AVERAGE LOW BID UNIT PRICE - MAINTENANCE - LUFKIN DISTRICT

Last Update: Wednesday, September 17, 2014
ITEMS 712 2002 TO 776 2035
Items Items Bid Code Range
0100 - 0169
0340 - 0340
0400 - 0496
0500 - 0545
0618 - 0690
0712 - 0776
1122 - 1138
3267 - 3267
6007 - 6044
7210 - 7210
8835 - 8835
712 2002 - 776 2035
Item No Description Units August 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     74.000 675.00000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,106.530 364.41942 2
730 2002 FULL - WIDTH MOWING AC     50,575.000 20.16175 9
730 2003 SPOT MOWING AC     350.000 33.28714 5
734 2001 LITTER REMOVAL AC     31,367.000 8.36377 9
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC     40.000 635.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     143.400 1,698.38215 5
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     5.000 4,500.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     18,225.000 40.98628 11
752 2023 TREE REMOVAL (12" - 18" DIA) EA     8,075.000 59.22477 11
752 2024 TREE REMOVAL (18" - 24" DIA) EA     3,975.000 108.03396 11
752 2025 TREE REMOVAL (24" - 30" DIA) EA     2,167.000 173.39409 11
752 2026 TREE REMOVAL (30" - 36" DIA) EA     870.000 228.06322 11
752 2027 TREE REMOVAL (36" - 42" DIA) EA     295.000 347.25085 11
752 2028 TREE REMOVAL (42" - 48" DIA) EA     90.000 403.10500 11
752 2029 TREE REMOVAL (48" - 60" DIA) EA     58.000 532.87414 10
752 2030 TREE REMOVAL (60" - 72" DIA) EA     22.000 477.59091 5
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     1,311,653.000 1.44323 12
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     14,450.000 13.01903 8
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     550.000 5.90909 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     425.000 6.11765 5
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     2,725.000 10.62385 9
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     375.000 42.80000 9
770 2006 REALIGN POSTS EA     415.000 14.45783 7
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     155.000 3.90323 7
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     153.000 10.03268 8
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     158.000 2,337.34177 9
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     76.000 722.36842 7
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     2,950.000 27.10847 8
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     270.000 80.55556 8
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     233.000 37.10300 9
770 2022 REM & RESET SGT IMPACT HEAD EA     135.000 73.74074 8
770 2023 REPLACE SGT OBJECT MARKER EA     50.000 15.00000 6
770 2024 REPLACE SGT CABLE ANCHOR EA     45.000 0.89000 5
770 2025 REPLACE SGT CABLE ASSEMBLY EA     50.000 24.70000 6
770 2026 REPLACE SGT STRUT EA     35.000 0.85857 5
770 2027 REMOVE & REPLACE BLOCKOUT EA     1,500.000 4.47680 9
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     5,125.000 11.94107 8
770 2031 INSTALL BLOCKOUT EA     65.000 24.42769 4
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 19.24000 1
770 2040 RAISE RAIL ELEMENT LF     200.000 8.00000 1
774 2006 REPAIR (TRACC) EA     1.000 3,000.00000 1
774 2007 REPAIR (TRACC) LF     50.000 200.00000 1
774 2011 REPAIR (CATCB - FRNT SECT) EA     1.000 1,500.00000 1
774 2012 REPAIR (CATCB - REAR SECT) EA     1.000 500.00000 1
774 2015 REPAIR (NARROW QUAD) EA     2.000 500.00000 1
774 2017 REPAIR (WIDE QUAD) EA     8.000 227.75000 4
774 2028 REPAIR (QUAD) (N) (BAY) EA     6.000 10.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     50.000 14.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     800.000 17.25000 7
776 2020 REPAIR (TY T101RC) LF     100.000 47.25000 4
776 2034 REPAIR (W - BEAM, TUBE & SPLICE - T101 RAIL) LF     300.000 16.66667 2
776 2035 REPAIR (W - BEAM - T101 RAIL) LF     300.000 12.66667 2