MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 06 AS OF MAY 15, 2013 PAGE 16 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ ANDREWS 0.1 MI SOUTH OF CR 2500 | 0.391 | 1,147,566.82| 0.00| 0.00| 0.0| US 385 0.3 MI NORTH OF CR 2500 | | | | | | 0228-04-040 | | | | | | C 228-4-40 INTERSECTION IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0228-04-040 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133227 | TOTALS | 1,147,566.82| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ANDREWS SH 176 EAST OF ANDREWS | 1.163 | 1,860,700.42| 318,989.00| 330,821.54| 17.7| SH 115 1.2 MI WEST | | | | | | 0548-01-039 | | | | | | C 548-1-39 EXCAV,EMB,BASE,EMUL,SURF TRT, C & G | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 04-09-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-23-13 | | | | | | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 16 PERCENT TIME USED- 16 | | | | | | | | | | | | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0548-01-039 | | | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 0.77 | | | | COX PAVING COMPANY, L.P. | |SUB %: 9.28 | | | | DESERT PAVING, INC. | |SUB %: 13.86 | | | | DOUBLE A CONTRACTING, L.P. | |SUB %: 0.99 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 2.03 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 2.57 | | | | DAVID CORRALES DUMPING SERVICE | |SUB %: 0.42 | | | | | | | | | | CONTRACT 08123211 | TOTALS | 1,860,700.42| 318,989.00| 330,821.54| 17.7| ************************************************************************************************************************************ ECTOR 0.2 MILES SOUTH OF BI 20-E | 2.084 | 2,445,467.58| 0.00| 0.00| 0.0| FM 1882 2.3 MILES SOUTH OF BI 20-E | | | | | | 2005-02-015 | | | | | | STP 2013(347) ROADWAY REHABILITATION | | | | | | | | | | | | WORK ORDER- 03-26-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2005-02-015 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133010 | TOTALS | 2,445,467.58| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ECTOR SH 191 | 2.214 | 2,324,375.93| 0.00| 30,531.92| 1.3| SP 588 ECTOR COUNTY LINE | | | | | | 3571-01-006 | | | | | | C 3571-1-6 INSTALL NEW TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 03-26-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3571-01-006 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133218 | TOTALS | 2,324,375.93| 0.00| 30,531.92| 1.3| ************************************************************************************************************************************ ECTOR DISTRICTWIDE | 51.716 | 269,987.35| 0.00| 0.00| 0.0| VA . | | | | | | 0906-00-138 | | | | | | STP 2013(481) PAVEMENT MARKINGS (FY-2013) | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 20 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | VIZCAINO, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0906-00-138 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133005 | TOTALS | 269,987.35| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ECTOR DISTRICTWIDE | 0.001 | 228,116.15| 0.00| 0.00| 0.0| VA . | | | | | | 0906-00-139 | | | | | | STP 2013(482) SIGN REPLACEMENTS (FY-2013) | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HJC FARMS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0906-00-139 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133215 | TOTALS | 228,116.15| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MARTIN SH 176 | 16.109 | 7,639,859.18| 11,081.52| 5,893,382.56| 77.2| SH 349 DAWSON COUNTY LINE | | | | | | 0380-07-021 | | | | | | STP 1102(400) TWO CRSE SURF TRT,PVMT REPR,SEE P-3 | | | | | | | | | | | | WORK ORDER- 08-25-11 WORK BEGAN- 04-02-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-24-11 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 233 PERCENT TIME USED- 103 | | | | | | | | | | | | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0380-07-021 | | | | | | DESERT PAVING, INC. | |SUB %: 0.89 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 0.34 | | | | ALTEX LANDSCAPE CONSTRUCTION, INC. | |SUB %: 0.39 | | | | DUSTROL, INC. | |SUB %: 1.28 | | | | WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED | |SUB %: 0.35 | | | | DAVID CORRALES DUMPING SERVICE | |SUB %: 0.00 | | | | DOUBLE A CONTRACTING, L.P. | |SUB %: 3.81 | | | | DTM TRUCKING, INC. | |SUB %: 6.25 | | | | | | | | | | CONTRACT 07113244 | TOTALS | 7,639,859.18| 11,081.52| 5,893,382.56| 77.2| ************************************************************************************************************************************ MARTIN MIDLAND COUNTY LINE | 16.743 | 15,156,095.44| 806,440.85| 3,974,320.36| 26.2| SH 349 SH 176 | | | | | | 0380-08-020 | | | | | | STP 2012(640) EXT STR,FLEX BASE,3 CRSE SURF TRT | | | | | | | | | | | | WORK ORDER- 11-14-12 WORK BEGAN- 01-17-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-17-13 | | | | | | CONTRACT WORKING DAYS- 360 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 20 | | | | | | | | | | | | DELHUR INDUSTRIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0380-08-020 | | | | | | WILLIS ELECTRIC CO., LP | |SUB %: 0.49 | | | | HJC FARMS, INC. | |SUB %: 0.35 | | | | INSTA-TURF | |SUB %: 0.34 | | | | WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED | |SUB %: 0.30 | | | | A.K. CONCRETE, INC. | |SUB %: 2.14 | | | | INTERNATIONAL SURFACING SYSTEMS | |SUB %: 30.83 | | | | DOUBLE A CONTRACTING, L.P. | |SUB %: 3.38 | | | | MARTIN GONZALES INCORPORATED | |SUB %: 5.35 | | | | NORTH AMERICA CONTRACTORS, LLC | |SUB %: 0.49 | | | | | | | | | | CONTRACT 09123002 | TOTALS | 15,156,095.44| 806,440.85| 3,974,320.36| 26.2| ************************************************************************************************************************************ MARTIN SH 176 | 16.109 | 6,430,782.01| 0.00| 57,305.00| 0.8| SH 349 DAWSON COUNTY LINE | | | | | | 0380-07-024 | | | | | | HP 2012(639) EXT STR,FLEX BASE,3 CRSE SURF TRT | | | | | | | | | | | | WORK ORDER- 11-01-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-02-13 | | | | | | CONTRACT WORKING DAYS- 200 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | DELHUR INDUSTRIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0380-07-024 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09123234 | TOTALS | 6,430,782.01| 0.00| 57,305.00| 0.8| ************************************************************************************************************************************ MIDLAND 0.23 MI WEST OF BS 349-C | 0.267 | 1,803,561.25| 0.00| 0.00| 0.0| LP 250 BS 349-C | | | | | | 1188-02-082 | | | | | | STP 2013(401) ROADWAY REHABILITATION | | | | | | | | | | | | WORK ORDER- 05-13-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1188-02-082 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133219 | TOTALS | 1,803,561.25| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MIDLAND WADLEY | 0.818 | 1,955,092.61| 0.00| 0.00| 0.0| FM 868 LOOP 250 | | | | | | 1188-01-024 | | | | | | STP 2013(483) ROADWAY REHABILITION | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-15-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1188-01-024 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133022 | TOTALS | 1,955,092.61| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MIDLAND 0.4 MI EAST OF SH 349 | 14.694 | 10,773,473.14| 767,701.29| 945,373.29| 8.7| IH 20 ECTOR COUNTY LINE | | | | | | 0005-14-077 | | | | | | C 5-14-77 PLANE,HOTMIX,CRACK ATTEN MIX,PAVMRK | | | | | | | | | | | | WORK ORDER- 08-20-12 WORK BEGAN- 04-08-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-17-13 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 17 PERCENT TIME USED- 14 | | | | | | | | | | | | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0005-14-077 | | | | | | WEST TEXAS BARRICADES, LLC DBA BARRICADES UNLIMITED | |SUB %: 0.33 | | | | DUSTROL, INC. | |SUB %: 2.60 | | | | RPV CONSTRUCTION | |SUB %: 0.07 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.66 | | | | LPZ ENTERPRISES, LLC | |SUB %: 0.00 | | | | T.O.C. TRUCKING | |SUB %: 0.37 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 0.06 | | | | DOUBLE A CONTRACTING, L.P. | |SUB %: 1.58 | | | | | | | | | | CONTRACT 06123229 | TOTALS | 10,773,473.14| 767,701.29| 945,373.29| 8.7| ************************************************************************************************************************************ MIDLAND IH 20 | 4.222 | 6,431,650.42| 0.00| 0.00| 0.0| SH 158 4.0 MILES EAST OF IH 20 | | | | | | 0463-03-045 | | | | | | STP 2013(101) ROADWAY REHABILITATION | | | | | | | | | | | | WORK ORDER- 11-14-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-15-13 | | | | | | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0463-03-045 | | | | | | WEST TEXAS BARRICADES, LLC DBA BARRICADES UNLIMITED | |SUB %: 0.28 | | | | DOUBLE A CONTRACTING, L.P. | |SUB %: 0.94 | | | | PERFORMANCE EQUIPMENT | |SUB %: 2.34 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.50 | | | | | | | | | | CONTRACT 10123003 | TOTALS | 6,431,650.42| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MIDLAND 0.4 MI EAST OF FM 1788 | 5.414 | 2,833,617.18| 0.00| 0.00| 0.0| IH 20 ECTOR COUNTY LINE | | | | | | 0005-14-078 | | | | | | IM 0201(183) REBUILD DRIVING LANES, OVERSEAL | | | | | | | | | | | | WORK ORDER- 02-13-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0005-14-078 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12123226 | TOTALS | 2,833,617.18| 0.00| 0.00| 0.0| ************************************************************************************************************************************ PECOS 2.0 MILES WEST OF FM 11 | 5.728 | 2,984,381.76| 0.00| 0.00| 0.0| IH 10 0.4 MILES WEST OF RM 2886 | | | | | | 0140-03-045 | | | | | | IM 0201(184) MILL,UNDERSEAL,HMAC,PAV MRKS&MARKER | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0140-03-045 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133030 | TOTALS | 2,984,381.76| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WARD RECONSTRUCTION OF SRA AT IH 20 | 1.181 | 14,473,728.60| 0.00| 15,868,324.42| 99.9| IH 20 13 MI WEST OF MONAHANS | | | | | | 0004-04-076 | | | | | | STP 2000(400)TE CONSTRUCT TOURIST & VISITOR CENTER | | | | | | | | | | | | WORK ORDER- 10-07-10 WORK BEGAN- 11-22-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-23-10 | | | | | | CONTRACT WORKING DAYS- 350 ADDL DAYS GRANTED- 125 | | | | | | WORKING DAYS CHARGED- 471 PERCENT TIME USED- 99 | | | | | | | | | | | | AUI CONTRACTORS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0004-04-076 | | | | | | AMERICAN FENCE COMPANY, INC. | |SUB %: 0.55 | | | | MERIT ELECTRICAL, INC | |SUB %: 7.61 | | | | WASTEWATER SOLUTIONS | |SUB %: 4.11 | | | | KIC DEVELOPMENT, LLC | |SUB %: 4.24 | | | | REECE ALBERT, INC. | |SUB %: 14.82 | | | | ALTEX LANDSCAPE CONSTRUCTION, INC. | |SUB %: 1.69 | | | | BOOTHE BROTHERS PAVING COMPANY, INC. | |SUB %: 0.57 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.27 | | | | LUEBE-JONES, INC | |SUB %: 0.20 | | | | MEIDLING CONCRETE, INC | |SUB %: 0.21 | | | | QUALITY PRODUCTS INC | |SUB %: 0.25 | | | | RANGER SPECIALIZED GLASS, INC | |SUB %: 0.96 | | | | TERRACON CONSULTANTS, INC. | |SUB %: 0.20 | | | | UNIVERSAL AUTOMATIC DOORS OF TEXAS, INC | |SUB %: 0.14 | | | | OJD ENGINEERING INC. | |SUB %: 0.27 | | | | ACE ERECTORS, LLC | |SUB %: 1.02 | | | | GREATER METROPLEX INTERIORS, INC. | |SUB %: 1.09 | | | | NATIONAL COOLING, HEATING & PLUMBING | |SUB %: 4.29 | | | | DTM TRUCKING, INC. | |SUB %: 3.58 | | | | CIRCLE T SERVICES, INC. | |SUB %: 0.13 | | | | SCHUMANN ENGINEERING CO., INC. | |SUB %: 0.17 | | | | J & T ENERGY SERVICES LLC | |SUB %: 1.13 | | | | CROSS COUNTRY RESOURCES | |SUB %: 0.08 | | | | WEST TEXAS BORING, INC. | |SUB %: 0.17 | | | | WILKS MASONRY CORPORATION | |SUB %: 2.47 | | | | CENTERPOINT PRODUCTIONS, INC. | |SUB %: 0.43 | | | | SHAW CONTRACT FLOORING SERVICES, INC. | |SUB %: 1.25 | | | | WILLIS COMPANY | |SUB %: 0.74 | | | | SURFACE AMERICA | |SUB %: 0.40 | | | | PROGRESSIVE PLAYGROUNDS, INC. | |SUB %: 0.29 | | | | TERMINIX INTERNATIONAL CO., LP | |SUB %: 0.04 | | | | B & S PREMIUM SHEET METAL, INC. | |SUB %: 1.98 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 4.00 | | | | RIVER CITIES SAWING, LLC | |SUB %: 0.50 | | | | FRANK BARTEL TRANSPORTATION | |SUB %: 0.57 | | | | HOWELL INSULATION COMPANY | |SUB %: 0.19 | | | | N.D. WHITE ENGINEERING SERVICE, INC. | |SUB %: 0.04 | | | | JANOV MILLWORK AND MANUFACTURING, LLC | |SUB %: 2.46 | | | | T. KING BUILDING SERVICES, INC. | |SUB %: 0.16 | | | | AMERITEX FLAG & FLAGPOLE, LLC | |SUB %: 0.03 | | | | THE GEORGE D. ALAN COMPANY, INC. | |SUB %: 0.20 | | | | BIG DOG DRILLING, LLC | |SUB %: 0.13 | | | | V & W TILES COMPANY | |SUB %: 0.89 | | | | CUSHION SURFACING, INC. | |SUB %: 0.09 | | | | HACIENDA TILE | |SUB %: 0.28 | | | | NATIONS ROOF | |SUB %: 0.55 | | | | CASEY INSTALLATION | |SUB %: 0.23 | | | | BCI TECHNOLOGIES | |SUB %: 0.62 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 0.58 | | | | DOUBLE A CONTRACTING, L.P. | |SUB %: 0.54 | | | | POST AND ASSOCIATES CORP. | |SUB %: 0.04 | | | | TOTAL DEMOLITION, INC. | |SUB %: 0.26 | | | | IRICK"S COUNTER TOPS | |SUB %: 0.22 | | | | EL CALA CONSTRUCTION LLC | |SUB %: 0.06 | | | | TRADE MANAGEMENT | |SUB %: 0.01 | | | | JOURNEYMAN STAFFING | |SUB %: 0.08 | | | | SIGN & AWNING SERVICES, INC. | |SUB %: 0.18 | | | | JAVALINA CONSTRUCTION SOUTH, INC. | |SUB %: 0.08 | | | | BEAN ELECTRICAL, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 08103305 | TOTALS | 14,473,728.60| 0.00| 15,868,324.42| 99.9| ************************************************************************************************************************************ WARD ETC IH 20 WEST OF MONAHANS | 218.758 | 7,719,461.19| 249,075.85| 553,695.68| 7.1| BI 20-D ETC IH 20 EAST OF MONAHANS | | | | | | 0004-03-047 | | | | | | STP 2013(158) SEAL COAT PROGRAM (FY-2013) | | | | | | | | | | | | WORK ORDER- 11-30-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-16-12 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | RONALD R. WAGNER & CO., LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0004-03-047 | | | | | | FLASHER EQUIPMENT COMPANY | |SUB %: 0.63 | | | | FLAT LINE, INC. | |SUB %: 12.22 | | | | RED SIXTEEN CONSTRUCTION, INC. | |SUB %: 0.87 | | | | | | | | | | CONTRACT 11123003 | TOTALS | 7,719,461.19| 249,075.85| 553,695.68| 7.1| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 86,477,917.03 DISTRICT ESTIMATES THIS MONTH 2,153,288.51 DISTRICT TOTAL ESTIMATES PAID TO DATE 27,653,754.77