Item No Description Units July 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     1,340.000 26.12836 2
1122 2009 ROCK FILTER DAMS (REMOVE) LF     1,340.000 12.48806 2
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     2,638.000 24.75398 12
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     2,638.000 9.93969 12
1122 2031 SANDBAGS FOR EROSION CONTROL EA 120.000 32.00000 54,330.000 5.82361 13
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF 70.000 13.50000 54,990.000 3.10813 10
1122 2042 LOW PROF SED CONT DEVICE LF     840.000 20.15893 2
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     600.000 3.14000 1
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF     200.000 8.25000 1
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     800.000 1.16250 2
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF 70.000 4.70000 54,990.000 .70219 10