00000 2
751 2006 MOWING, TRIMMING, AND EDGING (SITE A) CYC     32.000 300.00000 2
751 2016 MOWING, TRIMMING, AND EDGING (SITE B) CYC     16.000 300.00000 2
751 2024 LEAF REMOVAL CYC     4.000 325.00000 2
751 2025 LITTER PICKUP CYC     48.000 300.00000 2
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     385.000 1,673.24675 7
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     155.000 967.74194 7
752 2022 TREE REMOVAL (4" - 12" DIA) EA     10,250.000 34.00000 9
752 2023 TREE REMOVAL (12" - 18" DIA) EA     2,860.000 64.93007 8
752 2024 TREE REMOVAL (18" - 24" DIA) EA     1,940.000 86.39175 9
752 2025 TREE REMOVAL (24" - 30" DIA) EA     1,027.000 135.90555 9
752 2026 TREE REMOVAL (30" - 36" DIA) EA     290.000 245.86207 9
752 2027 TREE REMOVAL (36" - 42" DIA) EA     162.000 363.27160 9
752 2028 TREE REMOVAL (42" - 48" DIA) EA     157.000 367.51592 9
752 2029 TREE REMOVAL (48" - 60" DIA) EA     86.000 375.93023 7
752 2030 TREE REMOVAL (60" - 72" DIA) EA     37.000 311.27027 7
752 2045 STUMP REMOVAL EA     50.000 17.60000 5
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     95,000.000 1.63000 1
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF     356,760.000 1.37000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 3,000.000 13.00000 11,000.000 11.36818 4
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 50.000 20.00000 228.000 17.19298 4
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 50.000 20.00000 164.000 18.82927 4
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 500.000 17.00000 1,500.000 17.80000 4
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 50.000 1.00000 100.000 1.00000 2
770 2006 REALIGN POSTS EA 200.000 15.00000 800.000 8.00000 4
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 5.000 1.00000 14.000 1.00000 4
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     10.000 1,745.00000 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 50.000 600.00000 120.000 624.50000 4
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 3,000.000 23.00000 9,000.000 21.65000 4
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 400.000 30.00000 1,050.000 50.00000 4
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 5.000 1.00000 22.000 1.00000 4
770 2022 REM & RESET SGT IMPACT HEAD EA     90.000 195.00000 2
770 2024 REPLACE SGT CABLE ANCHOR EA     32.000 1.00000 2
770 2026 REPLACE SGT STRUT EA     6.000 1.00000 2
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     32.000 97.00000 2
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF 500.000 9.00000 3,000.000 5.66667 4
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     156.000 7.30000 2
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA 50.000 1.00000 100.000 1.00000 2
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA 20.000 40.00000 40.000 40.00000 2
774 2006 REPAIR (TRACC) EA 1.000 1,000.00000 2.000 1,000.00000 2
774 2007 REPAIR (TRACC) LF     96.000 1.00000 2
774 2011 REPAIR (CATCB - FRNT SECT) EA 1.000 1,000.00000 2.000 1,000.00000 2
774 2018 REPAIR (CATGR - FRONT SECTION) EA 1.000 1,000.00000 2.000 1,000.00000 2
774 2019 REPAIR (CATGR - END SECTION) EA 1.000 200.00000 2.000 200.00000 2
788 2002 CONCRETE BEAM REPAIR (CFRP) EA     13.000 8,100.00000 1
788 2003 CONCRETE BEAM REP (STRAND SPLICE & CFRP EA     3.000 13,200.00000 1