MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 11 AS OF DEC 11, 2008 PAGE 30 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ ANGELINA US 69 | 15.823 | 1,571,479.21| 62,787.75| 1,067,641.28| 67.9| FM 844 4.62 MI S OF FM 1818 (END PAVEMENT) | | | | | | 1166-01-017 | | | | | | STP 2008(443)HES SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | WORK ORDER- 05-05-08 WORK BEGAN- 05-15-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-21-08 | | | | | | CONTRACT WORKING DAYS- 307 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 130 PERCENT TIME USED- 42 | | | | | | | | | | | | AJAX EQUIPMENT COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1166-01-017 | | | | | | JORDAN SERVICES | |SUB %: 2.39 | | | | D. B. INDUSTRIES, INC. | |SUB %: 3.13 | | | | RED-GAP CONTRACTORS, L.L.C. | |SUB %: 9.43 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.82 | | | | | | | | | | CONTRACT 03083015 | TOTALS | 1,571,479.21| 62,787.75| 1,067,641.28| 67.9| ************************************************************************************************************************************ ANGELINA LP 287 | 0.820 | 38,956,006.00| 1,276,316.22| 19,637,869.50| 50.4| US 59 FM 3482 | | | | | | 0176-03-115 | | | | | | NH 2007(584) GR, STRS & SURF | | | | | | | | | | | | WORK ORDER- 08-31-07 WORK BEGAN- 03-24-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-29-07 | | | | | | CONTRACT WORKING DAYS- 947 ADDL DAYS GRANTED- 13 | | | | | | WORKING DAYS CHARGED- 195 PERCENT TIME USED- 20 | | | | | | | | | | | | ZACHRY CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0176-03-115 | | | | | | ENCINO LANDSCAPE, INC. | |SUB %: 1.81 | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 0.70 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 0.79 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 12.27 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 1.25 | | | | L.A. UTILITIES, INC. | |SUB %: 9.40 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.20 | | | | TRAF-TEX, INC. | |SUB %: 2.48 | | | | QUALITY TRAFFIC SERVICES, L.L.C. | |SUB %: 0.25 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.78 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.51 | | | | BATTEN DRILLING | |SUB %: 0.09 | | | | KELLYSTONE, INC | |SUB %: 0.50 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.07 | | | | JTB SERVICES | |SUB %: 0.60 | | | | CRAIG OLDEN, INC. | |SUB %: 1.20 | | | | TEXAS CUTTING & CORING, INC. | |SUB %: 0.04 | | | | COASTAL CRUSHED CONCRETE, LLC | |SUB %: 0.45 | | | | | | | | | | CONTRACT 06073001 | TOTALS | 38,956,006.00| 1,276,316.22| 19,637,869.50| 50.4| ************************************************************************************************************************************ ANGELINA VARIOUS LOCATIONS DISTRICT WIDE | 0.100 | 116,375.80| 29,341.45| 95,056.55| 81.6| VA . | | | | | | 0911-00-063 | | | | | | C 911-00-63 INSTALLING RAISED PAVEMENT MARKERS | | | | | | | | | | | | WORK ORDER- 07-10-08 WORK BEGAN- 10-07-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-08-08 | | | | | | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 39 PERCENT TIME USED- 97 | | | | | | | | | | | | HIGHWAY TECHNOLOGIES, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0911-00-063 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06083013 | TOTALS | 116,375.80| 29,341.45| 95,056.55| 81.6| ************************************************************************************************************************************ ANGELINA SH 103 | 11.547 | 646,998.61| 28,528.39| 543,774.92| 84.0| FM 842 JACK NERREN ROAD (END OF PAVEMENT) | | | | | | 1165-01-022 | | | | | | STP 2008(671)HES SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | WORK ORDER- 07-14-08 WORK BEGAN- 07-28-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-30-08 | | | | | | CONTRACT WORKING DAYS- 148 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 82 PERCENT TIME USED- 55 | | | | | | | | | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1165-01-022 | | | | | | TLS FARM SERVICES OF EAST TEXAS, LLC | |SUB %: 12.90 | | | | BANNER SIGN & BARRICADE, INC. (HOOKS) | |SUB %: 1.17 | | | | COLD CREEK CONSTRUCTION, LTD | |SUB %: 9.03 | | | | ODUM SERVICES, L.P. | |SUB %: 12.90 | | | | | | | | | | CONTRACT 06083018 | TOTALS | 646,998.61| 28,528.39| 543,774.92| 84.0| ************************************************************************************************************************************ ANGELINA FM 326 | 27.252 | 9,948,421.15| 70,416.56| 8,889,420.46| 94.0| FM 324 ETC US 69 | | | | | | 0176-08-018 | | | | | | SFT 176-8-18 PROVIDE ADDITIONAL PAVED SURF WIDTH | | | | | | | | | | | | WORK ORDER- 09-01-06 WORK BEGAN- 09-19-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-17-06 | | | | | | CONTRACT WORKING DAYS- 739 ADDL DAYS GRANTED- 4 | | | | | | WORKING DAYS CHARGED- 555 PERCENT TIME USED- 74 | | | | | | | | | | | | PINTO CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0176-08-018 | | | | | | M BROCK INC | |SUB %: 1.83 | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | |SUB %: 8.46 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 1.18 | | | | ODUM SERVICES, L.P. | |SUB %: 1.28 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.73 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (MANSFIELD) | |SUB %: 1.47 | | | | D. B. INDUSTRIES, INC. | |SUB %: 1.34 | | | | EAST TEXAS SIGN & SUPPLY, INC. | |SUB %: 0.25 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.18 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 19.28 | | | | | | | | | | CONTRACT 07063010 | TOTALS | 9,948,421.15| 70,416.56| 8,889,420.46| 94.0| ************************************************************************************************************************************ HOUSTON 0.1 MI SW OF FM 1280 (AUSTONIO) | 23.173 | 1,604,202.38| 0.00| 982,049.13| 61.2| SH 21 0.5 MI SW OF BIG CREEK (@ PUGH LN) | | | | | | 0117-06-042 | | | | | | NH 2008(330) HOT ASPHALT-RUBBER SURF TREATMENT | | | | | | | | | | | | WORK ORDER- 02-06-08 WORK BEGAN- 08-28-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-15-08 | | | | | | CONTRACT WORKING DAYS- 35 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 17 PERCENT TIME USED- 48 | | | | | | | | | | | | COX PAVING COMPANY, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0117-06-042 | | | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 9.78 | | | | BLACK TOPPER TECHNOLOGY, INC. | |SUB %: 19.77 | | | | | | | | | | CONTRACT 01083227 | TOTALS | 1,604,202.38| 0.00| 982,049.13| 61.2| ************************************************************************************************************************************ HOUSTON AT WHITE ROCK CREEK & 2 RELIEFS | 6.039 | 4,068,148.33| 0.00| 2,631,527.46| 64.6| FM 1280 . | | | | | | 0931-02-016 | | | | | | BR 2007(407) REPLACE BRIDGES AND APPROACHES | | | | | | | | | | | | WORK ORDER- 06-14-07 WORK BEGAN- 09-06-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 458 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0931-02-016 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 1.60 | | | | J & M CONTRACTING, COMPANY | |SUB %: 4.48 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 2.22 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.22 | | | | QUALITY TRAFFIC SERVICES, L.L.C. | |SUB %: 0.74 | | | | ODUM SERVICES, L.P. | |SUB %: 2.06 | | | | HIGHWAY TECHNOLOGIES, L.P. | |SUB %: 0.93 | | | | | | | | | | CONTRACT 04073226 | TOTALS | 4,068,148.33| 0.00| 2,631,527.46| 64.6| ************************************************************************************************************************************ HOUSTON LOOP 304 (CROCKETT) | 8.330 | 14,237,179.02| 115,585.10| 7,006,342.93| 49.2| SH 7 0.2 MI EAST OF FM 232 | | | | | | 0336-01-039 | | | | | | STP 2006(779) REHAB PAVMT,ADD 10'SHLDRS & PASSING | | | | | | | | | | | | WORK ORDER- 10-04-06 WORK BEGAN- 12-07-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-20-06 | | | | | | CONTRACT WORKING DAYS- 623 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 284 PERCENT TIME USED- 45 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0336-01-039 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.55 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.61 | | | | J & M CONTRACTING, COMPANY | |SUB %: 11.74 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.74 | | | | | | | | | | CONTRACT 08063205 | TOTALS | 14,237,179.02| 115,585.10| 7,006,342.93| 49.2| ************************************************************************************************************************************ HOUSTON 3.07 MI W OF US 287 (END PAVEMENT) | 3.075 | 379,359.70| 0.00| 339,537.00| 99.1| FM 2160 US 287 | | | | | | 2357-01-010 | | | | | | STP 2007(773)HES SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | WORK ORDER- 09-14-07 WORK BEGAN- 10-16-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-30-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 149 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 210 PERCENT TIME USED- 140 | |**************************************************| | | | | | | | STONERIDGE CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2357-01-010 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08073034 | TOTALS | 379,359.70| 0.00| 339,537.00| 99.1| ************************************************************************************************************************************ HOUSTON 0.1 MI SE OF LITTLE ELKHART CREEK | 23.380 | 7,140,972.29| 304,360.18| 5,763,414.50| 80.7| FM 229 LP 304 | | | | | | 0340-04-028 | | | | | | STP 2007(771)HES PROVIDE ADDTL PAVED SURFACE WIDTH | | | | | | | | | | | | WORK ORDER- 10-10-07 WORK BEGAN- 11-27-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-26-07 | | | | | | CONTRACT WORKING DAYS- 306 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 272 PERCENT TIME USED- 88 | | | | | | | | | | | | PINTO CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0340-04-028 | | | | | | J & M CONTRACTING, COMPANY | |SUB %: 3.51 | | | | ODUM SERVICES, L.P. | |SUB %: 0.69 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.79 | | | | M BROCK INC | |SUB %: 1.43 | | | | CRAWFORD YANT | |SUB %: 0.80 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.51 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 0.26 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 33.87 | | | | QUALITY TRAFFIC SERVICES, L.L.C. | |SUB %: 0.09 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.13 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 1.57 | | | | | | | | | | CONTRACT 08073219 | TOTALS | 7,140,972.29| 304,360.18| 5,763,414.50| 80.7| ************************************************************************************************************************************ NACOGDOCHES 1 MI W OF FM 95 | 1.861 | 897,222.53| 0.00| 210,498.69| 23.4| SH 21 LP 34 | | | | | | 0118-08-058 | | | | | | STP 2008(440)HES RECONFIGURE RDWY & ADD LEFT TURN LA | | | | | | | | | | | | WORK ORDER- 04-14-08 WORK BEGAN- 07-09-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 304 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0118-08-058 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.55 | | | | D. B. INDUSTRIES, INC. | |SUB %: 0.99 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 44.89 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 1.51 | | | | PANOLA LIGHT & SIGN | |SUB %: 1.53 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 5.21 | | | | | | | | | | CONTRACT 03083020 | TOTALS | 897,222.53| 0.00| 210,498.69| 23.4| ************************************************************************************************************************************ NACOGDOCHES AT ANGELINA RIVER,LOCO BAYOU, AND | 1.597 | 7,005,713.21| 27,926.36| 7,006,870.94| 99.9| SH 7 RELIEF | | | | | | 0553-03-016 | | | | | | BR 2006(426) REPLACE BRIDGES & APPROACHES | | | | | | | | | | | | WORK ORDER- 05-16-06 WORK BEGAN- 06-26-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-01-06 | | | | | | CONTRACT WORKING DAYS- 513 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 522 PERCENT TIME USED- 101 | | | | | | | | | | | | J-W PAYNE CONSTRUCTION COMPANY, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0553-03-016 | | | | | | D. B. INDUSTRIES, INC. | |SUB %: 0.88 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 2.58 | | | | SOUTHWEST ENVIRONMENT SERVICES, INC. | |SUB %: 0.59 | | | | MADDEN CONTRACTING COMPANY, INC. | |SUB %: 8.67 | | | | ODUM SERVICES, L.P. | |SUB %: 1.10 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.38 | | | | PINTO CONSTRUCTION CO., INC. | |SUB %: 42.06 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 1.19 | | | | GRIFFIN LOGGING COMPANY INC. | |SUB %: 0.05 | | | | EAGLE CONSTRUCTION AND ENVIRONMENTAL SERVICES, L.P. | |SUB %: 4.21 | | | | | | | | | | CONTRACT 04063021 | TOTALS | 7,005,713.21| 27,926.36| 7,006,870.94| 99.9| ************************************************************************************************************************************ NACOGDOCHES FM 2713 | 7.934 | 9,610,603.25| 122,963.24| 4,138,314.82| 43.0| SH 7 0.840 MILE WEST OF TERRAPIN CREEK | | | | | | 0059-01-049 | | | | | | STP 2006(104) REHAB & WIDEN RDWY, ADD TWO 10FT SH | | | | | | | | | | | | WORK ORDER- 07-09-07 WORK BEGAN- 09-05-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-25-07 | | | | | | CONTRACT WORKING DAYS- 585 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 217 PERCENT TIME USED- 37 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0059-01-049 | | | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 0.35 | | | | PANOLA LIGHT & SIGN | |SUB %: 0.51 | | | | JAVELINA CONSTRUCTION SOUTH, INC. | |SUB %: 0.45 | | | | D. B. INDUSTRIES, INC. | |SUB %: 1.01 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 15.77 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.98 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 2.55 | | | | WESCO TRUCKING COMPANY (PATTI BUSTER, INC.) | |SUB %: 1.44 | | | | | | | | | | CONTRACT 05073209 | TOTALS | 9,610,603.25| 122,963.24| 4,138,314.82| 43.0| ************************************************************************************************************************************ NACOGDOCHES WEST OF FM 2782 | 5.848 | 6,396,879.53| 660,227.04| 6,578,737.96| 99.9| SH 7 EAST OF MORAL CREEK | | | | | | 0553-03-019 | | | | | | C 553-3-19 ADD SHOULDERS & REHAB PAVEMENT | | | | | | | | | | | | WORK ORDER- 08-14-06 WORK BEGAN- 03-26-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-30-06 | | | | | | CONTRACT WORKING DAYS- 558 ADDL DAYS GRANTED- 40 | | | | | | WORKING DAYS CHARGED- 414 PERCENT TIME USED- 69 | | | | | | | | | | | | PINTO CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0553-03-019 | | | | | | EAST TEXAS SIGN & SUPPLY, INC. | |SUB %: 0.03 | | | | TEXAS SAFE SITE PRODUCTS, LP | |SUB %: 0.48 | | | | D. B. INDUSTRIES, INC. | |SUB %: 1.04 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.61 | | | | MADDEN CONTRACTING COMPANY, INC. | |SUB %: 24.40 | | | | MIDWEST ASPHALT CORPORATION | |SUB %: 0.40 | | | | M BROCK INC | |SUB %: 0.39 | | | | GRIFFIN LOGGING COMPANY INC. | |SUB %: 0.07 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.45 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 1.04 | | | | ODUM SERVICES, L.P. | |SUB %: 2.34 | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | |SUB %: 7.96 | | | | J-W PAYNE CONSTRUCTION COMPANY, LTD. | |SUB %: 0.54 | | | | | | | | | | CONTRACT 07063045 | TOTALS | 6,396,879.53| 660,227.04| 6,578,737.96| 99.9| ************************************************************************************************************************************ NACOGDOCHES FM 941 | 6.078 | 7,284,403.89| 16,241.72| 2,738,562.32| 34.5| FM 2609 LP 224 | | | | | | 2590-01-022 | | | | | | STP 2007(691)SB SFTY TRT FXD OBJS & CNSTR PVD SHLDR | | | | | | | | | | | | WORK ORDER- 01-23-08 WORK BEGAN- 02-05-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-08-08 | | | | | | CONTRACT WORKING DAYS- 453 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 126 PERCENT TIME USED- 27 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2590-01-022 | | | | | | BUILDER SERVICES | |SUB %: 0.64 | | | | JV ENVIRONMENTAL SERVICES | |SUB %: 1.26 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 0.74 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 1.41 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.09 | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | |SUB %: 13.34 | | | | | | | | | | CONTRACT 07073006 | TOTALS | 7,284,403.89| 16,241.72| 2,738,562.32| 34.5| ************************************************************************************************************************************ NACOGDOCHES FM 225 | 14.229 | 796,260.64| 0.00| 70,753.23| 8.8| FM 343 LP 224 | | | | | | 2300-01-017 | | | | | | STP 2008(841)HES SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | WORK ORDER- 09-12-08 WORK BEGAN- 11-13-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 268 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2300-01-017 | | | | | | PANOLA SIGN & BARRICADE, INC. | |SUB %: 1.45 | | | | | | | | | | CONTRACT 08083020 | TOTALS | 796,260.64| 0.00| 70,753.23| 8.8| ************************************************************************************************************************************ POLK .1MI N OF FM 1988 | 1.100 | 7,489,696.77| 530,533.82| 4,779,615.58| 67.1| US 59 .1MI S OF LP 393 | | | | | | 0177-01-082 | | | | | | SFT 177-1-82 CONSTRUCT INTERCHANGE | | | | | | | | | | | | WORK ORDER- 03-20-06 WORK BEGAN- 06-04-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-05-06 | | | | | | CONTRACT WORKING DAYS- 590 ADDL DAYS GRANTED- 3 | | | | | | WORKING DAYS CHARGED- 249 PERCENT TIME USED- 41 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0177-01-082 | | | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 1.36 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (DALLAS) | |SUB %: 1.19 | | | | TRAF-TEX, INC. | |SUB %: 2.20 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 29.10 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.71 | | | | DORAN STEEL, INC. | |SUB %: 0.10 | | | | WATERS CONSTRUCTION CO., INC. | |SUB %: 2.64 | | | | RDI FOUNDATION DRILLING | |SUB %: 2.17 | | | | N. GARZA TRUCKING | |SUB %: 5.89 | | | | NIROW, INC. | |SUB %: 0.06 | | | | ROSALES TRUCKING | |SUB %: 5.93 | | | | MAINTENANCE TO GO, INC. | |SUB %: 0.17 | | | | | | | | | | CONTRACT 02063005 | TOTALS | 7,489,696.77| 530,533.82| 4,779,615.58| 67.1| ************************************************************************************************************************************ POLK AT REST AREAS 1.5 MI N OF LEGGET | 0.001 | 7,382,392.65| 0.00| 8,420,607.12| 99.9| US 59 . | | | | | | 0176-05-135 | | | | | | STP 2000(305)TE RENOVATION OF SAFETY REST AREA | | | | | | | | | | | | POLK AT REST AREAS 1.5 MI N OF LEGGET | 0.810 | 392,507.35| 0.00| 606,909.08| 99.9| US 59 . | | | | | | 0176-05-153 | | | | | | C 176-5-153 HMA OVERLAY | | | | | | | | | | | | WORK ORDER- 11-15-05 WORK BEGAN- 01-09-06 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-01-05 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 250 ADDL DAYS GRANTED- 216 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 640 PERCENT TIME USED- 137 | |**************************************************| | | | | | | | ALLCO, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0176-05-135 | | | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.31 | | | | LONE STAR EQUIPMENT CO. INC. | |SUB %: 0.68 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.06 | | | | RIVERSIDE LANDSCAPE INC. | |SUB %: 0.87 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 5.24 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.34 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.86 | | | | COMMERCIAL & INDUSTRIAL MECHANICAL, LTD | |SUB %: 1.15 | | | | ALL STAR PLUMBING, INC. | |SUB %: 1.90 | | | | PREMIER CONSTRUCTION | |SUB %: 1.34 | | | | UNITED RENTALS (BOX 4719 - HOUSTON) | |SUB %: 0.69 | | | | UNITED RENTALS (BOX 4719 - HOUSTON) | |SUB %: 0.00 | | | | HI-TECH ELECTRIC, INC. | |SUB %: 7.95 | | | | TRI-COUNTY CONSTRUCTION | |SUB %: 1.00 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 12.28 | | | | LAKE AREA CONCRETE, LLC | |SUB %: 1.59 | | | | TRAK FOUNDATION DRILLING, INC. | |SUB %: 0.03 | | | | | | | | | | CONTRACT 09053401 | TOTALS | 7,774,900.00| 0.00| 9,027,516.20| 99.9| ************************************************************************************************************************************ SABINE REEVES RD AT PATROON BAYOU | 0.100 | 1,864,515.55| 94,886.50| 183,706.50| 9.8| CR . | | | | | | 0911-29-031 | | | | | | BR 2008(796) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 10-10-08 WORK BEGAN- 10-23-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-26-08 | | | | | | CONTRACT WORKING DAYS- 77 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 22 PERCENT TIME USED- 28 | | | | | | | | | | | | AJAX EQUIPMENT COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0911-29-031 | | | | | | ODUM SERVICES, L.P. | |SUB %: 2.56 | | | | TEXAS SHAFTS, INC. | |SUB %: 29.88 | | | | BLUE OX CONCRETE CONSTRUCTION | |SUB %: 0.22 | | | | | | | | | | CONTRACT 09083018 | TOTALS | 1,864,515.55| 94,886.50| 183,706.50| 9.8| ************************************************************************************************************************************ SAN AUGUSTINE SH 147 | 9.777 | 720,361.83| 5,060.00| 729,835.85| 99.9| FM 353 SHELBY COUNTY LINE | | | | | | 0118-12-013 | | | | | | STP 2008(318)HES SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | WORK ORDER- 02-20-08 WORK BEGAN- 05-05-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-07-08 | | | | | | CONTRACT WORKING DAYS- 175 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 116 PERCENT TIME USED- 64 | | | | | | | | | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0118-12-013 | | | | | | COLD CREEK CONSTRUCTION, LTD | |SUB %: 16.80 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 1.09 | | | | TLS FARM SERVICES OF EAST TEXAS, LLC | |SUB %: 6.79 | | | | PINTO CONSTRUCTION CO., INC. | |SUB %: 4.48 | | | | | | | | | | CONTRACT 01083231 | TOTALS | 720,361.83| 5,060.00| 729,835.85| 99.9| ************************************************************************************************************************************ SAN AUGUSTINE ETC FM 3230 | 6.900 | 1,841,548.97| 318,528.91| 951,291.11| 51.6| LP 547 ETC SH 21 (E) | | | | | | 0118-09-007 | | | | | | STP 2008(584) PLANING, SEALING AND OVERLAYING | | | | | | | | | | | | WORK ORDER- 06-13-08 WORK BEGAN- 10-21-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-01-08 | | | | | | CONTRACT WORKING DAYS- 44 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 42 PERCENT TIME USED- 95 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0118-09-007 | | | | | | BATTERSON, L.L.P. | |SUB %: 3.93 | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | |SUB %: 9.92 | | | | WATERS CONSTRUCTION CO., INC. | |SUB %: 0.27 | | | | | | | | | | CONTRACT 05083008 | TOTALS | 1,841,548.97| 318,528.91| 951,291.11| 51.6| ************************************************************************************************************************************ SAN JACINTO AT LP 424 (N) IN SHEPHERD | 0.010 | 60,614.00| 298.50| 58,437.60| 96.4| US 59 . | | | | | | 0177-02-082 | | | | | | C 177-2-82 LANDSCAPE IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 07-14-08 WORK BEGAN- 08-18-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-15-08 | | | | | | CONTRACT WORKING DAYS- 20 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 20 PERCENT TIME USED- 100 | | | | | | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0177-02-082 | | | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 3.13 | | | | | | | | | | CONTRACT 06083026 | TOTALS | 60,614.00| 298.50| 58,437.60| 96.4| ************************************************************************************************************************************ SHELBY US 84 IN TENAHA | 4.631 | 1,335,924.42| 0.00| 1,726,413.01| 99.9| US 96 0.6 MILES SOUTH FLAT FORK CREEK | | | | | | 0063-06-088 | | | | | | CPM 63-6-88 HOT MIX OVERLAY | | | | | | | | | | | | SHELBY SPUR 470 IN TIMPSON | 14.907 | 7,381,815.14| 0.00| 7,846,279.20| 99.9| SH 87 US 96 IN CENTER | | | | | | 0304-07-022 | | | | | | C 304-7-22 HMA BASE & SURF, SAFETY TRT, MBGF | | | | | | | | | | | | WORK ORDER- 08-16-05 WORK BEGAN- 01-17-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-01-05 | | | | | | CONTRACT WORKING DAYS- 246 ADDL DAYS GRANTED- 252 | | | | | | WORKING DAYS CHARGED- 512 PERCENT TIME USED- 102 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0063-06-088 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 2.57 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.47 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.18 | | | | ODUM SERVICES, L.P. | |SUB %: 0.08 | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | |SUB %: 9.99 | | | | | | | | | | CONTRACT 07053230 | TOTALS | 8,717,739.56| 0.00| 9,572,692.21| 99.9| ************************************************************************************************************************************ SHELBY AT HUANA CREEK | 1.458 | 3,924,244.16| 151,760.15| 2,423,676.78| 61.7| SH 7 . | | | | | | 0059-04-036 | | | | | | BR 2004(564) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 08-30-07 WORK BEGAN- 10-25-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-15-07 | | | | | | CONTRACT WORKING DAYS- 422 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 273 PERCENT TIME USED- 64 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0059-04-036 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 3.19 | | | | D. B. INDUSTRIES, INC. | |SUB %: 0.62 | | | | PANOLA LIGHT & SIGN | |SUB %: 0.56 | | | | JAVELINA CONSTRUCTION SOUTH, INC. | |SUB %: 0.43 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 2.45 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.26 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 19.50 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 1.08 | | | | S.T.L.P. ELECTRICAL DIVISION | |SUB %: 0.86 | | | | | | | | | | CONTRACT 07073008 | TOTALS | 3,924,244.16| 151,760.15| 2,423,676.78| 61.7| ************************************************************************************************************************************ SHELBY SH 147 | 16.195 | 3,198,524.76| 66,370.77| 3,122,701.49| 97.6| SH 87 FM 139 | | | | | | 0304-01-024 | | | | | | STP 2007(770)HES WIDEN PAVEMENT TO 28 FT | | | | | | | | | | | | WORK ORDER- 09-11-07 WORK BEGAN- 10-27-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-27-07 | | | | | | CONTRACT WORKING DAYS- 420 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 290 PERCENT TIME USED- 69 | | | | | | | | | | | | MOORE BROTHERS CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0304-01-024 | | | | | | RED GAP CONSTRUCTION CO. | |SUB %: 9.69 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.76 | | | | TEXAS SANDBLASTING AND PAINTING, IN | |SUB %: 0.90 | | | | ODUM SERVICES, L.P. | |SUB %: 0.67 | | | | PINTO CONSTRUCTION CO., INC. | |SUB %: 5.41 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.73 | | | | M.V. HENKE ENTERPRISES, INC. | |SUB %: 2.35 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 1.44 | | | | QUALITY TRAFFIC SERVICES, L.L.C. | |SUB %: 1.33 | | | | A R BROTHERS CONSTRUCTION SERVICES, INC. | |SUB %: 13.18 | | | | SCATES LAWN CARE | |SUB %: 0.54 | | | | | | | | | | CONTRACT 08073018 | TOTALS | 3,198,524.76| 66,370.77| 3,122,701.49| 97.6| ************************************************************************************************************************************ SHELBY ETC US 96 | 170.066 | 7,260,382.93| 0.00| 0.00| 0.0| SH 87 ETC CHURCH ST | | | | | | 0063-06-089 | | | | | | STP 2009(138) SEAL COAT | | | | | | | | | | | | WORK ORDER- 12-05-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | NEWMAN & KENG PAVING COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0063-06-089 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11083019 | TOTALS | 7,260,382.93| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 153,512,754.07 DISTRICT ESTIMATES THIS MONTH 3,882,132.66 DISTRICT TOTAL ESTIMATES PAID TO DATE 98,549,845.01