AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUFKIN DISTRICT

Last Update: Tuesday, November 29, 2016
ITEMS 500 6001 TO 560 6008
Items Items Bid Code Range
0100 - 0192
0204 - 0275
0305 - 0360
0400 - 0496
0500 - 0560
0618 - 0688
0752 - 0752
5003 - 5008
6001 - 6056
500 6001 - 560 6008
Item No Description Units November 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 5.000 341,850.00000 42.001 178,483.53611 42
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 42.000 2,102.38095 386.000 2,931.32642 42
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,365.000 30.00000 1
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 312.000 33.55385 6,012.000 31.40100 23
506 6011 ROCK FILTER DAMS (REMOVE) LF 312.000 7.73846 6,877.000 9.17919 23
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 133.000 30.00000 1,347.000 23.65553 7
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY     334.000 27.50000 1
506 6024 CONSTRUCTION EXITS (REMOVE) SY 133.000 7.00000 1,483.000 9.38287 7
506 6034 CONSTRUCTION PERIMETER FENCE LF     9,354.000 2.94925 6
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,554.000 3.80091 132,842.000 3.17937 38
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,554.000 2.18746 125,912.000 .98185 37
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF     2,130.000 2.75000 1
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     2,130.000 .50000 1
508 6001 CONSTRUCTING DETOURS SY     7,628.000 69.48492 3
512 6005 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF     540.000 68.00000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     2,460.000 15.00000 1
512 6053 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     560.000 22.85714 2
512 6067 PTB (FRN & INSTL) (F SHAPE) (TY 1) OR (STL LF     4,010.000 74.60100 2
512 6069 PTB (MOVE) (F SHAPE) (TY 1) OR (STL) LF     3,860.000 15.82902 2
512 6071 PTB (REMOVE) (F SHAPE) (TY 1) OR (STL) LF     4,010.000 21.31920 2
512 6072 PTB (FRN & INSTL) (SGL SLP) (TY 1) OR (STL LF     1,680.000 90.00000 1
512 6074 PTB (MOVE) (SGL SLP) (TY 1) OR (STL) LF     400.000 7.10000 1
512 6076 PTB (REMOVE) (SGL SLP) (TY 1) OR (STL) LF     1,680.000 6.25000 1
529 6002 CONC CURB (TY II) LF 230.000 40.00000 230.000 40.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF 584.000 32.06764 11,676.000 35.80331 3
530 6002 INTERSECTIONS (ACP) SY     818.000 68.50000 1
530 6004 DRIVEWAYS (CONC) SY     3,315.000 123.28235 3
530 6005 DRIVEWAYS (ACP) SY     9,123.000 43.70109 7
530 6006 DRIVEWAYS (SURF TREAT) SY     2,439.000 22.50000 1
530 6008 TURNOUTS (ACP) SY     445.000 47.27000 1
530 6009 TURNOUTS (SURF TREAT) SY     3,324.000 20.76655 2
530 6014 DRIVEWAYS AND TURNOUTS (ACP) SY     586.000 40.00000 1
530 6016 DRIVEWAYS (BASE) SY     139.000 29.40288 3
531 6001 CONC SIDEWALKS (4") SY 400.000 76.80375 4,798.500 66.17933 4
531 6005 CURB RAMPS (TY 2) EA 1.000 2,362.00000 2.000 2,831.00000 2
531 6010 CURB RAMPS (TY 7) EA 2.000 4,750.00000 2.000 4,750.00000 1
531 6013 CURB RAMPS (TY 10) EA     15.000 3,300.00000 1
531 6017 CURB RAMPS (TY 22) EA     1.000 3,300.00000 1
531 6018 CURB RAMPS (TY 1) SY 61.000 112.00000 61.000 112.00000 1
531 6023 CURB RAMPS (TY 6) SY 31.000 189.00000 31.000 189.00000 1
531 6024 CURB RAMPS (TY 7) SY 22.000 196.00000 22.000 196.00000 1
531 6027 CURB RAMPS (TY 10) SY 16.000 149.00000 16.000 149.00000 1
531 6033 CONC SIDEWALKS (SPECIAL) (TYPE B) SY 11.000 500.00000 11.000 500.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     236,645.000 .22544 6
533 6002 RUMBLE STRIPS (CENTERLINE) LF     32,678.000 .20000 1
536 6004 CONC DIRECTIONAL ISLAND SY     92.000 105.00000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 625.000 17.40000 37,306.250 19.64574 26
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF     300.000 64.50000 2
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     101.000 1,636.60396 11
540 6008 MTL BEAM GD FEN TRANS (T101) EA     8.000 1,000.00000 1
540 6013 TRANSITION ADJUSTMENT EA     1.000 500.00000 1
540 6014 SHORT RADIUS LF     503.500 38.05809 6
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA     5.000 967.00000 4
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 6.000 918.00000 88.000 1,073.47727 17
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF     100.000 38.36000 1
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     612.500 72.93061 5
542 6001 REMOVE METAL BEAM GUARD FENCE LF     45,856.000 3.03965 14
542 6002 REMOVE TERMINAL ANCHOR SECTION EA     107.000 150.71028 8
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     35.000 183.71429 6
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 2,040.00000 230.000 2,230.02000 22
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     199.000 224.37427 11
544 6006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     69.000 2,025.79710 4
545 6001 CRASH CUSH ATTEN (INSTL) EA     9.000 13,422.22222 3
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     15.000 2,570.00000 4
545 6005 CRASH CUSH ATTEN (REMOVE) EA     13.000 1,200.00000 4
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     4.000 12,000.00000 1
545 6025 CRASH CUSHION ATTEN (INSTALL) (REACT) (N EA     1.000 20,000.00000 1
552 6001 WIRE FENCE (TY A) LF     560.000 14.15446 2
552 6003 WIRE FENCE (TY C) LF     7,253.000 7.39803 6
552 6008 WIRE FENCE (WATER GAP) LF     60.000 36.10000 1
552 6009 GATE (SPECIAL) EA 1.000 6,615.00000 1.000 6,615.00000 1
556 6008 PIPE UNDERDRAINS (TY 8) (6") LF     4,660.000 22.50000 1
560 6001 MAILBOX INSTALL - S (TWG - POST) TY 1 EA     1.000 300.00000 1
560 6003 MAILBOX INSTALL - M (TWG - POST) TY 1 EA     3.000 353.33333 2
560 6007 MAILBOX INSTALL - S (WC - POST) TY 3 EA     98.000 164.29592 5
560 6008 MAILBOX INSTALL - D (WC - POST) TY 3 EA     11.000 164.54545 2