MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 12 AS OF JAN 10, 2012 PAGE 34 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ BRAZORIA MILLER RANCH RD AT HICKORY SLOUGH | 0.130 | 483,525.75| 0.00| 0.00| 0.0| CS . | | | | | | 0912-31-207 | | | | | | BR 2007(205) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 72 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ARANDA BROTHERS CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-207 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01123005 | TOTALS | 483,525.75| 0.00| 0.00| 0.0| ************************************************************************************************************************************ BRAZORIA CR 54 AT CHOC BYU WATER CO CANAL | 0.208 | 815,348.60| 0.00| 0.00| 0.0| CR . | | | | | | 0912-31-164 | | | | | | BR 2006(322) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 171 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TOM-MAC, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-164 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01123207 | TOTALS | 815,348.60| 0.00| 0.00| 0.0| ************************************************************************************************************************************ BRAZORIA SOUTH OF HARRIS COUNTY LINE | 1.915 | 13,267,224.77| 42,923.54| 12,372,466.76| 94.4| FM 865 FM 518 | | | | | | 0976-02-085 | | | | | | STP 2009(283) GR, BS & SURF | | | | | | | | | | | | BRAZORIA SOUTH OF HARRIS COUNTY LINE | 0.001 | 394,560.47| 0.00| 294,380.05| 74.6| FM 865 FM 518 | | | | | | 0976-02-087 | | | | | | RW 976-2-87 ROW ACQ. AND UTL. ADJ. | | | | | | | | | | | | WORK ORDER- 04-09-09 WORK BEGAN- 05-05-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-25-09 | | | | | | CONTRACT WORKING DAYS- 459 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 562 PERCENT TIME USED- 122 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0976-02-085 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.51 | | | | GMJ PAVING CO. | |SUB %: 4.67 | | | | PROTECTIVE ENVIRONMENTAL STRATEGIES, INC. | |SUB %: 0.70 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.27 | | | | CREACOM, INC. | |SUB %: 6.36 | | | | CHERRY CRUSHED CONCRETE | |SUB %: 4.42 | | | | SPECIALTY DRILLING | |SUB %: 0.58 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.00 | | | | BECO CONSTRUCTION, L.L.C. | |SUB %: 0.21 | | | | NBG CONSTRUCTORS, INC. | |SUB %: 17.22 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.10 | | | | MICKIE SERVICE, INC. | |SUB %: 0.01 | | | | BECO CONSTRUCTION, L.L.C. | |SUB %: 4.69 | | | | OATES INDUSTRIES, INC. | |SUB %: 0.20 | | | | FLORES CURBS | |SUB %: 0.10 | | | | | | | | | | CONTRACT 02093201 | TOTALS | 13,661,785.24| 42,923.54| 12,666,846.81| 93.9| ************************************************************************************************************************************ BRAZORIA DIXIE FARM RD FROM SH 35 | 2.173 | 12,512,243.81| -6,905.02| 12,229,153.28| 98.8| CS 1500 FT S OF FM 518 | | | | | | 0912-31-108 | | | | | | STP 99(546)MM WIDEN TO 4 LANES | | | | | | | | | | | | BRAZORIA DIXIE FARM ROAD FROM HARRIS COUNTY | 3.800 | 124,811.82| 0.00| 133,719.32| 99.9| CS SH 35 | | | | | | 0912-31-144 | | | | | | STP 2004(215)MM ACQUISITION AND UTILITIES | | | | | | | | | | | | WORK ORDER- 04-09-09 WORK BEGAN- 04-25-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-25-09 | | | | | | CONTRACT WORKING DAYS- 489 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 574 PERCENT TIME USED- 117 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-108 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.54 | | | | NBG CONSTRUCTORS, INC. | |SUB %: 7.22 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.00 | | | | TOM-MAC, INC. | |SUB %: 0.66 | | | | REDDICO CONSTRUCTION CO., INC. | |SUB %: 8.86 | | | | PROTECTIVE ENVIRONMENTAL STRATEGIES, INC. | |SUB %: 3.50 | | | | GMJ PAVING CO. | |SUB %: 5.61 | | | | HUBCO, INC. | |SUB %: 1.83 | | | | CREACOM, INC. | |SUB %: 3.60 | | | | BECO CONSTRUCTION, L.L.C. | |SUB %: 7.05 | | | | FLORES CURBS | |SUB %: 0.15 | | | | OATES INDUSTRIES, INC. | |SUB %: 0.11 | | | | SPECIALTY DRILLING | |SUB %: 0.17 | | | | GULF COAST PAVERS, INC. | |SUB %: 1.08 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.33 | | | | JMHP, INC. | |SUB %: 0.12 | | | | BIO LANDSCAPE & MAINTENANCE, INC. | |SUB %: 1.08 | | | | | | | | | | CONTRACT 02093202 | TOTALS | 12,637,055.63| 6,905.02| 12,362,872.60| 98.9| ************************************************************************************************************************************ BRAZORIA WEST CORNER OF 14TH STREET | 0.310 | 485,485.85| 62,493.75| 369,165.97| 76.0| SH 35 E CORNER OF 17TH ST IN W.COLUMBIA | | | | | | 0179-02-082 | | | | | | STP 2011(812) SDWIK REP.SPECIAL PV.PV MKS & SIGN | | | | | | | | | | | | WORK ORDER- 04-05-11 WORK BEGAN- 06-13-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-21-11 | | | | | | CONTRACT WORKING DAYS- 125 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 123 PERCENT TIME USED- 98 | | | | | | | | | | | | JERDON ENTERPRISE, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0179-02-082 | | | | | | KELLYSTONE, INC | |SUB %: 7.63 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 5.43 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.64 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.19 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 2.74 | | | | | | | | | | CONTRACT 02113023 | TOTALS | 485,485.85| 62,493.75| 369,165.97| 76.0| ************************************************************************************************************************************ BRAZORIA 0.373 MI N OF THIS WAY STREET | 4.735 | 63,360,228.52| 1,009,580.98| 57,388,698.35| 90.5| SH 332 0.196 MI S OF THIS WAY STREET | | | | | | 1524-01-041 | | | | | | NH 2009(399) GR, STRS, LTS, CSB & CONC PAVT | | | | | | | | | | | | WORK ORDER- 05-06-09 WORK BEGAN- 06-22-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-22-09 | | | | | | CONTRACT WORKING DAYS- 963 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 766 PERCENT TIME USED- 79 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1524-01-041 | | | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 0.65 | | | | CURB PLANET INC. | |SUB %: 0.07 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 2.96 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.39 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.69 | | | | EROSION CONTROL, INC. | |SUB %: 0.72 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.61 | | | | JOE VALENCIK, INC. | |SUB %: 0.41 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 10.64 | | | | TREVCON, INC. | |SUB %: 0.51 | | | | BATTERSON,LLP | |SUB %: 0.42 | | | | | | | | | | CONTRACT 03093226 | TOTALS | 63,360,228.52| 1,009,580.98| 57,388,698.35| 90.5| ************************************************************************************************************************************ BRAZORIA CR 105 (ROY RD) AT HICKORY SLOUGH | 0.135 | 649,949.93| 105,102.20| 310,705.19| 47.8| CS . | | | | | | 0912-31-197 | | | | | | BR 2007(202) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 04-15-11 WORK BEGAN- 10-10-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-10-11 | | | | | | CONTRACT WORKING DAYS- 77 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 48 PERCENT TIME USED- 62 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-197 | | | | | | REPUBLIC TRAFFIC SAFETY, INC. | |SUB %: 0.67 | | | | SPECIALTY DRILLING | |SUB %: 5.44 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.35 | | | | KELLYSTONE, INC | |SUB %: 3.07 | | | | PREMIER CONCRETE PRODUCTS,INC. | |SUB %: 3.90 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 4.30 | | | | YORK & YORK FOUNDATION DRILLING, INC. | |SUB %: 3.74 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 7.43 | | | | | | | | | | CONTRACT 03113003 | TOTALS | 649,949.93| 105,102.20| 310,705.19| 47.8| ************************************************************************************************************************************ BRAZORIA FORT BEND CL | 2.703 | 12,675,636.89| 590,809.98| 12,732,448.89| 99.9| FM 2234 SH 288 | | | | | | 2105-02-003 | | | | | | STP 2010(953)ES GR, STRS, BASE AND PAVE | | | | | | | | | | | | WORK ORDER- 07-21-10 WORK BEGAN- 08-20-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-06-10 | | | | | | CONTRACT WORKING DAYS- 372 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 341 PERCENT TIME USED- 91 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2105-02-003 | | | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.46 | | | | JMHP, INC. | |SUB %: 0.12 | | | | MURRAY CONSTRUCTION | |SUB %: 0.37 | | | | BECO CONSTRUCTION, L.L.C. | |SUB %: 1.11 | | | | CPAVE, INC. | |SUB %: 0.50 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.05 | | | | JAVALINA CONSTRUCTION SOUTH, INC. | |SUB %: 1.17 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 0.79 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 7.65 | | | | BATTERSON,LLP | |SUB %: 1.49 | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 7.71 | | | | PEREZ CONSTRUCTION CO. | |SUB %: 0.14 | | | | APCON SERVICES, LLC | |SUB %: 2.33 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.01 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.04 | | | | BUILDER SERVICES CO. | |SUB %: 0.35 | | | | TJ&T ENTERPRISES, INC. | |SUB %: 0.92 | | | | | | | | | | CONTRACT 06103015 | TOTALS | 12,675,636.89| 590,809.98| 12,732,448.89| 99.9| ************************************************************************************************************************************ BRAZORIA VARIOUS LOCATIONS BRAZORIA COUNTY | 0.003 | 308,543.60| 4,000.00| 321,963.62| 99.9| VA . | | | | | | 0912-31-228 | | | | | | NH 2009(830) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 08-10-09 WORK BEGAN- 08-26-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-26-09 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 48 PERCENT TIME USED- 80 | | | | | | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-228 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 1.45 | | | | TALL GRASS ENVIRONMENTAL SOLUTIONS, LLC | |SUB %: 7.89 | | | | | | | | | | CONTRACT 07093213 | TOTALS | 308,543.60| 4,000.00| 321,963.62| 99.9| ************************************************************************************************************************************ BRAZORIA CR 541 AT CHIGGER CREEK | 0.183 | 789,069.67| 3,598.75| 343,916.08| 43.5| CR . | | | | | | 0912-31-171 | | | | | | BR 2006(329) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 08-10-11 WORK BEGAN- 09-19-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-26-11 | | | | | | CONTRACT WORKING DAYS- 179 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 40 PERCENT TIME USED- 22 | | | | | | | | | | | | JOHN REED AND COMPANY, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-171 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.82 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.55 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 2.64 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 2.28 | | | | | | | | | | CONTRACT 07113005 | TOTALS | 789,069.67| 3,598.75| 343,916.08| 43.5| ************************************************************************************************************************************ BRAZORIA CR 128 AT DRAINAGE DITCH | 0.179 | 1,076,463.26| 0.00| 800,174.06| 74.3| CR . | | | | | | 0912-31-169 | | | | | | BR 2006(327) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 09-23-10 WORK BEGAN- 01-04-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-09-10 | | | | | | CONTRACT WORKING DAYS- 218 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 168 PERCENT TIME USED- 77 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-169 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.75 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 2.82 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.41 | | | | SHINN & GREGORY, INC. | |SUB %: 5.69 | | | | AAA ASPHALT PAVING, INC. | |SUB %: 9.08 | | | | | | | | | | CONTRACT 08103244 | TOTALS | 1,076,463.26| 0.00| 800,174.06| 74.3| ************************************************************************************************************************************ BRAZORIA AT 1300 FT N OF INTRACOASTAL BRIDGE | 0.001 | 299,499.00| 0.00| 0.00| 0.0| SH 332 . | | | | | | 0586-01-063 | | | | | | STP 1102(202) REPL EXIST DRN STRUCT | | | | | | | | | | | | WORK ORDER- 09-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-02-11 | | | | | | CONTRACT WORKING DAYS- 37 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0586-01-063 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113019 | TOTALS | 299,499.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ BRAZORIA 0.261 MI SE OF SH 35 | 66.958 | 1,083,224.24| 148,367.35| 627,249.17| 57.9| FM 523 SH 332 | | | | | | 1003-01-089 | | | | | | STP 1102(312)HES RUMBLE STRIPS | | | | | | | | | | | | WORK ORDER- 09-13-11 WORK BEGAN- 09-29-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-29-11 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 28 PERCENT TIME USED- 62 | | | | | | | | | | | | HIGHWAY TECHNOLOGIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1003-01-089 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113048 | TOTALS | 1,083,224.24| 148,367.35| 627,249.17| 57.9| ************************************************************************************************************************************ BRAZORIA AT CHOCOLATE BAYOU | 0.169 | 1,489,044.36| 150,736.32| 342,087.32| 22.9| FM 1462 (STR #10) | | | | | | 1414-03-034 | | | | | | BR 1102(314) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 10-13-11 WORK BEGAN- 11-07-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-29-11 | | | | | | CONTRACT WORKING DAYS- 114 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 29 PERCENT TIME USED- 25 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1414-03-034 | | | | | | CHERRY CRUSHED CONCRETE | |SUB %: 0.64 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.81 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.28 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.98 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.89 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.21 | | | | THIRD COAST SERVICES, LLC | |SUB %: 0.94 | | | | VALLEY PLACERS, LLC | |SUB %: 0.52 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.21 | | | | GMJ PAVING CO. | |SUB %: 7.76 | | | | JMHP, INC. | |SUB %: 1.01 | | | | CPAVE, INC. | |SUB %: 0.08 | | | | | | | | | | CONTRACT 08113055 | TOTALS | 1,489,044.36| 150,736.32| 342,087.32| 22.9| ************************************************************************************************************************************ BRAZORIA VARIOUS LOCATIONS BRAZORIA COUNTY | 0.001 | 114,114.14| 0.00| 0.00| 0.0| VA . | | | | | | 0912-31-227 | | | | | | STP 2012(022) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 10-13-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-29-11 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | JERDON ENTERPRISE, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-31-227 | | | | | | HEWITT ELECTRIC | |SUB %: 14.45 | | | | B & R MASONRY | |SUB %: 18.00 | | | | | | | | | | CONTRACT 09113009 | TOTALS | 114,114.14| 0.00| 0.00| 0.0| ************************************************************************************************************************************ BRAZORIA HARRIS COUNTY LINE | 2.706 | 19,620,958.21| 346,771.24| 9,885,463.96| 50.3| SH 35 FM 518 | | | | | | 0178-02-055 | | | | | | C 178-2-55 GR, WID STRS, BS & PAV | | | | | | | | | | | | BRAZORIA HARRIS COUNTY LINE | 0.001 | 2,096,363.08| 0.00| 1,985,093.61| 94.6| SH 35 FM 518 | | | | | | 0178-02-072 | | | | | | RW 178-2-72 ROW ACQ, UTIL ADJ & RELOC ASSIST | | | | | | | | | | | | WORK ORDER- 01-25-10 WORK BEGAN- 03-03-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-10-10 | | | | | | CONTRACT WORKING DAYS- 789 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 546 PERCENT TIME USED- 69 | | | | | | | | | | | | TRIPLE B SERVICES, L.L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0178-02-055 | | | | | | BATTERSON, L.L.P. | |SUB %: 1.01 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.40 | | | | APCON SERVICES, LLC | |SUB %: 0.80 | | | | BECO CONSTRUCTION, L.L.C. | |SUB %: 0.69 | | | | BEYER CONSTRUCTION, LLP | |SUB %: 2.31 | | | | CHERRY DEMOLITION | |SUB %: 0.53 | | | | HUBCO, INC. | |SUB %: 1.96 | | | | PROTECTIVE ENVIRONMENTAL STRATEGIES, INC. | |SUB %: 0.53 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 1.43 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.43 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 2.22 | | | | TOM-MAC, INC. | |SUB %: 4.65 | | | | RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC | |SUB %: 8.75 | | | | F & L CONCRETE SERVICES, INC. | |SUB %: 0.02 | | | | BORE CO. L.P. | |SUB %: 1.58 | | | | R & A BORING COMPANY | |SUB %: 0.73 | | | | JAVALINA CONSTRUCTION SOUTH, INC. | |SUB %: 0.29 | | | | MICKIE SERVICE, INC. | |SUB %: 0.40 | | | | NATIONAL DEWATERING SYSTEMS | |SUB %: 0.05 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.05 | | | | DOUGLAS PROPERTIES BORING | |SUB %: 0.24 | | | | CROSS ROADS INDUSTRIES, INC | |SUB %: 0.33 | | | | CURB PLANET INC. | |SUB %: 0.60 | | | | | | | | | | CONTRACT 12093002 | TOTALS | 21,717,321.29| 346,771.24| 11,870,557.57| 54.6| ************************************************************************************************************************************ BRAZORIA 0.19 MILES NORTH OF CR 360 | 2.092 | 5,344,886.63| 28,766.43| 5,463,776.22| 99.9| FM 524 SH 35 | | | | | | 1004-01-040 | | | | | | CC 1004-1-40 GR, STRS, LTS, CSB & ACP | | | | | | | | | | | | WORK ORDER- 01-10-11 WORK BEGAN- 01-26-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-26-11 | | | | | | CONTRACT WORKING DAYS- 215 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 213 PERCENT TIME USED- 99 | | | | | | | | | | | | TRIPLE B SERVICES, L.L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1004-01-040 | | | | | | CHAMPIONS HYDROLAWN | |SUB %: 0.08 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 0.25 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.28 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.15 | | | | JAVELINA CONSTRUCTION SOUTH, INC. | |SUB %: 0.62 | | | | MIKE SORRELL TRUCKING | |SUB %: 0.48 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.76 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 17.84 | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 1.06 | | | | THIRD COAST SERVICES, LLC | |SUB %: 2.84 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 1.61 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.04 | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 6.05 | | | | | | | | | | CONTRACT 12103010 | TOTALS | 5,344,886.63| 28,766.43| 5,463,776.22| 99.9| ************************************************************************************************************************************ FORT BEND 0.42 MILES NORTH OF WILLIAMS WAY | 0.665 | 826,826.01| 1,280.14| 774,135.34| 96.8| US 59 0.39 MILES NORTH OF SWEETWATER BLVD | | | | | | 0027-12-135 | | | | | | NH 2011(668) REALIGN NB FRONTAGE ROAD | | | | | | | | | | | | WORK ORDER- 02-15-11 WORK BEGAN- 03-03-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-03-11 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 110 PERCENT TIME USED- 183 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0027-12-135 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 3.78 | | | | PFEIFFER & SON LTD. | |SUB %: 0.50 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.45 | | | | JMHP, INC. | |SUB %: 0.74 | | | | HOLES INCORPORATED | |SUB %: 3.50 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 38.33 | | | | LANDPRO, INC. | |SUB %: 6.69 | | | | | | | | | | CONTRACT 01113208 | TOTALS | 826,826.01| 1,280.14| 774,135.34| 96.8| ************************************************************************************************************************************ FORT BEND W OF FARMER ROAD | 2.424 | 11,784,812.25| 240,065.52| 8,744,704.17| 74.6| FM 359 US 90A | | | | | | 0543-02-047 | | | | | | STP 2009(701)ES GR, STR, BASE, & CONC | | | | | | | | | | | | WORK ORDER- 04-01-10 WORK BEGAN- 04-19-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-17-10 | | | | | | CONTRACT WORKING DAYS- 468 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 503 PERCENT TIME USED- 107 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0543-02-047 | | | | | | BATTERSON, L.L.P. | |SUB %: 2.04 | | | | SEMARCK LANDSCAPE SERVICES, INC. | |SUB %: 0.04 | | | | GMJ PAVING CO. | |SUB %: 15.60 | | | | CHAMPIONS HYDROLAWN | |SUB %: 0.66 | | | | ORP CONSTRUCTION | |SUB %: 0.57 | | | | BREDA COMPANY, INC. | |SUB %: 0.72 | | | | HOLES INCORPORATED | |SUB %: 0.02 | | | | CHERRY DEMOLITION | |SUB %: 0.06 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.31 | | | | H & H CURB COMPANY | |SUB %: 0.20 | | | | JMHP, INC. | |SUB %: 0.03 | | | | GULF COAST PAVERS, INC. | |SUB %: 0.11 | | | | THIRD COAST SERVICES, LLC | |SUB %: 3.04 | | | | | | | | | | CONTRACT 02103003 | TOTALS | 11,784,812.25| 240,065.52| 8,744,704.17| 74.6| ************************************************************************************************************************************ FORT BEND SHILOH LAKES DR | 2.724 | 13,611,377.00| 821,134.25| 11,374,762.62| 83.5| FM 1464 SH 99 | | | | | | 1415-02-040 | | | | | | STP 2009(703)ES GR, STRS BASE & SURF | | | | | | | | | | | | WORK ORDER- 04-14-10 WORK BEGAN- 06-14-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-30-10 | | | | | | CONTRACT WORKING DAYS- 393 ADDL DAYS GRANTED- 85 | | | | | | WORKING DAYS CHARGED- 456 PERCENT TIME USED- 95 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1415-02-040 | | | | | | EMBARK | |SUB %: 0.21 | | | | BATTERSON, L.L.P. | |SUB %: 1.71 | | | | CHAMPIONS HYDROLAWN | |SUB %: 0.93 | | | | NBG CONSTRUCTORS, INC. | |SUB %: 16.22 | | | | SEMARCK LANDSCAPE SERVICES, INC. | |SUB %: 0.21 | | | | RDI FOUNDATION DRILLING | |SUB %: 0.68 | | | | CHERRY DEMOLITION | |SUB %: 0.09 | | | | ORP CONSTRUCTION | |SUB %: 0.41 | | | | BREDA COMPANY, INC. | |SUB %: 0.77 | | | | CURB PLANET INC. | |SUB %: 0.20 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 2.90 | | | | GMJ PAVING CO. | |SUB %: 8.33 | | | | JMHP, INC. | |SUB %: 0.18 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.45 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.02 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.02 | | | | SAN JACINTO BORING & TUNNELING, INC. | |SUB %: 0.15 | | | | MICKIE SERVICE, INC. | |SUB %: 0.07 | | | | EROSION PREVENTION PRODUCTS | |SUB %: 0.23 | | | | | | | | | | CONTRACT 02103203 | TOTALS | 13,611,377.00| 821,134.25| 11,374,762.62| 83.5| ************************************************************************************************************************************ FORT BEND STAFFORD/STAFFORDSHIRE,HARRIS C/L | 2.210 | 8,870,686.85| 259,153.75| 9,898,104.32| 99.9| CS 5TH STREET | | | | | | 0912-34-126 | | | | | | STP 2009(792)ES WIDEN TO 4 LANES CURB & GUTTER | | | | | | | | | | | | FORT BEND STAFFORD/STAFFORDSHIRE RD,HARRIS C/ | 2.210 | 1,557,289.00| 0.00| 1,627,193.26| 99.9| CS 5TH STREET | | | | | | 0912-34-168 | | | | | | CC 912-34-168 ROW UTL. ADJ. IN CST. CONTRACT | | | | | | | | | | | | HARRIS STAFFORD/STAFFORDSHIRE RD, BW 8 | 0.574 | 2,053,028.90| 2,093.99| 2,086,554.62| 99.9| CS FORT BEND COUNTY LINE | | | | | | 0912-72-246 | | | | | | CC 912-72-246 WIDEN TO 4 LANES CURB & GUTTER | | | | | | | | | | | | HARRIS STAFFORD/STAFFORDSHIRE RD, BW 8 | 0.574 | 63,887.00| 6,310.00| 61,303.00| 95.9| CS FORT BEND COUNTY LINE | | | | | | 0912-72-262 | | | | | | CC 912-72-262 ROW UTL. ADJ. IN CST. CONTRACT | | | | | | | | | | | | WORK ORDER- 05-11-10 WORK BEGAN- 06-07-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-27-10 | | | | | | CONTRACT WORKING DAYS- 360 ADDL DAYS GRANTED- 90 | | | | | | WORKING DAYS CHARGED- 446 PERCENT TIME USED- 99 | | | | | | | | | | | | DURWOOD GREENE CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-34-126 | | | | | | JMHP, INC. | |SUB %: 0.03 | | | | CURB PLANET INC. | |SUB %: 0.23 | | | | EROSION CONTROL, INC. | |SUB %: 0.83 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.27 | | | | BATTERSON, L.L.P. | |SUB %: 1.05 | | | | THIRD COAST SERVICES, LLC | |SUB %: 2.08 | | | | L.A. UTILITIES, INC. | |SUB %: 40.41 | | | | ASPLUNDH COMPANY | |SUB %: 0.05 | | | | BORTUNCO | |SUB %: 0.29 | | | | DORAN STEEL, INC. | |SUB %: 0.52 | | | | CENTRAL CONSTRUCTION SERVICES, INC. | |SUB %: 0.97 | | | | CLEARWATER UTILITIES, INC. | |SUB %: 4.54 | | | | R & A BORING COMPANY | |SUB %: 0.02 | | | | HUNTER WELLPOINT, INC. | |SUB %: 0.04 | | | | SIREN STEEL, INC. | |SUB %: 0.36 | | | | | | | | | | CONTRACT 03103003 | TOTALS | 12,544,891.75| 267,557.74| 13,673,155.20| 99.9| ************************************************************************************************************************************ FORT BEND VARIOUS LOCATIONS IN MISSOURI CITY | 0.001 | 2,778,094.72| 0.00| 2,401,246.00| 86.4| VA . | | | | | | 0912-34-150 | | | | | | STP 2010(303)ES ITS | | | | | | | | | | | | WORK ORDER- 04-30-10 WORK BEGAN- 07-01-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-16-10 | | | | | | CONTRACT WORKING DAYS- 135 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 124 PERCENT TIME USED- 91 | | | | | | | | | | | | TRANSCORE ITS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-34-150 | | | | | | BATTERSON, L.L.P. | |SUB %: 0.29 | | | | APMS TELECOM, LLC | |SUB %: 9.71 | | | | KAM CONSTRUCTION, INC. | |SUB %: 11.25 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 1.07 | | | | ADEPT GENERAL CONSTRUCTION, INC. | |SUB %: 7.88 | | | | | | | | | | CONTRACT 03103210 | TOTALS | 2,778,094.72| 0.00| 2,401,246.00| 86.4| ************************************************************************************************************************************ FORT BEND US 59 | 2.310 | 14,284,407.38| 838,718.48| 9,239,253.51| 64.6| FM 2218 FM 1640 | | | | | | 2093-01-009 | | | | | | STP 2008(050)MM GR, STRS, BASE & SURF | | | | | | | | | | | | WORK ORDER- 07-22-10 WORK BEGAN- 10-11-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-20-10 | | | | | | CONTRACT WORKING DAYS- 552 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 377 PERCENT TIME USED- 68 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2093-01-009 | | | | | | HURTADO CONSTRUCTION COMPANY | |SUB %: 13.80 | | | | BATTERSON,LLP | |SUB %: 1.84 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.36 | | | | BREDA COMPANY, INC. | |SUB %: 0.70 | | | | GMJ PAVING CO. | |SUB %: 6.95 | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | |SUB %: 9.09 | | | | H & H CURB COMPANY | |SUB %: 0.15 | | | | CHAMPIONS HYDROLAWN | |SUB %: 0.84 | | | | JMHP, INC. | |SUB %: 0.07 | | | | R & A BORING COMPANY | |SUB %: 1.10 | | | | EROSION PREVENTION PRODUCTS | |SUB %: 0.23 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 0.11 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 0.30 | | | | | | | | | | CONTRACT 05103002 | TOTALS | 14,284,407.38| 838,718.48| 9,239,253.51| 64.6| ************************************************************************************************************************************ FORT BEND KIRKWOOD | 2.775 | 204,936.96| 0.00| 211,547.40| 99.9| US 90A W PRESENT STREET | | | | | | 0027-08-167 | | | | | | NH 2011(162) CONTINUOUS SAFETY LIGHTING | | | | | | | | | | | | WORK ORDER- 09-15-10 WORK BEGAN- 10-18-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-01-10 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 80 PERCENT TIME USED- 88 | | | | | | | | | | | | THIRD COAST SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0027-08-167 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08103014 | TOTALS | 204,936.96| 0.00| 211,547.40| 99.9| ************************************************************************************************************************************ FORT BEND VARIOUS LOCATIONS ON US 59 | 0.001 | 232,761.67| 3,437.17| 219,106.84| 94.1| VA . | | | | | | 0912-34-148 | | | | | | STP 2010(059)ESTE LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 11-16-09 WORK BEGAN- 12-18-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-02-09 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 42 PERCENT TIME USED- 93 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-34-148 | | | | | | R & A DIRECTIONAL BORING | |SUB %: 2.14 | | | | XELLENT SERVICES | |SUB %: 4.19 | | | | | | | | | | CONTRACT 09093020 | TOTALS | 232,761.67| 3,437.17| 219,106.84| 94.1| ************************************************************************************************************************************ GALVESTON SEAWOLF PKWY AT PELICAN ISLAND CHNL | 0.612 | 3,439,504.50| 4,000.00| 3,188,158.80| 92.6| CS . | | | | | | 0912-73-117 | | | | | | BR 2007(366) REHABILITATE BRIDGE | | | | | | | | | | | | WORK ORDER- 05-18-11 WORK BEGAN- 08-03-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-03-11 | | | | | | CONTRACT WORKING DAYS- 301 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 135 PERCENT TIME USED- 44 | | | | | | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-73-117 | | | | | | ORION CONSTRUCTION, L.P. | |SUB %: 6.38 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.30 | | | | INTECH CONTRACTING LLC | |SUB %: 74.13 | | | | BRIDGES R US PAINTING CO., INC. | |SUB %: 36.05 | | | | | | | | | | CONTRACT 04113207 | TOTALS | 3,439,504.50| 4,000.00| 3,188,158.80| 92.6| ************************************************************************************************************************************ GALVESTON UPRR OUTFALL DITCHES D AND E | 0.955 | 462,223.71| 11,216.67| 385,931.30| 83.4| SH 3 . | | | | | | 0051-03-100 | | | | | | NH 1102(060) DRAINAGE IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 08-16-11 WORK BEGAN- 08-20-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-01-11 | | | | | | CONTRACT WORKING DAYS- 78 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 39 PERCENT TIME USED- 50 | | | | | | | | | | | | TRIPLE B SERVICES, L.L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0051-03-100 | | | | | | CANALES TRUCKING | |SUB %: 1.31 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.52 | | | | CHERRY DEMOLITION | |SUB %: 0.65 | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 3.89 | | | | | | | | | | CONTRACT 06113005 | TOTALS | 462,223.71| 11,216.67| 385,931.30| 83.4| ************************************************************************************************************************************ GALVESTON N OF LOOP 197 | 1.231 | 7,825,859.49| 116,872.16| 7,801,755.12| 99.7| SH 146 S OF LOOP 197 | | | | | | 0389-06-098 | | | | | | STP 2011(032)MM CONSTRUCT SB GRADE SEPARATION | | | | | | | | | | | | WORK ORDER- 09-01-10 WORK BEGAN- 09-16-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-17-10 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 12 | | | | | | WORKING DAYS CHARGED- 197 PERCENT TIME USED- 102 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0389-06-098 | | | | | | BATTERSON,LLP | |SUB %: 0.42 | | | | MAIN LANE INDUSTRIES, LTD. | |SUB %: 3.76 | | | | NORTHWEST MATERIALS | |SUB %: 0.11 | | | | PENNTEX MILLING, LLC | |SUB %: 0.22 | | | | PROTECTIVE ENVIRONMENTAL STRATEGIES, INC. | |SUB %: 0.25 | | | | RDI FOUNDATION DRILLING | |SUB %: 12.72 | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 0.22 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.04 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.12 | | | | JMHP, INC. | |SUB %: 0.16 | | | | MESA ROD BUSTERS, INC. | |SUB %: 4.50 | | | | DORAN STEEL, INC. | |SUB %: 0.63 | | | | EROSION CONTROL, INC. | |SUB %: 0.36 | | | | TRAF-TEX, INC. | |SUB %: 0.19 | | | | CURB PLANET INC. | |SUB %: 0.01 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.43 | | | | | | | | | | CONTRACT 07103064 | TOTALS | 7,825,859.49| 116,872.16| 7,801,755.12| 99.7| ************************************************************************************************************************************ GALVESTON BROADWAY ST FROM 6TH STREET | 0.001 | 633,856.07| 0.00| 623,785.36| 98.4| VA 61ST STREET | | | | | | 0912-73-137 | | | | | | CM 2011(329) UPGRADE TRAFFIC SIGNALS & SYNCH | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 01-31-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-31-11 | | | | | | CONTRACT WORKING DAYS- 106 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 102 PERCENT TIME USED- 96 | | | | | | | | | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-73-137 | | | | | | AMERICAN CABLE SERVICES, INC. | |SUB %: 3.62 | | | | HENKELS & MCCOY, INC. | |SUB %: 38.26 | | | | | | | | | | CONTRACT 08103097 | TOTALS | 633,856.07| 0.00| 623,785.36| 98.4| ************************************************************************************************************************************ GALVESTON AT FM 1765 | 0.001 | 154,993.60| 0.00| 74,201.00| 47.8| SH 146 . | | | | | | 0389-07-035 | | | | | | STP 1102(303)HESG TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 10-03-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 43 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 23 PERCENT TIME USED- 53 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0389-07-035 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113015 | TOTALS | 154,993.60| 0.00| 74,201.00| 47.8| ************************************************************************************************************************************ GALVESTON VARIOUS LOCATIONS | 3.842 | 3,284,825.97| 102,880.18| 118,227.49| 3.5| VA IN GALVESTON COUNTY | | | | | | 0912-73-180 | | | | | | STP 1102(311) CONSTRUCT CURB RAMPS | | | | | | | | | | | | WORK ORDER- 10-21-11 WORK BEGAN- 11-06-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-06-11 | | | | | | CONTRACT WORKING DAYS- 254 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 25 PERCENT TIME USED- 9 | | | | | | | | | | | | MAIN LANE INDUSTRIES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-73-180 | | | | | | THIRD COAST SERVICES, LLC | |SUB %: 11.29 | | | | WORK ZONE PRODUCTS, INC. | |SUB %: 5.46 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 1.91 | | | | SUPERIOR LIGHTING | |SUB %: 0.43 | | | | | | | | | | CONTRACT 08113036 | TOTALS | 3,284,825.97| 102,880.18| 118,227.49| 3.5| ************************************************************************************************************************************ GALVESTON BRAZORIA C/L | 6.862 | 1,626,527.86| 71,694.90| 1,609,038.32|100.0| FM 2004 SH 6 | | | | | | 2523-01-023 | | | | | | STP 1102(438) ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 09-30-11 | | | | | | DATE WORK COMPLETED- 01-06-12 TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 46 PERCENT TIME USED- 102 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2523-01-023 | | | | | | BATTERSON,LLP | |SUB %: 8.45 | | | | | | | | | | CONTRACT 08113064 | TOTALS | 1,626,527.86| 71,694.90| 1,609,038.32|100.0| ************************************************************************************************************************************ GALVESTON IH 45 | 1.434 | 9,777,012.33| 0.00| 1,559,868.20| 15.9| FM 646 SH 3 | | | | | | 3049-01-027 | | | | | | STP 1102(316) GR, BASE, SURF, STRS | | | | | | | | | | | | WORK ORDER- 09-30-11 WORK BEGAN- 10-17-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-16-11 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 9 PERCENT TIME USED- 3 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3049-01-027 | | | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 4.48 | | | | BATTERSON,LLP | |SUB %: 1.20 | | | | GULF COAST PAVERS, INC. | |SUB %: 1.06 | | | | H & H CURB COMPANY | |SUB %: 0.13 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.37 | | | | GMJ PAVING CO. | |SUB %: 5.15 | | | | JMHP, INC. | |SUB %: 0.15 | | | | CHAMPIONS HYDRO-LAWN | |SUB %: 0.64 | | | | BREDA COMPANY, INC. | |SUB %: 0.00 | | | | | | | | | | CONTRACT 08113210 | TOTALS | 9,777,012.33| 0.00| 1,559,868.20| 15.9| ************************************************************************************************************************************ GALVESTON AT DRAINAGE DITCH NO. 9 | 0.067 | 560,971.17| 162,428.40| 433,398.24| 77.2| FM 1765 . | | | | | | 0686-02-024 | | | | | | BR 1102(306) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 09-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-03-11 | | | | | | CONTRACT WORKING DAYS- 63 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 42 PERCENT TIME USED- 66 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0686-02-024 | | | | | | CHERRY CRUSHED CONCRETE | |SUB %: 1.65 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.43 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.22 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 10.77 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.76 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 9.50 | | | | | | | | | | CONTRACT 08113234 | TOTALS | 560,971.17| 162,428.40| 433,398.24| 77.2| ************************************************************************************************************************************ GALVESTON BIRCH ROAD | 0.053 | 377,937.65| 0.00| 0.00| 0.0| CR AT CLEAR LAKE SHORE CAN | | | | | | 0912-73-113 | | | | | | BR 2005(149) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 09-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-15-11 | | | | | | CONTRACT WORKING DAYS- 74 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ARANDA BROTHERS CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-73-113 | | | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 1.21 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 10.04 | | | | | | | | | | CONTRACT 08113251 | TOTALS | 377,937.65| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GALVESTON SH 146 | 1.990 | 1,219,291.07| 0.00| 0.00| 0.0| FM 1764 14TH STREET | | | | | | 1607-01-049 | | | | | | STP 1102(326) MILL, CAM, O/L, CURB REP | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1607-01-049 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 6.59 | | | | THIRD COAST SERVICES, LLC | |SUB %: 5.09 | | | | | | | | | | CONTRACT 08113259 | TOTALS | 1,219,291.07| 0.00| 0.00| 0.0| ************************************************************************************************************************************ GALVESTON SH 3 | 5.045 | 2,341,740.72| 274,670.56| 719,964.12| 30.7| FM 646 FM 3436 | | | | | | 3049-01-028 | | | | | | NH 2012(024) BS REPAIR, OCST & OVERLAY | | | | | | | | | | | | WORK ORDER- 10-13-11 WORK BEGAN- 11-09-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-29-11 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 24 PERCENT TIME USED- 40 | | | | | | | | | | | | DURWOOD GREENE CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3049-01-028 | | | | | | THIRD COAST SERVICES, LLC | |SUB %: 3.22 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 4.61 | | | | JMHP, INC. | |SUB %: 1.30 | | | | | | | | | | CONTRACT 09113007 | TOTALS | 2,341,740.72| 274,670.56| 719,964.12| 30.7| ************************************************************************************************************************************ GALVESTON WEST END OF GALVESTON SEAWALL | 2.860 | 1,274,438.63| 60,968.77| 1,138,670.27|100.0| FM 3005 SPUR 342 (61ST STREET) | | | | | | 0051-09-025 | | | | | | STP 2012(018) PLANE,ACP OVERLAY AND PAVEMENT MRKS | | | | | | | | | | | | WORK ORDER- 10-19-11 WORK BEGAN- 11-07-11 | | | | | | DATE WORK COMPLETED- 01-05-12 TIME COMPUTED- 11-04-11 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 17 PERCENT TIME USED- 37 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0051-09-025 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 9.43 | | | | | | | | | | CONTRACT 09113214 | TOTALS | 1,274,438.63| 60,968.77| 1,138,670.27|100.0| ************************************************************************************************************************************ GALVESTON N GALVESTON-BOLIVAR FERRY LANDING | 1.750 | 3,147,777.00| 0.00| 3,302,184.95| 99.9| SH 87 S GALVESTON-BOLIVAR FERRY LANDING | | | | | | 0367-05-047 | | | | | | ER 2009(935) REPAIR DAMAGE TO FERRY LANDING | | | | | | | | | | | | WORK ORDER- 01-07-10 WORK BEGAN- 01-23-10 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-23-10 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 27 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 272 PERCENT TIME USED- 91 | |**************************************************| | | | | | | | TEXAS GULF CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0367-05-047 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12093222 | TOTALS | 3,147,777.00| 0.00| 3,302,184.95| 99.9| ************************************************************************************************************************************ HARRIS IH 45, HARRIS/MONTGOMERY CO LINE | 26.525 | 1,184,058.62| 50,320.89| 1,072,921.90| 90.6| VA US 59 | | | | | | 0912-70-012 | | | | | | HP 2009(330) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 03-12-09 WORK BEGAN- 03-28-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-28-09 | | | | | | CONTRACT WORKING DAYS- 780 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 705 PERCENT TIME USED- 90 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-70-012 | | | | | | XELLENT SERVICES | |SUB %: 5.01 | | | | | | | | | | CONTRACT 01093001 | TOTALS | 1,184,058.62| 50,320.89| 1,072,921.90| 90.6| ************************************************************************************************************************************ HARRIS US 59 | 13.443 | 423,082.94| 3,653.20| 432,675.59| 99.9| IH 45 BW 8 SOUTH | | | | | | 0500-03-555 | | | | | | HP 2009(331) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 02-12-09 WORK BEGAN- 03-04-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-28-09 | | | | | | CONTRACT WORKING DAYS- 780 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 726 PERCENT TIME USED- 93 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0500-03-555 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01093021 | TOTALS | 423,082.94| 3,653.20| 432,675.59| 99.9| ************************************************************************************************************************************ HARRIS US 59, WILL CLAYTON PARKWAY | 17.889 | 825,017.52| 30,500.92| 753,325.56| 91.3| VA IH 45 | | | | | | 0912-70-013 | | | | | | HP 2009(332) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 03-12-09 WORK BEGAN- 03-28-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-28-09 | | | | | | CONTRACT WORKING DAYS- 780 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 705 PERCENT TIME USED- 90 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-70-013 | | | | | | XELLENT SERVICES | |SUB %: 4.07 | | | | | | | | | | CONTRACT 01093022 | TOTALS | 825,017.52| 30,500.92| 753,325.56| 91.3| ************************************************************************************************************************************ HARRIS WASHINGTON AVE. | 6.766 | 48,579,333.56| 959,353.13| 34,700,746.00| 70.8| IH 10 TAYLOR ST. | | | | | | 0271-07-242 | | | | | | STP 2010(232)ES RECONST & WIDEN SUBGR, PVMT & STRS | | | | | | | | | | | | WORK ORDER- 03-26-10 WORK BEGAN- 04-26-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-26-10 | | | | | | CONTRACT WORKING DAYS- 777 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 496 PERCENT TIME USED- 63 | | | | | | | | | | | | BALFOUR BEATTY INFRASTRUCTURE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-07-242 | | | | | | BATTERSON, L.L.P. | |SUB %: 0.60 | | | | BIO LANDSCAPE & MAINTENANCE, INC. | |SUB %: 2.02 | | | | CRAVENS SERVICES, INC. | |SUB %: 3.98 | | | | CREACOM, INC. | |SUB %: 6.12 | | | | CURB PLANET INC. | |SUB %: 0.05 | | | | ESSARY, HART & MACWILIAM,INC. | |SUB %: 0.65 | | | | FARR FOUNDATION, INC. | |SUB %: 0.66 | | | | GMJ PAVING CO. | |SUB %: 2.17 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.17 | | | | J.H. PAINTING COMPANY | |SUB %: 0.34 | | | | LMS, INC. | |SUB %: 0.54 | | | | MERIDIAN FENCE AND SECURITY, L.P. | |SUB %: 1.12 | | | | SOUTHERN CRUSHED CONCRETE INC. | |SUB %: 1.33 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 1.55 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.72 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 2.99 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.14 | | | | REINFORCED EARTH | |SUB %: 3.27 | | | | JOB LINK PERSONNEL SERVICES, INC. | |SUB %: 0.22 | | | | SPECIALTY DRILLING | |SUB %: 0.42 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.40 | | | | BEDO CONSTRUCTION PRODUCTS, INC. | |SUB %: 6.04 | | | | ISBELL CONSTRUCTION | |SUB %: 0.06 | | | | R & A BORING COMPANY | |SUB %: 0.20 | | | | BORING & TUNNELING COMPANY OF AMERICA, INC. | |SUB %: 0.22 | | | | T & C CONSTRUCTION, INC. | |SUB %: 11.18 | | | | S & S MASONRY,INC. | |SUB %: 0.07 | | | | VAN & SONS_DRILLING SERVICE, INC. | |SUB %: 0.05 | | | | MEDCALF FABRICATION, INC. | |SUB %: 0.70 | | | | ENERGY ELECTRICAL SUPPLY,INC. | |SUB %: 0.40 | | | | ALLSTATE GROUNDWATER CONTROL, LP | |SUB %: 0.19 | | | | PFEIFFER & SON LTD. | |SUB %: 1.75 | | | | TOM-MAC, INC. | |SUB %: 0.44 | | | | J. W. RENEAU ROOFING CO. | |SUB %: 0.03 | | | | UNIVERSAL COATING SPECIALISTS | |SUB %: 0.03 | | | | W.W. OVERHEAD DOOR COMPANY | |SUB %: 0.00 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.06 | | | | | | | | | | CONTRACT 01103201 | TOTALS | 48,579,333.56| 959,353.13| 34,700,746.00| 70.8| ************************************************************************************************************************************ HARRIS FORT BEND COUNTY LINE | 9.850 | 792,517.80| 0.00| 123,345.25| 15.5| IH 10 EAST OF MEMORIAL BROOK IN SECTIONS | | | | | | 0271-06-118 | | | | | | IM 0107(428) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 03-22-11 WORK BEGAN- 05-05-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-07-11 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 45 | | | | | | WORKING DAYS CHARGED- 42 PERCENT TIME USED- 46 | | | | | | | | | | | | BOYER, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-06-118 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01113007 | TOTALS | 792,517.80| 0.00| 123,345.25| 15.5| ************************************************************************************************************************************ HARRIS AT BW 8 | 1.515 | 474,428.50| 0.00| 443,151.25| 94.3| IH 45 . | | | | | | 0110-06-129 | | | | | | IM 0451(336) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 03-29-11 WORK BEGAN- 07-12-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-14-11 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 54 PERCENT TIME USED- 120 | | | | | | | | | | | | STONERIDGE CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0110-06-129 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.55 | | | | CC MATERIAL SUPPLY, LLC | |SUB %: 8.47 | | | | | | | | | | CONTRACT 01113209 | TOTALS | 474,428.50| 0.00| 443,151.25| 94.3| ************************************************************************************************************************************ HARRIS WEST OF GREENSPOINT DR. | 2.451 | 15,013,244.15| 182,345.48| 7,023,782.04| 46.7| BW 8 WEST HARDY ROAD | | | | | | 3256-02-061 | | | | | | CM 2008(838) GR, STRS, BASE AND PAVE | | | | | | | | | | | | HARRIS IH 45N | 1.553 | 390,857.00| 144,805.00| 242,568.00| 62.0| BW 8 HARDY TOLL ROAD | | | | | | 3256-02-070 | | | | | | CM 2006(382) ACQUISITION, UTILITIES AND RELOCATI | | | | | | | | | | | | WORK ORDER- 05-22-09 WORK BEGAN- 09-05-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-05-09 | | | | | | CONTRACT WORKING DAYS- 575 ADDL DAYS GRANTED- 502 | | | | | | WORKING DAYS CHARGED- 658 PERCENT TIME USED- 61 | | | | | | | | | | | | LIBERTY MUTUAL INSURANCE COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3256-02-061 | | | | | | COASTAL CRUSHED CONCRETE, LLC | |SUB %: 2.59 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.26 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 1.14 | | | | DIAMOND J DRILLING | |SUB %: 1.75 | | | | KENNETH LAMB CONSTRUCTION | |SUB %: 12.42 | | | | JOE VALENCIK, INC. | |SUB %: 0.88 | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 0.06 | | | | CHERRY DEMOLITION | |SUB %: 0.11 | | | | JET UNDERGROUND UTILITIES, INC. | |SUB %: 2.80 | | | | CPAV SPECIALTIES, LP | |SUB %: 0.42 | | | | TRIUMPH PARKING LOT MAINTENANCE, INC. | |SUB %: 0.04 | | | | NORTHWEST MATERIALS | |SUB %: 0.01 | | | | BAHENA STEEL | |SUB %: 0.12 | | | | MESA ROD BUSTERS, INC. | |SUB %: 1.17 | | | | GROUND HOG FOUNDATION DRILLING | |SUB %: 0.06 | | | | VICK OPERATING COMPANY, LLC | |SUB %: 0.96 | | | | HUBCO, INC. | |SUB %: 0.96 | | | | JTB SERVICES | |SUB %: 0.32 | | | | PEREZ CONSTRUCTION | |SUB %: 0.12 | | | | TEXAS STERLING CONSTRUCTION CO. | |SUB %: 65.72 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.70 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.07 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.38 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.17 | | | | BATTERSON,LLP | |SUB %: 1.24 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 2.39 | | | | SOUTHERN CRUSHED CONCRETE LLC | |SUB %: 1.64 | | | | EL DORADO PAVING COMPANY, INC. | |SUB %: 0.61 | | | | A A CONSTRUCTION | |SUB %: 0.61 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.16 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.31 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.97 | | | | | | | | | | CONTRACT 03093228 | TOTALS | 15,404,101.15| 327,150.48| 7,266,350.04| 47.1| ************************************************************************************************************************************ HARRIS ON LITTLE YORK E FROM AIRLINE | 0.918 | 7,317,100.79| 3,983.97| 7,397,721.67| 99.9| CS HARDY TOLL ROAD | | | | | | 0912-71-637 | | | | | | STP 99(550)ES WIDEN TO 4 LANE DIVIDED | | | | | | | | | | | | HARRIS ON LITTLE YORK E FROM AIRLINE | 0.920 | 875,983.00| 0.00| 951,888.50| 99.9| CS HARDY TOLL ROAD | | | | | | 0912-72-264 | | | | | | RW 912-72-264 ROW UTL. ADJ. IN CST. CONTRACT | | | | | | | | | | | | WORK ORDER- 05-24-10 WORK BEGAN- 06-09-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-09-10 | | | | | | CONTRACT WORKING DAYS- 295 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 294 PERCENT TIME USED- 99 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-637 | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.55 | | | | SPRING EQUIPMENT CO., INC. | |SUB %: 9.38 | | | | STATEWIDE SERVICES, INC | |SUB %: 0.43 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, INC | |SUB %: 0.84 | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | |SUB %: 2.00 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.15 | | | | FOSTER FENCE, LTD. | |SUB %: 0.45 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.40 | | | | BORING & TUNNELING COMPANY OF AMERICA, INC. | |SUB %: 0.09 | | | | SON-WAY AGRI. PRODUCTS | |SUB %: 0.47 | | | | AMERICAN DEWATERING SERVICES, INC. | |SUB %: 0.84 | | | | ROSALES TRUCKING | |SUB %: 3.77 | | | | EL DORADO PAVING COMPANY, INC. | |SUB %: 2.16 | | | | SPRINT SAND AND CLAY, LLC | |SUB %: 6.95 | | | | BREDA COMPANY, INC. | |SUB %: 0.07 | | | | | | | | | | CONTRACT 03103005 | TOTALS | 8,193,083.79| 3,983.97| 8,349,610.17| 99.9| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 4,068,749.00| 14,750.00| 1,988,899.10| 48.8| VA . | | | | | | 0912-00-397 | | | | | | STP 2009(706)ES ITS IMPLEMENTATION | | | | | | | | | | | | WORK ORDER- 05-13-10 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-29-10 | | | | | | CONTRACT WORKING DAYS- 260 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 100 PERCENT TIME USED- 38 | | | | | | | | | | | | REPUBLIC INTELLIGENT TRANSPORTATION SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-397 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03103006 | TOTALS | 4,068,749.00| 14,750.00| 1,988,899.10| 48.8| ************************************************************************************************************************************ HARRIS N WAYSIDE DR AT HALLS BAYOU | 0.161 | 1,596,215.05| -10,625.00| 1,430,603.68| 95.3| CS . | | | | | | 0912-72-051 | | | | | | BR 2006(742) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | HARRIS N WAYSIDE DR AT HALLS BAYOU | 0.161 | 57,070.50| 23,848.00| 45,981.25| 80.5| CS . | | | | | | 0912-72-268 | | | | | | CC 912-72-268 ROW UTL. ADJ. IN CST. CONTRACT | | | | | | | | | | | | WORK ORDER- 06-01-10 WORK BEGAN- 11-05-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-17-10 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 295 PERCENT TIME USED- 196 | | | | | | | | | | | | LIBERTY MUTUAL INSURANCE COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-051 | | | | | | CPAVE, INC. | |SUB %: 0.39 | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 1.08 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.45 | | | | MESA ROD BUSTERS, INC. | |SUB %: 3.74 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 6.14 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 4.93 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.09 | | | | PEREZ CONSTRUCTION CO. | |SUB %: 0.06 | | | | ODUM SERVICES, L.P. | |SUB %: 0.58 | | | | HY-TECH WELDING AND FABRICATING | |SUB %: 0.13 | | | | WALLACE CONCRETE SAWING | |SUB %: 0.15 | | | | S & R WELDING SERVICE | |SUB %: 0.13 | | | | TEXAS STERLING CONSTRUCTION CO. | |SUB %: 0.55 | | | | | | | | | | CONTRACT 03103017 | TOTALS | 1,653,285.55| 13,223.00| 1,476,584.93| 94.7| ************************************************************************************************************************************ HARRIS N MAIN BETWEEN TEXAS AVE AND BAKER | 0.001 | 984,861.47| 0.00| 966,055.82| 98.0| VA ALEXANDER BETWEEN TEXAS AVE/MCKINNE | | | | | | 0912-72-153 | | | | | | CM 2009(631) TS SYNCHRONIZATION | | | | | | | | | | | | WORK ORDER- 06-15-10 WORK BEGAN- 09-02-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-01-10 | | | | | | CONTRACT WORKING DAYS- 246 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 239 PERCENT TIME USED- 97 | | | | | | | | | | | | CREACOM, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-153 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.01 | | | | AMERICAN CONTRACTING & SERVICES, INC. OF INDIANA | |SUB %: 2.98 | | | | SPECIALTY DRILLING | |SUB %: 0.08 | | | | | | | | | | CONTRACT 03103211 | TOTALS | 984,861.47| 0.00| 966,055.82| 98.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS ON IH 610 | 0.001 | 1,025,615.96| 0.00| 997,029.64| 97.2| VA . | | | | | | 0912-72-118 | | | | | | CM 2009(035) ITS IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 05-11-09 WORK BEGAN- 07-15-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-27-09 | | | | | | CONTRACT WORKING DAYS- 300 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 287 PERCENT TIME USED- 95 | | | | | | | | | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-118 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04093003 | TOTALS | 1,025,615.96| 0.00| 997,029.64| 97.2| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 1,289,999.25| 0.00| 0.00| 0.0| VA . | | | | | | 0912-00-350 | | | | | | CM 2009(364) NEW TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 06-02-09 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-18-09 | | | | | | CONTRACT WORKING DAYS- 225 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | STATEWIDE TRAFFIC SIGNAL COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-350 | | | | | | CREACOM, INC. | |SUB %: 0.04 | | | | SPRING CREEK CONSTRUCTION, INC. | |SUB %: 3.15 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.76 | | | | | | | | | | CONTRACT 04093209 | TOTALS | 1,289,999.25| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS AT SH 99 | 0.001 | 29,178,645.02| 177,029.78| 29,374,014.84| 99.9| IH 10 . | | | | | | 0271-06-110 | | | | | | HP 2010(403)ES CONSTRUCT 2 DCS | | | | | | | | | | | | WORK ORDER- 06-15-10 WORK BEGAN- 07-07-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-01-10 | | | | | | CONTRACT WORKING DAYS- 479 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 446 PERCENT TIME USED- 93 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-06-110 | | | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.04 | | | | INTERSTATE FOUNDATION, LLC | |SUB %: 6.73 | | | | MESA ROD BUSTERS, INC. | |SUB %: 3.09 | | | | BATTERSON,LLP | |SUB %: 0.32 | | | | ODUM SERVICES, L.P. | |SUB %: 0.02 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.17 | | | | CREACOM, INC. | |SUB %: 2.35 | | | | DORAN STEEL, INC. | |SUB %: 1.30 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 0.46 | | | | CURB PLANET INC. | |SUB %: 0.00 | | | | SOUTHERN CRUSHED CONCRETE INC. | |SUB %: 0.08 | | | | SPECIALTY DRILLING | |SUB %: 0.21 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.01 | | | | CHOCTAW ERECTORS, INC. | |SUB %: 1.64 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.37 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.09 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.48 | | | | | | | | | | CONTRACT 04103001 | TOTALS | 29,178,645.02| 177,029.78| 29,374,014.84| 99.9| ************************************************************************************************************************************ HARRIS S. PINEMONT | 2.235 | 3,252,814.63| 0.00| 3,340,876.32| 99.9| VA ANTOINE DR. | | | | | | 0912-71-545 | | | | | | STP 97(224)ESTE HIKE AND BIKE TRAIL | | | | | | | | | | | | WORK ORDER- 06-24-10 WORK BEGAN- 07-21-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-10-10 | | | | | | CONTRACT WORKING DAYS- 165 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 152 PERCENT TIME USED- 92 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-545 | | | | | | BOYER, INC. | |SUB %: 1.76 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 1.08 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.17 | | | | JMHP, INC. | |SUB %: 0.11 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.57 | | | | PFEIFFER & SON LTD. | |SUB %: 6.36 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.83 | | | | SOUTH TEXAS INDUSTRIAL COATINGS, L.L.C. | |SUB %: 0.03 | | | | SPECIALTY DRILLING | |SUB %: 0.58 | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 0.41 | | | | BUILDER SERVICES CO. | |SUB %: 19.85 | | | | | | | | | | CONTRACT 04103015 | TOTALS | 3,252,814.63| 0.00| 3,340,876.32| 99.9| ************************************************************************************************************************************ HARRIS VAR LOCATIONS OUTSIDE HARRIS COUNTY | 0.001 | 783,351.77| 0.00| 789,528.01| 99.9| VA . | | | | | | 0912-00-384 | | | | | | STP 2010(741) PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 05-18-10 WORK BEGAN- 07-13-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-03-10 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 220 PERCENT TIME USED- 100 | | | | | | | | | | | | HIGHWAY TECHNOLOGIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-384 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04103022 | TOTALS | 783,351.77| 0.00| 789,528.01| 99.9| ************************************************************************************************************************************ HARRIS BS 146E WEST BOUND AT GOOSE CREEK | 0.259 | 2,543,254.76| 120,649.96| 1,970,252.07| 82.9| BS 146E . | | | | | | 0389-03-035 | | | | | | BR 2009(734) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 07-19-10 WORK BEGAN- 11-01-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-04-10 | | | | | | CONTRACT WORKING DAYS- 129 ADDL DAYS GRANTED- 52 | | | | | | WORKING DAYS CHARGED- 355 PERCENT TIME USED- 196 | | | | | | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0389-03-035 | | | | | | SULLIVAN LAND SERVICES LTD | |SUB %: 0.35 | | | | A. H. BECK FOUNDATION CO., INC. | |SUB %: 14.74 | | | | BREDA COMPANY, INC. | |SUB %: 2.62 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.16 | | | | PROFESSIONAL TRAFFIC CONTROL, LLC | |SUB %: 0.51 | | | | AAA ASPHALT PAVING, INC. | |SUB %: 8.80 | | | | ROMAR DUMP TRUCK SERVICES | |SUB %: 0.08 | | | | TOM-MAC, INC. | |SUB %: 5.50 | | | | TURNER BROS. CRANE & RIGGING | |SUB %: 0.58 | | | | JUST GROOVING, LTD. | |SUB %: 0.14 | | | | | | | | | | CONTRACT 04103207 | TOTALS | 2,543,254.76| 120,649.96| 1,970,252.07| 82.9| ************************************************************************************************************************************ HARRIS HOUSTON HERITAGE CORR-RR TRESTLE | 2.664 | 2,622,379.56| 127,322.09| 1,056,951.56| 40.3| VA JOHNNY GOYEN PARK ALONG WHITE OAK B | | | | | | 0912-71-505 | | | | | | CM 96(732) HIKE AND BIKE TRAIL | | | | | | | | | | | | WORK ORDER- 08-20-10 WORK BEGAN- 09-27-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-27-10 | | | | | | CONTRACT WORKING DAYS- 171 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 100 PERCENT TIME USED- 58 | | | | | | | | | | | | SPRING EQUIPMENT CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-505 | | | | | | CHERRY DEMOLITION | |SUB %: 0.38 | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 1.19 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 4.84 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 0.93 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 1.25 | | | | PFEIFFER & SON LTD. | |SUB %: 10.40 | | | | BUILDER SERVICES CO. | |SUB %: 10.08 | | | | CARMEN R. LABOY, INC. | |SUB %: 8.95 | | | | | | | | | | CONTRACT 05103206 | TOTALS | 2,622,379.56| 127,322.09| 1,056,951.56| 40.3| ************************************************************************************************************************************ HARRIS SUNNYSIDE AREA PEDESTRIAN TRAIL | 1.170 | 733,040.69| 0.00| 820,221.36| 99.9| CS IN SCOTTCREST PARK | | | | | | 0912-72-067 | | | | | | HP 2010(930) CONSTRUCT PEDESTRIAN TRAIL | | | | | | | | | | | | WORK ORDER- 08-10-11 WORK BEGAN- 09-06-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 08-26-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 74 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 82 | |**************************************************| | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-067 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.71 | | | | TRAF-TEX, INC. | |SUB %: 18.29 | | | | LANDSCAPE CONTRACTING AND IRRIGATION, INC. | |SUB %: 15.60 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 2.27 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.92 | | | | SOUTHWEST GRAPHIX | |SUB %: 0.37 | | | | | | | | | | CONTRACT 05113013 | TOTALS | 733,040.69| 0.00| 820,221.36| 99.9| ************************************************************************************************************************************ HARRIS AT PARKER AND LITTLE YORK ROAD | 0.130 | 364,992.00| 0.00| 0.00| 0.0| IH 45 . | | | | | | 0500-03-553 | | | | | | IM 0451(338) ARMOR JNT & WIDE FLNG BM REPR | | | | | | | | | | | | WORK ORDER- 06-10-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-26-11 | | | | | | CONTRACT WORKING DAYS- 36 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 31 PERCENT TIME USED- 86 | | | | | | | | | | | | SPRING EQUIPMENT CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0500-03-553 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05113014 | TOTALS | 364,992.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS TC JESTER TO N OF IH 10 ON IH 610 | 5.604 | 151,578,391.02| 2,859,564.92| 39,573,913.60| 26.0| IH 610 AND TO 34TH ST ON US 290 | | | | | | 0271-14-217 | | | | | | STP 2011(998)MM GR, STRS, BASE AND PAVE | | | | | | | | | | | | WORK ORDER- 06-15-11 WORK BEGAN- 06-20-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-11-11 | | | | | | CONTRACT WORKING DAYS- 1,124 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 148 PERCENT TIME USED- 13 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-14-217 | | | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 0.54 | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | |SUB %: 5.43 | | | | ESSARY, HART & MACWILIAM,INC. | |SUB %: 11.06 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.21 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.19 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.58 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.77 | | | | BORTUNCO | |SUB %: 0.29 | | | | SPECIALTY DRILLING | |SUB %: 0.39 | | | | AMERICAN TRAFFIC CONTROL, INC. | |SUB %: 0.01 | | | | TREVCON, INC. | |SUB %: 0.09 | | | | | | | | | | CONTRACT 05113015 | TOTALS | 151,578,391.02| 2,859,564.92| 39,573,913.60| 26.0| ************************************************************************************************************************************ HARRIS NYACK ROAD | 5.188 | 77,483,150.88| 1,932,556.73| 16,047,005.24| 20.7| IH 45 0.7881 MILES SOUTH OF FM 1959 | | | | | | 0500-03-462 | | | | | | C 500-3-462 GR, STRS, BASE, AND PAVE | | | | | | | | | | | | WORK ORDER- 06-15-11 WORK BEGAN- 06-17-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-17-11 | | | | | | CONTRACT WORKING DAYS- 1,135 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 155 PERCENT TIME USED- 13 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0500-03-462 | | | | | | BASE CONSTRUCTION, L.L.P. | |SUB %: 11.55 | | | | DORAN STEEL, INC. | |SUB %: 11.03 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 1.06 | | | | CREACOM, INC. | |SUB %: 4.33 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.59 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.00 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.58 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.33 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.23 | | | | | | | | | | CONTRACT 05113210 | TOTALS | 77,483,150.88| 1,932,556.73| 16,047,005.24| 20.7| ************************************************************************************************************************************ HARRIS AT CROSBY-LYNCHBURG ROAD | 0.056 | 654,969.69| 73,368.10| 535,347.04| 81.7| IH 10 . | | | | | | 0508-01-334 | | | | | | IM 0107(430) REP SLOPE FAILURE | | | | | | | | | | | | WORK ORDER- 06-14-11 WORK BEGAN- 07-05-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-30-11 | | | | | | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 9 | | | | | | WORKING DAYS CHARGED- 89 PERCENT TIME USED- 100 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0508-01-334 | | | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 8.79 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.99 | | | | KELLYSTONE, INC | |SUB %: 6.34 | | | | INTERSTATE SAFETY SYSTEMS, INC. | |SUB %: 2.52 | | | | | | | | | | CONTRACT 05113211 | TOTALS | 654,969.69| 73,368.10| 535,347.04| 81.7| ************************************************************************************************************************************ HARRIS MOONSHINE HILL RD AT JORDAN GULLY | 0.076 | 529,280.12| 0.00| 483,338.16| 97.7| CR IN CITY OF HOUSTON | | | | | | 0912-71-562 | | | | | | BR 98(82) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 10-28-10 WORK BEGAN- 04-13-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-13-10 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 155 PERCENT TIME USED- 172 | | | | | | | | | | | | MAR-CON SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-562 | | | | | | MAIN LANE INDUSTRIES, LTD. | |SUB %: 4.02 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 1.02 | | | | TOM-MAC, INC. | |SUB %: 5.78 | | | | JMHP, INC. | |SUB %: 9.12 | | | | | | | | | | CONTRACT 06103022 | TOTALS | 529,280.12| 0.00| 483,338.16| 97.7| ************************************************************************************************************************************ HARRIS FERRY ROAD | 2.660 | 1,963,261.77| 0.00| 2,053,089.35| 99.9| SH 146 CHAMBERS C/L | | | | | | 0389-03-036 | | | | | | NH 1102(107) RBL REP, SL COAT, RBL O/L & PFC | | | | | | | | | | | | WORK ORDER- 07-19-11 WORK BEGAN- 08-17-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-04-11 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 63 PERCENT TIME USED- 84 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0389-03-036 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 5.62 | | | | SCR CONSTRUCTION CO., INC. | |SUB %: 0.70 | | | | | | | | | | CONTRACT 06113021 | TOTALS | 1,963,261.77| 0.00| 2,053,089.35| 99.9| ************************************************************************************************************************************ HARRIS BELLAIRE BLVD FROM 900 FT W OF SH 6 | 0.284 | 1,308,626.44| 189,362.90| 1,309,625.34| 99.9| SH 6 595 FT E OF SH 6 | | | | | | 1685-05-089 | | | | | | CM 1102(066) INT IMPRUMTS | | | | | | | | | | | | WORK ORDER- 08-25-11 WORK BEGAN- 09-26-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-10-11 | | | | | | CONTRACT WORKING DAYS- 49 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 49 PERCENT TIME USED- 100 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1685-05-089 | | | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 4.33 | | | | THIRD COAST SERVICES, LLC | |SUB %: 3.50 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 1.36 | | | | GMJ PAVING CO. | |SUB %: 11.51 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 1.00 | | | | HOUSTON TREE FARM | |SUB %: 0.11 | | | | H & H CURB COMPANY | |SUB %: 0.15 | | | | CHAMPIONS HYDRO-LAWN | |SUB %: 0.38 | | | | | | | | | | CONTRACT 06113040 | TOTALS | 1,308,626.44| 189,362.90| 1,309,625.34| 99.9| ************************************************************************************************************************************ HARRIS SHAW ROAD AT FAULKEY GULLY | 0.065 | 291,969.84| 0.00| 148,210.47| 50.7| CR . | | | | | | 0912-72-058 | | | | | | BR 2008(186) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 08-15-11 WORK BEGAN- 09-22-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 08-31-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 34 PERCENT TIME USED- 42 | |**************************************************| | | | | | | | ARANDA BROTHERS CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-058 | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 1.70 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 1.68 | | | | SPECIALTY DRILLING | |SUB %: 4.36 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 5.13 | | | | CHANCE CONTRACTING | |SUB %: 9.14 | | | | | | | | | | CONTRACT 06113228 | TOTALS | 291,969.84| 0.00| 148,210.47| 50.7| ************************************************************************************************************************************ HARRIS EAST OF ELLA | 2.910 | 28,853,986.56| 4,405.37| 30,437,252.40| 99.7| IH 610 IH 45 | | | | | | 0271-14-223 | | | | | | STP 2009(519)ES RECONSTRUCT ROADWAY | | | | | | | | | | | | WORK ORDER- 09-01-09 WORK BEGAN- 09-16-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-17-09 | | | | | | CONTRACT WORKING DAYS- 730 ADDL DAYS GRANTED- 7 | | | | | | WORKING DAYS CHARGED- 735 PERCENT TIME USED- 99 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-14-223 | | | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 2.50 | | | | JTB SERVICES | |SUB %: 2.75 | | | | BREDA COMPANY, INC. | |SUB %: 1.76 | | | | EL DORADO PAVING COMPANY, INC. | |SUB %: 1.57 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.66 | | | | NORTHWEST MATERIALS | |SUB %: 0.42 | | | | CPAV SPECIALTIES, LP | |SUB %: 0.61 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.16 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.12 | | | | JOE VALENCIK, INC. | |SUB %: 1.60 | | | | EARTH MATERIAL SERVICES, LLC. | |SUB %: 3.39 | | | | MCRAY CRANE | |SUB %: 0.10 | | | | BATTERSON,LLP | |SUB %: 0.94 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.35 | | | | | | | | | | CONTRACT 07093001 | TOTALS | 28,853,986.56| 4,405.37| 30,437,252.40| 99.7| ************************************************************************************************************************************ HARRIS EAST OF MEMORIAL BROOK | 10.033 | 1,560,409.91| 0.00| 1,544,240.70| 98.9| IH 10 WASHINGTON AVENUE IN SECTIONS | | | | | | 0271-07-094 | | | | | | STP 2010(657)ESTE LANDSCAPING | | | | | | | | | | | | WORK ORDER- 09-27-10 WORK BEGAN- 10-13-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-13-10 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 80 PERCENT TIME USED- 88 | | | | | | | | | | | | BOYER, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-07-094 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07103004 | TOTALS | 1,560,409.91| 0.00| 1,544,240.70| 98.9| ************************************************************************************************************************************ HARRIS DIAMONDHEAD BLVD. | 0.870 | 8,537,094.26| 1,484,169.82| 1,484,169.82| 17.3| FM 2100 0.14 MI S. OF FIRST STREET | | | | | | 1062-04-047 | | | | | | STP 2010(903)RGS CONST RR GRADE SEPARATION STR & APP | | | | | | | | | | | | HARRIS DIAMONDHEAD BLVD. | 0.870 | 335,846.50| 21,634.00| 21,634.00| 6.4| FM 2100 0.14 MILE SOUTH OF FIRST STREET | | | | | | 1062-04-051 | | | | | | STP 2011(543)ES UTILITY ADJUSTMENT | | | | | | | | | | | | WORK ORDER- 09-01-10 WORK BEGAN- 11-28-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-17-10 | | | | | | CONTRACT WORKING DAYS- 455 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 22 PERCENT TIME USED- 4 | | | | | | | | | | | | NBG CONSTRUCTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1062-04-047 | | | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 2.70 | | | | BATTERSON,LLP | |SUB %: 0.79 | | | | HASSELL CONSTRUCTION COMPANY, INC. | |SUB %: 48.33 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.09 | | | | JTB SERVICES | |SUB %: 0.33 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.23 | | | | REPUBLIC TRAFFIC SAFETY, INC. | |SUB %: 0.43 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.26 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 2.70 | | | | MICKIE SERVICE, INC. | |SUB %: 0.10 | | | | SAN JACINTO BORING & TUNNELING, INC. | |SUB %: 0.23 | | | | SOUTHERN CRUSHED CONCRETE LLC | |SUB %: 0.31 | | | | PM CONSTRUCTION & REHAB, LLC | |SUB %: 1.62 | | | | JMHP, INC. | |SUB %: 0.52 | | | | GMJ PAVING CO. | |SUB %: 3.78 | | | | BREDA COMPANY, INC. | |SUB %: 0.61 | | | | H & H CURB COMPANY | |SUB %: 0.09 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.31 | | | | | | | | | | CONTRACT 07103015 | TOTALS | 8,872,940.76| 1,505,803.82| 1,505,803.82| 16.9| ************************************************************************************************************************************ HARRIS WEST OF YORKCHESTER | 1.293 | 684,826.50| 0.00| 612,344.56| 89.4| IH 10 LUMPKIN IN SECTIONS | | | | | | 0271-07-095 | | | | | | STP 2010(658)ESTE LANDSCAPING | | | | | | | | | | | | WORK ORDER- 09-13-10 WORK BEGAN- 10-04-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-29-10 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 87 PERCENT TIME USED- 96 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-07-095 | | | | | | A-1 AMERICAN FENCE, INC. | |SUB %: 4.49 | | | | | | | | | | CONTRACT 07103213 | TOTALS | 684,826.50| 0.00| 612,344.56| 89.4| ************************************************************************************************************************************ HARRIS TRANSTAR | 0.001 | 699,130.00| 27,965.20| 702,130.77| 99.9| VA . | | | | | | 0912-72-168 | | | | | | STP 2008(265)MM TRANSTAR COMMUNICATIONS TOWER | | | | | | | | | | | | WORK ORDER- 09-21-10 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-07-10 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 229 PERCENT TIME USED- 127 | | | | | | | | | | | | QUALITY TOWER SERVICES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-168 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07103236 | TOTALS | 699,130.00| 27,965.20| 702,130.77| 99.9| ************************************************************************************************************************************ HARRIS BRAYS BAYOU BRIDGES AT BOB WHITE, | 1.327 | 7,458,028.70| 211,595.16| 6,528,130.95| 87.6| VA ATWELL, HERMANN PARK & TIERWESTER | | | | | | 0912-71-432 | | | | | | STP 94(231)TE TRANSPORTATION ENHANCEMENT | | | | | | | | | | | | WORK ORDER- 09-21-10 WORK BEGAN- 11-08-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-07-10 | | | | | | CONTRACT WORKING DAYS- 240 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 249 PERCENT TIME USED- 102 | | | | | | | | | | | | SPAWGLASS CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-432 | | | | | | MARTINEZ STEEL | |SUB %: 2.76 | | | | BUILDER SERVICES CO. | |SUB %: 3.49 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 3.36 | | | | TRAF-TEX, INC. | |SUB %: 3.11 | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 0.31 | | | | JCF BRIDGE & CONCRETE, INC. | |SUB %: 10.57 | | | | CONSTRUCTION ECO SERVICES | |SUB %: 0.41 | | | | APCON SERVICES, LLC | |SUB %: 2.07 | | | | VALLEY PLACERS, LLC | |SUB %: 0.23 | | | | HAYDEN PAVING, INC. | |SUB %: 0.48 | | | | IRON ACCESS | |SUB %: 0.70 | | | | SOUTH TEXAS PAINTING CONTRACTORS | |SUB %: 0.41 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.77 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.47 | | | | | | | | | | CONTRACT 07103255 | TOTALS | 7,458,028.70| 211,595.16| 6,528,130.95| 87.6| ************************************************************************************************************************************ HARRIS AT E DENTON | 0.002 | 332,396.25| 400.00| 251,333.75| 75.6| FM 1960 . | | | | | | 1685-03-090 | | | | | | STP 1102(145)HES TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 08-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-01-11 | | | | | | CONTRACT WORKING DAYS- 98 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 54 PERCENT TIME USED- 55 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1685-03-090 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07113006 | TOTALS | 332,396.25| 400.00| 251,333.75| 75.6| ************************************************************************************************************************************ HARRIS S OF US 290 | 3.140 | 115,670,596.33| 973,769.74| 7,181,982.57| 6.2| SH 99 US 290 | | | | | | 3510-05-019 | | | | | | C 3510-5-19 4 DCS | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 10-03-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 691 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 68 PERCENT TIME USED- 9 | | | | | | | | | | | | WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3510-05-019 | | | | | | DORAN STEEL, INC. | |SUB %: 1.09 | | | | KELLYSTONE, INC | |SUB %: 0.14 | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 4.41 | | | | RDI FOUNDATION DRILLING | |SUB %: 4.34 | | | | EROSION CONTROL, INC. | |SUB %: 0.00 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.00 | | | | GMJ PAVING CO. | |SUB %: 1.32 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.79 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.22 | | | | | | | | | | CONTRACT 07113011 | TOTALS | 115,670,596.33| 973,769.74| 7,181,982.57| 6.2| ************************************************************************************************************************************ HARRIS NORTH OF HB&T RR | 1.230 | 1,984,915.07| 0.00| 1,873,280.11| 94.3| IH 45 NORTH OF AIRLINE | | | | | | 0500-03-564 | | | | | | IM 0451(340) MILL, SC, RBL, PFC & PAV MARKS | | | | | | | | | | | | WORK ORDER- 08-16-11 WORK BEGAN- 10-10-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-01-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 32 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 26 PERCENT TIME USED- 81 | |**************************************************| | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0500-03-564 | | | | | | BATTERSON,LLP | |SUB %: 3.16 | | | | | | | | | | CONTRACT 07113058 | TOTALS | 1,984,915.07| 0.00| 1,873,280.11| 94.3| ************************************************************************************************************************************ HARRIS MIDTOWN/DOWNTOWN HOUSTON | 0.001 | 1,453,930.00| 448,420.50| 448,420.50| 30.8| VA . | | | | | | 0912-72-141 | | | | | | CM 1102(006) CBD COMMUNICATIONS SYSTEM | | | | | | | | | | | | WORK ORDER- 10-18-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-03-11 | | | | | | CONTRACT WORKING DAYS- 186 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-141 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07113213 | TOTALS | 1,453,930.00| 448,420.50| 448,420.50| 30.8| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 1,441,141.70| 11,790.24| 467,481.92| 32.4| VA . | | | | | | 0912-00-455 | | | | | | NH 1102(144) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 09-06-11 WORK BEGAN- 09-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-22-11 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 45 PERCENT TIME USED- 100 | | | | | | | | | | | | BOYER, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-455 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07113215 | TOTALS | 1,441,141.70| 11,790.24| 467,481.92| 32.4| ************************************************************************************************************************************ HARRIS N OF MORTON RD | 8.903 | 122,892,918.02| 5,295,924.97| 18,723,103.38| 15.2| SH 99 S OF FM 529 (SEG E) | | | | | | 3510-05-023 | | | | | | C 3510-5-23 GR, STRS, BASE & PAV | | | | | | | | | | | | WORK ORDER- 09-13-11 WORK BEGAN- 09-19-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-29-11 | | | | | | CONTRACT WORKING DAYS- 650 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 71 PERCENT TIME USED- 10 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3510-05-023 | | | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.21 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 1.42 | | | | REPUBLIC TRAFFIC SAFETY, INC. | |SUB %: 0.09 | | | | CUT"N SHOOT, INC. | |SUB %: 0.13 | | | | BELL BOTTOM FOUNDATION CO. | |SUB %: 3.44 | | | | DORAN STEEL, INC. | |SUB %: 0.23 | | | | EGGEMEYER LAND CLEARING, LLC | |SUB %: 0.12 | | | | ESSARY, HART & MACWILIAM,INC. | |SUB %: 0.88 | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 3.34 | | | | CREACOM, INC. | |SUB %: 5.08 | | | | SPECIALTY DRILLING, LTD. | |SUB %: 0.08 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.08 | | | | | | | | | | CONTRACT 07113222 | TOTALS | 122,892,918.02| 5,295,924.97| 18,723,103.38| 15.2| ************************************************************************************************************************************ HARRIS AT BS 146E | 0.001 | 244,341.77| 0.00| 0.00| 0.0| SH 146 . | | | | | | 0389-13-055 | | | | | | STP 1102(142)HES TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 08-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-01-11 | | | | | | CONTRACT WORKING DAYS- 69 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | CREACOM, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0389-13-055 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07113226 | TOTALS | 244,341.77| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS N OF COLONIAL PKWY | 1.950 | 32,334,777.01| 2,259,057.02| 6,170,610.22| 19.0| SH 99 N OF MORTON RD (SEG E) | | | | | | 3510-05-022 | | | | | | C 3510-5-22 GR, STRS, BASE & PAV | | | | | | | | | | | | WORK ORDER- 09-30-11 WORK BEGAN- 10-17-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-16-11 | | | | | | CONTRACT WORKING DAYS- 602 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 57 PERCENT TIME USED- 9 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3510-05-022 | | | | | | GMJ PAVING CO. | |SUB %: 3.09 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.23 | | | | BREDA COMPANY, INC. | |SUB %: 0.56 | | | | GULF COAST PAVERS, INC. | |SUB %: 0.52 | | | | H & H CURB COMPANY | |SUB %: 0.04 | | | | CHAMPIONS HYDRO-LAWN | |SUB %: 0.59 | | | | LONE STAR ROAD CONSTRUCTION, LTD. | |SUB %: 31.94 | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 3.26 | | | | BATTERSON,LLP | |SUB %: 0.65 | | | | CREACOM, INC. | |SUB %: 6.17 | | | | LINDSEY CONSTRUCTION, INC. | |SUB %: 7.65 | | | | RDI FOUNDATION DRILLING | |SUB %: 2.21 | | | | VALLEY PLACERS, LLC | |SUB %: 0.12 | | | | | | | | | | CONTRACT 07113233 | TOTALS | 32,334,777.01| 2,259,057.02| 6,170,610.22| 19.0| ************************************************************************************************************************************ HARRIS US 59 N | 5.347 | 76,484,640.02| 778,469.77| 79,388,327.02| 99.2| IH 610 900' S OF GELLHORN | | | | | | 0271-14-197 | | | | | | IM 6107(410) BOND CONC O/L, RECONST ML & BR SLAB | | | | | | | | | | | | WORK ORDER- 10-13-06 WORK BEGAN- 09-07-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-29-06 | | | | | | CONTRACT WORKING DAYS- 1,203 ADDL DAYS GRANTED- 125 | | | | | | WORKING DAYS CHARGED- 1,266 PERCENT TIME USED- 95 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-14-197 | | | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.53 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 2.11 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.08 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.04 | | | | BORING & TUNNELING COMPANY OF AMERICA, INC. | |SUB %: 0.15 | | | | EROSION CONTROL, INC. | |SUB %: 0.39 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 9.95 | | | | JONES HIGHWAY MAINTENANCE | |SUB %: 0.00 | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | |SUB %: 5.02 | | | | SPECIALTY DRILLING | |SUB %: 0.51 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 1.46 | | | | AMERICAN TRAFFIC CONTROL | |SUB %: 0.01 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 0.35 | | | | POLY-CARB, INC. | |SUB %: 0.38 | | | | EROSION PREVENTION PRODUCTS | |SUB %: 0.73 | | | | HASSELL CONSTRUCTION COMPANY, INC. | |SUB %: 0.05 | | | | HOLES INCORPORATED | |SUB %: 0.00 | | | | ASHTON SAWING AND DRILLING LLC | |SUB %: 0.05 | | | | CURB PLANET INC. | |SUB %: 0.04 | | | | | | | | | | CONTRACT 08063001 | TOTALS | 76,484,640.02| 778,469.77| 79,388,327.02| 99.2| ************************************************************************************************************************************ HARRIS IH 45 N | 37.627 | 20,754,799.00| 0.00| 25,968,975.36| 99.9| BW 8 W OF UPRR | | | | | | 3256-02-079 | | | | | | CM 2007(830) INSTALL CTMS | | | | | | | | | | | | WORK ORDER- 12-05-07 WORK BEGAN- 07-07-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-02-08 | | | | | | CONTRACT WORKING DAYS- 780 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 754 PERCENT TIME USED- 96 | | | | | | | | | | | | EAS CONTRACTING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3256-02-079 | | | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.40 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 0.15 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 1.15 | | | | ANCHOR FENCE | |SUB %: 0.10 | | | | DEVOLVE CORP | |SUB %: 0.52 | | | | SUPERIOR GROUTING SERVICES, INC. | |SUB %: 1.16 | | | | LONE STAR PRESTRESS | |SUB %: 1.19 | | | | CONDUIT CONSTRUCTORS | |SUB %: 1.28 | | | | CPAV SPECIALTIES, LP | |SUB %: 0.14 | | | | | | | | | | CONTRACT 08073008 | TOTALS | 20,754,799.00| 0.00| 25,968,975.36| 99.9| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS IN HARRIS COUNTY | 0.001 | 1,462,321.41| 10,819.17| 3,060,112.21| 99.9| VA . | | | | | | 0912-72-088 | | | | | | CM 2008(054) TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-25-07 WORK BEGAN- 12-07-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-24-07 | | | | | | CONTRACT WORKING DAYS- 388 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 377 PERCENT TIME USED- 97 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-088 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 6.50 | | | | TEAM WORK CONSTRUCTION SERVICES | |SUB %: 14.35 | | | | | | | | | | CONTRACT 08073044 | TOTALS | 1,462,321.41| 10,819.17| 3,060,112.21| 99.9| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS IN HARRIS COUNTY | 0.001 | 1,787,739.66| 0.00| 1,647,199.89| 92.1| VA . | | | | | | 0912-72-091 | | | | | | CM 2008(052) TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-19-07 WORK BEGAN- 12-03-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-18-07 | | | | | | CONTRACT WORKING DAYS- 360 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 360 PERCENT TIME USED- 100 | | | | | | | | | | | | STATEWIDE TRAFFIC SIGNAL COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-091 | | | | | | SPRING CREEK CONSTRUCTION, INC. | |SUB %: 6.62 | | | | | | | | | | CONTRACT 08073210 | TOTALS | 1,787,739.66| 0.00| 1,647,199.89| 92.1| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 1,482,581.45| 0.00| 940,854.47| 63.4| VA . | | | | | | 0912-00-331 | | | | | | CM 2008(055) NEW TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 09-11-07 WORK BEGAN- 04-04-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-27-07 | | | | | | CONTRACT WORKING DAYS- 235 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 102 PERCENT TIME USED- 43 | | | | | | | | | | | | THIRD COAST SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-331 | | | | | | BATTERSON, L.L.P. | |SUB %: 1.04 | | | | SPRING CREEK CONSTRUCTION, INC. | |SUB %: 4.49 | | | | | | | | | | CONTRACT 08073244 | TOTALS | 1,482,581.45| 0.00| 940,854.47| 63.4| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS IN HARRIS COUNTY | 0.001 | 1,122,979.07| 0.00| 1,124,513.21| 99.9| VA . | | | | | | 0912-72-083 | | | | | | CM 2008(855) TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-12-08 WORK BEGAN- 12-01-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-28-08 | | | | | | CONTRACT WORKING DAYS- 298 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 147 PERCENT TIME USED- 49 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-083 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08083212 | TOTALS | 1,122,979.07| 0.00| 1,124,513.21| 99.9| ************************************************************************************************************************************ HARRIS PORT ROAD, SH 146 | 2.024 | 11,790,329.44| 12,630.49| 11,816,231.85| 99.9| CS TODVILLE RD | | | | | | 0912-72-073 | | | | | | HP 2008(783) GR, STRS, BASE AND PAVE | | | | | | | | | | | | WORK ORDER- 11-06-09 WORK BEGAN- 12-09-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-22-09 | | | | | | CONTRACT WORKING DAYS- 340 ADDL DAYS GRANTED- 31 | | | | | | WORKING DAYS CHARGED- 367 PERCENT TIME USED- 98 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-073 | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.11 | | | | EL DORADO PAVING COMPANY, INC. | |SUB %: 3.05 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.78 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 2.15 | | | | JOE VALENCIK, INC. | |SUB %: 0.46 | | | | EARTH MATERIAL SERVICES, LLC. | |SUB %: 1.07 | | | | JMHP, INC. | |SUB %: 0.20 | | | | BORING & TUNNELING COMPANY OF AMERICA, INC. | |SUB %: 0.11 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.72 | | | | MUNGLE BROS. CONSTRUCTION,LLC | |SUB %: 1.71 | | | | RAILWORKS TRACK SYSTEMS, INC. | |SUB %: 1.25 | | | | RAILROAD SIGNAL, INC. | |SUB %: 0.03 | | | | J. T. B. SERVICES, INC. | |SUB %: 0.19 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.03 | | | | FOSTER FENCE, LTD. | |SUB %: 0.25 | | | | | | | | | | CONTRACT 08093005 | TOTALS | 11,790,329.44| 12,630.49| 11,816,231.85| 99.9| ************************************************************************************************************************************ HARRIS GREEN HOUSE ROAD | 1.485 | 8,936,871.99| 49,466.58| 5,504,556.05| 61.5| FM 529 FRY ROAD | | | | | | 1006-01-058 | | | | | | STP 2009(671)MM GR, STRS, BASE AND SURF | | | | | | | | | | | | WORK ORDER- 10-16-09 WORK BEGAN- 08-05-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-14-10 | | | | | | CONTRACT WORKING DAYS- 516 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 379 PERCENT TIME USED- 73 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1006-01-058 | | | | | | GMJ PAVING CO. | |SUB %: 4.27 | | | | BECO CONSTRUCTION, L.L.C. | |SUB %: 6.90 | | | | CREACOM, INC. | |SUB %: 4.13 | | | | CURB PLANET INC. | |SUB %: 0.08 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.42 | | | | TOM-MAC, INC. | |SUB %: 0.42 | | | | BATTERSON, L.L.P. | |SUB %: 1.45 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 1.16 | | | | BREDA COMPANY, INC. | |SUB %: 7.12 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 1.13 | | | | VALLEY PLACERS, LLC | |SUB %: 0.06 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.08 | | | | | | | | | | CONTRACT 08093007 | TOTALS | 8,936,871.99| 49,466.58| 5,504,556.05| 61.5| ************************************************************************************************************************************ HARRIS AT BNSF RR/PORT ROAD | 3.213 | 41,949,338.29| 626,986.72| 31,032,950.41| 73.9| SH 146 . | | | | | | 0389-05-105 | | | | | | HP 2009(817) CONSTRUCT DIRECT CONNECTORS | | | | | | | | | | | | WORK ORDER- 10-14-09 WORK BEGAN- 10-26-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-30-09 | | | | | | CONTRACT WORKING DAYS- 931 ADDL DAYS GRANTED- 1 | | | | | | WORKING DAYS CHARGED- 659 PERCENT TIME USED- 70 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0389-05-105 | | | | | | CURB PLANET INC. | |SUB %: 0.03 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.49 | | | | ANGEL BROTHERS ENTERPRISES, LTD. | |SUB %: 6.73 | | | | CRAVENS PARTNERS, LTD. | |SUB %: 7.03 | | | | TRAF-TEX, INC. | |SUB %: 6.18 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.19 | | | | EROSION CONTROL, INC. | |SUB %: 1.26 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 5.92 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 1.51 | | | | BATTERSON, L.L.P. | |SUB %: 0.55 | | | | BSP CONSTRUCTION | |SUB %: 5.20 | | | | KATY CONSTRUCTION | |SUB %: 0.09 | | | | SPECIALTY DRILLING | |SUB %: 0.07 | | | | DIXIE DRILLING COMPANY, INC. | |SUB %: 0.05 | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 0.95 | | | | | | | | | | CONTRACT 08093202 | TOTALS | 41,949,338.29| 626,986.72| 31,032,950.41| 73.9| ************************************************************************************************************************************ HARRIS MONTGOMERY C/L | 2.288 | 11,581,370.88| 19,758.79| 12,174,762.23|100.0| FM 2978 FM 2920 | | | | | | 3050-03-005 | | | | | | STP 2007(510)MM GR, STRS, BS & SURF | | | | | | | | | | | | HARRIS 0.307 MILES NORTH OF UPRR | 0.777 | 6,909,231.46| 416.20| 6,688,930.60|100.0| FM 2978 0.470 MILES SOUTH OF UPRR | | | | | | 3050-03-012 | | | | | | STP 2007(822)ES GR, STRS, BASE & PAVT | | | | | | | | | | | | WORK ORDER- 10-14-09 WORK BEGAN- 10-19-09 | | | | | | DATE WORK COMPLETED- 01-05-12 TIME COMPUTED- 10-19-09 | | | | | | CONTRACT WORKING DAYS- 507 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 490 PERCENT TIME USED- 96 | | | | | | | | | | | | SMITH & COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3050-03-005 | | | | | | A & G EBERHARDT ENTERPRISES, INC. | |SUB %: 1.16 | | | | A. H. BECK FOUNDATION CO., INC. | |SUB %: 0.06 | | | | EROSION CONTROL, INC. | |SUB %: 1.05 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.05 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.08 | | | | TEXAS LAND CLEARING SERVICE | |SUB %: 0.06 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 1.46 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.63 | | | | CRAVENS SERVICES, INC. | |SUB %: 21.57 | | | | BATTERSON, L.L.P. | |SUB %: 0.60 | | | | BREDA COMPANY, INC. | |SUB %: 0.52 | | | | DEANIE HAYES, INC. | |SUB %: 2.03 | | | | BEDO CONSTRUCTION PRODUCTS, INC. | |SUB %: 11.05 | | | | KATY CONSTRUCTION | |SUB %: 0.11 | | | | TEXAS STERLING CONSTRUCTION CO. | |SUB %: 4.83 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.36 | | | | | | | | | | CONTRACT 08093206 | TOTALS | 18,490,602.34| 20,174.99| 18,863,692.83|100.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS IN HARRIS COUNTY | 0.002 | 1,924,706.58| 0.00| 1,800,158.03| 93.5| VA . | | | | | | 0912-72-084 | | | | | | CM 2008(894) TRAFFIC SIGNAL INTERCONNECT | | | | | | | | | | | | WORK ORDER- 09-23-10 WORK BEGAN- 10-14-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-09-10 | | | | | | CONTRACT WORKING DAYS- 312 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 278 PERCENT TIME USED- 89 | | | | | | | | | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-084 | | | | | | THE L.E. MYERS CO. | |SUB %: 7.02 | | | | B&M TELECOM, INC. | |SUB %: 5.66 | | | | | | | | | | CONTRACT 08103011 | TOTALS | 1,924,706.58| 0.00| 1,800,158.03| 93.5| ************************************************************************************************************************************ HARRIS MEADOW ROAD | 10.931 | 855,313.31| 6,810.47| 740,050.09| 86.5| IH 10 W OF BW 8 AT UPS RR (IN SECTIONS) | | | | | | 0508-01-323 | | | | | | HP 2011(167) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 10-04-10 WORK BEGAN- 10-22-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-20-10 | | | | | | CONTRACT WORKING DAYS- 89 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 81 PERCENT TIME USED- 91 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0508-01-323 | | | | | | XELLENT SERVICES | |SUB %: 5.26 | | | | | | | | | | CONTRACT 08103018 | TOTALS | 855,313.31| 6,810.47| 740,050.09| 86.5| ************************************************************************************************************************************ HARRIS SB AT CLINTON DR AT AND UPRR | 0.316 | 3,356,583.34| 66,818.50| 3,511,296.03| 99.9| US 90A . | | | | | | 0027-10-064 | | | | | | BR 2010(779) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 10-07-10 WORK BEGAN- 11-04-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-23-10 | | | | | | CONTRACT WORKING DAYS- 244 ADDL DAYS GRANTED- 24 | | | | | | WORKING DAYS CHARGED- 273 PERCENT TIME USED- 101 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0027-10-064 | | | | | | BATTERSON,LLP | |SUB %: 0.79 | | | | CPAVE, INC. | |SUB %: 0.07 | | | | CRAIG & HEIDT, INC. | |SUB %: 6.33 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.03 | | | | JMHP, INC. | |SUB %: 0.20 | | | | MESA ROD BUSTERS, INC. | |SUB %: 4.15 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.30 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.40 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 0.98 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 9.49 | | | | VALLEY PLACERS, LLC | |SUB %: 0.55 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.03 | | | | MAIN LANE INDUSTRIES, LTD. | |SUB %: 0.13 | | | | CURB PLANET INC. | |SUB %: 0.02 | | | | | | | | | | CONTRACT 08103022 | TOTALS | 3,356,583.34| 66,818.50| 3,511,296.03| 99.9| ************************************************************************************************************************************ HARRIS EL CAMINO REAL | 0.059 | 951,005.80| 94,838.60| 930,234.53| 98.9| CS AT COW BYU/CAN | | | | | | 0912-72-001 | | | | | | BR 2005(25) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 10-07-10 WORK BEGAN- 08-12-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-23-10 | | | | | | CONTRACT WORKING DAYS- 65 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 86 PERCENT TIME USED- 132 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-001 | | | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 4.92 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.28 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.04 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.43 | | | | CURB PLANET INC. | |SUB %: 0.05 | | | | | | | | | | CONTRACT 08103040 | TOTALS | 951,005.80| 94,838.60| 930,234.53| 98.9| ************************************************************************************************************************************ HARRIS GREEN HOUSE ROAD | 1.250 | 411,110.10| 1,186.75| 393,773.78| 95.7| FM 529 FRY ROAD | | | | | | 1006-01-061 | | | | | | NH 2010(988) 2 DETENTION PONDS | | | | | | | | | | | | WORK ORDER- 09-15-10 WORK BEGAN- 02-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-01-10 | | | | | | CONTRACT WORKING DAYS- 63 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 60 PERCENT TIME USED- 95 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1006-01-061 | | | | | | BOYER, INC. | |SUB %: 29.84 | | | | | | | | | | CONTRACT 08103062 | TOTALS | 411,110.10| 1,186.75| 393,773.78| 95.7| ************************************************************************************************************************************ HARRIS AT WHITE OAK BAYOU | 0.001 | 3,594,471.44| 0.00| 270,188.62| 7.5| IH 10 . | | | | | | 0271-07-292 | | | | | | STP 2011(025)MM DRAINAGE AND DETENTION FACILITIES | | | | | | | | | | | | WORK ORDER- 10-20-10 WORK BEGAN- 01-05-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-05-11 | | | | | | CONTRACT WORKING DAYS- 156 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 10 PERCENT TIME USED- 6 | | | | | | | | | | | | BALFOUR BEATTY INFRASTRUCTURE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-07-292 | | | | | | APCON SERVICES, LLC | |SUB %: 1.60 | | | | SOUTHERN CRUSHED CONCRETE INC. | |SUB %: 2.52 | | | | BOYER, INC. | |SUB %: 10.09 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 1.00 | | | | EROSION CONTROL, INC. | |SUB %: 2.42 | | | | EROSION PREVENTION PRODUCTS | |SUB %: 13.41 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.19 | | | | GUS TRUCKING SERVICES | |SUB %: 36.75 | | | | PRIME TREES, INC. | |SUB %: 0.91 | | | | | | | | | | CONTRACT 08103205 | TOTALS | 3,594,471.44| 0.00| 270,188.62| 7.5| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS IN HARRIS COUNTY | 0.002 | 4,497,940.86| 143,451.37| 3,029,366.06| 67.3| VA . | | | | | | 0912-72-089 | | | | | | CM 2011(101) TRAFFIC SIGNAL INTERCONNECT | | | | | | | | | | | | WORK ORDER- 09-23-10 WORK BEGAN- 03-08-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-09-10 | | | | | | CONTRACT WORKING DAYS- 468 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 248 PERCENT TIME USED- 52 | | | | | | | | | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-089 | | | | | | L.E. MYERS CO. | |SUB %: 2.24 | | | | B&M TELECOM, INC. | |SUB %: 7.15 | | | | FORDE CONSTRUCTION COMPANY, INC. | |SUB %: 1.97 | | | | | | | | | | CONTRACT 08103208 | TOTALS | 4,497,940.86| 143,451.37| 3,029,366.06| 67.3| ************************************************************************************************************************************ HARRIS BURKE/CRENSHAW PARK | 2.917 | 1,165,916.75| 18,190.68| 1,133,919.66| 97.2| CS STRAWBERRY PARK ON VINCE BAYOU | | | | | | 0912-71-793 | | | | | | STP 2002(145)TE 10-FT WIDE CONCRETE SHARED-USE PATH | | | | | | | | | | | | WORK ORDER- 09-21-10 WORK BEGAN- 11-17-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-17-10 | | | | | | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 98 PERCENT TIME USED- 98 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-793 | | | | | | JMHP, INC. | |SUB %: 0.61 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 1.05 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.30 | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 1.49 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.60 | | | | TEXAS ENVIRONMENTAL STRATEGIES COMPANY, LLC | |SUB %: 1.80 | | | | | | | | | | CONTRACT 08103217 | TOTALS | 1,165,916.75| 18,190.68| 1,133,919.66| 97.2| ************************************************************************************************************************************ HARRIS AT UNION PACIFIC RAILROAD | 8.406 | 650,522.13| 7,692.18| 531,487.70| 81.7| IH 10 SPRING BAYOU | | | | | | 0508-01-324 | | | | | | HP 2011(168) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 09-27-10 WORK BEGAN- 10-18-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-13-10 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 87 PERCENT TIME USED- 96 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0508-01-324 | | | | | | XELLENT SERVICES | |SUB %: 4.22 | | | | | | | | | | CONTRACT 08103218 | TOTALS | 650,522.13| 7,692.18| 531,487.70| 81.7| ************************************************************************************************************************************ HARRIS FARTHER POINT AT BUFFALO BAYOU | 0.097 | 1,509,342.80| 17,138.74| 1,517,048.52| 99.9| CS . | | | | | | 0912-70-002 | | | | | | BR 2007(834) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 10-07-10 WORK BEGAN- 04-04-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-23-10 | | | | | | CONTRACT WORKING DAYS- 161 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 157 PERCENT TIME USED- 97 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-70-002 | | | | | | BATTERSON,LLP | |SUB %: 0.28 | | | | DORAN STEEL, INC. | |SUB %: 0.87 | | | | ODUM SERVICES, L.P. | |SUB %: 2.91 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.60 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 9.83 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.09 | | | | GEO-GLEN ENTERPRISES, INC. | |SUB %: 0.53 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.43 | | | | CURB PLANET INC. | |SUB %: 0.06 | | | | | | | | | | CONTRACT 08103243 | TOTALS | 1,509,342.80| 17,138.74| 1,517,048.52| 99.9| ************************************************************************************************************************************ HARRIS CONGRESS AVE | 0.052 | 1,130,952.80| 5,796.00| 1,124,261.78| 99.4| CS FROM SMITH STREET TO LOUISIANA ST | | | | | | 0912-71-076 | | | | | | BR 2007(835) REPLACE BRIDGE | | | | | | | | | | | | HARRIS CONGRESS AVE | 0.001 | 29,277.00| 7,500.00| 11,529.00| 39.3| CS FROM SMITH STREET TO LOUISIANA ST | | | | | | 0912-72-267 | | | | | | RW 912-72-267 ROW UTL. ADJ. IN CST. CONTRACT | | | | | | | | | | | | WORK ORDER- 09-27-10 WORK BEGAN- 11-15-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-13-10 | | | | | | CONTRACT WORKING DAYS- 207 ADDL DAYS GRANTED- 82 | | | | | | WORKING DAYS CHARGED- 289 PERCENT TIME USED- 100 | | | | | | | | | | | | LIBERTY MUTUAL INSURANCE COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-076 | | | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 10.29 | | | | ALLSTATE SIGNAL & CONSTRUCTION, LLC | |SUB %: 2.23 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.35 | | | | CPAVE, INC. | |SUB %: 0.21 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.36 | | | | DORAN STEEL, INC. | |SUB %: 1.01 | | | | HUBCO, INC. | |SUB %: 0.30 | | | | DIAMOND J DRILLING | |SUB %: 0.00 | | | | HY-TECH WELDING AND FABRICATING | |SUB %: 0.18 | | | | | | | | | | CONTRACT 08103299 | TOTALS | 1,160,229.80| 13,296.00| 1,135,790.78| 97.8| ************************************************************************************************************************************ HARRIS 0.490 MI N OF KINGSLAND BLVD | 0.896 | 17,265,149.66| 870,874.63| 4,374,429.47| 25.3| SH 99 0.120 MI S OF COLONIAL PKWY | | | | | | 3510-05-010 | | | | | | C 3510-5-10 GR, STRS, BASE AND PAVEMENT | | | | | | | | | | | | HARRIS AT IH 10 (W) | 0.436 | 32,174,192.92| 503,492.36| 6,010,554.57| 18.6| SH 99 N OF COLONIAL PKWY | | | | | | 3510-05-018 | | | | | | NH 1102(439) CONSTRUCT 2 DIRECT CONNECTORS | | | | | | | | | | | | WORK ORDER- 09-15-11 WORK BEGAN- 09-23-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-01-11 | | | | | | CONTRACT WORKING DAYS- 598 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 72 PERCENT TIME USED- 12 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3510-05-018 | | | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.84 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.54 | | | | BASE CONSTRUCTION, L.L.P. | |SUB %: 3.00 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.18 | | | | AMERICAN DRAINAGE SYSTEM, INC. | |SUB %: 0.16 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.56 | | | | MESA ROD BUSTERS, INC. | |SUB %: 13.52 | | | | BORTUNCO | |SUB %: 0.16 | | | | BATTERSON,LLP | |SUB %: 0.34 | | | | CREACOM, INC. | |SUB %: 4.96 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.11 | | | | SPECIALTY DRILLING, LTD. | |SUB %: 0.19 | | | | | | | | | | CONTRACT 08113001 | TOTALS | 49,439,342.58| 1,374,366.99| 10,384,984.04| 21.0| ************************************************************************************************************************************ HARRIS AT WEST ROAD | 0.002 | 446,813.34| 0.00| 0.00| 0.0| US 290 . | | | | | | 0050-08-091 | | | | | | STP 1102(300)HESG TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-13-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-29-11 | | | | | | CONTRACT WORKING DAYS- 108 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0050-08-091 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113011 | TOTALS | 446,813.34| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS AT ALMEDA GENOA ROAD | 0.002 | 308,183.65| 0.00| 0.00| 0.0| SH 288 . | | | | | | 0598-01-093 | | | | | | STP 1102(304)HESG TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 94 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0598-01-093 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113020 | TOTALS | 308,183.65| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS GROESCHKE ROAD AT MAYDE CREEK | 0.157 | 1,167,229.35| 85,483.76| 385,579.80| 33.0| CS . | | | | | | 0912-72-126 | | | | | | BR 2007(836) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 09-30-11 WORK BEGAN- 11-15-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-16-11 | | | | | | CONTRACT WORKING DAYS- 76 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 26 PERCENT TIME USED- 34 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-126 | | | | | | CRAIG & HEIDT, INC. | |SUB %: 8.21 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.41 | | | | ODUM SERVICES, L.P. | |SUB %: 1.24 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.25 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.61 | | | | TOM-MAC, INC. | |SUB %: 4.80 | | | | VALLEY PLACERS, LLC | |SUB %: 0.37 | | | | | | | | | | CONTRACT 08113031 | TOTALS | 1,167,229.35| 85,483.76| 385,579.80| 33.0| ************************************************************************************************************************************ HARRIS BW 8, NORTH OF IH 10 | 21.348 | 1,437,954.68| 322,386.32| 493,715.51| 34.3| VA EAST OF SH 249 | | | | | | 0912-70-080 | | | | | | HP 1102(309) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 10-07-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-23-11 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 32 PERCENT TIME USED- 26 | | | | | | | | | | | | BOYER, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-70-080 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113035 | TOTALS | 1,437,954.68| 322,386.32| 493,715.51| 34.3| ************************************************************************************************************************************ HARRIS BUFFALO BAYOU TRAIL: FROM SHEPHERD | 4.637 | 4,586,473.80| 237,276.43| 471,366.43| 10.2| VA SABINE | | | | | | 0912-71-503 | | | | | | CM 96(730) HIKE AND BIKE TRAIL | | | | | | | | | | | | WORK ORDER- 10-19-11 WORK BEGAN- 11-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-04-11 | | | | | | CONTRACT WORKING DAYS- 225 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 22 PERCENT TIME USED- 9 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-503 | | | | | | LANDPRO, INC. | |SUB %: 5.64 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 2.68 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.81 | | | | REPUBLIC TRAFFIC SAFETY, INC. | |SUB %: 0.20 | | | | PFEIFFER & SON LTD. | |SUB %: 11.76 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.07 | | | | DIAMOND J DRILLING | |SUB %: 2.55 | | | | VALLEY PLACERS, LLC | |SUB %: 0.41 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.02 | | | | CARMA CONSTRUCTION, LLC | |SUB %: 3.36 | | | | AGGREGATE TECHNOLOGIES, INC. | |SUB %: 0.72 | | | | | | | | | | CONTRACT 08113043 | TOTALS | 4,586,473.80| 237,276.43| 471,366.43| 10.2| ************************************************************************************************************************************ HARRIS AT SHADOWBRIAR DRIVE | 0.001 | 146,421.50| 0.00| 10,200.00| 6.9| FM 1093 . | | | | | | 1258-04-059 | | | | | | STP 1102(313)HESG TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 39 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | THIRD COAST SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1258-04-059 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113053 | TOTALS | 146,421.50| 0.00| 10,200.00| 6.9| ************************************************************************************************************************************ HARRIS SOUTH OF BW 8 | 1.106 | 9,266,318.15| 551,192.15| 1,203,651.45| 12.9| FM 865 BRAZORIA COUNTY LINE(CLEAR CREEK) | | | | | | 0976-01-035 | | | | | | STP 1102(436) CR, BS & SURF | | | | | | | | | | | | WORK ORDER- 10-27-11 WORK BEGAN- 11-29-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-12-11 | | | | | | CONTRACT WORKING DAYS- 410 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 23 PERCENT TIME USED- 5 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0976-01-035 | | | | | | EMBARK TREE AND LANDSCAPE SERVICES | |SUB %: 0.35 | | | | URBAN FORESTERS, LLC | |SUB %: 0.34 | | | | RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC | |SUB %: 4.74 | | | | GMJ PAVING CO. | |SUB %: 2.40 | | | | BREDA COMPANY, INC. | |SUB %: 0.35 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.25 | | | | BATTERSON,LLP | |SUB %: 1.10 | | | | CHAMPIONS HYDROLAWN | |SUB %: 0.33 | | | | JMHP, INC. | |SUB %: 0.05 | | | | H & H CURB COMPANY | |SUB %: 0.11 | | | | NBG CONSTRUCTORS, INC. | |SUB %: 22.94 | | | | | | | | | | CONTRACT 08113207 | TOTALS | 9,266,318.15| 551,192.15| 1,203,651.45| 12.9| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS IH 10 AT | 5.666 | 1,191,334.89| 1,111.11| 86,145.40| 7.2| VA US 90 INTERCHANGE ALONG IH 610 | | | | | | 0912-70-079 | | | | | | HP 1102(308) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 09-28-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-70-079 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113243 | TOTALS | 1,191,334.89| 1,111.11| 86,145.40| 7.2| ************************************************************************************************************************************ HARRIS ON SH 6; IH 10 | 9.000 | 3,134,199.14| 89,980.13| 470,534.91| 15.0| VA VOSS ROAD (FORT BEND & HARRIS CO.) | | | | | | 0912-00-399 | | | | | | NH 1102(307) ACCESS MGT IMPRVMTS | | | | | | | | | | | | WORK ORDER- 09-30-11 WORK BEGAN- 10-31-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-16-11 | | | | | | CONTRACT WORKING DAYS- 176 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 49 PERCENT TIME USED- 27 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-399 | | | | | | BATTERSON,LLP | |SUB %: 8.48 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 8.00 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.72 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.53 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 8.01 | | | | CURB PLANET INC. | |SUB %: 4.67 | | | | CPAVE, INC. | |SUB %: 0.30 | | | | | | | | | | CONTRACT 08113249 | TOTALS | 3,134,199.14| 89,980.13| 470,534.91| 15.0| ************************************************************************************************************************************ HARRIS AT PIPING ROCK | 0.002 | 256,046.10| 0.00| 10,727.05| 4.1| SH 6 . | | | | | | 1685-05-101 | | | | | | STP 1102(315)HESG TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-13-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-29-11 | | | | | | CONTRACT WORKING DAYS- 81 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | STATEWIDE TRAFFIC SIGNAL COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1685-05-101 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113261 | TOTALS | 256,046.10| 0.00| 10,727.05| 4.1| ************************************************************************************************************************************ HARRIS HEGAR ROAD AT SPRING CREEK | 0.086 | 681,208.36| 195,654.54| 380,942.86| 55.9| CR . | | | | | | 0912-72-057 | | | | | | BR 2008(622) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 09-16-11 WORK BEGAN- 11-01-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-02-11 | | | | | | CONTRACT WORKING DAYS- 79 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 39 PERCENT TIME USED- 49 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-057 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.92 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 7.56 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.70 | | | | MESA ROD BUSTERS, INC. | |SUB %: 1.07 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 0.17 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 8.67 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 2.44 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 6.10 | | | | CHERRY DEMOLITION | |SUB %: 1.39 | | | | | | | | | | CONTRACT 08113265 | TOTALS | 681,208.36| 195,654.54| 380,942.86| 55.9| ************************************************************************************************************************************ HARRIS AT JOHN F KENNEDY BLVD | 0.002 | 380,585.05| 3,750.00| 91,597.50| 24.0| BW 8 . | | | | | | 3256-02-086 | | | | | | STP 1102(317)HESG TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 122 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 34 PERCENT TIME USED- 27 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3256-02-086 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113272 | TOTALS | 380,585.05| 3,750.00| 91,597.50| 24.0| ************************************************************************************************************************************ HARRIS AT VISTA,SPENCER,PASADENA BLVD_& | 0.360 | 2,349,189.33| 13,888.91| 2,547,956.39| 99.9| BW 8 RED BLUFF | | | | | | 3256-03-072 | | | | | | CM 2007(854)ES TURN RADIUS IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 11-02-09 WORK BEGAN- 12-14-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-18-09 | | | | | | CONTRACT WORKING DAYS- 230 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 229 PERCENT TIME USED- 99 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3256-03-072 | | | | | | TRAF-TEX, INC. | |SUB %: 20.67 | | | | BATTERSON, L.L.P. | |SUB %: 4.11 | | | | EL DORADO PAVING COMPANY, INC. | |SUB %: 5.00 | | | | SOUTHERN CRUSHED CONCRETE INC. | |SUB %: 1.22 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.16 | | | | | | | | | | CONTRACT 09093006 | TOTALS | 2,349,189.33| 13,888.91| 2,547,956.39| 99.9| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 946,870.85| 13,000.00| 409,550.65| 43.2| VA . | | | | | | 0912-00-383 | | | | | | STP 2010(058)ES UPGRADE/RECONSTRUCT TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 10-30-09 WORK BEGAN- 01-25-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-15-09 | | | | | | CONTRACT WORKING DAYS- 238 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 24 PERCENT TIME USED- 10 | | | | | | | | | | | | REPUBLIC INTELLIGENT TRANSPORTATION SERVICES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-383 | | | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.00 | | | | YORK & YORK FOUNDATION DRILLING, INC. | |SUB %: 0.11 | | | | | | | | | | CONTRACT 09093011 | TOTALS | 946,870.85| 13,000.00| 409,550.65| 43.2| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 898,349.73| 0.00| 430,433.56| 47.9| VA . | | | | | | 0912-00-335 | | | | | | STP 2010(057)ES UPGRADE/RECONSTRUCT TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 11-16-09 WORK BEGAN- 08-17-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-02-10 | | | | | | CONTRACT WORKING DAYS- 188 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 65 PERCENT TIME USED- 34 | | | | | | | | | | | | STATEWIDE TRAFFIC SIGNAL COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-335 | | | | | | SPRING CREEK CONSTRUCTION, INC. | |SUB %: 3.85 | | | | BATTERSON,LLP | |SUB %: 1.16 | | | | | | | | | | CONTRACT 09093012 | TOTALS | 898,349.73| 0.00| 430,433.56| 47.9| ************************************************************************************************************************************ HARRIS AT IH 45 | 0.454 | 305,747.82| 1,790.85| 332,401.87| 99.9| US 59 . | | | | | | 0027-13-198 | | | | | | NH 2010(049) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 10-06-09 WORK BEGAN- 11-02-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-22-09 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 60 PERCENT TIME USED- 100 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0027-13-198 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09093018 | TOTALS | 305,747.82| 1,790.85| 332,401.87| 99.9| ************************************************************************************************************************************ HARRIS IH 45 | 7.964 | 3,356,949.75| 0.00| 3,034,059.40| 90.3| NASA 1 SH 146 | | | | | | 0981-01-102 | | | | | | CM 2008(837) INSTALL CTMS | | | | | | | | | | | | WORK ORDER- 11-06-09 WORK BEGAN- 01-04-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-22-09 | | | | | | CONTRACT WORKING DAYS- 375 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 372 PERCENT TIME USED- 99 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0981-01-102 | | | | | | VACA UNDERGOUND UTILITIES INC | |SUB %: 1.34 | | | | ODUM SERVICES, L.P. | |SUB %: 0.59 | | | | SUPERIOR GROUTING SERVICES, INC. | |SUB %: 0.60 | | | | | | | | | | CONTRACT 09093210 | TOTALS | 3,356,949.75| 0.00| 3,034,059.40| 90.3| ************************************************************************************************************************************ HARRIS AT WAYSIDE | 0.208 | 1,550,849.21| 0.00| 0.00| 0.0| IH 10 . | | | | | | 0508-01-331 | | | | | | IM 0107(429) INSTALL U-TURNS | | | | | | | | | | | | WORK ORDER- 11-03-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-19-11 | | | | | | CONTRACT WORKING DAYS- 115 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0508-01-331 | | | | | | FLORIDA TRAFFIC CONTROL DEVICES, INC. | |SUB %: 31.27 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.74 | | | | CRAIG & HEIDT, INC. | |SUB %: 1.42 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 0.52 | | | | GULF COAST PAVERS, INC. | |SUB %: 2.21 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.33 | | | | | | | | | | CONTRACT 09113029 | TOTALS | 1,550,849.21| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS PR 138 INSIDE SHELDON LAKE STATE PK | 2.249 | 3,457,061.25| 0.00| 0.00| 0.0| PW . | | | | | | 0912-71-888 | | | | | | C 912-71-888 CONSTR ROADS & PARKING | | | | | | | | | | | | WORK ORDER- 11-09-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-25-11 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | JAMES CONSTRUCTION GROUP, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-888 | | | | | | THOMAS TRACTOR WORKS, INC. | |SUB %: 3.55 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.98 | | | | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | |SUB %: 11.57 | | | | BATTERSON,LLP | |SUB %: 0.54 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 2.09 | | | | CHAMPIONS HYDRO-LAWN | |SUB %: 1.50 | | | | GBI PARTNERS, LP | |SUB %: 1.10 | | | | BEYER FARMS, INC. | |SUB %: 2.59 | | | | SPECIALTY DRILLING, LTD. | |SUB %: 1.15 | | | | | | | | | | CONTRACT 09113207 | TOTALS | 3,457,061.25| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 1,515,998.78| 0.00| 0.00| 0.0| VA . | | | | | | 0912-00-380 | | | | | | STP 2012(020) NEW TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 11-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-02-11 | | | | | | CONTRACT WORKING DAYS- 437 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | STATEWIDE TRAFFIC SIGNAL COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-380 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09113211 | TOTALS | 1,515,998.78| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS ARMARANTH RD | 1.737 | 1,782,753.11| 1,856.10| 1,440,676.88| 80.8| CR 0.2 MI E OF GREENHOUSE ON MAYDE CRE | | | | | | 0912-71-808 | | | | | | STP 2002(160)ESTE 10' WDN ASPH CONC SHARED USE PATH | | | | | | | | | | | | WORK ORDER- 12-06-10 WORK BEGAN- 04-04-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-03-11 | | | | | | CONTRACT WORKING DAYS- 109 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 63 PERCENT TIME USED- 57 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-808 | | | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 1.05 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 12.98 | | | | DORAN STEEL, INC. | |SUB %: 0.12 | | | | LEGENDS LANDSCAPES LLC | |SUB %: 10.40 | | | | REPUBLIC TRAFFIC SAFETY, INC. | |SUB %: 0.58 | | | | A & A CONSTRUCTION | |SUB %: 7.29 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 1.12 | | | | VALLEY PLACERS, LLC | |SUB %: 0.03 | | | | NATIONAL FENCE CO. | |SUB %: 0.73 | | | | EROSION CONTROL, INC. | |SUB %: 0.74 | | | | | | | | | | CONTRACT 10103010 | TOTALS | 1,782,753.11| 1,856.10| 1,440,676.88| 80.8| ************************************************************************************************************************************ HARRIS HOUSTON CITY STREETS (AT TELLESPEN | 0.549 | 3,069,254.60| 250,365.94| 1,483,926.90| 48.3| IH 45 UNDERPASS) | | | | | | 0500-03-563 | | | | | | DMO 2006(885) FLOOD/DRAINAGE IMPROVEMENTS | | | | | | | | | | | | HARRIS HOUSTON CITY STREETS (AT TELLESPEN | 0.001 | 0.00| 0.00| 0.00| 0.0| IH 45 UNDERPASS) | | | | | | 0500-03-568 | | | | | | IM 0451(337) ROW UTL. ADJ. | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 06-28-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-06-11 | | | | | | CONTRACT WORKING DAYS- 391 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 163 PERCENT TIME USED- 41 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0500-03-563 | | | | | | BATTERSON,LLP | |SUB %: 1.28 | | | | PFEIFFER & SON LTD. | |SUB %: 0.22 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.54 | | | | EL DORADO PAVING COMPANY, INC. | |SUB %: 1.22 | | | | T & C CONSTRUCTION, INC. | |SUB %: 17.91 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 0.32 | | | | MAGNUM TUNNELING, LLC | |SUB %: 1.09 | | | | | | | | | | CONTRACT 10103023 | TOTALS | 3,069,254.60| 250,365.94| 1,483,926.90| 48.3| ************************************************************************************************************************************ HARRIS HERMANN PARK TRAIL IMPROVEMENTS | 1.952 | 1,698,562.24| 0.00| 1,938,094.11| 99.9| CS . | | | | | | 0912-71-805 | | | | | | STP 2002(157)TE 8' TO 14' PEDESTRIAN TRAIL | | | | | | | | | | | | WORK ORDER- 01-27-11 WORK BEGAN- 02-12-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-12-11 | | | | | | CONTRACT WORKING DAYS- 92 ADDL DAYS GRANTED- 11 | | | | | | WORKING DAYS CHARGED- 127 PERCENT TIME USED- 123 | | | | | | | | | | | | SPAWGLASS CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-805 | | | | | | TRAF-TEX, INC. | |SUB %: 43.03 | | | | CHERRY CONCRETE REMOVAL | |SUB %: 0.17 | | | | FORDE CONSTRUCTION COMPANY, INC. | |SUB %: 1.19 | | | | CONSTRUCTION ECO SERVICES | |SUB %: 0.14 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 0.20 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.01 | | | | JCF BRIDGE & CONCRETE, INC. | |SUB %: 0.23 | | | | PRECISION SITE WORKS, LLC | |SUB %: 5.69 | | | | CHAMPION CURB | |SUB %: 1.58 | | | | BUILDER SERVICES CO. | |SUB %: 0.49 | | | | LANDPRO, INC. | |SUB %: 7.37 | | | | J.E.F. FABRICATION, INC. | |SUB %: 0.15 | | | | A-1 HYDRO-MULCHING OF TEXAS, INC. | |SUB %: 1.64 | | | | | | | | | | CONTRACT 10103213 | TOTALS | 1,698,562.24| 0.00| 1,938,094.11| 99.9| ************************************************************************************************************************************ HARRIS SH 6; VOSS ROAD | 10.895 | 2,782,284.17| 0.00| 2,440,923.63| 88.7| VA 500 FT S OF TEAL BLVD (FT BEND CO.) | | | | | | 0912-00-341 | | | | | | CM 2008(495) ACCESS MGT IMPRVMTS | | | | | | | | | | | | WORK ORDER- 01-03-11 WORK BEGAN- 02-07-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-19-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 174 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 209 PERCENT TIME USED- 120 | |**************************************************| | | | | | | | MATL CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-341 | | | | | | CHERRY CONCRETE REMOVAL | |SUB %: 0.95 | | | | CROSSROADS DECORATIVE PAVEMENT | |SUB %: 6.53 | | | | EASTGATE RESOURCES, INC. | |SUB %: 0.89 | | | | LOZANO BRICK AND TILE, INC. | |SUB %: 1.48 | | | | LANDSTORM CONSTRUCTION, LLC | |SUB %: 20.34 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 6.84 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 1.19 | | | | CINCH CONSTRUCTION LLC | |SUB %: 0.77 | | | | CROSS TEX CURBS | |SUB %: 1.54 | | | | CURB PLANET INC. | |SUB %: 1.07 | | | | HUBCO, INC. | |SUB %: 0.43 | | | | KING TILE & MARBLE, INC. | |SUB %: 0.16 | | | | A-1 STRIPING & PAVEMENT SERVICE | |SUB %: 2.70 | | | | SAN JACINTO BORING & TUNNELING, INC. | |SUB %: 0.83 | | | | LANDPRO, INC. | |SUB %: 4.48 | | | | EROSION PREVENTION PRODUCTS | |SUB %: 0.54 | | | | WINDROSE LAND SERVICES, INC. | |SUB %: 0.28 | | | | G & D DIRECCIONAL | |SUB %: 0.57 | | | | DIXIE DRILLING COMPANY, INC. | |SUB %: 0.14 | | | | A & A PREMIER BUILDERS, INC. | |SUB %: 0.89 | | | | AGGREGATE TECHNOLOGIES, INC. | |SUB %: 2.26 | | | | STRIPES & STOPS COMPANY, INC. | |SUB %: 2.04 | | | | J. T. B. SERVICES, INC. | |SUB %: 0.60 | | | | CARMEN R. LABOY, INC. | |SUB %: 0.86 | | | | HERNAN DUARTE | |SUB %: 0.38 | | | | TAG COMMUNICATION CONTRACTORS (HUB) | |SUB %: 0.03 | | | | | | | | | | CONTRACT 10103217 | TOTALS | 2,782,284.17| 0.00| 2,440,923.63| 88.7| ************************************************************************************************************************************ HARRIS VAR LOCATIONS IN CENTRAL HOUSTON | 0.001 | 1,887,399.75| 0.00| 0.00| 0.0| VA . | | | | | | 0912-72-213 | | | | | | NH 2012(067) REHAB AND OTHER MISC. WORK | | | | | | | | | | | | WORK ORDER- 11-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-02-11 | | | | | | CONTRACT WORKING DAYS- 238 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ISI CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-213 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.67 | | | | MB WESTERN INDUSTRIAL CONTRACTING | |SUB %: 1.87 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.43 | | | | | | | | | | CONTRACT 10113010 | TOTALS | 1,887,399.75| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS | 0.001 | 991,340.00| 0.00| 0.00| 0.0| VA . | | | | | | 0912-72-117 | | | | | | STP 2012(066) UPGRADE VIA'S WITH REACTS IN C. HOU | | | | | | | | | | | | WORK ORDER- 11-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-02-11 | | | | | | CONTRACT WORKING DAYS- 55 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-117 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10113012 | TOTALS | 991,340.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS HEMPSTEAD RD AT UPRR | 1.439 | 668,395.50| 0.00| 0.00| 0.0| MH WHITE OAK BAYOU | | | | | | 8170-12-002 | | | | | | RW 8170-12-2 ROW UTL. ADJ.; RELOC. ASSIST. | | | | | | | | | | | | HARRIS ON WASHINGTON/HEMPSTEAD | 2.151 | 10,729,927.24| 0.00| 0.00| 0.0| MH WASHINGTON-KATY SPLIT TO IH 10 | | | | | | 8170-12-006 | | | | | | HP 2008(049) GR, STRS & SURF | | | | | | | | | | | | WORK ORDER- 12-09-11 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 407 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SER CONSTRUCTION PARTNERS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 8170-12-006 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10113205 | TOTALS | 11,398,322.74| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS IH 10 AT W OF WILCREST | 0.031 | 141,822.84| 0.00| 0.00| 0.0| IH 10 . | | | | | | 0271-07-303 | | | | | | C 271-7-303 SOUND_WALL | | | | | | | | | | | | WORK ORDER- 11-16-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-02-11 | | | | | | CONTRACT WORKING DAYS- 25 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-07-303 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10113212 | TOTALS | 141,822.84| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS AT FM 1960 | 0.319 | 349,418.82| 0.00| 0.00| 0.0| US 59 AT FM 1960 | | | | | | 0177-06-080 | | | | | | NH 2012(105) REMOVE EXISTING RAMP | | | | | | | | | | | | WORK ORDER- 12-02-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-18-11 | | | | | | CONTRACT WORKING DAYS- 48 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | FORDE CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0177-06-080 | | | | | | TRAF-TEX, INC. | |SUB %: 8.08 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 3.74 | | | | AGGREGATE TECHNOLOGIES, INC. | |SUB %: 4.27 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.51 | | | | REGIONAL TRAFFIC SERVICES, LLC | |SUB %: 1.40 | | | | A-1 HYDRO-MULCHING OF TEXAS, INC. | |SUB %: 2.66 | | | | | | | | | | CONTRACT 11113011 | TOTALS | 349,418.82| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS | 0.001 | 1,680,068.00| 0.00| 0.00| 0.0| VA . | | | | | | 0912-00-404 | | | | | | STP 2012(106) REPAIR OF BRIDGE APPROACHES | | | | | | | | | | | | WORK ORDER- 01-03-12 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-19-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | URETEK USA, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-404 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11113213 | TOTALS | 1,680,068.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.003 | 439,963.75| 18,471.76| 18,471.76| 4.1| VA . | | | | | | 0912-00-336 | | | | | | STP 2011(578)G INSTALL VIVDS AND INSTALL LOOPS | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-22-11 | | | | | | CONTRACT WORKING DAYS- 187 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | THIRD COAST SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-336 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12103011 | TOTALS | 439,963.75| 18,471.76| 18,471.76| 4.1| ************************************************************************************************************************************ HARRIS WEST OF TELGE RD | 6.125 | 513,601.75| 0.00| 653,547.21| 99.9| US 290 EAST OF NORTH ELDRIDGE PARKWAY | | | | | | 0050-08-089 | | | | | | CC 50-8-89 CONSTR DIAMOND LN | | | | | | | | | | | | WORK ORDER- 01-24-11 WORK BEGAN- 03-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-09-11 | | | | | | CONTRACT WORKING DAYS- 59 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 51 PERCENT TIME USED- 86 | | | | | | | | | | | | ROZCO CONTRACTING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0050-08-089 | | | | | | JMHP, INC. | |SUB %: 0.97 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 47.55 | | | | | | | | | | CONTRACT 12103020 | TOTALS | 513,601.75| 0.00| 653,547.21| 99.9| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS INSIDE HARRIS CTY | 0.001 | 2,063,799.80| 63,623.76| 1,438,918.34| 69.7| VA . | | | | | | 0912-72-212 | | | | | | STP 2011(716)G PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-22-11 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 199 PERCENT TIME USED- 90 | | | | | | | | | | | | BATTERSON,LLP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-212 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12103031 | TOTALS | 2,063,799.80| 63,623.76| 1,438,918.34| 69.7| ************************************************************************************************************************************ HARRIS VAR LOCATIONS OUTSIDE HARRIS COUNTY | 0.001 | 2,213,307.80| 106,850.71| 1,617,842.05| 73.0| VA . | | | | | | 0912-00-386 | | | | | | STP 2011(715)G PAVEMENT MARKINGS | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 03-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-22-11 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 187 PERCENT TIME USED- 85 | | | | | | | | | | | | BATTERSON,LLP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-386 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12103203 | TOTALS | 2,213,307.80| 106,850.71| 1,617,842.05| 73.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS | 0.001 | 1,865,335.43| 0.00| 1,372,953.02| 73.6| VA . | | | | | | 0912-72-116 | | | | | | STP 2011(579) BASE, SHLDR, SLOPE, STR & SIGN WORK | | | | | | | | | | | | WORK ORDER- 01-06-11 WORK BEGAN- 01-29-11 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 01-22-11 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 303 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 292 PERCENT TIME USED- 96 | |**************************************************| | | | | | | | SPRING EQUIPMENT CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-116 | | | | | | BUILDER SERVICES CO. | |SUB %: 2.58 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 1.05 | | | | TOM-MAC, INC. | |SUB %: 5.11 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 1.78 | | | | BATTERSON,LLP | |SUB %: 1.58 | | | | EPOXY DESIGN SYSTEMS, INC. | |SUB %: 5.15 | | | | MICA CORPORATION | |SUB %: 3.60 | | | | HOLES INCORPORATED | |SUB %: 0.57 | | | | CPAVE, INC. | |SUB %: 0.06 | | | | TEXAS STERLING CONSTRUCTION CO. | |SUB %: 0.32 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 1.20 | | | | NBG CONSTRUCTORS, INC. | |SUB %: 11.79 | | | | | | | | | | CONTRACT 12103214 | TOTALS | 1,865,335.43| 0.00| 1,372,953.02| 73.6| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS DISTRICTWIDE | 0.001 | 911,168.15| 45,355.30| 117,673.70| 12.9| VA . | | | | | | 0912-00-385 | | | | | | STP 2011(714)G UPGRADE/RECONSTRUCT TRAFFIC SIGNALS | | | | | | | | | | | | WORK ORDER- 02-10-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-26-11 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 14 PERCENT TIME USED- 5 | | | | | | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-00-385 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12103230 | TOTALS | 911,168.15| 45,355.30| 117,673.70| 12.9| ************************************************************************************************************************************ HARRIS .122 MILES WST OF SH 35 | 2.016 | 1,018,574.45| 0.00| 0.00| 0.0| IH 610 .228 MILES WEST OF LONG DRIVE | | | | | | 0271-16-131 | | | | | | IM 6107(432) HIGH MAST ILLUMINATION | | | | | | | | | | | | WORK ORDER- 01-03-12 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0271-16-131 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12113012 | TOTALS | 1,018,574.45| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS W OF ACADEMY ST | 0.700 | 462,462.62| 0.00| 0.00| 0.0| CS E OF EDLOE ST ON BELLAIRE BLVD | | | | | | 0912-71-794 | | | | | | STP 2002(146)TE LANDSCAPE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JERDON ENTERPRISE, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-71-794 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12113015 | TOTALS | 462,462.62| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HARRIS VARIOUS LOCATIONS | 0.001 | 1,464,291.55| 0.00| 0.00| 0.0| VA . | | | | | | 0912-72-180 | | | | | | STP 2012(148) FULL DEPTH REPAIR & BRIDGE REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 255 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-72-180 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12113214 | TOTALS | 1,464,291.55| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MONTGOMERY IH 45, HARRIS/MONTGOMERY C/L | 11.862 | 738,493.25| 35,644.96| 678,868.99| 91.9| VA LOOP 336 SOUTH | | | | | | 0912-37-201 | | | | | | HP 2009(333) LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 03-20-09 WORK BEGAN- 04-10-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-05-09 | | | | | | CONTRACT WORKING DAYS- 780 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 698 PERCENT TIME USED- 89 | | | | | | | | | | | | BIO LANDSCAPE & MAINTENANCE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0912-37-201 | | | | | | XELLENT SERVICES | |SUB %: 5.30 | | | | | | | | | | CONTRACT 01093221 | TOTALS | 738,493.25| 35,644.96| 678,868.99| 91.9| ************************************************************************************************************************************ MONTGOMERY SH 242 | 16.171 | 3,754,449.19| 0.00| 0.00| 0.0| FM 1485 KIDD CEMETERY ROAD | | | | | | 1062-03-046 | | | | | | STP 2012(331) BASE REPAIR,O/L & RUMBLE STRIPS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SMITH & COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1062-03-046 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01123017 | TOTALS | 3,754,449.19| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MONTGOMERY LP 336W | 5.632 | 2,748,532.60| 0.00| 0.00| 0.0| SH 105 SH 75 | | | | | | 0338-03-086 | | | | | | NH 2012(207) BASE & ASPHALT REPAIR, OCST | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SMITH & COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0338-03-086 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01123024 | TOTALS | 2,748,532.60| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MONTGOMERY N OF LP 336 | 2.747 | 51,156,044.10| 2,056,639.16| 31,066,607.96| 60.7| IH 45 S OF FM 3083 | | | | | | 0675-08-061 | | | | | | STP 2010(547)ES GR, STRS, BASE AND CONC PAVE | | | | | | | | | | | | MONTGOMERY LP 336 NORTH | 4.015 | 1,205,196.00| 0.00| 1,040,022.00| 86.2| IH 45 FM 830 | | | | | | 0675-08-092 | | | | | | STP 2010(552)ES ROW ACQ., UTL. ADJ.; RELOC ASSIST | | | | | | | | | | | | WORK ORDER- 04-15-10 WORK BEGAN- 07-19-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-19-10 | | | | | | CONTRACT WORKING DAYS- 1,021 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 421 PERCENT TIME USED- 41 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0675-08-061 | | | | | | BOOTHE BROTHERS PAVING COMPANY, INC. | |SUB %: 0.45 | | | | BORING & TUNNELING COMPANY OF AMERICA, INC. | |SUB %: 0.96 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 0.67 | | | | REPUBLIC TRAFFIC SAFETY, INC. | |SUB %: 0.09 | | | | CENTRAL NORTH CONSTRUCTION, LLC | |SUB %: 0.84 | | | | SLACK & CO. CONTRACTING, INC. | |SUB %: 1.85 | | | | S & V CONSTRUCTION LLC | |SUB %: 0.79 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.31 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.13 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 7.30 | | | | A. H. BECK FOUNDATION CO., INC. | |SUB %: 0.70 | | | | SMITH & CO. (SEE 16033) | |SUB %: 9.31 | | | | NORTHWEST MATERIALS | |SUB %: 0.00 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.85 | | | | MICKIE SERVICE, INC. | |SUB %: 0.02 | | | | K & K CONSTRUCTION, INC. | |SUB %: 0.01 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.31 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.25 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 3.81 | | | | CURB BUILDERS, INC. | |SUB %: 0.04 | | | | SOUTHERN CRUSHED CONCRETE LLC | |SUB %: 0.45 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.10 | | | | | | | | | | CONTRACT 02103201 | TOTALS | 52,361,240.10| 2,056,639.16| 32,106,629.96| 61.3| ************************************************************************************************************************************ MONTGOMERY NORTH OF CALVARY | 5.098 | 57,435,821.47| 1,143,371.04| 32,145,435.61| 55.9| IH 45 SOUTH OF FM 830 | | | | | | 0675-08-084 | | | | | | STP 2010(629)ES GR, STRS, BASE AND CONC PAVE | | | | | | | | | | | | MONTGOMERY FM 830 | 8.208 | 181,827.00| 0.00| 78,499.00| 43.1| IH 45 WALKER COUNTY LINE | | | | | | 0675-08-093 | | | | | | RW 675-8-93 ROW ACQ. | | | | | | | | | | | | WORK ORDER- 05-07-10 WORK BEGAN- 05-25-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-23-10 | | | | | | CONTRACT WORKING DAYS- 1,177 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 484 PERCENT TIME USED- 41 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0675-08-084 | | | | | | JOE VALENCIK, INC. | |SUB %: 0.94 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.15 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.38 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 14.55 | | | | CREATIVE LANDSCAPES OF TEXAS | |SUB %: 1.20 | | | | SMITH & COMPANY | |SUB %: 10.78 | | | | L.A. UTILITIES, INC. | |SUB %: 5.04 | | | | JET UNDERGROUND UTILITIES | |SUB %: 4.78 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 0.95 | | | | BORING & TUNNELING COMPANY OF AMERICA, INC. | |SUB %: 0.17 | | | | | | | | | | CONTRACT 03103001 | TOTALS | 57,617,648.47| 1,143,371.04| 32,223,934.61| 55.9| ************************************************************************************************************************************ MONTGOMERY FM 1774 | 10.064 | 2,074,235.85| 353.29| 1,966,887.54|100.0| FM 1488 FM 149 | | | | | | 0523-09-019 | | | | | | STP 1102(063) BASE REPAIR, OCST & ACP OVERLAY | | | | | | | | | | | | WORK ORDER- 07-19-11 WORK BEGAN- 08-04-11 | | | | | | DATE WORK COMPLETED- 01-04-12 TIME COMPUTED- 08-04-11 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 66 PERCENT TIME USED- 110 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0523-09-019 | | | | | | BATTERSON,LLP | |SUB %: 7.25 | | | | | | | | | | CONTRACT 06113024 | TOTALS | 2,074,235.85| 353.29| 1,966,887.54|100.0| ************************************************************************************************************************************ MONTGOMERY AT KROPIK,FIRETOWER,HAYDEN,HICKORY, | 0.002 | 1,258,077.63| 6,329.44| 988,451.57| 78.5| SH 242 LONESTAR RANCH AND FAWN RIDGE | | | | | | 3538-01-040 | | | | | | CM 1102(147) ADD LT TN LNS | | | | | | | | | | | | WORK ORDER- 08-16-11 WORK BEGAN- 09-26-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-01-11 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 60 PERCENT TIME USED- 100 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3538-01-040 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 10.70 | | | | SEAMARCK LANDSCAPE SERVICES, INC | |SUB %: 0.31 | | | | | | | | | | CONTRACT 07113021 | TOTALS | 1,258,077.63| 6,329.44| 988,451.57| 78.5| ************************************************************************************************************************************ MONTGOMERY US 59 NORTH | 0.001 | 252,586.36| 0.00| 251,028.41| 99.3| BU 59-L US 59 SOUTH | | | | | | 0177-16-007 | | | | | | C 177-16-7 BS REP,OCST & ACP O/L | | | | | | | | | | | | MONTGOMERY GRIMES COUNTY LINE | 24.302 | 3,524,398.83| 538,185.75| 3,450,166.26| 97.8| FM 149 .190 MILES NORTH OF KEENAN CUTOFF | | | | | | 0720-02-079 | | | | | | STP 1102(391) BASE REPAIR, OCST AND HOT MIX | | | | | | | | | | | | WORK ORDER- 08-05-11 WORK BEGAN- 08-22-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-21-11 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 74 PERCENT TIME USED- 70 | | | | | | | | | | | | SMITH & COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0720-02-079 | | | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.17 | | | | WATERS CONSTRUCTION COMPANY, INC., BOB | |SUB %: 17.55 | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.41 | | | | BATTERSON,LLP | |SUB %: 6.38 | | | | | | | | | | CONTRACT 07113031 | TOTALS | 3,776,985.19| 538,185.75| 3,701,194.67| 97.9| ************************************************************************************************************************************ MONTGOMERY 0.717 MI NORTH OF NORTH LOOP 336 | 4.489 | 168,445,217.29| 1,502,285.27| 157,814,155.56| 92.1| IH 45 0.118 MI NORTH OF SOUTH LOOP 336 | | | | | | 0675-08-052 | | | | | | NH 2007(813) GR, STRS, BASE & CONC PAVE | | | | | | | | | | | | MONTGOMERY 0.60 MI NORTH OF NORTH LOOP 336 | 4.489 | 7,079,517.00| 0.00| 6,893,343.52| 97.3| IH 45 0.043 MI NORTH OF SOUTH LOOP 336 | | | | | | 0675-08-089 | | | | | | NH 2007(211) UTILITIES | | | | | | | | | | | | WORK ORDER- 08-28-07 WORK BEGAN- 09-04-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-13-07 | | | | | | CONTRACT WORKING DAYS- 1,196 ADDL DAYS GRANTED- 110 | | | | | | WORKING DAYS CHARGED- 1,056 PERCENT TIME USED- 80 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0675-08-052 | | | | | | ESSARY, HART & MACWILIAM,INC. | |SUB %: 10.92 | | | | JOE VALENCIK, INC. | |SUB %: 0.41 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.38 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.04 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.19 | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 0.50 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.18 | | | | EROSION CONTROL, INC. | |SUB %: 0.46 | | | | NILEX CONSTRUCTION LLC | |SUB %: 0.38 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.24 | | | | BORTUNCO | |SUB %: 1.20 | | | | TRAFFIC SYSTEMS CONSTRUCTION, INC. | |SUB %: 3.62 | | | | VICON SERVICES, INC. | |SUB %: 0.01 | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 0.34 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 0.09 | | | | | | | | | | CONTRACT 08073001 | TOTALS | 175,524,734.29| 1,502,285.27| 164,707,499.08| 92.3| ************************************************************************************************************************************ MONTGOMERY 1.1 MI SOUTH OF WALKER COUNTY LINE | 2.610 | 24,972,837.01| 302,148.21| 13,722,447.05| 54.9| IH 45 NORTH OF CALVARY ROAD | | | | | | 0675-08-103 | | | | | | NH 2011(372) GR, STRS, BASE AND CONC PAVE | | | | | | | | | | | | WORK ORDER- 11-16-10 WORK BEGAN- 12-06-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-02-10 | | | | | | CONTRACT WORKING DAYS- 587 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 305 PERCENT TIME USED- 51 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0675-08-103 | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.08 | | | | SMITH & COMPANY | |SUB %: 8.67 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.05 | | | | RDI FOUNDATION DRILLING | |SUB %: 0.66 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.39 | | | | EROSION CONTROL, INC. | |SUB %: 0.89 | | | | BATTERSON,LLP | |SUB %: 1.08 | | | | L.A. UTILITIES, INC. | |SUB %: 8.15 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 8.05 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.46 | | | | VALLEY PLACERS, LLC | |SUB %: 0.03 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 2.64 | | | | SOUTHERN CRUSHED CONCRETE INC. | |SUB %: 0.77 | | | | MTAM CORPORATION | |SUB %: 0.59 | | | | BORTUNCO | |SUB %: 1.97 | | | | CREACOM, INC. | |SUB %: 4.40 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.21 | | | | B & D MAINTENANCE | |SUB %: 0.79 | | | | SPECIALTY DRILLING | |SUB %: 0.24 | | | | | | | | | | CONTRACT 08103119 | TOTALS | 24,972,837.01| 302,148.21| 13,722,447.05| 54.9| ************************************************************************************************************************************ MONTGOMERY N OF CRIGHTON RD | 6.889 | 1,095,536.50| 0.00| 0.00| 0.0| IH 45 LEAGUE LINE ROAD | | | | | | 0675-08-071 | | | | | | CM 1102(305) INST CTMS | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 375 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | TRAF-TEX, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0675-08-071 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113025 | TOTALS | 1,095,536.50| 0.00| 0.00| 0.0| ************************************************************************************************************************************ MONTGOMERY 0.109 MI N OF FM 1488 | 2.320 | 11,301,777.00| 798,871.82| 849,871.82| 7.5| FM 1774 0.045 MI S OF W LOST CREEK BLVD | | | | | | 1400-04-035 | | | | | | STP 1102(437) RECONSTRUCT ROADWAY | | | | | | | | | | | | WORK ORDER- 11-03-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-19-11 | | | | | | CONTRACT WORKING DAYS- 280 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 11 PERCENT TIME USED- 3 | | | | | | | | | | | | HASSELL CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1400-04-035 | | | | | | GULF COAST PAVERS, INC. | |SUB %: 0.22 | | | | GMJ PAVING CO. | |SUB %: 7.32 | | | | H & H CURB COMPANY | |SUB %: 0.12 | | | | BREDA COMPANY, INC. | |SUB %: 0.89 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.55 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.36 | | | | BATTERSON,LLP | |SUB %: 1.83 | | | | THIRD COAST SERVICES, LLC | |SUB %: 4.26 | | | | URBAN FORESTERS, LLC | |SUB %: 0.44 | | | | | | | | | | CONTRACT 08113209 | TOTALS | 11,301,777.00| 798,871.82| 849,871.82| 7.5| ************************************************************************************************************************************ MONTGOMERY WALKER COUNTY LINE | 1.075 | 8,966,666.70| 1,137,436.51| 7,626,831.13| 85.0| IH 45 1.1 MI SOUTH OF WALKER COUNTY LINE | | | | | | 0675-08-104 | | | | | | NH 2011(754) GR, STRS, BASE AND CONC PAVE | | | | | | | | | | | | WORK ORDER- 02-10-11 WORK BEGAN- 02-28-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-26-11 | | | | | | CONTRACT WORKING DAYS- 375 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 243 PERCENT TIME USED- 64 | | | | | | | | | | | | WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0675-08-104 | | | | | | ROADSAFE TRAFFIC SYSTEMS, INC. | |SUB %: 0.11 | | | | EROSION CONTROL, INC. | |SUB %: 1.04 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.15 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 0.18 | | | | SMITH & COMPANY | |SUB %: 12.65 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.08 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 8.55 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.39 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.56 | | | | SOUTHERN CRUSHED CONCRETE LLC | |SUB %: 0.95 | | | | MTAM CORPORATION | |SUB %: 0.11 | | | | CREACOM, INC. | |SUB %: 0.54 | | | | | | | | | | CONTRACT 12103032 | TOTALS | 8,966,666.70| 1,137,436.51| 7,626,831.13| 85.0| ************************************************************************************************************************************ WALLER 1.943 MI S OF BU 290H | 6.128 | 4,277,601.81| 246,762.90| 3,248,848.44| 75.9| FM 362 0.25 MI S OF DAVIS ROAD | | | | | | 0523-02-032 | | | | | | STP 2011(969) ACP O/L,BS REP & WDN SHLDRS | | | | | | | | | | | | WORK ORDER- 06-14-11 WORK BEGAN- 08-01-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-30-11 | | | | | | CONTRACT WORKING DAYS- 112 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 110 PERCENT TIME USED- 98 | | | | | | | | | | | | TRIPLE B SERVICES, L.L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0523-02-032 | | | | | | BATTERSON,LLP | |SUB %: 1.91 | | | | CANALES TRUCKING | |SUB %: 1.72 | | | | COX PAVING COMPANY, L.P. | |SUB %: 5.39 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.13 | | | | HJC FARMS, INC. | |SUB %: 1.54 | | | | JAVALINA CONSTRUCTION SOUTH, INC. | |SUB %: 0.33 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 43.22 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, INC | |SUB %: 5.97 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.08 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.26 | | | | | | | | | | CONTRACT 05113229 | TOTALS | 4,277,601.81| 246,762.90| 3,248,848.44| 75.9| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 1,590,421,872.04 DISTRICT ESTIMATES THIS MONTH 36,097,496.67 DISTRICT TOTAL ESTIMATES PAID TO DATE 905,141,806.74