AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUFKIN DISTRICT

Last Update: Friday, April 29, 2016
ITEMS 500 6001 TO 560 6008
Items Items Bid Code Range
0100 - 0169
0204 - 0276
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0752 - 0752
5003 - 5008
6001 - 6001
500 6001 - 560 6008
Item No Description Units April 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 3.000 113,703.66667 37.000 234,958.50757 37
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 19.000 1,215.78947 410.000 2,836.23171 37
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 313.000 31.91693 14,825.000 29.30445 22
506 6011 ROCK FILTER DAMS (REMOVE) LF 313.000 8.15016 14,825.000 7.28930 22
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 156.000 40.00000 3,047.000 24.83098 12
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY     1,583.000 30.26532 3
506 6024 CONSTRUCTION EXITS (REMOVE) SY 156.000 20.00000 4,630.000 9.42834 15
506 6034 CONSTRUCTION PERIMETER FENCE LF 150.000 15.00000 9,555.000 3.80934 5
506 6035 SANDBAGS FOR EROSION CONTROL EA     4,000.000 1.00000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,913.000 3.28356 194,243.000 2.41534 35
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,913.000 1.49983 194,243.000 .74726 35
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF     2,130.000 2.75000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     2,130.000 .50000 1
508 6001 CONSTRUCTING DETOURS SY     25,166.000 58.50544 4
512 6005 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF     540.000 68.00000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     2,460.000 15.00000 1
512 6053 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     560.000 22.85714 2
512 6067 PTB (FRN & INSTL) (F SHAPE) (TY 1) OR (STL LF     4,010.000 74.60100 2
512 6069 PTB (MOVE) (F SHAPE) (TY 1) OR (STL) LF     3,860.000 15.82902 2
512 6071 PTB (REMOVE) (F SHAPE) (TY 1) OR (STL) LF     4,010.000 21.31920 2
512 6072 PTB (FRN & INSTL) (SGL SLP) (TY 1) OR (STL LF     2,730.000 90.76923 2
512 6074 PTB (MOVE) (SGL SLP) (TY 1) OR (STL) LF     400.000 7.10000 1
512 6076 PTB (REMOVE) (SGL SLP) (TY 1) OR (STL) LF     2,730.000 7.30769 2
528 6006 REMOVE AND RELAY PAVERS SY     18.000 105.00000 1
528 6008 COLORED TEXTURED CONC (5") SY     226.000 155.00000 1
529 6001 CONC CURB (TY I) LF     104.000 25.00000 1
529 6002 CONC CURB (TY II) LF     932.000 26.80901 2
529 6007 CONC CURB & GUTTER (TY I) LF     551.000 35.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF     11,468.000 39.16707 2
529 6011 CONC CURB (DOWEL) LF     505.000 26.00000 1
529 6012 CONC CURB (SLOTTED) LF     10.000 34.00000 1
530 6002 INTERSECTIONS (ACP) SY     3,117.000 107.77786 4
530 6003 INTERSECTIONS (SURF TREAT) SY     218.000 26.40000 1
530 6004 DRIVEWAYS (CONC) SY     5,218.000 100.56075 7
530 6005 DRIVEWAYS (ACP) SY     23,561.000 45.06874 13
530 6006 DRIVEWAYS (SURF TREAT) SY     3,746.000 23.86073 2
530 6008 TURNOUTS (ACP) SY     2,189.300 56.08544 4
530 6009 TURNOUTS (SURF TREAT) SY     3,743.000 21.39717 3
530 6011 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY     661.000 37.00000 1
530 6014 DRIVEWAYS AND TURNOUTS (ACP) SY     586.000 40.00000 1
530 6015 DRIVEWAYS AND TURNOUTS (SURF TREAT) SY     293.000 65.00000 1
530 6016 DRIVEWAYS (BASE) SY     132.000 25.72727 2
531 6001 CONC SIDEWALKS (4") SY     4,839.500 76.57754 3
531 6004 CURB RAMPS (TY 1) EA     24.000 2,137.50000 2
531 6005 CURB RAMPS (TY 2) EA     11.000 1,750.00000 2
531 6006 CURB RAMPS (TY 3) EA     7.000 1,450.00000 1
531 6009 CURB RAMPS (TY 6) EA     19.000 1,450.00000 1
531 6010 CURB RAMPS (TY 7) EA     63.000 1,659.52381 2
531 6013 CURB RAMPS (TY 10) EA     37.000 1,940.54054 2
531 6017 CURB RAMPS (TY 22) EA     3.000 2,200.00000 1
531 6032 CONC SIDEWALKS (SPECIAL) (TYPE A) SY     260.000 150.00000 1
531 6033 CONC SIDEWALKS (SPECIAL) (TYPE B) SY     3.000 200.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF 21,041.000 .20000 262,750.000 .22355 7
533 6002 RUMBLE STRIPS (CENTERLINE) LF     76,265.000 .17322 3
536 6002 CONC MEDIAN SY     7.000 105.00000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 500.000 23.10000 66,343.750 17.89605 22
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     20,288.000 20.65802 3
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     163.000 1,592.60736 15
540 6008 MTL BEAM GD FEN TRANS (T101) EA     8.000 1,000.00000 1
540 6013 TRANSITION ADJUSTMENT EA     1.000 500.00000 1
540 6014 SHORT RADIUS LF     420.000 48.86905 8
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA     10.000 818.00000 8
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 6.000 1,000.00000 55.000 1,053.60000 10
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     502.500 65.08955 5
542 6001 REMOVE METAL BEAM GUARD FENCE LF 494.000 3.30000 94,327.000 2.08270 19
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     166.000 156.51205 14
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     67.000 165.22388 8
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 2,332.00000 194.000 2,180.92784 17
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     255.000 198.52549 14
544 6006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     155.000 1,965.49032 5
545 6001 CRASH CUSH ATTEN (INSTL) EA     11.000 12,618.18182 4
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     15.000 2,570.00000 4
545 6005 CRASH CUSH ATTEN (REMOVE) EA     15.000 1,146.66667 5
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     4.000 12,000.00000 1
545 6025 CRASH CUSHION ATTEN (INSTALL) (REACT) (N EA     1.000 20,000.00000 1
552 6001 WIRE FENCE (TY A) LF     3,296.000 8.00000 2
552 6003 WIRE FENCE (TY C) LF     10,210.000 7.12629 5
552 6005 GATE (TY 1) EA     1.000 550.00000 1
556 6008 PIPE UNDERDRAINS (TY 8) (6") LF     4,660.000 22.50000 1
560 6003 MAILBOX INSTALL - M (TWG - POST) TY 1 EA     9.000 335.55556 5
560 6004 MAILBOX INSTALL - S (TWG - POST) TY 2 EA     4.000 138.00000 1
560 6007 MAILBOX INSTALL - S (WC - POST) TY 3 EA     158.000 168.66456 11
560 6008 MAILBOX INSTALL - D (WC - POST) TY 3 EA     23.000 173.52174 6