Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS     33.000 28,220.43273 33
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     122.000 1,955.49967 34
502 2021 BARR, SIGNS & TRAF HANDLE (MOBILE OP) HR     200.000 10.00000 1
502 2022 FURN.ADDITIONAL TRUCKMOUNT. ATTENUATOR HR     60.000 35.00000 1
506 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     3,148.000 13.52192 8
506 2009 ROCK FILTER DAMS (REMOVE) LF     2,848.000 3.76088 7
506 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     199.000 40.98794 7
506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF     4,285.000 2.40805 15
510 2001 ONE - WAY TRAFFIC CONTROL HR     20,868.000 23.28991 5
510 2002 ONE - WAY TRAFFIC CONTROL (FLAGGERS ONLY) HR     10,250.000 20.65000 4
529 2002 CONC CURB (TY II) LF     208.500 18.02950 4
529 2004 CONC CURB & GUTTER (TY II) LF     164.000 28.00000 1
529 2008 CONC CURB & GUTTER (SPECIAL) LF     200.000 32.00000 2
530 2003 INTERSECTIONS (SURF TREAT) EA     12.000 2,792.26667 2
530 2006 INTERSECTIONS (SURF TREAT) SY     1,106.000 43.26944 4
530 2011 DRIVEWAYS (ACP) SY     1,293.000 29.53596 3
530 2012 DRIVEWAYS (SURF TREAT) SY     220.000 15.00000 1
530 2015 TURNOUTS (SURF TREAT) EA     11.000 750.00000 1
530 2018 TURNOUTS (SURF TREAT) SY     370.000 13.00000 1
531 2005 CURB RAMPS (TY 1) EA     17.000 1,462.68706 2
531 2013 CURB RAMPS (TY 20) EA     2.000 2,500.00000 1
531 2016 CONC SIDEWALKS (6') (6") LF     50.000 46.00000 1
531 2024 CONC SIDEWALK (5") SY     23.000 250.00000 1
533 2007 SHOULDER TEXTURING (MILLED) (CONCRETE) LF     11,600.000 1.00000 2
536 2002 CONC MEDIAN SY     19.000 120.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     900.000 13.77778 4
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     300.000 12.00000 3
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     20.000 922.00000 5
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     2.000 300.00000 2
540 2013 MTL BEAM GD FEN TRANS (T101) EA     6.000 590.00000 3
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     100.000 5.00000 2
540 2022 MTL W - BEAM GD FEN (STL POST) RADIUS RAIL LF     150.000 15.00000 1
540 2031 MTL BM GD FN (REMOVE & RESET) LF     2,250.000 14.77667 3
542 2001 REMOVING METAL BEAM GUARD FENCE LF     2,000.000 1.58750 8
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     51.000 192.60784 9
542 2004 REMOVING MTL BM GD FEN TRANS (TL2) LF     75.000 3.25000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     76.000 1,701.28947 8
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     10.000 100.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     8.000 125.00000 3
560 2011 MAILBOX INSTALL - S (TWG - POST) TY 2 FND EA     136.000 137.91912 5
560 2013 MAILBOX INSTALL - D (TWG - POST) TY 2 FND EA     10.000 268.00000 3
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     11.000 200.00000 1
560 2024 MAILBOX INSTALL - M (TWG - POST) TY 2 FND EA     3.000 443.33333 3