AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUBBOCK DISTRICT
| ITEMS 1122 2002 TO 1122 2057 |
| Items | Items | Bid Code Range |
|---|---|---|
| 0100 - 0193 0216 - 0292 0305 - 0368 0400 - 0496 0500 - 0560 0610 - 0690 0730 - 0740 |
1122 - 1122 3142 - 3224 5049 - 5522 6007 - 6834 8251 - 8864 |
1122 2002 - 1122 2057 |
| Item No | Description | Units | April 30, 2013 | Twelve Month Moving | Usage | ||
|---|---|---|---|---|---|---|---|
| Quantity | Avg Bid | Quantity | Avg Bid | ||||
| 1122 2002 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 898.000 | 21.31548 | 2 | ||
| 1122 2009 | ROCK FILTER DAMS (REMOVE) | LF | 538.000 | 5.40000 | 1 | ||
| 1122 2016 | CONSTRUCTION EXITS (INSTALL) (TY 1) | SY | 2,200.000 | 10.86364 | 2 | ||
| 1122 2019 | CONSTRUCTION EXITS (REMOVE) | SY | 2,200.000 | 4.54545 | 2 | ||
| 1122 2031 | SANDBAGS FOR EROSION CONTROL | EA | 5,937.000 | 2.77009 | 3 | ||
| 1122 2034 | SANDBAGS FOR EROSION CONTROL (18") | LF | 840.000 | 20.25000 | 1 | ||
| 1122 2037 | TEMPORARY SEDIMENT CONTROL FENCE INSTL | LF | 17,917.000 | 1.85629 | 4 | ||
| 1122 2048 | BIOGRD EROSN CONT LOGS (12" DIA) INSTAL | LF | 260.000 | 2.95000 | 1 | ||
| 1122 2049 | BIOGRD EROSN CONT LOGS (18" DIA) INSTAL | LF | 64.000 | 7.25000 | 1 | ||
| 1122 2056 | BIODEGRADBLE EROSION CONTROL LOGS REMO | LF | 324.000 | .98457 | 2 | ||
| 1122 2057 | TEMPORARY SEDIMENT CONTROL FENCE REMOV | LF | 17,917.000 | .72653 | 4 | ||