MIS.CIS.19 MONTHLY STATE LET MAINTENANCE REPORT DISTRICT 12 AS OF JUN 11, 2013 PAGE 35 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ BRAZORIA VARIOUS HWYS IN BRAZORIA COUNTY | 0.001 | 368,955.73| 0.00| 17,195.75| 80.2| SH0288 VARIOUS HWYS IN BRAZORIA COUNTY | | | | | | 6251-87-001 | | | | | | RMC - 625187001 SPALL REPAIR | | | | | | | | | | | | WORK ORDER- 04-01-13 WORK BEGAN- 04-28-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-28-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 34 PERCENT TIME USED- 9 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6251-87-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02134016 | TOTALS | 368,955.73| 0.00| 17,195.75| 80.2| ************************************************************************************************************************************ BRAZORIA VARIOUS HWYS WITHIN BRAZORIA COUNTY | 0.001 | 422,857.00| 0.00| 113,590.05| 51.1| SH0288 VARIOUS HWYS WITHIN BRAZORIA COUNTY | | | | | | 6250-44-001 | | | | | | RMC - 625044001 FLEXIBLE PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 03-29-13 WORK BEGAN- 04-01-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 16 | |**************************************************| | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-44-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02134036 | TOTALS | 422,857.00| 0.00| 113,590.05| 51.1| ************************************************************************************************************************************ BRAZORIA SH 288 AT CR 48 (NORTH CONNECTOR ROAD); | 0.001 | 799,096.61| 0.00| 0.00| 0.0| SH0288 FM 524 AT FM 521 TO SOUTH UPRR | | | | | | 6252-55-001 | | | | | | RMC - 625255001 ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 05-13-13 WORK BEGAN- 05-20-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-20-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 42 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JAMES CONSTRUCTION GROUP, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-55-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03134005 | TOTALS | 799,096.61| 0.00| 0.00| 0.0| ************************************************************************************************************************************ BRAZORIA VARIOUS HYWS IN SOUTH BRAZORIA COUNTY | 0.001 | 501,932.94| 0.00| 434,731.44| 94.6| SH0288 VARIOUS HYWS IN SOUTH BRAZORIA COUNTY | | | | | | 6219-97-001 | | | | | | RMC - 621997001 MOWING SOUTH | | | | | | | | | | | | WORK ORDER- 08-04-11 WORK BEGAN- 08-08-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 08-08-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 243 ADDL DAYS GRANTED- 2 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 165 PERCENT TIME USED- 67 | |**************************************************| | | | | | | | LANGFORD CONTRACTORS | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6219-97-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04114023 | TOTALS | 501,932.94| 0.00| 434,731.44| 94.6| ************************************************************************************************************************************ BRAZORIA FM 2611 | 9.789 | 424,661.75| 0.00| 0.00| 0.0| FM2918 INTRACOASTAL WATERWAY | | | | | | 6252-53-001 | | | | | | RMC - 625253001 SEAL COAT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 24 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-53-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134022 | TOTALS | 424,661.75| 0.00| 0.00| 0.0| ************************************************************************************************************************************ BRAZORIA VARIOUS HWYS IN S BRAZORIA COUNTY | 0.001 | 412,496.01| 0.00| 0.00| 0.0| SH0288 VARIOUS HWYS IN S BRAZORIA COUNTY | | | | | | 6252-92-001 | | | | | | RMC - 625292001 MOWING HIGHWAY ROW (S STATE) | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 162 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-92-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134024 | TOTALS | 412,496.01| 0.00| 0.00| 0.0| ************************************************************************************************************************************ BRAZORIA VARIOUS HWYS IN BRAZORIA COUNTY | 0.001 | 989,800.00| 0.00| 0.00| 0.0| SH0288 VARIOUS HWYS IN BRAZORIA COUNTY | | | | | | 6251-59-001 | | | | | | RMC - 625159001 CLEANING & SWEEPING HIGHWAYS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6251-59-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134039 | TOTALS | 989,800.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ FORT BEND 0.25 MI EAST OF FM 762 | 7.076 | 1,161,961.26| 0.00| 0.00| 6.3| FM2759 THOMPSONS | | | | | | 6252-36-001 | | | | | | RMC - 625236001 BASE REPAIR, ACP OVERLAY AND PAV | | | | | | MRKS | | | | | | | | | | | | WORK ORDER- 05-20-13 WORK BEGAN- 05-28-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-28-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 4 PERCENT TIME USED- 8 | |**************************************************| | | | | | | | DURWOOD GREENE CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-36-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134004 | TOTALS | 1,161,961.26| 0.00| 0.00| 6.3| ************************************************************************************************************************************ FORT BEND VARIOUS HWYS IN FORT BEND COUNTY | 0.001 | 280,153.14| 0.00| 0.00| 0.0| SH0006 VARIOUS HWYS IN FORT BEND COUNTY | | | | | | 6254-23-001 | | | | | | RMC - 625423001 MOWING HIGHWAY RIGHT OF WAY | | | | | | | | | | | | WORK ORDER- 05-30-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-05-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6254-23-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134025 | TOTALS | 280,153.14| 0.00| 0.00| 0.0| ************************************************************************************************************************************ FORT BEND VARIOUS AREAS OF US 59 | 1.000 | 2,095,745.22| 0.00| 488,106.85| 27.1| US0059 VARIOUS AREAS OF US 59 | | | | | | 6245-77-001 | | | | | | RMC - 624577001 GENERAL ROUTINE MAINTENANCE OF US | | | | | | 59 | | | | | | | | | | | | WORK ORDER- 01-01-13 WORK BEGAN- 01-01-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 151 PERCENT TIME USED- 41 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6245-77-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10124026 | TOTALS | 2,095,745.22| 0.00| 488,106.85| 27.1| ************************************************************************************************************************************ FORT BEND VARIOUS AREAS OF US 59 | 1.000 | 2,198,806.07| 0.00| 2,251,837.27|100.0| US0059 VARIOUS AREAS OF US 59 | | | | | | 6231-76-001 | | | | | | RMC - 623176001 GENERAL ROUTINE MAINTENANCE OF US | | | | | | 59 | | | | | | | | | | | | WORK ORDER- 01-01-12 WORK BEGAN- 01-01-12 | |**************************************************| | DATE WORK COMPLETED- 01-02-13 TIME COMPUTED- 01-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 365 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6231-76-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11114004 | TOTALS | 2,198,806.07| 0.00| 2,251,837.27|100.0| ************************************************************************************************************************************ GALVESTON GALVESTON CAUSEWAY | 0.001 | 632,077.00| 0.00| 922,352.37| 99.9| IH0045 GALVESTON CAUSEWAY | | | | | | 6204-78-001 | | | | | | RMC - 620478001 FENDER SYSTEM REPAIR | | | | | | | | | | | | WORK ORDER- 04-06-10 WORK BEGAN- 08-15-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-01-10 | | | | | | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 120 | | | | | | WORKING DAYS CHARGED- 781 PERCENT TIME USED- 91 | | | | | | | | | | | | TEXAS GULF CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6204-78-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01104022 | TOTALS | 632,077.00| 0.00| 922,352.37| 99.9| ************************************************************************************************************************************ GALVESTON GALVESTON FERRY LANDING | 1.000 | 1,461,125.00| 0.00| 1,741,336.61| 99.9| SH0087 BOLIVAR FERRY LANDING | | | | | | 6222-92-001 | | | | | | RMC - 622292001 REPAIR OF MARINE EQUIPMENT | | | | | | | | | | | | WORK ORDER- 02-16-12 WORK BEGAN- 04-02-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-02-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 731 ADDL DAYS GRANTED- 36 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 425 PERCENT TIME USED- 55 | |**************************************************| | | | | | | | RUSSELL MARINE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6222-92-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01124019 | TOTALS | 1,461,125.00| 0.00| 1,741,336.61| 99.9| ************************************************************************************************************************************ GALVESTON SH 146 | 0.001 | 481,331.90| 421,562.76| 421,562.76| 87.5| FM0517 28TH STREET | | | | | | 6250-06-001 | | | | | | RMC - 625006001 ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 04-24-13 WORK BEGAN- 05-06-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-01-13 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 20 PERCENT TIME USED- 44 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-06-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03134016 | TOTALS | 481,331.90| 421,562.76| 421,562.76| 87.5| ************************************************************************************************************************************ GALVESTON BOLIVAR FERRY LANDING | 0.001 | 1,380,000.00| 0.00| 90,000.00| 99.9| SH0087 . | | | | | | 6255-18-001 | | | | | | RMC - 625518001 DREDGING | | | | | | | | | | | | WORK ORDER- 04-25-13 WORK BEGAN- 04-27-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-27-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 65 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 29 PERCENT TIME USED- 44 | |**************************************************| | | | | | | | MIKE HOOKS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6255-18-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03134032 | TOTALS | 1,380,000.00| 0.00| 90,000.00| 99.9| ************************************************************************************************************************************ GALVESTON HIGHLAND BAYOU BRIDGE | 0.001 | 239,645.00| 0.00| 0.00| 0.0| SH0006 HIGHLAND BAYOU BRIDGE | | | | | | 6252-14-001 | | | | | | RMC - 625214001 BRIDGE REPAIR | | | | | | | | | | | | WORK ORDER- 06-05-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-17-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-14-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134021 | TOTALS | 239,645.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GALVESTON VARIOUS HWYS IN GALVESTON COUNTY | 0.001 | 307,003.05| 0.00| 311,091.71|100.0| IH0045 VARIOUS HWYS IN GALVESTON COUNTY | | | | | | 6221-92-001 | | | | | | RMC - 622192001 MOWING HWY RIGHT-OF-WAY | | | | | | | | | | | | WORK ORDER- 06-21-11 WORK BEGAN- 06-21-11 | |**************************************************| | DATE WORK COMPLETED- 04-30-13 TIME COMPUTED- 06-29-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 135 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 100 PERCENT TIME USED- 74 | |**************************************************| | | | | | | | L. M. TRACTOR, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6221-92-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05114019 | TOTALS | 307,003.05| 0.00| 311,091.71|100.0| ************************************************************************************************************************************ GALVESTON GALVESTON FERRY | 0.001 | 649,000.00| 0.00| 696,871.35|100.0| SH0087 . | | | | | | 6240-28-001 | | | | | | RMC - 624028001 REM & CNST RMP & SPRNG ASSEMBLY | | | | | | | | | | | | WORK ORDER- 08-09-12 WORK BEGAN- 08-09-12 | |**************************************************| | DATE WORK COMPLETED- 06-01-13 TIME COMPUTED- 08-09-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 35 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 115 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | TEXAS GULF CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6240-28-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05124015 | TOTALS | 649,000.00| 0.00| 696,871.35|100.0| ************************************************************************************************************************************ GALVESTON GALVESTON FERRY LANDING | 1.000 | 2,872,775.00| 0.00| 0.00| 0.0| SH0087 BOLIVAR FERRY LANDING | | | | | | 6195-11-001 | | | | | | EMC - 619511001 EMERGENCY DOLPHIN REPAIRS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TEXAS GULF CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6195-11-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06091240 | TOTALS | 2,872,775.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GALVESTON GALVESTON FERRY LANDING STAGING AREA | 0.001 | 835,432.31| 0.00| 0.00| 0.0| SH0087 BOLIVAR FERRY LANDING STAGING AREA | | | | | | 6257-34-001 | | | | | | RMC - 625734001 OVERLAY OF FERRY LANDING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6257-34-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06134005 | TOTALS | 835,432.31| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GALVESTON FM 518: RIVERSIDE DR TO 0.095 MI. EAST | 0.001 | 565,064.94| 0.00| 0.00| 0.0| FM0518 FM 2351: MELODY LN TO ROYAL CT | | | | | | 6234-52-001 | | | | | | RMC - 623452001 STORM DRAINAGE REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6234-52-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06134007 | TOTALS | 565,064.94| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GALVESTON VARIOUS HIGHWAYS IN GALVESTON | 0.001 | 361,378.04| 12,829.16| 295,530.17| 81.7| SH0146 VARIOUS HIGHWAYS IN GALVESTON | | | | | | 6213-70-001 | | | | | | RMC - 621370001 REFLECTIVE PAVEMENT MARKERS | | | | | | (GRAPHICS) | | | | | | | | | | | | WORK ORDER- 09-28-12 WORK BEGAN- 10-15-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-15-12 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 229 PERCENT TIME USED- 62 | | | | | | | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6213-70-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07124006 | TOTALS | 361,378.04| 12,829.16| 295,530.17| 81.7| ************************************************************************************************************************************ GALVESTON VARIOUS HWYS IN GALVESTON COUNTY | 0.001 | 372,000.00| 35,313.05| 142,321.88| 38.2| FM0517 VARIOUS HWYS IN GALVESTON COUNTY | | | | | | 6243-45-001 | | | | | | RMC - 624345001 ASPHALT PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 10-25-12 WORK BEGAN- 12-04-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-01-12 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 212 PERCENT TIME USED- 58 | | | | | | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6243-45-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09124014 | TOTALS | 372,000.00| 35,313.05| 142,321.88| 38.2| ************************************************************************************************************************************ GALVESTON VARIOUS HWYS IN GALVESTON COUNTY | 0.001 | 364,320.00| 82,308.95| 364,317.70| 99.9| FM0517 VARIOUS HWYS IN GALVESTON COUNTY | | | | | | 6245-76-001 | | | | | | RMC - 624576001 DITCH CLEANING & RESHAPING | | | | | | | | | | | | WORK ORDER- 12-10-12 WORK BEGAN- 02-05-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-15-12 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 168 PERCENT TIME USED- 46 | | | | | | | | | | | | TEXAS DRAINAGE INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6245-76-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10124025 | TOTALS | 364,320.00| 82,308.95| 364,317.70| 99.9| ************************************************************************************************************************************ HARRIS SH 288 | 1.396 | 1,197,737.80| 0.00| 373,777.44| 47.9| US0059 NORTH OF IH-45 | | | | | | 6235-48-001 | | | | | | RMC - 623548001 TY E-3 RAIL REMOVAL AND INSTALL | | | | | | SSCB | | | | | | | | | | | | WORK ORDER- 03-18-13 WORK BEGAN- 03-18-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 03-18-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 158 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 69 PERCENT TIME USED- 43 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6235-48-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01124004 | TOTALS | 1,197,737.80| 0.00| 373,777.44| 47.9| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 591,649.00| 5,480.00| 5,480.00| 0.9| SH0225 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6250-50-001 | | | | | | RMC - 625050001 GUARDRAIL REPAIR | | | | | | | | | | | | WORK ORDER- 04-16-13 WORK BEGAN- 05-01-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-01-13 | | | | | | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 31 PERCENT TIME USED- 4 | | | | | | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-50-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01134005 | TOTALS | 591,649.00| 5,480.00| 5,480.00| 0.9| ************************************************************************************************************************************ HARRIS IH45 @ SENGER GULLY IN N.HARRIS CTY | 0.001 | 396,318.00| 0.00| 1,150.00| 68.9| IH0045 IH45 @ SENGER GULLY IN N.HARRIS CTY | | | | | | 6239-77-001 | | | | | | RMC - 623977001 RECONSTRUCT EXIST CHANNEL & RIPRAP | | | | | | | | | | | | WORK ORDER- 04-17-13 WORK BEGAN- 04-22-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-22-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 31 PERCENT TIME USED- 68 | |**************************************************| | | | | | | | LECON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6239-77-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01134006 | TOTALS | 396,318.00| 0.00| 1,150.00| 68.9| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 476,875.00| 0.00| 0.00| 0.0| SH0225 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6250-17-001 | | | | | | RMC - 625017001 ASPAHLT PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 05-30-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-17-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01134025 | TOTALS | 476,875.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 682,499.00| 0.00| 484,135.39|100.0| IH0010 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6220-36-001 | | | | | | RMC - 622036001 GUARDRAIL REPAIR | | | | | | | | | | | | WORK ORDER- 04-18-11 WORK BEGAN- 05-01-11 | |**************************************************| | DATE WORK COMPLETED- 04-30-13 TIME COMPUTED- 05-01-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 731 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6220-36-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02114004 | TOTALS | 682,499.00| 0.00| 484,135.39|100.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 308,476.92| 14,772.80| 14,772.80| 4.7| SH0225 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6250-96-001 | | | | | | RMC - 625096001 REFLECTIVE PAVEMENT MARKINGS | | | | | | (GRAPHICS) | | | | | | | | | | | | WORK ORDER- 04-16-13 WORK BEGAN- 05-01-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-01-13 | | | | | | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 31 PERCENT TIME USED- 4 | | | | | | | | | | | | HIGHWAY TECHNOLOGIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-96-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02134017 | TOTALS | 308,476.92| 14,772.80| 14,772.80| 4.7| ************************************************************************************************************************************ HARRIS VARIOUS HGHWYS IN NORTH HARRIS COUNTY | 0.001 | 461,250.00| 0.00| 0.00| 0.0| US0059 VARIOUS HGHWYS IN NORTH HARRIS COUNTY | | | | | | 6250-62-001 | | | | | | RMC - 625062001 SLAB STABILIZATION/JACKING | | | | | | | | | | | | WORK ORDER- 04-25-13 WORK BEGAN- 05-01-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 182 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 31 PERCENT TIME USED- 17 | |**************************************************| | | | | | | | NORTEX CONCRETE LIFT & STABILIZATION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-62-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02134037 | TOTALS | 461,250.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 339,173.88| 39,366.34| 250,420.38| 73.8| IH0010 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6220-67-001 | | | | | | RMC - 622067001 MOWING HIGHWAY RIGHT OF WAY | | | | | | | | | | | | WORK ORDER- 07-01-11 WORK BEGAN- 07-01-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-01-11 | | | | | | CONTRACT WORKING DAYS- 198 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 106 PERCENT TIME USED- 53 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6220-67-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03114005 | TOTALS | 339,173.88| 39,366.34| 250,420.38| 73.8| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 396,778.90| 0.00| 413,452.24|100.0| IH0010 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6220-93-001 | | | | | | RMC - 622093001 REFLECTIVE PAVEMENT MARKINGS | | | | | | (GRAPHICS) | | | | | | | | | | | | WORK ORDER- 05-12-11 WORK BEGAN- 06-01-11 | |**************************************************| | DATE WORK COMPLETED- 04-30-13 TIME COMPUTED- 06-01-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 700 PERCENT TIME USED- 95 | |**************************************************| | | | | | | | HIGHWAY TECHNOLOGIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6220-93-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03114024 | TOTALS | 396,778.90| 0.00| 413,452.24|100.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 780,811.70| 0.00| 435,103.68|100.0| IH0045 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6236-37-001 | | | | | | RMC - 623637001 FULL DEPTH CONCRETE REPAIR | | | | | | | | | | | | WORK ORDER- 05-14-12 WORK BEGAN- 05-29-12 | |**************************************************| | DATE WORK COMPLETED- 05-28-13 TIME COMPUTED- 05-29-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 365 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6236-37-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03124009 | TOTALS | 780,811.70| 0.00| 435,103.68|100.0| ************************************************************************************************************************************ HARRIS COLLEGE AVE | 0.001 | 1,987,997.07| 0.00| 0.00| 0.0| SH0003 FUQUA | | | | | | 6250-79-001 | | | | | | RMC - 625079001 1 1/2"ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 05-20-13 WORK BEGAN- 06-04-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-04-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURWOOD GREENE CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-79-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134003 | TOTALS | 1,987,997.07| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS IN EAST HARRIS | 0.001 | 463,750.20| 0.00| 0.00| 0.0| SP0330 VARIOUS LOCATIONS IN EAST HARRIS | | | | | | 6250-22-001 | | | | | | RMC - 625022001 REPAIR MAIN LANE APPROACHES URETEC | | | | | | SLAB | | | | | | | | | | | | WORK ORDER- 05-24-13 WORK BEGAN- 06-02-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-02-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | NORTEX CONCRETE LIFT & STABILIZATION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-22-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134005 | TOTALS | 463,750.20| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 885,900.00| 0.00| 0.00| 0.0| SH0288 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6254-65-001 | | | | | | RMC - 625465001 FULL DEPTH CONCRETE REPAIR | | | | | | | | | | | | WORK ORDER- 05-20-13 WORK BEGAN- 06-01-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6254-65-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134006 | TOTALS | 885,900.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 347,600.00| 0.00| 0.00| 0.0| SH0288 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6252-81-001 | | | | | | RMC - 625281001 PUMP STATION & DRAINAGE SYSTEM | | | | | | CLEANING | | | | | | | | | | | | WORK ORDER- 05-20-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | CLEANSERVE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-81-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134007 | TOTALS | 347,600.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HIGHWAYS IN DISTRICT 12 | 0.001 | 2,484,500.00| 0.00| 0.00| 0.0| IH0010 VARIOUS HIGHWAYS IN DISTRICT 12 | | | | | | 6253-64-001 | | | | | | RMC - 625364001 CALLOUT DEBRIS REMOVAL AFTER A | | | | | | HURRICANE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 85 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TEXAS TREE & LANDSCAPE, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6253-64-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134018 | TOTALS | 2,484,500.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS FAIRMONT | 0.001 | 329,272.66| 0.00| 0.00| 0.0| BS0146D WHARTON WEEMS | | | | | | 6250-78-001 | | | | | | RMC - 625078001 BASE REPAIR,OVERLAY AND STRIPING | | | | | | | | | | | | WORK ORDER- 06-06-13 WORK BEGAN- 06-24-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-24-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6250-78-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134023 | TOTALS | 329,272.66| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS IH-10 EB & WB_MAINLANES | 0.001 | 136,254.00| 0.00| 0.00| 0.0| IH0010 OVER MCCARTY (US 90A) | | | | | | 6252-04-001 | | | | | | BPM - 625204001 BRIDGE MAINTENANCE REPAIRS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 50 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-04-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04134040 | TOTALS | 136,254.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 674,600.00| 31,502.67| 309,734.06| 45.9| SH0225 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6232-56-001 | | | | | | RMC - 623256001 CLEANING AND SWEEPING HIGHWAYS | | | | | | | | | | | | WORK ORDER- 06-22-12 WORK BEGAN- 07-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-01-12 | | | | | | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 335 PERCENT TIME USED- 45 | | | | | | | | | | | | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6232-56-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05124006 | TOTALS | 674,600.00| 31,502.67| 309,734.06| 45.9| ************************************************************************************************************************************ HARRIS 0.55 MI S.OF MONTGOMERY/HARRIS C/L | 1.240 | 745,889.42| 0.00| 0.00| 0.0| LP0494 600' N.OF KINGWOOD IN MONT/HARRIS C/L | | | | | | 6252-82-001 | | | | | | RMC - 625282001 MILL & OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURWOOD GREENE CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-82-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05134003 | TOTALS | 745,889.42| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN HOUSTON DISTRICT | 0.001 | 1,129,365.00| 0.00| 0.00| 0.0| IH0045 VARIOUS HWYS IN HOUSTON DISTRICT | | | | | | 6254-66-001 | | | | | | RMC - 625466001 PREV MNT OF SGNL EQUIP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6254-66-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05134004 | TOTALS | 1,129,365.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN HOUSTON DISTRICT | 0.001 | 448,185.00| 0.00| 0.00| 0.0| IH0610 VARIOUS HWYS IN HOUSTON DISTRICT | | | | | | 6255-63-001 | | | | | | RMC - 625563001 MNT OF VIVDS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6255-63-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05134014 | TOTALS | 448,185.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS ROADS IN COASTAL DISTRICT | 0.100 | 3,689,600.00| 0.00| 0.00| 0.0| US0059 VARIOUS ROADS IN COASTAL DISTRICT | | | | | | 6193-73-001 | | | | | | RMC - 619373001 CALLOUT DEBRIS REMOVAL AND DISPOSAL | | | | | | | | | | | | WORK ORDER- 07-21-09 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-21-09 | | | | | | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 730 | | | | | | WORKING DAYS CHARGED- 1,380 PERCENT TIME USED- 94 | | | | | | | | | | | | TEXAS TREE & LANDSCAPE, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6193-73-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06094012 | TOTALS | 3,689,600.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS SH 87 | 100.810 | 26,974,243.67| 303,642.71| 2,904,068.89| 11.5| IH0045 WALKER/MONTGOMERY COUNTY LINE | | | | | | 6236-65-001 | | | | | | RMC - 623665001 ROUTINE MAINTENANCE OF IH 45 | | | | | | | | | | | | WORK ORDER- 08-01-12 WORK BEGAN- 08-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-01-12 | | | | | | CONTRACT WORKING DAYS- 1,826 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 273 PERCENT TIME USED- 14 | | | | | | | | | | | | TRANSFIELD SERVICES INFRASTRUCTURE INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6236-65-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06124003 | TOTALS | 26,974,243.67| 303,642.71| 2,904,068.89| 11.5| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 348,816.00| 0.00| 353,359.40|100.0| SH0288 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6241-03-001 | | | | | | RMC - 624103001 SPALL REPAIR | | | | | | | | | | | | WORK ORDER- 08-13-12 WORK BEGAN- 09-01-12 | |**************************************************| | DATE WORK COMPLETED- 04-30-13 TIME COMPUTED- 09-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 242 PERCENT TIME USED- 66 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6241-03-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06124009 | TOTALS | 348,816.00| 0.00| 353,359.40|100.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 752,350.00| 0.00| 161,311.02| 23.4| SH0225 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6238-48-001 | | | | | | RMC - 623848001 FULL DEPTH CONCRETE REPAIR | | | | | | | | | | | | WORK ORDER- 10-10-12 WORK BEGAN- 11-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-01-12 | | | | | | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 212 PERCENT TIME USED- 29 | | | | | | | | | | | | WINDING ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6238-48-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06124010 | TOTALS | 752,350.00| 0.00| 161,311.02| 23.4| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 325,200.00| 0.00| 146,277.86| 44.9| SH0288 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6240-62-001 | | | | | | RMC - 624062001 ASPHALT PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 08-13-12 WORK BEGAN- 09-01-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 273 PERCENT TIME USED- 74 | |**************************************************| | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6240-62-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06124023 | TOTALS | 325,200.00| 0.00| 146,277.86| 44.9| ************************************************************************************************************************************ HARRIS 2,100' EAST OF FRY RD | 1.273 | 553,154.00| 0.00| 0.00| 0.0| BU0290L 650' WEST OF SKINNER RD | | | | | | 6252-41-001 | | | | | | RMC - 625241001 PLANING, SEAL COAT, ACP OVERLAY, | | | | | | PAV MRK | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 22 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURWOOD GREENE CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-41-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06134012 | TOTALS | 553,154.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS: US 59, IH-610 | 0.001 | 570,967.76| 0.00| 0.00| 0.0| IH0610 SH 288 | | | | | | 6252-42-001 | | | | | | RMC - 625242001 ARMOR JOINT REPLACEMENT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 146 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6252-42-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06134013 | TOTALS | 570,967.76| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN HOUSTON DISTRICT | 0.001 | 2,100,620.00| 0.00| 0.00| 0.0| IH0610 VARIOUS HWYS IN HOUSTON DISTRICT | | | | | | 6256-17-001 | | | | | | RMC - 625617001 MAINTNENANCE OF ILLUMINATION | | | | | | SYSTEMS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LINDSEY ELECTRIC, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6256-17-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06134014 | TOTALS | 2,100,620.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS HIGHWAYS IN WEST HARRIS CO. | 0.001 | 1,204,965.00| 0.00| 770,720.36| 75.1| US0290 . | | | | | | 6226-92-001 | | | | | | RMC - 622692001 FULL DEPTH CONC REP & MISC CONC | | | | | | ITEMS | | | | | | | | | | | | WORK ORDER- 09-13-11 WORK BEGAN- 09-13-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-13-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 731 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 627 PERCENT TIME USED- 85 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6226-92-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07114005 | TOTALS | 1,204,965.00| 0.00| 770,720.36| 75.1| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN EAST HARRIS COUNTY | 0.001 | 463,125.00| 101,899.10| 414,782.21| 89.5| SH0225 VARIOUS HWYS IN EAST HARRIS COUNTY | | | | | | 6226-73-001 | | | | | | RMC - 622673001 ASPHALT PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 08-25-11 WORK BEGAN- 09-01-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-01-11 | | | | | | CONTRACT WORKING DAYS- 731 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 639 PERCENT TIME USED- 87 | | | | | | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6226-73-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07114020 | TOTALS | 463,125.00| 101,899.10| 414,782.21| 89.5| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN HOUSTON DISTRICT | 0.001 | 1,625,180.50| 0.00| 1,559,388.20| 99.9| IH0610 VARIOUS HWYS IN HOUSTON DISTRICT | | | | | | 6227-57-001 | | | | | | RMC - 622757001 MAITENANCE OF ILLUMINATION SYSTEMS | | | | | | | | | | | | WORK ORDER- 10-05-11 WORK BEGAN- 10-05-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-05-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 731 ADDL DAYS GRANTED- 60 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 605 PERCENT TIME USED- 76 | |**************************************************| | | | | | | | LINDSEY ELECTRIC, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6227-57-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07114023 | TOTALS | 1,625,180.50| 0.00| 1,559,388.20| 99.9| ************************************************************************************************************************************ HARRIS VARIOUS HIGHWAYS IN WEST HARRIS CO. | 0.001 | 640,420.00| 0.00| 170,260.00| 29.7| US0290 . | | | | | | 6243-38-001 | | | | | | RMC - 624338001 CLEANING AND SWEEPING HIGHWAYS | | | | | | | | | | | | WORK ORDER- 10-01-12 WORK BEGAN- 10-01-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 243 PERCENT TIME USED- 33 | |**************************************************| | | | | | | | PANNELL INDUSTRIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6243-38-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07124021 | TOTALS | 640,420.00| 0.00| 170,260.00| 29.7| ************************************************************************************************************************************ HARRIS VARIOUS HIGHWAYS IN WEST HARRIS CO. | 0.001 | 291,805.00| 0.00| 175,045.00| 68.3| US0290 . | | | | | | 6227-08-001 | | | | | | RMC - 622708001 STORM SEWER SYSTEM CLEANING | | | | | | | | | | | | WORK ORDER- 09-27-11 WORK BEGAN- 10-01-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-01-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 731 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 609 PERCENT TIME USED- 83 | |**************************************************| | | | | | | | CLEANSERVE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6227-08-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08114007 | TOTALS | 291,805.00| 0.00| 175,045.00| 68.3| ************************************************************************************************************************************ HARRIS VARIOUS HIGHWAYS IN WEST HARRIS CO. | 0.001 | 756,414.00| 0.00| 556,972.62| 86.0| US0290 . | | | | | | 6227-00-001 | | | | | | RMC - 622700001 REFLECTIVE PAVEMENT MARKINGS | | | | | | (GRAPHICS) | | | | | | | | | | | | WORK ORDER- 10-01-11 WORK BEGAN- 10-01-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-01-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 731 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 609 PERCENT TIME USED- 83 | |**************************************************| | | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6227-00-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08114008 | TOTALS | 756,414.00| 0.00| 556,972.62| 86.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 659,900.00| 0.00| 153,050.00| 26.7| LP0008 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6242-96-001 | | | | | | RMC - 624296001 CLEANING AND SWEEPING HIGHWAYS | | | | | | | | | | | | WORK ORDER- 10-24-12 WORK BEGAN- 11-01-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 11-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 212 PERCENT TIME USED- 29 | |**************************************************| | | | | | | | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6242-96-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08124013 | TOTALS | 659,900.00| 0.00| 153,050.00| 26.7| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN NORTH HARRIS COUNTY | 0.001 | 441,158.00| 0.00| 244,948.67| 65.4| US0059 VARIOUS HWYS IN NORTH HARRIS COUNTY | | | | | | 6241-12-001 | | | | | | RMC - 624112001 CLEANING AND SWEEPING HIGHWAYS | | | | | | | | | | | | WORK ORDER- 10-10-12 WORK BEGAN- 10-15-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-15-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 229 PERCENT TIME USED- 62 | |**************************************************| | | | | | | | CROSBY RD CONSTRUCTION INC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6241-12-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08124032 | TOTALS | 441,158.00| 0.00| 244,948.67| 65.4| ************************************************************************************************************************************ HARRIS VARIOUS HWYS WITHIN HOUSTON DISTRICT | 0.001 | 1,187,463.20| 24,408.06| 1,269,271.50|100.0| IH0010 VARIOUS HWYS WITHIN HOUSTON DISTRICT | | | | | | 6240-78-001 | | | | | | RMC - 624078001 RETR OR REPL PV MRK & RAIS MRKS | | | | | | | | | | | | WORK ORDER- 10-23-12 WORK BEGAN- 10-23-12 | | | | | | DATE WORK COMPLETED- 04-01-13 TIME COMPUTED- 10-30-12 | | | | | | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 30 PERCENT TIME USED- 100 | | | | | | | | | | | | HIGHWAY TECHNOLOGIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6240-78-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09124005 | TOTALS | 1,187,463.20| 24,408.06| 1,269,271.50|100.0| ************************************************************************************************************************************ HARRIS VARIOUS HWYS HOUSTON DISTRICT | 0.001 | 1,189,845.00| 0.00| 460,521.80| 43.6| IH0010 VARIOUS HWYS HOUSTON DISTRICT | | | | | | 6244-29-001 | | | | | | RMC - 624429001 MAINT OF TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 11-13-12 WORK BEGAN- 11-14-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 11-14-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 199 PERCENT TIME USED- 27 | |**************************************************| | | | | | | | LINDSEY ELECTRIC, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6244-29-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09124006 | TOTALS | 1,189,845.00| 0.00| 460,521.80| 43.6| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 272,160.00| 0.00| 79,757.64| 32.1| LP0008 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6241-35-001 | | | | | | RMC - 624135001 GUARDRAIL REPAIR | | | | | | | | | | | | WORK ORDER- 11-01-12 WORK BEGAN- 11-01-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 11-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 212 PERCENT TIME USED- 58 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6241-35-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09124015 | TOTALS | 272,160.00| 0.00| 79,757.64| 32.1| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN HOUSTON DISTRICT | 0.001 | 1,358,820.00| 0.00| 743,161.13| 56.2| IH0610 VARIOUS HWYS IN HOUSTON DISTRICT | | | | | | 6205-75-001 | | | | | | RMC - 620575001 LOOP DETECTOR REPAIR AND | | | | | | REPLACEMENT | | | | | | | | | | | | WORK ORDER- 02-28-12 WORK BEGAN- 03-05-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 03-05-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 731 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 453 PERCENT TIME USED- 61 | |**************************************************| | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6205-75-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10114029 | TOTALS | 1,358,820.00| 0.00| 743,161.13| 56.2| ************************************************************************************************************************************ HARRIS HARRIS/CHAMBERS COUNTY LINE | 0.001 | 2,336,927.73| 190,230.65| 763,584.02| 32.6| IH0010 FM 3538 (CANE BELT) OVERPASS | | | | | | 6239-72-001 | | | | | | RMC - 623972001 GENERAL MAINTENANCE CONTRACT | | | | | | | | | | | | WORK ORDER- 11-20-12 WORK BEGAN- 12-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-01-12 | | | | | | CONTRACT WORKING DAYS- 274 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 151 PERCENT TIME USED- 55 | | | | | | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6239-72-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10124010 | TOTALS | 2,336,927.73| 190,230.65| 763,584.02| 32.6| ************************************************************************************************************************************ HARRIS CENTRAL HARRIS COUNTY | 0.001 | 2,111,402.80| 0.00| 500,648.45| 32.1| US0059 . | | | | | | 6239-73-001 | | | | | | RMC - 623973001 GENERAL MAINTENANCE CONTRACT | | | | | | | | | | | | WORK ORDER- 11-29-12 WORK BEGAN- 12-01-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 274 ADDL DAYS GRANTED- 122 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 182 PERCENT TIME USED- 45 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6239-73-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10124011 | TOTALS | 2,111,402.80| 0.00| 500,648.45| 32.1| ************************************************************************************************************************************ HARRIS CENTRAL HARRIS COUNTY | 0.001 | 1,843,965.01| 0.00| 566,322.49| 35.7| IH0610 . | | | | | | 6239-74-001 | | | | | | RMC - 623974001 GEN ROUT MNT OF IH 610, ETC. | | | | | | | | | | | | WORK ORDER- 11-29-12 WORK BEGAN- 12-01-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-01-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 274 ADDL DAYS GRANTED- 122 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 182 PERCENT TIME USED- 45 | |**************************************************| | | | | | | | TEXAS HIGHWAY MAINTENANCE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6239-74-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10124012 | TOTALS | 1,843,965.01| 0.00| 566,322.49| 35.7| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN NORTH HARRIS COUNTY | 0.001 | 515,887.00| 0.00| 27,792.00| 5.3| US0059 VARIOUS HWYS IN NORTH HARRIS COUNTY | | | | | | 6244-62-001 | | | | | | RMC - 624462001 FULL DEPTH CONCRETE & ASPHALT | | | | | | REPAIR | | | | | | | | | | | | WORK ORDER- 01-10-13 WORK BEGAN- 01-17-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-17-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 135 PERCENT TIME USED- 36 | |**************************************************| | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6244-62-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10124024 | TOTALS | 515,887.00| 0.00| 27,792.00| 5.3| ************************************************************************************************************************************ HARRIS VARIOUS HWYS IN SOUTH HARRIS COUNTY | 0.001 | 282,330.83| 0.00| 132,408.60| 46.8| LP0008 VARIOUS HWYS IN SOUTH HARRIS COUNTY | | | | | | 6248-92-001 | | | | | | RMC - 624892001 REFLECTIVE PAVEMENT MARKINGS | | | | | | (GRAPHICS) | | | | | | | | | | | | WORK ORDER- 12-12-12 WORK BEGAN- 01-01-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 151 PERCENT TIME USED- 41 | |**************************************************| | | | | | | | HIGHWAY TECHNOLOGIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6248-92-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11124008 | TOTALS | 282,330.83| 0.00| 132,408.60| 46.8| ************************************************************************************************************************************ MONTGOMERY VARIOUS HWYS IN MONTGOMERY COUNTY | 0.001 | 409,200.00| 0.00| 483,206.89| 99.9| US0059 VARIOUS HWYS IN MONTGOMERY COUNTY | | | | | | 6238-57-001 | | | | | | RMC - 623857001 GUARDRAIL END TREATMENT INSTALL | | | | | | | | | | | | WORK ORDER- 06-14-12 WORK BEGAN- 07-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-01-12 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 335 PERCENT TIME USED- 91 | | | | | | | | | | | | CKORP, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6238-57-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05124016 | TOTALS | 409,200.00| 0.00| 483,206.89| 99.9| ************************************************************************************************************************************ MONTGOMERY VARIOUS HWYS IN MONTGOMERY COUNTY | 0.001 | 641,452.42| 0.00| 265,478.65| 57.9| SH0075 VARIOUS HWYS IN MONTGOMERY COUNTY | | | | | | 6226-71-001 | | | | | | RMC - 622671001 SEAL COAT (STRIP/SPOT SEAL) | | | | | | | | | | | | WORK ORDER- 09-30-11 WORK BEGAN- 10-03-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-03-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 550 ADDL DAYS GRANTED- 60 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 607 PERCENT TIME USED- 99 | |**************************************************| | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6226-71-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06114021 | TOTALS | 641,452.42| 0.00| 265,478.65| 57.9| ************************************************************************************************************************************ MONTGOMERY VARIOUS HWYS IN MONTGOMERY COUNTY | 0.001 | 406,760.00| 29,920.00| 150,370.00| 36.9| US0059 VARIOUS HWYS IN MONTGOMERY COUNTY | | | | | | 6244-21-001 | | | | | | RMC - 624421001 CLEANING & SWEEPING HYWS | | | | | | | | | | | | WORK ORDER- 11-30-12 WORK BEGAN- 12-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-03-12 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 180 PERCENT TIME USED- 49 | | | | | | | | | | | | CROSBY RD CONSTRUCTION INC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6244-21-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08124014 | TOTALS | 406,760.00| 29,920.00| 150,370.00| 36.9| ************************************************************************************************************************************ MONTGOMERY VARIOUS HWYS IN MONTGOMERY COUNTY | 0.001 | 528,983.24| 75,284.07| 150,567.94| 28.4| US0059 VARIOUS HWYS IN MONTGOMERY COUNTY | | | | | | 6235-99-001 | | | | | | RMC - 623599001 ROADSIDE MOWING | | | | | | | | | | | | WORK ORDER- 11-08-12 WORK BEGAN- 11-19-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-19-12 | | | | | | CONTRACT WORKING DAYS- 234 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 24 PERCENT TIME USED- 10 | | | | | | | | | | | | WAYNE YANCEY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6235-99-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08124037 | TOTALS | 528,983.24| 75,284.07| 150,567.94| 28.4| ************************************************************************************************************************************ MONTGOMERY VARIOUS HWYS IN MONGTOMERY COUNTY | 0.001 | 435,100.00| 0.00| 0.00| 0.0| US0059 VARIOUS HWYS IN MONTGOMERY COUNTY | | | | | | 6248-15-001 | | | | | | RMC - 624815001 CONCRETE STRUCTURE REPAIR | | | | | | | | | | | | WORK ORDER- 05-15-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BLUEBAY CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6248-15-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12124006 | TOTALS | 435,100.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MONTGOMERY VARIOUS HWYS IN MONTGOMERY COUNTY | 0.001 | 416,487.00| 0.00| 0.00| 0.0| US0059 VARIOUS HWYS IN MONTGOMERY COUNTY | | | | | | 6248-16-001 | | | | | | RMC - 624816001 ASPHALT PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 05-15-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-01-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6248-16-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12124015 | TOTALS | 416,487.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WALLER VARIOUS HIGHWAYS IN WALLER COUNTY | 0.001 | 243,350.00| 0.00| 116,944.56| 56.4| US0290 VARIOUS HIGHWAYS IN WALLER COUNTY | | | | | | 6233-59-001 | | | | | | RMC - 623359001 BRIDGE DECK REPAIR | | | | | | | | | | | | WORK ORDER- 06-13-12 WORK BEGAN- 07-02-12 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-18-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 348 PERCENT TIME USED- 47 | |**************************************************| | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6233-59-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03124010 | TOTALS | 243,350.00| 0.00| 116,944.56| 56.4| ************************************************************************************************************************************ WALLER VARIOUS ROADWAYS IN WALLER COUNTY | 0.001 | 365,775.00| 0.00| 338,305.03|100.0| US0290 VARIOUS ROADWAYS IN WALLER COUNTY | | | | | | 6233-60-001 | | | | | | RMC - 623360001 ASPHALT PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 05-17-12 WORK BEGAN- 08-06-12 | |**************************************************| | DATE WORK COMPLETED- 05-17-13 TIME COMPUTED- 05-18-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 365 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6233-60-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04124006 | TOTALS | 365,775.00| 0.00| 338,305.03|100.0| ************************************************************************************************************************************ WALLER VARIOUS HWYS IN WALLER COUNTY | 0.001 | 449,325.00| 0.00| 0.00| 0.0| US0290 VARIOUS HWYS IN WALLER COUNTY | | | | | | 6253-87-001 | | | | | | RMC - 625387001 ASPHALT PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 6253-87-001 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06134006 | TOTALS | 449,325.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 91,835,654.68 DISTRICT ESTIMATES THIS MONTH 1,368,520.32 DISTRICT TOTAL ESTIMATES PAID TO DATE 24,237,396.83