Monthly State Let Construction Report For Lufkin District As Of Dec 10, 2014 Page 2 Of 3

Last Update: Wednesday, December 10, 2014
FTP Icon
page 1 | page 2 | page 3

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyPOLK
Highway US 59
From MC & SA RR OVERPASS
To GRASS MEDIAN S OF LEGGETT
CSJ 0176-05-176
Proj ID NH 2014(815)
Work Type HMA LEVEL - UP, OCST & PFC
 
8.594 5586536.64 443629.76 2510650.75 44.9
Work Order 06-11-14
Work Began 06-30-14
Work Completed  
Time Computed 06-27-14
Contract Working Days 84
Addl Days Granted 6
Working Days Charged 80
Percent Time Used 88
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0176-05-176
N-LINE TRAFFIC MAINTENANCE, L.P. (0.20%)
W.O.E. CONSTRUCTION(0.98%)
J & M CONTRACTING, COMPANY (5.38%)
DUSTROL, INC.(1.28%)
AMERICAN REMEDIATION OPTIONS, INC. (0.27%)
CLARK CONSTRUCTION OF TEXAS, INC.(9.45%)
SPHERION (0.00%)
STRIPING TECHNOLOGY, L.P.(1.21%)
Contract # 04143034
Totals 5586536.64 443629.76 2510650.75 44.9

CountyPOLK
Highway US 59
From JUST N OF KNIGHT STREET
To 0.5 MI SOUTH
CSJ 0177-01-099
Proj ID NH 2013(915)
Work Type REMOVE X - OVERS & CONST TURN - AROUNDS
 
0.610 1577675.45 0.00 1462332.64 94.1
Work Order 12-19-13
Work Began 02-03-14
Work Completed  
Time Computed 02-03-14
Contract Working Days 41
Addl Days Granted 1
Working Days Charged 71
Percent Time Used 169
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0177-01-099
A R BROTHERS CONSTRUCTION SERVICES, INC. (9.12%)
INTERSTATE BARRICADES & MARKINGS, INC. (1.07%)
PINTO CONSTRUCTION CO., INC. ( 15.98%)
AMERICAN REMEDIATION OPTIONS, INC. (2.17%)
COWBELL TRAFFIC SERVICES, INC. (0.31%)
M BROCK INC(1.73%)
DUSTROL, INC.(0.82%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.30%)
LUDCO, INC.(1.75%)
Contract # 09133028
Totals 1577675.45 0.00 1462332.64 94.1

CountySAN JACINTO
Highway US 59
From SH 150
To S OF UP RR
CSJ 0177-02-053
Proj ID STP 2009(574)SB
Work Type GR, STR & SURF
 
3.436 33439437.65 0.00 33303717.77 100.0
CountySAN JACINTO
Highway US 59
From AT UPRR IN SHEPHERD
To .
CSJ 0177-02-072
Proj ID RW 177-2-72
Work Type ACQUISITION, UTILITIES AND RELOCATI
 
0.001 683821.20 0.00 593394.94 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-24-10
Work Began 04-01-10
Work Completed 08-21-14
Time Computed 04-09-10
Contract Working Days 839
Addl Days Granted 76
Working Days Charged 910
Percent Time Used 99
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0177-02-053
SCOTT DERR PAINTING CO (0.04%)
INDUS CONSTRUCTION, L.P. ( 11.65%)
PFEIFFER & SON LTD.(0.04%)
VICON SERVICES, INC. (0.29%)
ARTEX ELECTRIC, INC. (3.80%)
BASE CONSTRUCTION, L.L.P.(5.22%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.54%)
BATTERSON, L.L.P.(0.60%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.37%)
CENTRAL NORTH CONSTRUCTION, LLC(0.73%)
BORING & TUNNELING COMPANY OF AMERICA, INC.(0.17%)
FOSTER FENCE, LTD. (0.00%)
BELL BOTTOM FOUNDATION CO. (0.87%)
DORAN STEEL, INC.(0.03%)
WEST TEXAS RUMBLE STRIP(0.07%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.18%)
Contract # 02103001
Totals 34123258.85 0.00 33897112.71 100.0

CountySAN JACINTO
Highway US 59
From 1.00 MILE NORTH OF FM 2914
To 1.00 MILE SOUTH OF FM 2914
CSJ 0177-02-080
Proj ID STP 1102(058)HES
Work Type CNSTR INTRCHANGE & CLOSE CROSSOVERS
 
2.059 12895988.97 418989.03 7331475.69 56.8
Work Order 01-31-12
Work Began 06-22-12
Work Completed  
Time Computed 04-02-12
Contract Working Days 535
Addl Days Granted 65
Working Days Charged 377
Percent Time Used 62
Contractor(s)
LONE STAR ROAD CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0177-02-080
CRABTREE BARRICADE SYSTEMS, INC. (1.02%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.31%)
MESA ROD BUSTERS, INC. (2.06%)
WEBBER-BALKE FOUNDATION COMPANY, INC.(1.82%)
ODUM SERVICES, L.P.(0.12%)
KOSSMAN CONTRACTING CO., INC.(0.38%)
ENVIRONMENTAL ALLIES, L.P. (0.09%)
SCOTT DERR PAINTING CO, LLC(0.16%)
TRAF-TEX, INC. (4.36%)
DUSTROL, INC.(0.46%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.26%)
WILLOW CITY SIGN & RAIL, INC.(0.12%)
TRIPLE B SERVICES LLP( 37.18%)
SMITH & COMPANY( 16.56%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.10%)
GREY WOLF CLEARING INC.(0.52%)
A & B CRUSHED CONCRETE (0.12%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.47%)
SILVA, INC.(1.21%)
INDUS CONSTRUCTION, L.P. (0.63%)
JASSO"S SAWING & SEALING (0.36%)
CURB PLANET INC. (0.08%)
Contract # 12113203
Totals 12895988.97 418989.03 7331475.69 56.8

CountySAN JACINTO
Highway US 59
From JUST S OF UPRR IN SHEPHERD
To JUST N OF FM 2914
CSJ 0177-02-089
Proj ID STP 2013(916)
Work Type ADD SB FRTG RD & RECONST MAIN LANES
 
1.642 8948536.85 8035.00 693166.68 7.7
Work Order 05-14-14
Work Began 08-15-14
Work Completed  
Time Computed 05-30-14
Contract Working Days 230
Addl Days Granted 0
Working Days Charged 57
Percent Time Used 24
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0177-02-089
FLORIDA TRAFFIC CONTROL DEVICES, INC.(0.88%)
DOUBLE OAK CONSTRUCTION, INC.(0.67%)
CRABTREE BARRICADE SYSTEMS, INC. (0.25%)
SMITH & COMPANY( 20.62%)
WILLOW CITY SIGN & RAIL, INC.(0.59%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.20%)
BREDA COMPANY, INC.(0.92%)
CPAVE, INC.(1.78%)
ROY LEE WALKER (0.13%)
THOMAS TRACTOR WORKS, INC. (0.16%)
Contract # 02143221
Totals 8948536.85 8035.00 693166.68 7.7

CountyPOLK
Highway PR 56
From US 190
To 1.317 MI S
CSJ 0213-12-009
Proj ID PLD 2014(053)
Work Type RECONSTRUCT & WIDEN EXISTING PVMT
 
1.317 1144070.43 2732.05 1072444.11 93.7
Work Order 01-17-14
Work Began 03-12-14
Work Completed  
Time Computed 03-12-14
Contract Working Days 49
Addl Days Granted 4
Working Days Charged 50
Percent Time Used 94
Contractor(s)
PINTO CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0213-12-009
LONESTAR TRAFFIC SAFETY, LLC (0.32%)
MOORE BROTHERS CONSTRUCTION COMPANY( 29.10%)
A R BROTHERS CONSTRUCTION SERVICES, INC. ( 13.34%)
INTERSTATE BARRICADES & MARKINGS, INC. (1.52%)
AMERICAN REMEDIATION OPTIONS, INC. (5.88%)
Contract # 10133218
Totals 1144070.43 2732.05 1072444.11 93.7

CountySABINE
Highway SH 87
From 1.61 MI S OF FM 944
To 0.2 MI SE OF FM 2928
CSJ 0304-04-042
Proj ID STP 2013(463)HES
Work Type PROVIDE ADDITIONAL PAVED SURF WIDTH
 
7.996 1937298.95 0.00 2159723.29 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-23-13
Work Began 07-01-13
Work Completed 10-13-14
Time Computed 06-08-13
Contract Working Days 62
Addl Days Granted 22
Working Days Charged 91
Percent Time Used 108
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0304-04-042
AMERICAN REMEDIATION OPTIONS, INC. (6.78%)
CRABTREE BARRICADE SYSTEMS, INC. (2.64%)
LONE STAR EQUIPMENT CO. INC. (INACTIVE--SEE 12687) ( 21.75%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.36%)
EXPRESS PERSONNEL SERVICES (0.25%)
Contract # 03133229
Totals 1937298.95 0.00 2159723.29 100.0

CountyTRINITY
Highway SH 94
From SH 19
To US 287
CSJ 0319-01-063
Proj ID STP 2015(236)HES
Work Type SAFETY TREAT FIXED OBJECTS
 
16.561 1039600.99 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-09-14
Work Began 00-00-00
Work Completed  
Time Computed 12-25-14
Contract Working Days 135
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0319-01-063
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10143014
Totals 1039600.99 0.00 0.00 0.0

CountyTRINITY
Highway SH 94
From US 287
To 1.659 MI W OF FM 358
CSJ 0319-02-029
Proj ID STP 2015(241)HES
Work Type SAFETY TREAT FIXED OBJECTS
 
20.409 1785216.75 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-05-14
Work Began 00-00-00
Work Completed  
Time Computed 12-21-14
Contract Working Days 180
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
L.C. JORDAN & SON
SUBCONTRACTOR(S) FOR CCSJ: 0319-02-029
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10143222
Totals 1785216.75 0.00 0.00 0.0

CountyHOUSTON
Highway SH 7
From 0.2 MI E OF FM 232
To KENNARD
CSJ 0336-01-046
Proj ID NH 2015(156)
Work Type GRADING, STRUT, BASE, HMAC SURFACE
 
7.057 10296162.55 0.00 0.00 0.0
Work Order 10-28-14
Work Began 00-00-00
Work Completed  
Time Computed 11-13-14
Contract Working Days 390
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
PINTO CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0336-01-046
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09143203
Totals 10296162.55 0.00 0.00 0.0

CountyANGELINA
Highway SP 339
From LP 36
To SH 94
CSJ 0336-04-014
Proj ID STP 2013(120)
Work Type PLANE, SEAL AND OVERLAY
 
1.166 778694.77 0.00 922737.51 100.0
CountyANGELINA
Highway SP 339
From LP 287
To LP 36
CSJ 0336-04-015
Proj ID PLD 1102(545)
Work Type RESURF & WIDEN FOR CTWLTL W / C & G
 
1.110 2633618.29 0.00 2497755.13 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-04-12
Work Began 02-08-13
Work Completed 10-14-14
Time Computed 02-04-13
Contract Working Days 231
Addl Days Granted 1
Working Days Charged 248
Percent Time Used 106
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0336-04-014
HIGHWAY TECHNOLOGIES, INC. (1.80%)
AMERICAN REMEDIATION OPTIONS, INC. (1.48%)
J & M CONTRACTING, COMPANY ( 31.01%)
DUSTROL, INC.(2.89%)
LONE STAR EQUIPMENT CO. INC. (INACTIVE--SEE 12687) (6.61%)
M BROCK INC(0.46%)
PINTO CONSTRUCTION CO., INC. (5.74%)
CRABTREE BARRICADE SYSTEMS, INC. (1.81%)
MOORE BUILDING ASSOCIATES, INC.(1.05%)
Contract # 10123006
Totals 3412313.06 0.00 3420492.64 100.0

CountyHOUSTON
Highway US 287
From LP 304
To TRINITY COUNTY LINE
CSJ 0340-01-040
Proj ID STP 2014(637)HES
Work Type IMPROVE GUARDRAIL AND SAFETY TREAT
 
14.369 1379201.46 87025.15 607971.44 44.0
Work Order 07-10-14
Work Began 08-18-14
Work Completed  
Time Computed 07-26-14
Contract Working Days 217
Addl Days Granted 0
Working Days Charged 75
Percent Time Used 34
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0340-01-040
PANOLA SIGN & BARRICADE, INC.(0.97%)
DUSTIN ALLEN, INC. ( 12.41%)
BAHENA CONSTRUCTION CO.,INC. ( 43.28%)
Contract # 05143216
Totals 1379201.46 87025.15 607971.44 44.0

CountyPOLK
Highway US 287
From US 59
To TYLER COUNTY LINE
CSJ 0341-03-037
Proj ID STP 2014(925)HESG
Work Type IMPROVE GUARDRAIL AND SAFETY TREAT
 
23.125 928912.62 135754.04 272368.08 29.3
Work Order 09-09-14
Work Began 00-00-00
Work Completed  
Time Computed 09-25-14
Contract Working Days 219
Addl Days Granted 0
Working Days Charged 34
Percent Time Used 15
Contractor(s)
A R BROTHERS CONSTRUCTION SERVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0341-03-037
PANOLA SIGN & BARRICADE, INC.(1.55%)
RICE ENVIRONMENTAL SERVICES(7.74%)
Contract # 07143213
Totals 928912.62 135754.04 272368.08 29.3

CountyNACOGDOCHES
Highway SH 204
From CHEROKEE C/L (@ ANGELINA RIVER)
To 0.1 MI E OF FM 2783
CSJ 0450-04-044
Proj ID STP 2014(840)
Work Type OCST AND SUPERPAVE
 
2.556 1010920.03 28449.22 875017.01 86.8
Work Order 08-13-14
Work Began 09-30-14
Work Completed  
Time Computed 08-29-14
Contract Working Days 28
Addl Days Granted 0
Working Days Charged 33
Percent Time Used 117
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0450-04-044
AMERICAN REMEDIATION OPTIONS, INC. (7.72%)
L. S. EQUIPMENT CO., INC.( 16.08%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.44%)
STRIPING TECHNOLOGY, L.P.(2.38%)
EXPRESS PERSONNEL SERVICES (0.49%)
SPHERION (0.29%)
Contract # 06143031
Totals 1010920.03 28449.22 875017.01 86.8

CountySHELBY
Highway FM 139
From SH 7
To SH 87
CSJ 0742-01-052
Proj ID STP 2015(314)HRR
Work Type IMPROVE GUARDRAIL AND SAFETY TREAT
 
28.429 1987837.07 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 121
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
A R BROTHERS CONSTRUCTION SERVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0742-01-052
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11143218
Totals 1987837.07 0.00 0.00 0.0

CountyANGELINA
Highway VA
From AT VARIOUS LOCATIONS IN LUFKIN
To DISTRICT
CSJ 0911-00-073
Proj ID STP 2014(928)
Work Type CONSTRUCT CURB RAMPS
 
0.001 556965.00 82136.00 235052.25 42.2
Work Order 09-12-14
Work Began 10-07-14
Work Completed  
Time Computed 09-28-14
Contract Working Days 126
Addl Days Granted 0
Working Days Charged 38
Percent Time Used 30
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0911-00-073
STRIPING TECHNOLOGY, L.P.(2.25%)
CLASSIC TEJAS CONSTRUCTION, INC. (2.80%)
Contract # 07143009
Totals 556965.00 82136.00 235052.25 42.2

CountyNACOGDOCHES
Highway CR
From CR 706 AT YSELETA CREEK
To .
CSJ 0911-08-044
Proj ID BR 2013(438)
Work Type BRIDGE REPLACEMENT
 
0.041 217515.25 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-13-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 38
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0911-08-044
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07143032
Totals 217515.25 0.00 0.00 0.0

CountySABINE
Highway CR
From ROCK CREEK RD AT ROCK CREEK
To .
CSJ 0911-29-036
Proj ID BR 2012(488)
Work Type BRIDGE REPLACEMENT
 
0.129 436864.83 0.00 466017.52 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-14-13
Work Began 03-04-14
Work Completed 09-15-14
Time Computed 00-00-00
Contract Working Days 89
Addl Days Granted 0
Working Days Charged 76
Percent Time Used 85
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0911-29-036
AMERICAN REMEDIATION OPTIONS, INC. (6.81%)
CRABTREE BARRICADE SYSTEMS, INC. (2.02%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. ( 10.92%)
MESA ROD BUSTERS, INC. (0.59%)
Contract # 04133226
Totals 436864.83 0.00 466017.52 100.0

CountySAN AUGUSTINE
Highway CR
From CR 4320 AT CHIAMON BAYOU
To .
CSJ 0911-30-021
Proj ID BR 2013(435)
Work Type BRIDGE REPLACEMENT
 
0.176 510181.60 103229.01 437374.04 86.0
Work Order 03-12-14
Work Began 07-07-14
Work Completed  
Time Computed 06-10-14
Contract Working Days 75
Addl Days Granted 0
Working Days Charged 78
Percent Time Used 104
Contractor(s)
HODGES AND SON CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0911-30-021
DUSTY ALLEN, INC.(7.41%)
PANOLA SIGN & BARRICADE, INC.(0.68%)
TEXAS ALTERNATIVE GRASSER, INC.(1.70%)
LONE STAR HIGHWAY PRODUCTS, INC. (2.39%)
Contract # 01143019
Totals 510181.60 103229.01 437374.04 86.0

CountySAN AUGUSTINE
Highway CR
From CR 201 AT BIG IRON ORE CREEK
To .
CSJ 0911-30-028
Proj ID BR 2013(437)
Work Type BRIDGE REPLACEMENT
 
0.211 644984.12 16989.25 632919.29 98.1
Work Order 04-15-14
Work Began 07-21-14
Work Completed  
Time Computed 07-14-14
Contract Working Days 73
Addl Days Granted 0
Working Days Charged 67
Percent Time Used 91
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0911-30-028
AMERICAN REMEDIATION OPTIONS, INC. (8.54%)
BANNER SIGN & BARRICADE, INC. (HOOKS)(0.44%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (6.50%)
MESA ROD BUSTERS, INC. (0.30%)
Contract # 02143023
Totals 644984.12 16989.25 632919.29 98.1

page 1 | page 2 | page 3