AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUFKIN DISTRICT

Last Update: Friday, October 31, 2014
ITEMS 204 2003 TO 276 2284
Items Items Bid Code Range
0100 - 0169
0204 - 0276
0305 - 0360
0400 - 0497
0500 - 0560
0610 - 0687
0740 - 0740
1122 - 1122
2115 - 2115
3150 - 3284
4430 - 4674
5369 - 5926
6007 - 6834
8020 - 8835
204 2003 - 276 2284
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
204 2003 SPRINKLING (DUST CONTROL) MG     2,099.500 .01000 2
216 2001 PROOF ROLLING HR     88.000 130.00000 1
247 2054 FL BS (CMP IN PLC) (TY D GR 2) (FNAL POS CY     17,316.000 59.31000 1
247 2060 FL BS (CMP IN PLC) (TY E GR 4) (FNAL POS CY     670.000 61.85075 2
247 2134 FL BS (RDWY DEL) (TY D GR 2) TON     100,714.000 29.89878 3
260 2002 LIME (HYDRATED LIME (SLURRY) ) TON     1,151.000 148.50000 1
260 2004 LIME (QUICKLIME (DRY) ) TON     2,183.000 142.36372 2
260 2011 LIME TRT (EXST MATL) (12") SY     128,020.000 4.05573 3
275 2001 CEMENT TON     10,556.000 139.78922 3
275 2004 CEMENT TREAT (MX EXST MTL & NW BS) (6" SY     530.000 2.00000 1
275 2008 CEMENT TREAT (MX EXST MTL & NW BS) (15" SY     162,482.000 2.00000 1
275 2023 CEMENT TREAT (MX EXST MTL & NW BS) (12") SY     145,382.000 1.90000 1
275 2043 CEMENT TREAT (EXIST MATL) (14") SY     13,500.000 3.00000 1
275 2065 CEM TRT (MX EXST MTL & NEW BS) (14") SY     190,047.000 2.00000 1
276 2218 CEM TRT (PLNT MX) (CL N) (TY D) (GR 2) (6" SY     32,856.000 23.50000 1
276 2284 CEM TRT (PLNT MX) (CL N) (TY D) (GR 2) (10" SY     13,606.000 29.65000 1