Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     74.000 675.00000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,703.060 353.76442 3
730 2002 FULL - WIDTH MOWING AC 50,575.000 20.16175 62,726.000 20.19288 12
730 2003 SPOT MOWING AC 350.000 33.28714 450.000 26.05667 7
734 2001 LITTER REMOVAL AC 31,367.000 8.36377 38,030.000 8.36760 12
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     198.400 1,560.22177 5
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     5.000 4,500.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     20,265.000 40.59388 12
752 2023 TREE REMOVAL (12" - 18" DIA) EA     8,695.000 58.05405 12
752 2024 TREE REMOVAL (18" - 24" DIA) EA     4,865.000 100.45324 12
752 2025 TREE REMOVAL (24" - 30" DIA) EA     2,727.000 152.96113 12
752 2026 TREE REMOVAL (30" - 36" DIA) EA     1,190.000 221.16387 12
752 2027 TREE REMOVAL (36" - 42" DIA) EA     450.000 319.53111 12
752 2028 TREE REMOVAL (42" - 48" DIA) EA     145.000 270.37552 12
752 2029 TREE REMOVAL (48" - 60" DIA) EA     103.000 398.31748 11
752 2030 TREE REMOVAL (60" - 72" DIA) EA     67.000 399.95522 6
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     1,610,853.000 1.45236 15
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     8,250.000 14.17273 6
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     100.000 10.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     125.000 10.60000 4
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     2,150.000 9.91860 7
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     310.000 40.64516 7
770 2006 REALIGN POSTS EA     235.000 12.12766 5
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     125.000 4.28000 6
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     123.000 14.34959 7
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     137.000 2,329.92701 7
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     48.000 520.83333 5
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,325.000 25.09434 6
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     120.000 81.25000 7
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     173.000 47.31214 7
770 2022 REM & RESET SGT IMPACT HEAD EA     110.000 90.27273 7
770 2023 REPLACE SGT OBJECT MARKER EA     25.000 59.00000 4
770 2024 REPLACE SGT CABLE ANCHOR EA     25.000 1.60200 4
770 2025 REPLACE SGT CABLE ASSEMBLY EA     25.000 30.40000 4
770 2026 REPLACE SGT STRUT EA     25.000 0.80200 4
770 2027 REMOVE & REPLACE BLOCKOUT EA     1,370.000 1.55109 7
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     5,025.000 11.82587 6
770 2031 INSTALL BLOCKOUT EA     50.000 22.00000 3
774 2015 REPAIR (NARROW QUAD) EA     2.000 500.00000 1
774 2017 REPAIR (WIDE QUAD) EA     6.000 303.33333 3
774 2028 REPAIR (QUAD) (N) (BAY) EA     6.000 10.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     550.000 19.09091 5
776 2020 REPAIR (TY T101RC) LF     75.000 43.33333 3
776 2034 REPAIR (W - BEAM, TUBE & SPLICE - T101 RAIL) LF     100.000 10.00000 1
776 2035 REPAIR (W - BEAM - T101 RAIL) LF     100.000 10.00000 1