AVERAGE LOW BID UNIT PRICE - MAINTENANCE - PARIS DISTRICT

Last Update: Thursday, March 20, 2014
ITEMS 700 2003 TO 788 2003
Items Items Bid Code Range
0100 - 0168
0204 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1122 - 1122
3225 - 3268
6006 - 6949
7622 - 7622
8094 - 8852
700 2003 - 788 2003
Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
700 2003 POTHOLE REPAIR (STANDARD) TON     5,484.000 103.99816 4
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     79.070 719.00000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,769.906 443.37608 6
730 2002 FULL - WIDTH MOWING AC     212,779.000 22.35950 36
730 2003 SPOT MOWING AC     2,806.000 21.37971 22
730 2056 FULL - WIDTH MOWING - TRACT (1) AC     4,244.000 24.00000 2
734 2001 LITTER REMOVAL AC     22,682.000 9.93444 11
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC     520.000 63.00000 1
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC     312.000 41.00000 1
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC     364.000 39.00000 1
735 2068 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) CYC     352.000 188.84091 4
735 2069 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) CYC     144.000 132.00000 2
735 2070 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) CYC     168.000 188.50000 4
735 2071 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) CYC     128.000 239.68750 4
735 2072 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (5) CYC     48.000 286.25000 4
735 2073 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (6) CYC     52.000 120.00000 2
735 2074 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (7) CYC     24.000 107.00000 2
735 2075 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (8) CYC     24.000 211.00000 2
735 2076 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (9) CYC     24.000 100.00000 2
735 2077 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (10 CYC     24.000 218.00000 2
735 2078 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (11 CYC     24.000 141.00000 2
735 2079 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (12 CYC     24.000 130.00000 2
735 2080 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (13 CYC     24.000 240.00000 2
735 2081 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (14 CYC     24.000 176.00000 2
735 2082 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (15 CYC     24.000 176.00000 2
735 2083 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (16 CYC     24.000 193.00000 2
735 2084 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (17 CYC     24.000 130.00000 2
735 2085 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (18 CYC     24.000 192.00000 2
735 2088 DEBRIS - FRONTAGE ROADS - AREA (1) CYC     24.000 120.00000 2
735 2089 DEBRIS - FRONTAGE ROADS - AREA (2) CYC     232.000 128.06897 4
735 2090 DEBRIS - FRONTAGE ROADS - AREA (3) CYC     24.000 120.00000 2
735 2108 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (1) CYC     232.000 128.06897 4
735 2109 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (2) CYC     24.000 120.00000 2
735 2110 DEBRIS - ENTRANCE / EXIT RAMPS - AREA (3) CYC     24.000 120.00000 2
745 2006 JANITORIAL MAINT (PICNIC AREAS) CYC     325.000 232.08000 2
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC     196.000 122.81633 2
751 2005 LITTER PICKUP (SITE A) CYC     24.000 285.00000 1
751 2006 MOWING, TRIMMING, AND EDGING (SITE A) CYC     40.000 1,840.20000 2
751 2008 PLANT BED MAINTENANCE (SITE A) CYC     24.000 75.00000 1
751 2009 PRUNING (SITE A) CYC     2.000 500.00000 1
751 2016 MOWING, TRIMMING, AND EDGING (SITE B) CYC     8.000 350.00000 1
751 2024 LEAF REMOVAL CYC     2.000 325.00000 1
751 2025 LITTER PICKUP CYC     48.000 252.00000 2
751 2027 MOWING, TRIMMING, AND EDGING CYC     60.000 463.80000 2
751 2030 PLANT BED MAINTENANCE CYC     1.000 1,845.00000 1
751 2031 PRUNING CYC     1.000 2,891.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI 50.000 1,800.00000 218.690 1,462.54429 4
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC 25.000 1,200.00000 90.400 913.04867 4
752 2022 TREE REMOVAL (4" - 12" DIA) EA 1,500.000 25.00000 5,331.000 35.91259 9
752 2023 TREE REMOVAL (12" - 18" DIA) EA 450.000 50.00000 2,180.000 60.43578 8
752 2024 TREE REMOVAL (18" - 24" DIA) EA 200.000 75.00000 1,148.000 87.81359 8
752 2025 TREE REMOVAL (24" - 30" DIA) EA 67.000 125.00000 621.000 149.55717 8
752 2026 TREE REMOVAL (30" - 36" DIA) EA 10.000 200.00000 177.000 298.02260 8
752 2027 TREE REMOVAL (36" - 42" DIA) EA 10.000 250.00000 106.000 418.39623 8
752 2028 TREE REMOVAL (42" - 48" DIA) EA 10.000 300.00000 105.000 481.80952 7
752 2029 TREE REMOVAL (48" - 60" DIA) EA 10.000 500.00000 53.000 485.09434 6
752 2030 TREE REMOVAL (60" - 72" DIA) EA 15.000 700.00000 22.000 486.59091 4
752 2045 STUMP REMOVAL EA 10.000 75.00000 30.000 28.33333 2
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 95,000.000 1.63000 101,220.000 1.53598 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     5,350.000 14.72897 3
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     170.500 10.35191 4
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     143.000 3.99301 4
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     200.000 13.25000 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     40.000 1.00000 1
770 2006 REALIGN POSTS EA     581.000 8.74527 2
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     4.000 50.50000 3
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     32.000 1,575.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     49.000 588.97959 4
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     2,650.000 25.43396 4
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     404.000 34.75248 4
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     10.000 16.20000 3
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     420.000 23.21429 2
770 2019 REM / REPL STEEL POST W / O CONC FND EA     30.000 1.00000 1
770 2020 REM / REPL TIMBER POST W / CONC FND EA     5.000 1.00000 1
770 2021 REM / REPL STEEL POST W / CONC FND EA     5.000 1.00000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     100.000 1.00000 1
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     500.000 10.00000 1
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     1,500.000 12.00000 1
770 2031 INSTALL BLOCKOUT EA     100.000 1.00000 1
770 2032 REMOVE AND RESET SGT IMPACT HEAD EA     24.000 50.00000 1
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     80.000 8.00000 1
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     50.000 2.00000 1
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     20.000 35.00000 1
774 2006 REPAIR (TRACC) EA     1.000 1,000.00000 1
774 2007 REPAIR (TRACC) LF     1.000 400.00000 1
774 2011 REPAIR (CATCB - FRNT SECT) EA     2.000 475.00000 2
774 2018 REPAIR (CATGR - FRONT SECTION) EA     2.000 1,500.00000 2
774 2019 REPAIR (CATGR - END SECTION) EA     3.000 152.00000 3
776 2031 REPAIR (ALUMINUM RAIL) LF     80.000 28.00000 1
780 2001 EPOXY INJECTION (TY IX) LF     28.000 60.00000 1
784 2006 REPAIR STL BRIDGE MEMBER (PILING) EA     90.000 1,000.00000 2
788 2002 CONCRETE BEAM REPAIR (CFRP) EA 13.000 8,100.00000 13.000 8,100.00000 1
788 2003 CONCRETE BEAM REP (STRAND SPLICE & CFRP EA 3.000 13,200.00000 3.000 13,200.00000 1