AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUBBOCK DISTRICT

Last Update: Wednesday, February 25, 2015
ITEMS 1122 2002 TO 1122 2057
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0368
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0760
1122 - 1122
2184 - 2184
3142 - 3288
5367 - 5926
6007 - 6834
8251 - 8999
1122 2002 - 1122 2057
Item No Description Units January 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     1,060.000 24.87925 2
1122 2009 ROCK FILTER DAMS (REMOVE) LF     1,020.000 9.58235 2
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     1,726.000 24.58314 8
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     1,726.000 9.62769 8
1122 2031 SANDBAGS FOR EROSION CONTROL EA     22,392.000 5.24956 9
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     145,345.000 1.90418 6
1122 2042 LOW PROF SED CONT DEVICE LF     4,698.000 10.17401 3
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     831.000 4.07401 2
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     831.000 .88357 2
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     145,345.000 .52360 6