MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 05 AS OF MAY 15, 2013 PAGE 13 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ BAILEY UVALDE STREET IN MULESHOE | 2.436 | 6,024,404.49| 698,081.53| 3,592,197.15| 59.6| US 70 EAST 6TH STREET IN MULESHOE | | | | | | 0052-02-033 | | | | | | NH 2012(201) SALVAGE, BASE TREATMENT AND ACP | | | | | | | | | | | | WORK ORDER- 02-17-12 WORK BEGAN- 04-17-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-17-12 | | | | | | CONTRACT WORKING DAYS- 238 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 195 PERCENT TIME USED- 81 | | | | | | | | | | | | J. LEE MILLIGAN, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0052-02-033 | | | | | | WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED | |SUB %: 1.56 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.82 | | | | RAY ELECTRIC COMPANY | |SUB %: 0.04 | | | | | | | | | | CONTRACT 01123004 | TOTALS | 6,024,404.49| 698,081.53| 3,592,197.15| 59.6| ************************************************************************************************************************************ DAWSON MARTIN COUNTY LINE | 19.326 | 11,239,069.78| 0.00| 0.00| 0.0| US 87 SOUTH Y IN LAMESA | | | | | | 0068-05-033 | | | | | | NH 2013(756) PLANING,REWORK BASE,ACP & ONE CRSE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DUININCK, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0068-05-033 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133206 | TOTALS | 11,239,069.78| 0.00| 0.00| 0.0| ************************************************************************************************************************************ FLOYD HALE COUNTY LINE | 18.017 | 18,689,402.80| 1,246,884.40| 2,995,593.90| 16.0| US 70 TEXAS STREET IN FLOYDADA | | | | | | 0145-06-023 | | | | | | STP 2012(256) LEVEL-UP AND OVERLAY | | | | | | | | | | | | WORK ORDER- 02-22-12 WORK BEGAN- 03-26-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-09-12 | | | | | | CONTRACT WORKING DAYS- 130 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 99 PERCENT TIME USED- 76 | | | | | | | | | | | | J. LEE MILLIGAN, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0145-06-023 | | | | | | DUSTROL, INC. | |SUB %: 0.22 | | | | WEST TEXAS BARRICADES, LLC DBA BARRICADES UNLIMITED | |SUB %: 1.45 | | | | | | | | | | CONTRACT 01123201 | TOTALS | 18,689,402.80| 1,246,884.40| 2,995,593.90| 16.0| ************************************************************************************************************************************ HALE NORTH OF US 70 | 1.400 | 4,693,021.10| 0.00| 91,221.10| 1.9| IH 27 SH 194 | | | | | | 0067-04-039 | | | | | | IM 0277(090) GRAD, ASB, ACP, CONC PAV, STR, BR | | | | | | | | | | | | HALE SOUTH FM 3466 | 0.927 | 15,256,193.45| 315,745.90| 3,260,596.69| 21.3| IH 27 NORTH OF US 70 | | | | | | 0067-05-042 | | | | | | IM 0277(090) GRAD, ASB, ACP, CONC PAV, STR, BR | | | | | | | | | | | | WORK ORDER- 09-13-12 WORK BEGAN- 01-14-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-08-13 | | | | | | CONTRACT WORKING DAYS- 340 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 81 PERCENT TIME USED- 23 | | | | | | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0067-05-042 | | | | | | WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED | |SUB %: 0.33 | | | | DUSTROL, INC. | |SUB %: 0.41 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 2.65 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.30 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.14 | | | | WEST TEXAS PAVING, INC. | |SUB %: 13.40 | | | | FLOYD TRUCKING, INC. | |SUB %: 0.00 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 2.78 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.84 | | | | TRUMBLE CRANE & RIGGING | |SUB %: 0.00 | | | | RMI WORLDWIDE, LLC | |SUB %: 0.21 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 0.45 | | | | CMT ENGINEERING, INC. | |SUB %: 0.00 | | | | MICA CORPORATION | |SUB %: 0.24 | | | | EARTH REINFORCEMENT SPECIALISTS | |SUB %: 2.66 | | | | DRILL PIER CONSTRUCTION, LLC | |SUB %: 0.87 | | | | | | | | | | CONTRACT 07123005 | TOTALS | 19,949,214.55| 315,745.90| 3,351,817.79| 16.8| ************************************************************************************************************************************ LAMB US 385 | 5.853 | 2,234,275.15| 3,264.71| 1,796,817.13| 80.4| FM 37 FM 1072 | | | | | | 0884-04-008 | | | | | | STP 1102(397) BASE CEMENT STAB, & TWO CRSE | | | | | | | | | | | | WORK ORDER- 08-16-11 WORK BEGAN- 05-16-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-01-12 | | | | | | CONTRACT WORKING DAYS- 213 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 138 PERCENT TIME USED- 64 | | | | | | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0884-04-008 | | | | | | WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED | |SUB %: 3.18 | | | | CAMPBELL-WEST, LLC | |SUB %: 1.67 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.99 | | | | BLACK TOPPER TECHNOLOGY, INC. | |SUB %: 2.10 | | | | | | | | | | CONTRACT 07113060 | TOTALS | 2,234,275.15| 3,264.71| 1,796,817.13| 80.4| ************************************************************************************************************************************ LAMB ETC WEST US 84 | 207.731 | 10,295,048.31| 796,075.00| 1,370,409.00| 13.3| LP 430 ETC EAST 84 | | | | | | 0052-13-004 | | | | | | STP 2013(155) SEAL COAT | | | | | | | | | | | | WORK ORDER- 11-30-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-16-12 | | | | | | CONTRACT WORKING DAYS- 57 ADDL DAYS GRANTED- 8 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | LIPHAM ASPHALT AND PAVING COMPANY, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0052-13-004 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11123204 | TOTALS | 10,295,048.31| 796,075.00| 1,370,409.00| 13.3| ************************************************************************************************************************************ LUBBOCK 5TH STREET | 3.800 | 1,521,813.12| 0.00| 9,964.37| 0.6| US 84 IH 27 | | | | | | 0053-18-040 | | | | | | STP 2013(325) UTBHMWC AND PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 03-26-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 27 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | CLARK CONSTRUCTION OF TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0053-18-040 | | | | | | FLOYD TRUCKING, INC. | |SUB %: 2.99 | | | | | | | | | | CONTRACT 01133019 | TOTALS | 1,521,813.12| 0.00| 9,964.37| 0.6| ************************************************************************************************************************************ LUBBOCK 0.499 MI WEST OF MILWAUKEE AVE | 1.393 | 22,428,061.92| 0.00| 0.00| 0.0| US 62 0.297 MI EAST OF MILWAUKEE AVE | | | | | | 0380-01-081 | | | | | | NH 2012(767) GRD,ACP,CRCP,TREAT SUBGRD,CG,STR OP | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 469 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0380-01-081 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133002 | TOTALS | 22,428,061.92| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LUBBOCK VARIOUS LOCATIONS IN | 0.001 | 334,626.48| 0.00| 0.00| 0.0| VA THE LUBBOCK DISTRICT | | | | | | 0905-00-067 | | | | | | STP 2013(392) RRPMS AND SPECIALITY MARKINGS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DRS CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0905-00-067 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133015 | TOTALS | 334,626.48| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LUBBOCK VARIOUS LOCATIONS IN | 0.001 | 2,755,904.20| 0.00| 0.00| 0.0| VA THE LUBBOCK DISTRICT | | | | | | 0905-00-063 | | | | | | STP 2013(391) FY 2013 PAVEMENT MARKERS | | | | | | | | | | | | WORK ORDER- 04-17-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-03-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | L&L COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0905-00-063 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133217 | TOTALS | 2,755,904.20| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LUBBOCK VARIOUS LOCATIONS IN | 11.737 | 2,091,830.24| 0.00| 359,575.85| 17.1| VA THE LUBBOCK DISTRICT | | | | | | 0905-00-068 | | | | | | STP 2012(485) PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 04-17-12 WORK BEGAN- 09-04-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-01-12 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 15 PERCENT TIME USED- 25 | | | | | | | | | | | | J. LEE MILLIGAN, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0905-00-068 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03123227 | TOTALS | 2,091,830.24| 0.00| 359,575.85| 17.1| ************************************************************************************************************************************ LUBBOCK 1500 FT WEST OF UPLAND AVE | 2.193 | 7,401,462.21| 29,402.31| 6,388,204.35| 86.4| FM 2255 500 FT WEST OF FM 2528 | | | | | | 2256-01-019 | | | | | | STP 1102(398) GRAD, BASE, C&G, ACP, STR | | | | | | | | | | | | WORK ORDER- 08-11-11 WORK BEGAN- 09-06-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-06-11 | | | | | | CONTRACT WORKING DAYS- 282 ADDL DAYS GRANTED- 30 | | | | | | WORKING DAYS CHARGED- 273 PERCENT TIME USED- 87 | | | | | | | | | | | | ALLEN BUTLER CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2256-01-019 | | | | | | ARTEX ELECTRIC, INC. | |SUB %: 2.70 | | | | BACK TO NATURE | |SUB %: 1.17 | | | | WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED | |SUB %: 2.19 | | | | CMT ENGINEERING, INC. | |SUB %: 0.93 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.29 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.21 | | | | V-TECH ENVIRONMENTAL SERVICES | |SUB %: 0.27 | | | | HUGO REED & ASSOCIATES, INC. | |SUB %: 0.33 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.96 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 1.41 | | | | | | | | | | CONTRACT 07113240 | TOTALS | 7,401,462.21| 29,402.31| 6,388,204.35| 86.4| ************************************************************************************************************************************ LUBBOCK 990 FEET EAST OF SLIDE ROAD | 1.620 | 26,923,572.74| 950,753.13| 7,277,838.69| 27.0| LP 289 2585 FEET EAST OF QUAKER AVENUE | | | | | | 0783-02-084 | | | | | | C 783-2-84 GR, BASE, STR, ASB, ACP, OVERPASS | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 11-12-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-12-12 | | | | | | CONTRACT WORKING DAYS- 581 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 116 PERCENT TIME USED- 19 | | | | | | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0783-02-084 | | | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 1.84 | | | | TOM"S TREE PLACE | |SUB %: 1.09 | | | | WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED | |SUB %: 0.31 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.14 | | | | DRILL PIER CONSTRUCTION, LLC | |SUB %: 0.00 | | | | ARTEX ELECTRIC, INC. | |SUB %: 0.01 | | | | MICA CORPORATION | |SUB %: 0.95 | | | | A & A CONSTRUCTION | |SUB %: 0.36 | | | | BUILDER SERVICES CO. | |SUB %: 0.24 | | | | S & S PAINTING | |SUB %: 0.12 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.59 | | | | WEST TEXAS PAVING, INC. | |SUB %: 15.59 | | | | CMT ENGINEERING, INC. | |SUB %: 0.07 | | | | FARR FOUNDATION, INC. | |SUB %: 0.53 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 1.34 | | | | TRUMBLE CRANE & RIGGING | |SUB %: 0.32 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.00 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 5.48 | | | | FLOYD TRUCKING, INC. | |SUB %: 0.00 | | | | | | | | | | CONTRACT 07123204 | TOTALS | 26,923,572.74| 950,753.13| 7,277,838.69| 27.0| ************************************************************************************************************************************ LUBBOCK VARIOUS LOCATIONS IN | 0.001 | 1,488,393.00| 249,276.52| 446,223.43| 29.9| VA THE LUBBOCK DISTRICT | | | | | | 0905-00-070 | | | | | | STP 2013(154) FY 2013 ADA COMPLIANCE | | | | | | | | | | | | WORK ORDER- 01-17-13 WORK BEGAN- 03-11-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-02-13 | | | | | | CONTRACT WORKING DAYS- 188 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 38 PERCENT TIME USED- 20 | | | | | | | | | | | | TI-ZACK CONCRETE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0905-00-070 | | | | | | ONE WAY CONCRETE | |SUB %: 41.09 | | | | WEST TEXAS BARRICADES, LLC DBA BARRICADES UNLIMITED | |SUB %: 0.63 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.97 | | | | | | | | | | CONTRACT 11123015 | TOTALS | 1,488,393.00| 249,276.52| 446,223.43| 29.9| ************************************************************************************************************************************ LUBBOCK SLIDE ROAD, FROM US 84 | 1.482 | 5,440,142.31| 0.00| 1,381,847.72| 25.4| CS MARSHALL STREET | | | | | | 0905-06-081 | | | | | | STP 2013(019)MM GRAD, BASE, C&G, ACP, STR | | | | | | | | | | | | WORK ORDER- 02-19-13 WORK BEGAN- 03-11-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 148 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 36 PERCENT TIME USED- 24 | |**************************************************| | | | | | | | DUININCK, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0905-06-081 | | | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.52 | | | | FLOYD TRUCKING, INC. | |SUB %: 1.23 | | | | LONE STAR HIGHWAY PRODUCTS, INC. | |SUB %: 4.72 | | | | CAMPBELL-WEST INFRASTRUCTURE CONSTRUCTION, LLC | |SUB %: 5.79 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.17 | | | | RURAL ELECTRIC, INC. | |SUB %: 6.60 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.23 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.69 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.54 | | | | PEREZ REBAR CONSTRUCTION | |SUB %: 0.00 | | | | | | | | | | CONTRACT 12123225 | TOTALS | 5,440,142.31| 0.00| 1,381,847.72| 25.4| ************************************************************************************************************************************ TERRY 0.336 MILE NORTH OF US 385 | 3.129 | 10,645,068.78| 667,725.54| 1,565,413.75| 14.7| US 62 INTERSECTION OF US 82 | | | | | | 0227-07-039 | | | | | | NH 2013(326) MILL, REWORK BASE, SC, ACP, CRCP | | | | | | | | | | | | WORK ORDER- 02-28-13 WORK BEGAN- 03-13-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-13-13 | | | | | | CONTRACT WORKING DAYS- 259 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 35 PERCENT TIME USED- 13 | | | | | | | | | | | | ALLEN BUTLER CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0227-07-039 | | | | | | TEX OP CONSTRUCTION, LP | |SUB %: 2.56 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.19 | | | | CMT ENGINEERING, INC. | |SUB %: 0.96 | | | | V-TECH ENVIRONMENTAL SERVICES | |SUB %: 0.17 | | | | WEST TEXAS BARRICADES, LLC DBA BARRICADES UNLIMITED | |SUB %: 2.47 | | | | FLOYD TRUCKING, INC. | |SUB %: 5.61 | | | | | | | | | | CONTRACT 01133001 | TOTALS | 10,645,068.78| 667,725.54| 1,565,413.75| 14.7| ************************************************************************************************************************************ TERRY 1500' NORTH OF GAINES COUNTY LINE | 8.549 | 875,983.38| 0.00| 207,442.34| 23.6| US 62 FM 213 IN WELLMAN | | | | | | 0228-01-055 | | | | | | NH 2013(327) MICROSURFACE OVERLAY AND PVMT MKRS | | | | | | | | | | | | WORK ORDER- 03-19-13 WORK BEGAN- 04-22-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 24 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 3 PERCENT TIME USED- 12 | |**************************************************| | | | | | | | INTERMOUNTAIN SLURRY SEAL, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0228-01-055 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133216 | TOTALS | 875,983.38| 0.00| 207,442.34| 23.6| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 150,338,273.46 DISTRICT ESTIMATES THIS MONTH 4,957,209.04 DISTRICT TOTAL ESTIMATES PAID TO DATE 30,743,345.47