Monthly State Let Construction Report For Lufkin District As Of Jul 13, 2015 Page 2 Of 3

Last Update: Monday, July 13, 2015
FTP Icon
page 1 | page 2 | page 3

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyPOLK
Highway US 59
From JUST N OF KNIGHT STREET
To 0.5 MI SOUTH
CSJ 0177-01-099
Proj ID NH 2013(915)
Work Type REMOVE X - OVERS & CONST TURN - AROUNDS
 
0.610 1577675.45 0.00 1494393.82 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-19-13
Work Began 02-03-14
Work Completed 03-20-15
Time Computed 02-03-14
Contract Working Days 41
Addl Days Granted 14
Working Days Charged 71
Percent Time Used 129
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0177-01-099
A R BROTHERS CONSTRUCTION SERVICES, INC. (9.12%)
INTERSTATE BARRICADES & MARKINGS, INC. (1.07%)
PINTO CONSTRUCTION CO., INC. ( 15.98%)
AMERICAN REMEDIATION OPTIONS, INC. (2.17%)
COWBELL TRAFFIC SERVICES, INC. (0.31%)
M BROCK INC(1.73%)
DUSTROL, INC.(0.82%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.30%)
LUDCO, INC.(1.75%)
Contract # 09133028
Totals 1577675.45 0.00 1494393.82 100.0

CountySAN JACINTO
Highway US 59
From SH 150
To S OF UP RR
CSJ 0177-02-053
Proj ID STP 2009(574)SB
Work Type GR, STR & SURF
 
3.436 33439437.65 0.00 34089173.09 100.0
CountySAN JACINTO
Highway US 59
From AT UPRR IN SHEPHERD
To .
CSJ 0177-02-072
Proj ID RW 177-2-72
Work Type ACQUISITION, UTILITIES AND RELOCATI
 
0.001 683821.20 0.00 667394.94 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-24-10
Work Began 04-01-10
Work Completed 08-21-14
Time Computed 04-09-10
Contract Working Days 839
Addl Days Granted 76
Working Days Charged 911
Percent Time Used 99
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0177-02-053
SCOTT DERR PAINTING CO (0.04%)
INDUS CONSTRUCTION, L.P. ( 11.65%)
PFEIFFER & SON LTD.(0.04%)
VICON SERVICES, INC. (0.29%)
ARTEX ELECTRIC, INC. (3.80%)
BASE CONSTRUCTION, L.L.P.(5.22%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.54%)
BATTERSON, L.L.P.(0.60%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.37%)
CENTRAL NORTH CONSTRUCTION, LLC(0.73%)
BORING & TUNNELING COMPANY OF AMERICA, INC.(0.17%)
FOSTER FENCE, LTD. (0.00%)
BELL BOTTOM FOUNDATION CO. (0.87%)
DORAN STEEL, INC.(0.03%)
WEST TEXAS RUMBLE STRIP(0.07%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.18%)
Contract # 02103001
Totals 34123258.85 0.00 34756568.03 100.0

CountySAN JACINTO
Highway US 59
From 1.00 MILE NORTH OF FM 2914
To 1.00 MILE SOUTH OF FM 2914
CSJ 0177-02-080
Proj ID STP 1102(058)HES
Work Type CNSTR INTRCHANGE & CLOSE CROSSOVERS
 
2.059 12895988.97 534365.75 9418436.37 73.0
Work Order 01-31-12
Work Began 06-22-12
Work Completed  
Time Computed 04-02-12
Contract Working Days 535
Addl Days Granted 77
Working Days Charged 521
Percent Time Used 85
Contractor(s)
LONE STAR ROAD CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0177-02-080
CRABTREE BARRICADE SYSTEMS, INC. (1.02%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.31%)
MESA ROD BUSTERS, INC. (2.06%)
WEBBER-BALKE FOUNDATION COMPANY, INC.(1.82%)
ODUM SERVICES, L.P.(0.12%)
KOSSMAN CONTRACTING CO., INC.(0.38%)
ENVIRONMENTAL ALLIES, L.P. (0.09%)
SCOTT DERR PAINTING CO, LLC(0.16%)
TRAF-TEX, INC. (4.36%)
DUSTROL, INC.(0.46%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.26%)
WILLOW CITY SIGN & RAIL, INC.(0.12%)
TRIPLE B SERVICES LLP( 37.18%)
SMITH & COMPANY( 16.56%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.10%)
GREY WOLF CLEARING INC.(0.52%)
A & B CRUSHED CONCRETE (0.12%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.47%)
SILVA, INC.(1.21%)
INDUS CONSTRUCTION, L.P. (0.63%)
JASSO"S SAWING & SEALING (0.36%)
CURB PLANET INC. (0.08%)
Contract # 12113203
Totals 12895988.97 534365.75 9418436.37 73.0

CountySAN JACINTO
Highway US 59
From JUST S OF UPRR IN SHEPHERD
To JUST N OF FM 2914
CSJ 0177-02-089
Proj ID STP 2013(916)
Work Type ADD SB FRTG RD & RECONST MAIN LANES
 
1.642 8948536.85 2500.00 710666.68 7.9
Work Order 05-14-14
Work Began 08-15-14
Work Completed  
Time Computed 05-30-14
Contract Working Days 230
Addl Days Granted 0
Working Days Charged 57
Percent Time Used 24
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0177-02-089
FLORIDA TRAFFIC CONTROL DEVICES, INC.(0.88%)
DOUBLE OAK CONSTRUCTION, INC.(0.67%)
CRABTREE BARRICADE SYSTEMS, INC. (0.25%)
SMITH & COMPANY( 20.62%)
WILLOW CITY SIGN & RAIL, INC.(0.59%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.20%)
BREDA COMPANY, INC.(0.92%)
CPAVE, INC.(1.78%)
ROY LEE WALKER (0.13%)
THOMAS TRACTOR WORKS, INC. (0.16%)
Contract # 02143221
Totals 8948536.85 2500.00 710666.68 7.9

CountyTRINITY
Highway SH 94
From SH 19
To US 287
CSJ 0319-01-063
Proj ID STP 2015(236)HES
Work Type SAFETY TREAT FIXED OBJECTS
 
16.561 1039600.99 181568.50 444955.60 42.8
Work Order 01-05-15
Work Began 02-02-15
Work Completed  
Time Computed 01-21-15
Contract Working Days 135
Addl Days Granted 0
Working Days Charged 68
Percent Time Used 50
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0319-01-063
RICE ENVIRONMENTAL SERVICES( 12.69%)
BAHENA CONSTRUCTION CO.,INC. (6.03%)
LONESTAR TRAFFIC SAFETY, LLC (0.82%)
Contract # 10143014
Totals 1039600.99 181568.50 444955.60 42.8

CountyTRINITY
Highway SH 94
From US 287
To 1.659 MI W OF FM 358
CSJ 0319-02-029
Proj ID STP 2015(241)HES
Work Type SAFETY TREAT FIXED OBJECTS
 
20.409 1785216.75 79184.00 985392.60 55.1
Work Order 12-05-14
Work Began 12-16-14
Work Completed  
Time Computed 12-21-14
Contract Working Days 180
Addl Days Granted 0
Working Days Charged 107
Percent Time Used 59
Contractor(s)
L.C. JORDAN & SON
SUBCONTRACTOR(S) FOR CCSJ: 0319-02-029
ODUM SERVICES, L.P.(8.97%)
Contract # 10143222
Totals 1785216.75 79184.00 985392.60 55.1

CountyHOUSTON
Highway SH 7
From 0.2 MI E OF FM 232
To KENNARD
CSJ 0336-01-046
Proj ID NH 2015(156)
Work Type GRADING, STRUT, BASE, HMAC SURFACE
 
7.057 10296162.55 241067.58 1556151.22 15.1
Work Order 10-28-14
Work Began 01-07-15
Work Completed  
Time Computed 11-13-14
Contract Working Days 390
Addl Days Granted 4
Working Days Charged 57
Percent Time Used 14
Contractor(s)
PINTO CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0336-01-046
INTERSTATE BARRICADES & MARKINGS, INC. (0.87%)
TEX OP CONSTRUCTION, LP(0.06%)
WEST TEXAS RUMBLE STRIP(0.04%)
PANOLA SIGN & BARRICADE, INC.(0.43%)
RICE ENVIRONMENTAL SERVICES(1.77%)
J & M CONTRACTING, COMPANY (9.35%)
SANDHILL FOUNDATION, LLC (1.69%)
MOORE BROTHERS CONSTRUCTION COMPANY( 26.16%)
AMERICAN REMEDIATION OPTIONS, INC. (0.55%)
Contract # 09143203
Totals 10296162.55 241067.58 1556151.22 15.1

CountyHOUSTON
Highway US 287
From LP 304
To TRINITY COUNTY LINE
CSJ 0340-01-040
Proj ID STP 2014(637)HES
Work Type IMPROVE GUARDRAIL AND SAFETY TREAT
 
14.369 1379201.46 172912.70 1225543.65 88.8
Work Order 07-10-14
Work Began 08-18-14
Work Completed  
Time Computed 07-26-14
Contract Working Days 217
Addl Days Granted 0
Working Days Charged 173
Percent Time Used 79
Contractor(s)
CDM HOLDINGS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0340-01-040
PANOLA SIGN & BARRICADE, INC.(0.97%)
DUSTIN ALLEN, INC. ( 12.41%)
BAHENA CONSTRUCTION CO.,INC. ( 43.28%)
Contract # 05143216
Totals 1379201.46 172912.70 1225543.65 88.8

CountyPOLK
Highway US 287
From 2.50 MI W OF US 59
To 2.0 MI W OF US 59
CSJ 0341-02-046
Proj ID STP 1502(212)
Work Type ADD TURN LANES
 
0.593 1220777.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 55
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0341-02-046
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05153252
Totals 1220777.00 0.00 0.00 0.0

CountyPOLK
Highway US 287
From US 59
To TYLER COUNTY LINE
CSJ 0341-03-037
Proj ID STP 2014(925)HESG
Work Type IMPROVE GUARDRAIL AND SAFETY TREAT
 
23.125 928912.62 1111.54 692042.26 74.5
Work Order 09-09-14
Work Began 10-15-14
Work Completed  
Time Computed 09-25-14
Contract Working Days 219
Addl Days Granted 0
Working Days Charged 117
Percent Time Used 53
Contractor(s)
A R BROTHERS CONSTRUCTION SERVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0341-03-037
PANOLA SIGN & BARRICADE, INC.(1.55%)
RICE ENVIRONMENTAL SERVICES(7.74%)
J.P. ABNER STUMP GRINDING & TREE SERVICE (0.16%)
Contract # 07143213
Totals 928912.62 1111.54 692042.26 74.5

CountyNACOGDOCHES
Highway SH 204
From CHEROKEE C/L (@ ANGELINA RIVER)
To 0.1 MI E OF FM 2783
CSJ 0450-04-044
Proj ID STP 2014(840)
Work Type OCST AND SUPERPAVE
 
2.556 1010920.03 0.00 989177.48 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-13-14
Work Began 09-30-14
Work Completed 03-25-15
Time Computed 08-29-14
Contract Working Days 28
Addl Days Granted 0
Working Days Charged 47
Percent Time Used 167
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0450-04-044
AMERICAN REMEDIATION OPTIONS, INC. (7.72%)
L. S. EQUIPMENT CO., INC.( 16.08%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.44%)
STRIPING TECHNOLOGY, L.P.(2.38%)
EXPRESS PERSONNEL SERVICES (0.49%)
SPHERION (0.29%)
Contract # 06143031
Totals 1010920.03 0.00 989177.48 100.0

CountyNACOGDOCHES
Highway FM 95
From RUSK COUNTY LINE
To 0.5 MI W OF US 59 IN GARRISON
CSJ 0706-01-013
Proj ID STP 2013(519)HES
Work Type RECONSTRUCT AND WIDEN PAVEMENT
 
3.938 1382155.18 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 70
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
PINTO CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0706-01-013
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153240
Totals 1382155.18 0.00 0.00 0.0

CountySHELBY
Highway FM 139
From SH 7
To SH 87
CSJ 0742-01-052
Proj ID STP 2015(314)HRR
Work Type IMPROVE GUARDRAIL AND SAFETY TREAT
 
28.429 1987837.07 142912.00 1093064.65 54.9
Work Order 01-07-15
Work Began 02-18-15
Work Completed  
Time Computed 02-18-15
Contract Working Days 121
Addl Days Granted 0
Working Days Charged 45
Percent Time Used 37
Contractor(s)
A R BROTHERS CONSTRUCTION SERVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0742-01-052
DUSTIN ALLEN, INC. ( 13.59%)
LONESTAR TRAFFIC SAFETY, LLC (0.59%)
LONGVIEW BRIDGE AND ROAD, LTD. ( 17.65%)
N-LINE TRAFFIC MAINTENANCE, L.P. (5.60%)
STRIPING TECHNOLOGY, L.P.(0.99%)
Contract # 11143218
Totals 1987837.07 142912.00 1093064.65 54.9

CountySAN AUGUSTINE
Highway US 96
From AT AYISH BAYOU
To .
CSJ 0809-04-046
Proj ID BR 1502(202)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.545 3951203.54 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 07-02-15
Work Began 00-00-00
Work Completed  
Time Computed 08-02-15
Contract Working Days 152
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0809-04-046
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05153241
Totals 3951203.54 0.00 0.00 0.0

CountyANGELINA
Highway VA
From AT VARIOUS LOCATIONS IN LUFKIN
To DISTRICT
CSJ 0911-00-073
Proj ID STP 2014(928)
Work Type CONSTRUCT CURB RAMPS
 
0.001 556965.00 0.00 546183.75 98.0
Work Order 09-12-14
Work Began 10-07-14
Work Completed  
Time Computed 09-28-14
Contract Working Days 126
Addl Days Granted 0
Working Days Charged 84
Percent Time Used 66
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0911-00-073
STRIPING TECHNOLOGY, L.P.(2.25%)
CLASSIC TEJAS CONSTRUCTION, INC. (2.80%)
Contract # 07143009
Totals 556965.00 0.00 546183.75 98.0

CountyANGELINA
Highway VA
From AT VARIOUS LOCATIONS IN LUFKIN DIST
To .
CSJ 0911-00-074
Proj ID STP 1502(258)
Work Type CONSTRUCT CURB RAMPS
 
0.001 1038185.70 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 100
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TI-ZACK CONCRETE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0911-00-074
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07153263
Totals 1038185.70 0.00 0.00 0.0

CountyPOLK
Highway CR
From KELLEY RD OVER MENARD CREEK
To .
CSJ 0911-04-056
Proj ID BR 2014(692)
Work Type BRIDGE REPLACEMENT
 
0.281 707623.10 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-26-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 250
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0911-04-056
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02153220
Totals 707623.10 0.00 0.00 0.0

CountyPOLK
Highway CR
From DICK SKINNER RD AT TRIB OF NECHES R
To .
CSJ 0911-04-059
Proj ID BR 1402(188)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.413 1215872.88 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 151
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0911-04-059
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07153052
Totals 1215872.88 0.00 0.00 0.0

CountyNACOGDOCHES
Highway CR
From CR 706 AT YSELETA CREEK
To .
CSJ 0911-08-044
Proj ID BR 2013(438)
Work Type BRIDGE REPLACEMENT
 
0.041 217515.25 2124.50 213932.92 100.0
Work Order 08-13-14
Work Began 01-05-15
Work Completed 06-08-15
Time Computed 11-11-14
Contract Working Days 38
Addl Days Granted 0
Working Days Charged 35
Percent Time Used 92
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0911-08-044
AMERICAN REMEDIATION OPTIONS, INC. (5.95%)
BANNER SIGN & BARRICADE, INC. (HOOKS)(0.91%)
Contract # 07143032
Totals 217515.25 2124.50 213932.92 100.0

CountyHOUSTON
Highway CR
From CR 3480 AT BIG CREEK TRIBUTARY
To .
CSJ 0911-28-031
Proj ID BR 2014(433)
Work Type BRIDGE REPLACEMENT
 
0.137 748567.80 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 68
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HARTBEAT CONSTRUCTION
SUBCONTRACTOR(S) FOR CCSJ: 0911-28-031
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153231
Totals 748567.80 0.00 0.00 0.0