AVERAGE LOW BID UNIT PRICE - MAINTENANCE - LUFKIN DISTRICT

Last Update: Friday, April 17, 2015
ITEMS 730 2002 TO 778 6001
Items Items Bid Code Range
0100 - 0168
0400 - 0496
0500 - 0545
0636 - 0677
0730 - 0778
1122 - 1122
3267 - 3267
4581 - 4581
6056 - 6056
730 2002 - 778 6001
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
730 2002 FULL - WIDTH MOWING AC     101,150.000 20.16175 18
730 2003 SPOT MOWING AC     700.000 33.28714 10
730 6001 STRIP MOWING AC 413.500 24.74443 827.000 24.74443 4
730 6002 FULL - WIDTH MOWING AC 13,319.020 25.50103 26,638.040 25.50103 4
730 6003 SPOT MOWING AC 150.000 20.93333 300.000 20.93333 4
734 2001 LITTER REMOVAL AC     62,734.000 8.36377 18
734 6001 LITTER REMOVAL AC 11,340.640 8.85410 22,681.280 8.85410 4
734 6003 LITTER REMOVAL (SPOT) AC 413.500 8.63362 827.000 8.63362 4
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC     40.000 635.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     81.000 1,995.67901 5
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     5.000 4,500.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     6,600.000 38.40909 6
752 2023 TREE REMOVAL (12" - 18" DIA) EA     4,150.000 53.18072 6
752 2024 TREE REMOVAL (18" - 24" DIA) EA     2,200.000 82.36364 6
752 2025 TREE REMOVAL (24" - 30" DIA) EA     927.000 152.08198 6
752 2026 TREE REMOVAL (30" - 36" DIA) EA     405.000 240.30864 6
752 2027 TREE REMOVAL (36" - 42" DIA) EA     100.000 331.50000 6
752 2028 TREE REMOVAL (42" - 48" DIA) EA     50.000 410.00000 6
752 2029 TREE REMOVAL (48" - 60" DIA) EA     33.000 310.90909 6
752 2030 TREE REMOVAL (60" - 72" DIA) EA     13.000 385.00000 3
752 6003 TREE TRIMMING / BRUSH REMOVAL MI 10.000 1,860.00000 85.900 1,719.60768 3
752 6004 TREE TRIMMING / BRUSH REMOVAL (CHANNELS AC 5.000 1,600.00000 18.000 1,731.11111 3
752 6005 TREE REMOVAL (4" - 12" DIA) EA 750.000 52.00000 1,581.000 51.64137 3
752 6006 TREE REMOVAL (12" - 18" DIA) EA 650.000 75.00000 1,331.000 74.76709 3
752 6007 TREE REMOVAL (18" - 24" DIA) EA 385.000 100.00000 780.000 99.80769 3
752 6008 TREE REMOVAL (24" - 30" DIA) EA 200.000 150.00000 410.000 149.73171 3
752 6009 TREE REMOVAL (30" - 36" DIA) EA 60.000 255.00000 120.000 255.00000 2
752 6010 TREE REMOVAL (36" - 42" DIA) EA 60.000 375.00000 120.000 375.00000 2
752 6011 TREE REMOVAL (42" - 48" DIA) EA 60.000 425.00000 120.000 425.00000 2
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     505,153.000 1.27008 5
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 64,000.000 1.15000 128,000.000 1.15000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     9,800.000 12.77551 4
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     450.000 5.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     350.000 4.71429 3
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     725.000 15.68966 4
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     95.000 48.15789 4
770 2006 REALIGN POSTS EA     240.000 16.25000 4
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     70.000 2.71429 3
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     70.000 2.71429 3
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     41.000 2,490.24390 4
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     48.000 727.08333 4
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,875.000 30.25067 4
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     180.000 83.33333 3
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     80.000 13.25000 4
770 2022 REM & RESET SGT IMPACT HEAD EA     41.000 39.63415 3
770 2023 REPLACE SGT OBJECT MARKER EA     35.000 15.00000 4
770 2024 REPLACE SGT CABLE ANCHOR EA     30.000 1.00000 3
770 2025 REPLACE SGT CABLE ASSEMBLY EA     35.000 22.14286 4
770 2026 REPLACE SGT STRUT EA     20.000 1.00000 3
770 2027 REMOVE & REPLACE BLOCKOUT EA     140.000 34.03714 4
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     200.000 15.24000 4
770 2031 INSTALL BLOCKOUT EA     45.000 20.84000 3
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 19.24000 1
770 2040 RAISE RAIL ELEMENT LF     200.000 8.00000 1
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA 400.000 25.00000 1,200.000 25.83333 3
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA 50.000 40.00000 150.000 38.33333 3
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 35.000 10.00000 105.000 23.33333 3
770 6017 REALIGN POSTS EA 50.000 20.00000 100.000 20.00000 2
770 6019 REMOVE & REPLACE BLOCKOUT EA 200.000 10.00000 600.000 11.66667 3
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 600.000 5.00000 1,800.000 20.00000 3
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 15.000 200.00000 45.000 200.00000 3
770 6024 REPLACE TERMINAL ANCHOR POSTS EA     15.000 20.00000 1
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 50.000 2,750.00000 115.000 2,743.47826 3
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 5.000 200.00000 20.000 525.00000 3
770 6029 REM & RESET SGT IMPACT HEAD EA 10.000 100.00000 30.000 133.33333 3
770 6034 REPAIR RAIL ELEMENT (W - BEAM FURNISHED LF 1,475.000 16.00000 4,425.000 15.66667 3
774 2006 REPAIR (TRACC) EA     1.000 3,000.00000 1
774 2007 REPAIR (TRACC) LF     50.000 200.00000 1
774 2011 REPAIR (CATCB - FRNT SECT) EA     1.000 1,500.00000 1
774 2012 REPAIR (CATCB - REAR SECT) EA     1.000 500.00000 1
774 2017 REPAIR (WIDE QUAD) EA     6.000 500.33333 3
774 6001 REMOVE AND REPLACE (TRACC) EA     2.000 3,000.00000 1
774 6002 REMOVE AND REPLACE (WIDE TRACC) EA     2.000 3,500.00000 1
774 6014 REMOVE AND REPLACE (NARROW QUAD) EA     2.000 3,000.00000 1
774 6028 REPAIR (QUAD) (N) (BAY) EA     5.000 1,500.00000 1
774 6059 REPAIR (TRACC) (BAY) EA     10.000 2,500.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     50.000 14.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     350.000 11.71429 4
776 2020 REPAIR (TY T101RC) LF     150.000 17.16667 3
776 2034 REPAIR (W - BEAM, TUBE & SPLICE - T101 RAIL) LF     200.000 20.00000 1
776 2035 REPAIR (W - BEAM - T101 RAIL) LF     300.000 16.00000 2
776 6020 REPAIR (TY T101RC) LF 100.000 30.00000 300.000 33.33333 3
776 6049 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) EA 200.000 20.00000 400.000 20.00000 2
778 6001 CONCRETE RAIL REPAIR (IN - KIND) LF     100.000 200.00000 1