MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 02 AS OF MAY 15, 2013 PAGE 4 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ ERATH FM 8 | 2.010 | 1,276,567.15| 0.00| 0.00| 0.0| FM 988 US 67 | | | | | | 2926-01-011 | | | | | | STP 2013(389) MILL, BASE AND HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 04-19-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-05-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 85 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | JAY MILLS CONTRACTING, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2926-01-011 | | | | | | NORTH EASTERN PAVERS | |SUB %: 51.31 | | | | | | | | | | CONTRACT 02133210 | TOTALS | 1,276,567.15| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ERATH US 67 | 3.822 | 1,220,000.65| 0.00| 0.00| 0.0| BU 377J US 377 | | | | | | 0079-07-015 | | | | | | STP 2013(535) BS REPAIR AND HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 29 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | NORTHEASTERN PAVERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0079-07-015 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133012 | TOTALS | 1,220,000.65| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ERATH VARIOUS LOCATIONS | 0.282 | 379,628.18| 0.00| 232,655.20| 61.2| VA AROUND STEPHENVILLE | | | | | | 0902-49-066 | | | | | | STP 2012(569) LANDSCAPE ENHANCEMENT | | | | | | | | | | | | WORK ORDER- 06-18-12 WORK BEGAN- 10-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-04-12 | | | | | | CONTRACT WORKING DAYS- 63 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 55 PERCENT TIME USED- 87 | | | | | | | | | | | | JAY MILLS CONTRACTING, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-49-066 | | | | | | MEMCO | |SUB %: 6.42 | | | | LONE OAK LANDSCAPE LLC | |SUB %: 50.03 | | | | | | | | | | CONTRACT 05123017 | TOTALS | 379,628.18| 0.00| 232,655.20| 61.2| ************************************************************************************************************************************ ERATH SH 6 | 3.096 | 8,735,147.51| 283,488.99| 2,496,086.98| 28.5| SH 267 1.57 MI N OF FM 219/EXISTING US 67 | | | | | | 0079-08-001 | | | | | | NH 2012(668) GRADING, DRAINAGE, STRUCTURE & PAVE | | | | | | | | | | | | WORK ORDER- 10-12-12 WORK BEGAN- 11-19-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-19-12 | | | | | | CONTRACT WORKING DAYS- 340 ADDL DAYS GRANTED- 4 | | | | | | WORKING DAYS CHARGED- 108 PERCENT TIME USED- 31 | | | | | | | | | | | | PRATER EQUIPMENT CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0079-08-001 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.18 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 0.58 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, INC | |SUB %: 3.43 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 0.84 | | | | J & M CONTRACTING, COMPANY | |SUB %: 6.45 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.04 | | | | | | | | | | CONTRACT 08123210 | TOTALS | 8,735,147.51| 283,488.99| 2,496,086.98| 28.5| ************************************************************************************************************************************ HOOD AT RESORT CONFERENCE CENTER | 0.100 | 120,000.00| 0.00| 110,991.00|100.0| BU 377H IN GRANBURY | | | | | | 0080-10-017 | | | | | | CC 80-10-17 TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 09-17-12 | |**************************************************| | DATE WORK COMPLETED- 04-18-13 TIME COMPUTED- 08-14-12 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 112 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 37 PERCENT TIME USED- 33 | |**************************************************| | | | | | | | DURABLE SPECIALTIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0080-10-017 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.57 | | | | | | | | | | CONTRACT 04123022 | TOTALS | 120,000.00| 0.00| 110,991.00|100.0| ************************************************************************************************************************************ HOOD FM 51, NORTH OF GRANBURY | 2.405 | 4,564,896.99| 125,556.41| 3,311,767.51| 72.5| SL 567 BU 377H, WEST OF BRAZOS RIVER BRIDG | | | | | | 3524-01-003 | | | | | | STP 1102(203) GR, STRS, DRAINAGE & PAVEMENT | | | | | | | | | | | | WORK ORDER- 09-13-11 WORK BEGAN- 05-21-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-12-12 | | | | | | CONTRACT WORKING DAYS- 287 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 235 PERCENT TIME USED- 81 | | | | | | | | | | | | JAY MILLS CONTRACTING, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3524-01-003 | | | | | | NORTHEASTERN PAVERS, INC. | |SUB %: 19.70 | | | | ELLIS-MCGINNIS CONSTRUCTION CO. | |SUB %: 14.55 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.21 | | | | JUST GROOVING, LTD. | |SUB %: 0.07 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.09 | | | | TEXAS SHAFTS, INC. | |SUB %: 1.11 | | | | RAMBO CONTRACTING, INC. | |SUB %: 4.49 | | | | MELS ELECTRIC, L.P. | |SUB %: 3.92 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 0.87 | | | | A & A CONSTRUCTION | |SUB %: 0.22 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 1.33 | | | | LANDSCAPE CONTRACTING AND IRRIGATION, INC. | |SUB %: 0.64 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.30 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.09 | | | | LONE STAR HIGHWAY PRODUCTS, INC. | |SUB %: 1.12 | | | | | | | | | | CONTRACT 06113044 | TOTALS | 4,564,896.99| 125,556.41| 3,311,767.51| 72.5| ************************************************************************************************************************************ JACK AT LOST CREEK | 0.178 | 2,210,770.45| 234.00| 2,216,735.74| 99.9| US 281 . | | | | | | 0249-07-058 | | | | | | BR 1102(137) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 08-17-11 WORK BEGAN- 01-04-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-15-11 | | | | | | CONTRACT WORKING DAYS- 176 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 237 PERCENT TIME USED- 134 | | | | | | | | | | | | EARTH BUILDERS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0249-07-058 | | | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.95 | | | | GJ SEEDING, LLC | |SUB %: 1.01 | | | | JONA CONTRACTING, INC. | |SUB %: 0.53 | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 0.43 | | | | FARR FOUNDATION, INC. | |SUB %: 3.00 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 8.86 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.13 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.56 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.22 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.10 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.08 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.29 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.31 | | | | | | | | | | CONTRACT 07113014 | TOTALS | 2,210,770.45| 234.00| 2,216,735.74| 99.9| ************************************************************************************************************************************ JACK WEST INTERSECTION OF FM 1156 | 13.570 | 2,163,655.64| 0.00| 0.00| 0.0| US 380 WISE COUNTY LINE | | | | | | 0134-10-018 | | | | | | NH 2013(229) SEAL COAT | | | | | | | | | | | | WORK ORDER- 02-19-13 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-07-13 | | | | | | CONTRACT WORKING DAYS- 77 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | PEACHTREE CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0134-10-018 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.28 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 1.62 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 5.73 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 11.36 | | | | TORRES TRUCKINGS | |SUB %: 0.48 | | | | PAT"S TRUCKING CO., INC. | |SUB %: 2.54 | | | | | | | | | | CONTRACT 12123223 | TOTALS | 2,163,655.64| 0.00| 0.00| 0.0| ************************************************************************************************************************************ JOHNSON BU 67M | 4.168 | 17,490,460.34| 130,827.86| 17,098,890.42| 99.9| US 67 0.6 MILES EAST OF FM 4 | | | | | | 0422-05-004 | | | | | | STP 2010(558)ES GR, DR, BS, AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 05-13-10 WORK BEGAN- 05-21-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-21-10 | | | | | | CONTRACT WORKING DAYS- 384 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 659 PERCENT TIME USED- 171 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0422-05-004 | | | | | | ASHLAR CONTRACTING COMPANY | |SUB %: 2.15 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.83 | | | | AARON CONCRETE CONTRACTORS, L.P. | |SUB %: 0.36 | | | | S & V CONSTRUCTION LLC | |SUB %: 3.99 | | | | J & M CONTRACTING, COMPANY | |SUB %: 7.28 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.12 | | | | GLENN THURMAN, INC. | |SUB %: 17.12 | | | | ENVIRONMENTAL STANDARDS | |SUB %: 0.04 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.68 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 0.20 | | | | BREDA COMPANY, INC. | |SUB %: 0.01 | | | | ROSCH COMPANY | |SUB %: 3.03 | | | | GARY A. CRAIN, INC. | |SUB %: 0.01 | | | | RIVER CITIES SAWING, LLC | |SUB %: 0.01 | | | | RG PAINTING | |SUB %: 0.01 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.32 | | | | SOUTHWEST ENVIRONMENT SERVICES LLC | |SUB %: 1.09 | | | | MELS ELECTRIC, L.P. | |SUB %: 0.18 | | | | SAN-ANN-CO., INC. | |SUB %: 0.84 | | | | WW CONSTRUCTION WATERING SERVICE LLC | |SUB %: 1.02 | | | | RICE TUNNELING & BORING, INC. | |SUB %: 0.08 | | | | DAVE"S CONCRETE | |SUB %: 0.34 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.07 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.07 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.14 | | | | J & K EXCAVATION, LLC | |SUB %: 0.18 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 0.28 | | | | | | | | | | CONTRACT 03103203 | TOTALS | 17,490,460.34| 130,827.86| 17,098,890.42| 99.9| ************************************************************************************************************************************ JOHNSON FM 917 | 5.370 | 2,998,734.86| 12,847.00| 2,951,670.15| 98.4| FM 2738 US 67 | | | | | | 2762-01-016 | | | | | | STP 2012(354)HES GRADING, BASE AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 06-18-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-31-12 | | | | | | CONTRACT WORKING DAYS- 192 ADDL DAYS GRANTED- 8 | | | | | | WORKING DAYS CHARGED- 176 PERCENT TIME USED- 88 | | | | | | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2762-01-016 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.36 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 1.47 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 2.31 | | | | J.V. CONCRETE CONSTRUCTION | |SUB %: 15.92 | | | | | | | | | | CONTRACT 03123213 | TOTALS | 2,998,734.86| 12,847.00| 2,951,670.15| 98.4| ************************************************************************************************************************************ JOHNSON GRANBURY STREET | 1.028 | 597,035.09| 0.00| 639,372.53| 99.9| BU 67-M ROBINSON STREET | | | | | | 0259-05-069 | | | | | | STP 2012(459) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 05-15-12 WORK BEGAN- 09-17-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-31-12 | | | | | | CONTRACT WORKING DAYS- 64 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 85 PERCENT TIME USED- 132 | | | | | | | | | | | | PEACHTREE CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0259-05-069 | | | | | | TEX OP CONSTRUCTION, LP | |SUB %: 5.84 | | | | INDEPENDENT UTILITY CONSTRUCTION INCORPORATED | |SUB %: 10.17 | | | | CROSS ROADS INDUSTRIES, INC | |SUB %: 1.08 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 4.00 | | | | | | | | | | CONTRACT 04123220 | TOTALS | 597,035.09| 0.00| 639,372.53| 99.9| ************************************************************************************************************************************ JOHNSON FM 2738 AT MOUNTAIN CREEK | 0.307 | 1,319,000.00| 0.00| 15,503.00| 1.1| FM 2738 . | | | | | | 2762-01-014 | | | | | | BR 2012(572) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-16-12 WORK BEGAN- 04-29-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-01-12 | | | | | | CONTRACT WORKING DAYS- 192 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2762-01-014 | | | | | | T-BAR FENCE, INC. | |SUB %: 0.73 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 6.71 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.21 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.49 | | | | ATS DRILLING, L.P. | |SUB %: 2.91 | | | | GJ SEEDING, LLC | |SUB %: 1.43 | | | | MCL CONTRACTING, LLC | |SUB %: 0.49 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.27 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.31 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.21 | | | | | | | | | | CONTRACT 05123231 | TOTALS | 1,319,000.00| 0.00| 15,503.00| 1.1| ************************************************************************************************************************************ JOHNSON AT FM 916 WB & EB INTER | 0.100 | 315,236.00| 0.00| 0.00| 0.0| SH 174 IN RIO VISTA | | | | | | 0519-01-023 | | | | | | STP 2013(673) TRAFFIC SIGNAL INSTALLATION | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 64 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SIEMENS INDUSTRY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0519-01-023 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133022 | TOTALS | 315,236.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ JOHNSON EAST OF CHAMBER CREEK | 9.348 | 4,238,722.21| 0.00| 0.00| 0.0| US 67 ELLIS COUNTY LINE | | | | | | 0260-01-053 | | | | | | NH 2013(670) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | NORTHEASTERN PAVERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0260-01-053 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133224 | TOTALS | 4,238,722.21| 0.00| 0.00| 0.0| ************************************************************************************************************************************ JOHNSON FM 916 OVER CHAMBERS CREEK | 0.576 | 1,800,640.71| 0.00| 1,695,125.39| 94.6| FM 916 . | | | | | | 0712-02-013 | | | | | | BR 2010(168) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 10-19-11 WORK BEGAN- 11-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-14-11 | | | | | | CONTRACT WORKING DAYS- 234 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 250 PERCENT TIME USED- 106 | | | | | | | | | | | | JAY MILLS CONTRACTING, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0712-02-013 | | | | | | ELLIS-MCGINNIS CONSTRUCTION CO. | |SUB %: 27.34 | | | | JUST GROOVING, LTD. | |SUB %: 0.17 | | | | TEXAS SHAFTS, INC. | |SUB %: 1.72 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 3.89 | | | | NORTHEASTERN PAVERS, INC. | |SUB %: 14.71 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.21 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.48 | | | | JAVELINA CONSTRUCTION SOUTH, INC. | |SUB %: 0.74 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.13 | | | | RAMBO CONTRACTING, INC. | |SUB %: 0.46 | | | | ODUM SERVICES, L.P. | |SUB %: 3.49 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.92 | | | | | | | | | | CONTRACT 08113235 | TOTALS | 1,800,640.71| 0.00| 1,695,125.39| 94.6| ************************************************************************************************************************************ JOHNSON NORTH FORK CHAMBERS CREEK | 9.694 | 4,319,954.96| 950,979.84| 4,152,322.66| 96.1| IH 35W APPROX. 0.25 MI N OF S FORK CHAM CK | | | | | | 0014-04-077 | | | | | | IM 0355(150) MILL AND HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 11-12-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-10-12 | | | | | | CONTRACT WORKING DAYS- 107 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 109 PERCENT TIME USED- 101 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0014-04-077 | | | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 1.85 | | | | DUSTROL, INC. | |SUB %: 9.36 | | | | CROSSROADS, L.P. | |SUB %: 0.24 | | | | CHEROKEE SERVICES | |SUB %: 0.96 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.00 | | | | TRANSPORT TRUST | |SUB %: 0.00 | | | | | | | | | | CONTRACT 08123021 | TOTALS | 4,319,954.96| 950,979.84| 4,152,322.66| 96.1| ************************************************************************************************************************************ JOHNSON SOUTH OF FM 731 | 2.737 | 4,068,872.21| 153,207.43| 716,880.45| 17.6| SH 174 UPRR RR BRIDGE IN BURLESON | | | | | | 0019-01-137 | | | | | | STP 2012(683) MEDIAN AND HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 02-15-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-03-12 | | | | | | CONTRACT WORKING DAYS- 320 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 80 PERCENT TIME USED- 25 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0019-01-137 | | | | | | AXIS CONTRACTING, INC. | |SUB %: 9.95 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.38 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.26 | | | | M-CO CONSTRUCTION, INC. | |SUB %: 1.97 | | | | MELS ELECTRIC, L.P. | |SUB %: 9.05 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 8.00 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 9.53 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 5.69 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 4.46 | | | | | | | | | | CONTRACT 08123026 | TOTALS | 4,068,872.21| 153,207.43| 716,880.45| 17.6| ************************************************************************************************************************************ JOHNSON FM 4 | 5.255 | 2,926,691.63| 99,192.46| 2,586,872.40| 88.3| FM 2135 SH 171 | | | | | | 2734-01-014 | | | | | | STP 2012(571)HES GRAVING, BASE AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 12-03-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-03-12 | | | | | | CONTRACT WORKING DAYS- 192 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 104 PERCENT TIME USED- 54 | | | | | | | | | | | | BIG CREEK CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2734-01-014 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.93 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.43 | | | | J.V. CONCRETE CONSTRUCTION | |SUB %: 7.19 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.51 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 2.80 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 0.08 | | | | SAN-ANN-CO., INC. | |SUB %: 0.93 | | | | | | | | | | CONTRACT 08123225 | TOTALS | 2,926,691.63| 99,192.46| 2,586,872.40| 88.3| ************************************************************************************************************************************ JOHNSON SH 174 | 3.774 | 1,516,716.65| 627,820.37| 1,279,059.83| 84.3| FM 3048 FM 2280 | | | | | | 3414-01-010 | | | | | | STP 2013(014) GR, BS, SURFACE AND STRIPING | | | | | | | | | | | | WORK ORDER- 10-12-12 WORK BEGAN- 02-01-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-01-13 | | | | | | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 63 PERCENT TIME USED- 49 | | | | | | | | | | | | NORTHEASTERN PAVERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3414-01-010 | | | | | | VANN/ELLI, INC. | |SUB %: 5.01 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.43 | | | | INDEPENDENT UTILITY CONSTRUCTION INCORPORATED | |SUB %: 2.81 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.19 | | | | | | | | | | CONTRACT 09123028 | TOTALS | 1,516,716.65| 627,820.37| 1,279,059.83| 84.3| ************************************************************************************************************************************ JOHNSON APPROX. 0.50 MI S OF FM 3048 | 3.256 | 828,650.76| 0.00| 829,691.14| 99.9| FM 2280 FM 917 | | | | | | 2465-01-018 | | | | | | STP 2013(013) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 11-12-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-03-12 | | | | | | CONTRACT WORKING DAYS- 43 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 53 PERCENT TIME USED- 117 | | | | | | | | | | | | PEACHTREE CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2465-01-018 | | | | | | WESTHILL CONSTRUCTION | |SUB %: 0.88 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.74 | | | | CROSS ROADS INDUSTRIES, INC | |SUB %: 0.62 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.09 | | | | LONE STAR BARRIER SERVICES, LLC | |SUB %: 6.24 | | | | | | | | | | CONTRACT 09123228 | TOTALS | 828,650.76| 0.00| 829,691.14| 99.9| ************************************************************************************************************************************ JOHNSON AT BUSINESS US 67 | 0.227 | 1,193,253.24| 74,744.02| 1,083,826.48| 96.0| BI 35-V . | | | | | | 0014-13-003 | | | | | | BR 2012(137) REMV BRDG & REPL W/ AN INTERSECTION | | | | | | | | | | | | WORK ORDER- 01-31-12 WORK BEGAN- 02-24-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-16-12 | | | | | | CONTRACT WORKING DAYS- 192 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 283 PERCENT TIME USED- 147 | | | | | | | | | | | | KEN-DO CONTRACTING, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0014-13-003 | | | | | | BROWN"S CONSTRUCTION CO. | |SUB %: 8.62 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 3.13 | | | | MELS ELECTRIC, L.P. | |SUB %: 15.85 | | | | RIOS TRUCKING CO. | |SUB %: 0.00 | | | | LOS ALTOS FENCE & SUPPLY | |SUB %: 0.66 | | | | ALLIANCE TRUCKING | |SUB %: 1.67 | | | | PREMIER PAVING, LTD. | |SUB %: 13.81 | | | | RICE TUNNELING & BORING, INC. | |SUB %: 0.44 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.73 | | | | A.M.S. COMPANY, INC. | |SUB %: 12.77 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.59 | | | | SYNERGY SIGNS & SERVICES | |SUB %: 0.47 | | | | | | | | | | CONTRACT 12113020 | TOTALS | 1,193,253.24| 74,744.02| 1,083,826.48| 96.0| ************************************************************************************************************************************ PALO PINTO 1.62 MILES EAST OF FM 919 | 3.183 | 905,834.88| 0.00| 0.00| 0.0| US 180 FM 4, WEST OF PALO PINTO | | | | | | 0007-10-055 | | | | | | STP 2013(386) MILL AND OVERLAY | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-19-13 | | | | | | CONTRACT WORKING DAYS- 32 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | BICK'S CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0007-10-055 | | | | | | DUSTROL, INC. | |SUB %: 6.66 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.33 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 4.43 | | | | | | | | | | CONTRACT 02133024 | TOTALS | 905,834.88| 0.00| 0.00| 0.0| ************************************************************************************************************************************ PALO PINTO SW 6TH STREET | 1.398 | 581,143.78| 0.00| 0.00| 0.0| US 281 FM 2256 | | | | | | 0250-01-034 | | | | | | STP 2013(456) MILL AND OVERLAY | | | | | | | | | | | | WORK ORDER- 05-08-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-24-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 44 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BICK'S CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0250-01-034 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133025 | TOTALS | 581,143.78| 0.00| 0.00| 0.0| ************************************************************************************************************************************ PALO PINTO FM 4 IN GRAFORD | 11.191 | 2,066,986.35| 0.00| 0.00| 0.0| SH 254 US 281 | | | | | | 0539-04-035 | | | | | | STP 2013(539) HMAC OVERLAY AND BASE REPAIR | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 89 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ZACK BURKETT CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0539-04-035 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133225 | TOTALS | 2,066,986.35| 0.00| 0.00| 0.0| ************************************************************************************************************************************ PALO PINTO ETC ERATH COUNTY LINE | 186.833 | 9,175,662.95| 196,253.69| 854,526.56| 9.3| IH 20 ETC FM 4 | | | | | | 0314-03-050 | | | | | | IM 0204(286) SEAL COAT | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-27-13 | | | | | | CONTRACT WORKING DAYS- 56 ADDL DAYS GRANTED- 1 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | NORTHEASTERN PAVERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0314-03-050 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.79 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 4.34 | | | | | | | | | | CONTRACT 10123205 | TOTALS | 9,175,662.95| 196,253.69| 854,526.56| 9.3| ************************************************************************************************************************************ PARKER 0.7 MI WEST OF FM 5 | 6.109 | 2,425,865.62| 0.00| 0.00| 0.0| IH 20 FM 1187 | | | | | | 0008-03-104 | | | | | | IM 0204(288) OVERLAY FRONTAGE ROADS | | | | | | | | | | | | WORK ORDER- 05-08-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-24-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 71 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BICK'S CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-03-104 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133035 | TOTALS | 2,425,865.62| 0.00| 0.00| 0.0| ************************************************************************************************************************************ PARKER OLD AIRPORT ROAD AT BURGESS CREEK | 0.236 | 1,315,774.70| 0.00| 1,286,984.50|100.0| CR . | | | | | | 0902-38-062 | | | | | | BR 2005(612) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 05-09-12 WORK BEGAN- 06-04-12 | | | | | | DATE WORK COMPLETED- 04-12-13 TIME COMPUTED- 05-25-12 | | | | | | CONTRACT WORKING DAYS- 113 ADDL DAYS GRANTED- 6 | | | | | | WORKING DAYS CHARGED- 119 PERCENT TIME USED- 100 | | | | | | | | | | | | ELLIS-MCGINNIS CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-38-062 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.19 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 7.76 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.27 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 1.01 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 8.75 | | | | JAY MILLS CONTRACTING, INCORPORATED | |SUB %: 14.10 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.22 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.26 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.32 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.69 | | | | | | | | | | CONTRACT 04123030 | TOTALS | 1,315,774.70| 0.00| 1,286,984.50|100.0| ************************************************************************************************************************************ PARKER AT WESTERN LOOP | 0.100 | 147,070.71| 933.00| 144,790.22| 98.4| SP 312 AT WESTERN LOOP | | | | | | 0314-01-078 | | | | | | CC 314-1-78 TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 05-09-12 WORK BEGAN- 01-14-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-08-12 | | | | | | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 24 PERCENT TIME USED- 53 | | | | | | | | | | | | INDEPENDENT UTILITY CONSTRUCTION INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0314-01-078 | | | | | | TX DOWN UNDER CONSTRUCTION LLC | |SUB %: 1.88 | | | | CROSSROADS, L.P. | |SUB %: 1.66 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.08 | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.44 | | | | | | | | | | CONTRACT 04123226 | TOTALS | 147,070.71| 933.00| 144,790.22| 98.4| ************************************************************************************************************************************ PARKER IH 20, AT WALSH RANCH PARKWAY | 1.541 | 14,593,117.40| 0.00| 0.00| 0.0| IH 30 TARRANT COUNTY LINE | | | | | | 1068-05-009 | | | | | | IM 0304(092) GRADING, DRAINAGE, STRUCTURE & PAVE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 225 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HAYDON BUILDING CORP. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-05-009 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133201 | TOTALS | 14,593,117.40| 0.00| 0.00| 0.0| ************************************************************************************************************************************ PARKER AT WESTERN LOOP | 0.356 | 1,319,101.20| 43,115.03| 1,424,218.19| 99.9| US 180 WEST SIDE OF WEATHERFORD | | | | | | 0008-02-069 | | | | | | CC 8-2-69 GR, BS, STRUCTURES AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 06-29-12 WORK BEGAN- 08-09-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-15-12 | | | | | | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 100 PERCENT TIME USED- 100 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-02-069 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.57 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 11.14 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.33 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.69 | | | | GJ SEEDING, LLC | |SUB %: 1.40 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.12 | | | | DUSTROL, INC. | |SUB %: 0.96 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 12.78 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.48 | | | | | | | | | | CONTRACT 05123041 | TOTALS | 1,319,101.20| 43,115.03| 1,424,218.19| 99.9| ************************************************************************************************************************************ PARKER OAK STREET, IN ALEDO | 2.133 | 11,725,765.52| 291,369.47| 3,321,910.34| 28.3| FM 1187 IH 20 SOUTH FR RD | | | | | | 0008-09-033 | | | | | | STP 1102(290) GR, BS, PAVEMENT AND STRIPING | | | | | | | | | | | | WORK ORDER- 07-12-12 WORK BEGAN- 10-01-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-28-12 | | | | | | CONTRACT WORKING DAYS- 416 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 127 PERCENT TIME USED- 30 | | | | | | | | | | | | MCMAHON CONTRACTING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-09-033 | | | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.23 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 3.88 | | | | ELITE LANDSCAPE | |SUB %: 2.03 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.69 | | | | KLUTZ CONSTRUCTION, LLC | |SUB %: 7.08 | | | | MAS-TEK ENGINEERING & ASSOCIATES, INC. | |SUB %: 0.30 | | | | ORNELAS & SON"S TRUCKING | |SUB %: 1.67 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 18.20 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.35 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.36 | | | | VENUS CONSTRUCTION | |SUB %: 8.71 | | | | W.O.E. CONSTRUCTION | |SUB %: 6.07 | | | | SONSHINE FENCE CO | |SUB %: 0.84 | | | | METROPLEX PAVEMENT MARKINGS, LLC | |SUB %: 1.03 | | | | GJ SEEDING, LLC | |SUB %: 0.10 | | | | C.B. SERVICES, INC. | |SUB %: 0.60 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.24 | | | | JESUS MORALES TRUCKING | |SUB %: 0.43 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.18 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.13 | | | | | | | | | | CONTRACT 05123201 | TOTALS | 11,725,765.52| 291,369.47| 3,321,910.34| 28.3| ************************************************************************************************************************************ PARKER 0.2 MILES WEST OF FM 51 | 8.994 | 5,792,172.40| 969,565.98| 5,111,215.07| 88.2| SH 199 FM 730 | | | | | | 0171-03-064 | | | | | | NH 2012(351) HOTMIX OVERLAY | | | | | | | | | | | | WORK ORDER- 07-09-12 WORK BEGAN- 09-27-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-25-12 | | | | | | CONTRACT WORKING DAYS- 105 ADDL DAYS GRANTED- 30 | | | | | | WORKING DAYS CHARGED- 105 PERCENT TIME USED- 77 | | | | | | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0171-03-064 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.18 | | | | HJC FARMS, INC. | |SUB %: 6.67 | | | | MICA CORPORATION | |SUB %: 1.82 | | | | MPB, INC. | |SUB %: 0.26 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 13.44 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 6.26 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.08 | | | | WEST TEXAS RUMBLE STRIP | |SUB %: 0.07 | | | | BRENDA PRICE TRUCKING | |SUB %: 4.99 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 1.82 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.40 | | | | | | | | | | CONTRACT 05123207 | TOTALS | 5,792,172.40| 969,565.98| 5,111,215.07| 88.2| ************************************************************************************************************************************ PARKER HOLDERS CHAPEL RD AT DRY CREEK | 0.100 | 669,465.65| 25.22| 654,318.05| 97.8| CR . | | | | | | 0902-38-071 | | | | | | BR 2009(107) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 06-14-12 WORK BEGAN- 08-13-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-30-12 | | | | | | CONTRACT WORKING DAYS- 107 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 108 PERCENT TIME USED- 100 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-38-071 | | | | | | SCOTT DERR PAINTING CO | |SUB %: 0.69 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.86 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 3.39 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.95 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.95 | | | | GJ SEEDING, LLC | |SUB %: 0.79 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.20 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.84 | | | | TEXAS SHAFTS, INC. | |SUB %: 5.11 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.29 | | | | | | | | | | CONTRACT 05123254 | TOTALS | 669,465.65| 25.22| 654,318.05| 97.8| ************************************************************************************************************************************ PARKER AT WESTBOUND EXIT | 2.161 | 2,032,614.56| 149,723.89| 682,717.93| 33.5| IH 20 FM 5 | | | | | | 0008-03-102 | | | | | | CC 8-3-102 GR, BASE AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 11-09-12 WORK BEGAN- 11-30-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-25-12 | | | | | | CONTRACT WORKING DAYS- 122 ADDL DAYS GRANTED- 10 | | | | | | WORKING DAYS CHARGED- 81 PERCENT TIME USED- 61 | | | | | | | | | | | | JAY MILLS CONTRACTING, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-03-102 | | | | | | FORTSON CONTRACTING, INC. | |SUB %: 3.34 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.15 | | | | MICA CORPORATION | |SUB %: 4.60 | | | | NORTHEASTERN PAVERS, INC. | |SUB %: 12.88 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.04 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.58 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.05 | | | | | | | | | | CONTRACT 06123019 | TOTALS | 2,032,614.56| 149,723.89| 682,717.93| 33.5| ************************************************************************************************************************************ PARKER T&PRR & S FORK TRINITY RIVER (WB&EB | 0.411 | 8,635,957.58| 591.24| 8,707,021.63| 99.9| US 180 . | | | | | | 0008-03-077 | | | | | | BR 2002(923) REPL 2 BRS & APPRS | | | | | | | | | | | | WORK ORDER- 10-21-09 WORK BEGAN- 03-29-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-01-10 | | | | | | CONTRACT WORKING DAYS- 438 ADDL DAYS GRANTED- 95 | | | | | | WORKING DAYS CHARGED- 545 PERCENT TIME USED- 102 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-03-077 | | | | | | USA EROSION, INC. | |SUB %: 0.24 | | | | C.T. AND S. METALWORKS, INC. | |SUB %: 1.33 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.27 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.86 | | | | RG PAINTING | |SUB %: 0.72 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.48 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.16 | | | | TEXAS SHAFTS, INC. | |SUB %: 3.23 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.23 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.08 | | | | RUNNING HORSE CONSTRUCTION, INC. | |SUB %: 1.91 | | | | S & V CONSTRUCTION LLC | |SUB %: 0.23 | | | | W.O.E. CONSTRUCTION | |SUB %: 3.04 | | | | CONCRETE PAVER SYSTEMS, INC. | |SUB %: 0.60 | | | | MICA CORPORATION | |SUB %: 3.73 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.51 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 1.16 | | | | BREDA COMPANY, INC. | |SUB %: 1.08 | | | | AXIS CONTRACTING, INC. | |SUB %: 0.63 | | | | TEXAS SAFE SITE PRODUCTS, LP | |SUB %: 0.09 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.05 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.05 | | | | | | | | | | CONTRACT 08093009 | TOTALS | 8,635,957.58| 591.24| 8,707,021.63| 99.9| ************************************************************************************************************************************ PARKER 0.4 MILE WEST OF FM 113 | 7.547 | 23,651,493.12| 107,585.21| 23,175,711.78| 98.0| IH 20 SPUR 312 | | | | | | 0314-01-074 | | | | | | C 314-1-74 GR, BS, AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 09-14-10 WORK BEGAN- 03-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-14-11 | | | | | | CONTRACT WORKING DAYS- 325 ADDL DAYS GRANTED- 19 | | | | | | WORKING DAYS CHARGED- 349 PERCENT TIME USED- 101 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0314-01-074 | | | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.17 | | | | JONA CONTRACTING, INC. | |SUB %: 1.35 | | | | ENVIRONMENTAL STANDARDS, INC. | |SUB %: 1.09 | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 2.44 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.10 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.52 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.09 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 0.08 | | | | S & V CONSTRUCTION LLC | |SUB %: 0.16 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 1.76 | | | | STEPHENS MARTIN PAVING, L.P. | |SUB %: 3.07 | | | | WALKER CONSTRUCTION | |SUB %: 0.06 | | | | DAWSON CONCRETE CONSTRUCTION SERVICES | |SUB %: 0.24 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.59 | | | | HJC FARMS, INC. | |SUB %: 0.09 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.03 | | | | M & M INDUSTRIAL PAINTING | |SUB %: 0.06 | | | | | | | | | | CONTRACT 08103002 | TOTALS | 23,651,493.12| 107,585.21| 23,175,711.78| 98.0| ************************************************************************************************************************************ PARKER AT LAKE WEATHERFORD | 0.677 | 2,502,493.61| 0.00| 2,425,501.55| 96.9| FM 730 . | | | | | | 1601-01-018 | | | | | | BR 2006(503) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 10-07-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 256 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 256 PERCENT TIME USED- 100 | | | | | | | | | | | | JAY MILLS CONTRACTING, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1601-01-018 | | | | | | COPPELL CONSTRUCTION CO., INC. | |SUB %: 38.35 | | | | TEXAS SHAFTS, INC. | |SUB %: 3.46 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.40 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.04 | | | | NORTHEASTERN PAVERS, INC. | |SUB %: 17.00 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.21 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.11 | | | | RG PAINTING | |SUB %: 0.39 | | | | | | | | | | CONTRACT 08113258 | TOTALS | 2,502,493.61| 0.00| 2,425,501.55| 96.9| ************************************************************************************************************************************ PARKER B.B. FIELDER ROAD | 6.305 | 6,349,600.35| 84,330.00| 1,370,332.53| 21.5| FM 1884 TO END OF FM 1884 | | | | | | 1601-02-023 | | | | | | STP 2012(685) GR, DRAINAGE, STRUCTURES, & PAVEMEN | | | | | | | | | | | | WORK ORDER- 11-01-12 WORK BEGAN- 01-21-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-17-12 | | | | | | CONTRACT WORKING DAYS- 299 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 62 PERCENT TIME USED- 20 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1601-02-023 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.23 | | | | DUSTROL, INC. | |SUB %: 0.30 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.36 | | | | MCL CONTRACTING, LLC | |SUB %: 0.11 | | | | NORTHEASTERN PAVERS, INC. | |SUB %: 36.29 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.04 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.90 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.04 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.33 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.78 | | | | USA EROSION, INC. | |SUB %: 1.18 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 3.54 | | | | BRENDA PRICE TRUCKING | |SUB %: 1.23 | | | | | | | | | | CONTRACT 08123234 | TOTALS | 6,349,600.35| 84,330.00| 1,370,332.53| 21.5| ************************************************************************************************************************************ TARRANT SOUTH STEWART STREET AT ASH CREEK | 0.135 | 799,000.00| 0.00| 59,818.72| 7.4| CS IN AZLE | | | | | | 0902-48-506 | | | | | | BR 2003(356) REPLACE BR & APPRS | | | | | | | | | | | | WORK ORDER- 03-06-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-05-12 | | | | | | CONTRACT WORKING DAYS- 84 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | EMPIRE CIVIL CONSTRUCTION, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-48-506 | | | | | | ACTION SERVICES | |SUB %: 0.35 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.63 | | | | GJ SEEDING, LLC | |SUB %: 2.58 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 5.65 | | | | TEXAS SHAFTS, INC. | |SUB %: 6.70 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.35 | | | | | | | | | | CONTRACT 01123025 | TOTALS | 799,000.00| 0.00| 59,818.72| 7.4| ************************************************************************************************************************************ TARRANT AT WESTPORT PARKWAY | 0.100 | 105,000.00| 0.00| 0.00| 0.0| US 377 . | | | | | | 0081-02-066 | | | | | | CC 81-2-66 TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 04-11-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURABLE SPECIALTIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0081-02-066 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01133021 | TOTALS | 105,000.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT AT SH 180 (DIVISION STREET) | 0.854 | 55,975,100.62| 0.00| 57,924,856.13| 99.9| SH 360 AND UPRR; IN ARLINGTON | | | | | | 2266-02-127 | | | | | | NH 2007(806) GR, STRS & PAVEMENT | | | | | | | | | | | | WORK ORDER- 04-07-08 WORK BEGAN- 03-07-09 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 10-05-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 555 ADDL DAYS GRANTED- 75 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 1,044 PERCENT TIME USED- 165 | |**************************************************| | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2266-02-127 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.20 | | | | EVANS ENVIRONMENTAL CONTRACTING, LLC. | |SUB %: 0.43 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.01 | | | | CRAIG OLDEN, INC. | |SUB %: 1.53 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.00 | | | | HAYWARD BAKER, INC. | |SUB %: 1.52 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.68 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.32 | | | | MICA CORPORATION | |SUB %: 3.87 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 7.49 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.33 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 0.67 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.07 | | | | BRENDA PRICE TRUCKING | |SUB %: 4.11 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.06 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 2.51 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.05 | | | | RAILWORKS TRACK SYSTEMS TEXAS, INC. | |SUB %: 11.20 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.11 | | | | ERWIN STEEL WORKS, LLC | |SUB %: 0.29 | | | | MOBILE ENTERPRISES, INC. | |SUB %: 0.39 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.27 | | | | RIVER CITIES SAWING LLC | |SUB %: 0.01 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.41 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.00 | | | | | | | | | | CONTRACT 02083001 | TOTALS | 55,975,100.62| 0.00| 57,924,856.13| 99.9| ************************************************************************************************************************************ TARRANT AT HALTOM ROAD | 0.100 | 120,481.10| 2,955.00| 109,309.32|100.0| SH 121 IN HALTOM CITY | | | | | | 0363-03-048 | | | | | | NH 2012(104) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 03-16-12 WORK BEGAN- 04-20-12 | | | | | | DATE WORK COMPLETED- 04-19-13 TIME COMPUTED- 04-01-12 | | | | | | CONTRACT WORKING DAYS- 59 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 58 PERCENT TIME USED- 98 | | | | | | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0363-03-048 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.18 | | | | TX DOWN UNDER CONSTRUCTION LLC | |SUB %: 2.98 | | | | TEXAS HYDRO-MULCH | |SUB %: 0.41 | | | | | | | | | | CONTRACT 02123026 | TOTALS | 120,481.10| 2,955.00| 109,309.32|100.0| ************************************************************************************************************************************ TARRANT E. OF VILLAGE CREEK | 2.577 | 2,122,722.18| 0.00| 0.00| 0.0| SH 180 FIELDER ROAD | | | | | | 0008-06-049 | | | | | | NH 2013(387) MILL, PAVT REPAIR AND OVERLAY | | | | | | | | | | | | TARRANT ROSEDALE STREET | 1.767 | 943,856.86| 0.00| 0.00| 0.0| BU 287P BERRY STREET | | | | | | 0172-01-050 | | | | | | NH 2013(387) MILL, PAVT REPAIR AND OVERLAY | | | | | | | | | | | | WORK ORDER- 04-10-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-26-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 84 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-06-049 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133016 | TOTALS | 3,066,579.04| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT IH 820 | 0.188 | 306,881.92| 0.00| 0.00| 0.0| SH 10 0.23 MILE EAST OF IH 820 | | | | | | 0094-02-120 | | | | | | CC 94-2-120 GR, BS, PAVEMENT AND TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 32 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ANALYTICAL TECHNOLOGY CONSULTANTS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0094-02-120 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133028 | TOTALS | 306,881.92| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT OVER SYCAMORE CREEK/COBB PARK ROAD | 0.178 | 3,466,498.55| 0.00| 0.00| 0.0| US 287 IN FORT WORTH | | | | | | 0172-06-081 | | | | | | BR 2013(011) BRIDGE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 05-13-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-29-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 256 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | INTERSTATE HIGHWAY CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0172-06-081 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133225 | TOTALS | 3,466,498.55| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT NEWT PATTERSON | 1.503 | 6,895,052.12| 162,915.88| 4,798,371.77| 69.5| FM 1187 BU 287P | | | | | | 1330-02-034 | | | | | | STP 2010(399)ES GRADING, DRAINAGE, STRUCTURES & PAV | | | | | | | | | | | | WORK ORDER- 05-05-10 WORK BEGAN- 06-17-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-01-10 | | | | | | CONTRACT WORKING DAYS- 427 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 425 PERCENT TIME USED- 99 | | | | | | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1330-02-034 | | | | | | UNDERGROUND COALITION, INC. | |SUB %: 2.92 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 2.88 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 2.04 | | | | BANDA TRUCKING COMPANY | |SUB %: 0.10 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.31 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 8.05 | | | | AUSTIN BRIDGE & ROAD, LP | |SUB %: 17.43 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.34 | | | | DUSTROL, INC. | |SUB %: 0.53 | | | | JM MATERIALS, INC. | |SUB %: 0.32 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.83 | | | | | | | | | | CONTRACT 03103004 | TOTALS | 6,895,052.12| 162,915.88| 4,798,371.77| 69.5| ************************************************************************************************************************************ TARRANT WALNUT CREEK DRIVE | 1.440 | 10,839,704.21| 19,585.11| 10,406,218.51| 97.9| US 287 BROAD STREET; IN MANSFIELD | | | | | | 0172-09-031 | | | | | | STP 2010(624)MM GR,DR,STR, PAVEMENT AND SIGNING | | | | | | | | | | | | WORK ORDER- 05-05-10 WORK BEGAN- 05-24-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-21-10 | | | | | | CONTRACT WORKING DAYS- 417 ADDL DAYS GRANTED- 66 | | | | | | WORKING DAYS CHARGED- 632 PERCENT TIME USED- 130 | | | | | | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0172-09-031 | | | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 5.10 | | | | UNDERGROUND COALITION, INC. | |SUB %: 2.15 | | | | ATS DRILLING, L.P. | |SUB %: 1.78 | | | | S & V CONSTRUCTION LLC | |SUB %: 1.54 | | | | SITE-SAFE PRODUCTS OF TEXAS, L.P. | |SUB %: 0.89 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 10.61 | | | | MELS ELECTRIC, L.P. | |SUB %: 2.77 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.63 | | | | A BROTHERS | |SUB %: 0.49 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 1.68 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.00 | | | | BANDA TRUCKING COMPANY | |SUB %: 0.04 | | | | CENTRAL NORTH CONSTRUCTION, LLC | |SUB %: 2.42 | | | | J.H. PAINTING COMPANY | |SUB %: 0.18 | | | | RATLIFF HARDSCAPE, LTD. | |SUB %: 1.15 | | | | SOUTHEAST GRINDING & GROOVING, LLC | |SUB %: 0.11 | | | | | | | | | | CONTRACT 03103205 | TOTALS | 10,839,704.21| 19,585.11| 10,406,218.51| 97.9| ************************************************************************************************************************************ TARRANT VARIOUS LOCATIONS | 0.001 | 3,378,473.70| 165,674.45| 1,615,784.29| 47.8| VA IN TARRANT COUNTY | | | | | | 0902-48-822 | | | | | | NH 2012(353) CONSTRUCT CURB RAMPS | | | | | | | | | | | | WORK ORDER- 06-08-12 WORK BEGAN- 07-16-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-24-12 | | | | | | CONTRACT WORKING DAYS- 283 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 206 PERCENT TIME USED- 72 | | | | | | | | | | | | KEN-DO CONTRACTING, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-48-822 | | | | | | ROAD MASTER STRIPING LLC | |SUB %: 7.83 | | | | MEL"S ELECTRIC SERVICE, INC. | |SUB %: 21.22 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.11 | | | | ALLIANCE TRUCKING | |SUB %: 0.18 | | | | APAC-TEXAS, INC. | |SUB %: 0.07 | | | | CHAPAS TRUCKING | |SUB %: 0.11 | | | | | | | | | | CONTRACT 03123020 | TOTALS | 3,378,473.70| 165,674.45| 1,615,784.29| 47.8| ************************************************************************************************************************************ TARRANT VARIOUS LOCATIONS | 0.100 | 815,000.00| 0.00| 0.00| 0.0| VA DISTRICTWIDE | | | | | | 0902-00-133 | | | | | | STP 2013(552) TRAFFIC SIGNAL INSTALLATION | | | | | | | | | | | | WORK ORDER- 04-23-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-23-13 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURABLE SPECIALTIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-00-133 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133030 | TOTALS | 815,000.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT FM 1709 | 3.942 | 2,154,441.29| 0.00| 0.00| 0.0| FM 1938 STANES/RUMFIELD | | | | | | 1978-01-053 | | | | | | STP 2013(458) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 86 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | NORTHEASTERN PAVERS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1978-01-053 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03133233 | TOTALS | 2,154,441.29| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT VILLAGE CREEK | 3.364 | 628,000.00| 0.00| 499,191.67| 79.4| BU 287P EDEN ROAD; IN KENNEDALE | | | | | | 0172-02-071 | | | | | | STP 2012(497) LANDSCAPE ENHANCEMENT | | | | | | | | | | | | WORK ORDER- 06-21-12 WORK BEGAN- 08-20-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-07-12 | | | | | | CONTRACT WORKING DAYS- 107 ADDL DAYS GRANTED- 38 | | | | | | WORKING DAYS CHARGED- 99 PERCENT TIME USED- 68 | | | | | | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0172-02-071 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.51 | | | | AQUA BORE | |SUB %: 3.37 | | | | TEJAS COMMERCIAL CONSTRUCTION, LLC | |SUB %: 1.89 | | | | | | | | | | CONTRACT 05123047 | TOTALS | 628,000.00| 0.00| 499,191.67| 79.4| ************************************************************************************************************************************ TARRANT SH 114 | 2.205 | 856,000.00| 135,840.93| 554,736.26| 64.8| FM 1938 RANDOL MILL ROAD | | | | | | 1978-01-055 | | | | | | STP 2012(570) LANDSCAPE ENHANCEMENT | | | | | | | | | | | | WORK ORDER- 07-12-12 WORK BEGAN- 12-14-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-28-12 | | | | | | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 96 PERCENT TIME USED- 75 | | | | | | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1978-01-055 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.36 | | | | | | | | | | CONTRACT 05123245 | TOTALS | 856,000.00| 135,840.93| 554,736.26| 64.8| ************************************************************************************************************************************ TARRANT WEST C/L (SHADY VALLEY DR) | 1.647 | 197,430.50| 0.00| 0.00| 0.0| SP 303 EAST C/L (W CORNERSTONE LN) | | | | | | 2208-01-063 | | | | | | NH 2013(289) LANDSCAPE ENHANCEMENT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 81 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | GREY CONSTRUCTION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2208-01-063 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133037 | TOTALS | 197,430.50| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT AT WEST L.D. LOCKETT | 0.100 | 120,000.00| 0.00| 0.00| 0.0| FM 3029 IN COLLEYVILLE/NORTH RICHLAND HILLS | | | | | | 3125-01-020 | | | | | | NH 2013(674) TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURABLE SPECIALTIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3125-01-020 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133209 | TOTALS | 120,000.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT ROBERT CUTTOFF; VARIOUS LOCATIONS | 0.988 | 161,237.75| 0.00| 0.00| 0.0| SH 199 SKYLINE; IN SANSOM PARK | | | | | | 0171-05-092 | | | | | | NH 2013(668) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 56 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0171-05-092 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133215 | TOTALS | 161,237.75| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT IH 35W; ON GOLDEN TRIANGLE BLVD | 3.410 | 19,069,431.45| 232,694.96| 18,156,940.62| 95.4| CS US 377; IN FORT WORTH | | | | | | 0902-48-708 | | | | | | STP 2010(897)MM GR,BS,DR,STR & PAVEMENT | | | | | | | | | | | | WORK ORDER- 08-17-10 WORK BEGAN- 10-04-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-02-10 | | | | | | CONTRACT WORKING DAYS- 394 ADDL DAYS GRANTED- 180 | | | | | | WORKING DAYS CHARGED- 604 PERCENT TIME USED- 105 | | | | | | | | | | | | GLENN THURMAN, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-48-708 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.20 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.70 | | | | J.T. DERSNER INC. | |SUB %: 21.99 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.15 | | | | BAKER BRIDGE, L.P. | |SUB %: 5.18 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.33 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.49 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 12.12 | | | | MICA CORPORATION | |SUB %: 2.37 | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.82 | | | | GARY A. CRAIN, INC. | |SUB %: 0.03 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.19 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 1.57 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.07 | | | | J-N CONSTRUCTION COMPANY, INC. | |SUB %: 0.02 | | | | TEXAS MANHOLES COMPANY, INC. | |SUB %: 0.04 | | | | | | | | | | CONTRACT 06103002 | TOTALS | 19,069,431.45| 232,694.96| 18,156,940.62| 95.4| ************************************************************************************************************************************ TARRANT 0.5 MILE EAST OF IH 35W | 1.425 | 3,679,267.90| 39,318.50| 2,960,873.02| 80.9| FM 1187 EAST OF OAK GROVE S (EAST INTER) | | | | | | 1330-02-041 | | | | | | NH 1102(093) GR, DR, STRUC, AND PAVING | | | | | | | | | | | | WORK ORDER- 08-19-11 WORK BEGAN- 02-14-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-04-11 | | | | | | CONTRACT WORKING DAYS- 256 ADDL DAYS GRANTED- 14 | | | | | | WORKING DAYS CHARGED- 291 PERCENT TIME USED- 107 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1330-02-041 | | | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.59 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.60 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 4.52 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.95 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 3.18 | | | | ANALYTICAL TECHNOLOGY CONSULTANTS, INC. | |SUB %: 7.59 | | | | CEN CONCRETE CONSTRUCTION COMPANY, INC. | |SUB %: 1.21 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 1.16 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.23 | | | | | | | | | | CONTRACT 06113235 | TOTALS | 3,679,267.90| 39,318.50| 2,960,873.02| 80.9| ************************************************************************************************************************************ TARRANT W 7TH ST OVER THE TRINITY | 0.559 | 24,150,158.45| 1,050,966.17| 14,794,039.15| 61.2| CS . | | | | | | 0902-48-505 | | | | | | BR 2006(767) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 08-10-11 WORK BEGAN- 05-07-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-26-11 | | | | | | CONTRACT WORKING DAYS- 327 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 112 PERCENT TIME USED- 34 | | | | | | | | | | | | SUNDT CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-48-505 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.06 | | | | C.T. AND S. METALWORKS, INC. | |SUB %: 1.16 | | | | CAIN FENCE | |SUB %: 0.07 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.13 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 1.83 | | | | MICA CORPORATION | |SUB %: 2.46 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 1.06 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 1.62 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.05 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, INC | |SUB %: 1.41 | | | | VSTRUCTURAL LLC | |SUB %: 3.46 | | | | BURKHALTER RIGGING, INC. | |SUB %: 7.22 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 0.30 | | | | ATS DRILLING, INC. | |SUB %: 4.50 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.23 | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 3.04 | | | | PENHALL COMPANY | |SUB %: 0.04 | | | | CROSSROADS, L.P. | |SUB %: 0.10 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.03 | | | | | | | | | | CONTRACT 06113245 | TOTALS | 24,150,158.45| 1,050,966.17| 14,794,039.15| 61.2| ************************************************************************************************************************************ TARRANT BRUMLOW ROAD (GRAPEVINE SECTION) | 1.482 | 11,897,196.21| 205,449.43| 11,317,834.74| 95.0| SH 26 0.5 MILES SOUTH OF SH 114 | | | | | | 0363-01-111 | | | | | | STP 2011(208)ES RECONST GR, ACP, CONC PVMT, BRDGS | | | | | | | | | | | | WORK ORDER- 09-15-10 WORK BEGAN- 04-27-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-01-10 | | | | | | CONTRACT WORKING DAYS- 491 ADDL DAYS GRANTED- 70 | | | | | | WORKING DAYS CHARGED- 514 PERCENT TIME USED- 91 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0363-01-111 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.43 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.36 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.59 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 2.87 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 2.08 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 16.56 | | | | W.O.E. CONSTRUCTION | |SUB %: 4.98 | | | | BREDA COMPANY, INC. | |SUB %: 0.80 | | | | LIRA ELECTRIC | |SUB %: 2.39 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.75 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.06 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 2.35 | | | | METRO CUTTING AND SEALING, INC. | |SUB %: 0.03 | | | | P & C INLETS, INC. | |SUB %: 0.24 | | | | RAMBO CONTRACTING, INC. | |SUB %: 0.24 | | | | PRESERVATION...A TREE SERVICE, INC. | |SUB %: 0.00 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.59 | | | | BIG DOG DRILLING, LLC | |SUB %: 0.08 | | | | NORTHEAST SERVICE, INC. | |SUB %: 0.11 | | | | C.T. AND S. METALWORKS, INC. | |SUB %: 0.32 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 0.31 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.00 | | | | BENCHMARK GARDENS, LLC | |SUB %: 3.40 | | | | IRRI-TECH CORPORATION | |SUB %: 0.78 | | | | ILLUMINATIONS BY GREENLEE | |SUB %: 0.29 | | | | URBANOVSKY ADVANCED CONSTRUCTION, LLC | |SUB %: 0.08 | | | | AQUA BORE | |SUB %: 0.04 | | | | DOWAGER CONSTRUCTION, INC. | |SUB %: 0.12 | | | | | | | | | | CONTRACT 07103228 | TOTALS | 11,897,196.21| 205,449.43| 11,317,834.74| 95.0| ************************************************************************************************************************************ TARRANT IH 20 | 1.297 | 15,619,992.64| 0.00| 0.00| 0.0| US 377 WINSCOTT/LAKEWAY | | | | | | 0080-07-085 | | | | | | C 80-7-85 GR, DR, STR & PAVEMENT | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-24-13 | | | | | | CONTRACT WORKING DAYS- 598 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | LONE STAR CIVIL CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0080-07-085 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07123003 | TOTALS | 15,619,992.64| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT IH 820; IN SECTIONS | 1.399 | 335,495.00| 78,800.00| 148,080.00| 44.1| SP 580 PHOENIX DRIVE IN FORT WORTH | | | | | | 0008-04-047 | | | | | | NH 2012(637) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 08-21-12 WORK BEGAN- 03-18-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-18-13 | | | | | | CONTRACT WORKING DAYS- 59 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 48 PERCENT TIME USED- 81 | | | | | | | | | | | | C. GREEN SCAPING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-04-047 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.15 | | | | MID AMERICA OF TEXAS | |SUB %: 1.43 | | | | | | | | | | CONTRACT 07123224 | TOTALS | 335,495.00| 78,800.00| 148,080.00| 44.1| ************************************************************************************************************************************ TARRANT ON ROSEDALE ST FROM IH 35W | 1.050 | 14,895,063.03| 164,375.47| 14,795,578.94| 99.9| BU 287P RIVERSIDE DR IN FORT WORTH | | | | | | 0172-01-042 | | | | | | HP 2008(828) WIDEN GR, DR, BASE & SURF, & REPL R | | | | | | | | | | | | TARRANT ON ROSEDALE ST FROM RIVERSIDE DR | 0.250 | 2,290,892.62| 41,029.23| 2,194,282.49| 95.7| MH US 287 IN FORT WORTH | | | | | | 8649-02-004 | | | | | | C 8649-2-4 WIDEN GR, DR, BASE & SURF | | | | | | | | | | | | WORK ORDER- 11-14-08 WORK BEGAN- 06-29-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-14-09 | | | | | | CONTRACT WORKING DAYS- 425 ADDL DAYS GRANTED- 300 | | | | | | WORKING DAYS CHARGED- 836 PERCENT TIME USED- 115 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0172-01-042 | | | | | | BREDA COMPANY, INC. | |SUB %: 0.54 | | | | BUYER BARRICADES | |SUB %: 0.46 | | | | CHOCTAW ERECTORS, INC. | |SUB %: 6.71 | | | | CRAIG OLDEN, INC. | |SUB %: 0.49 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.42 | | | | INDEPENDENT UTILITY CONSTRUCTION, INC. | |SUB %: 5.19 | | | | A R DANIEL CONSTRUCTION SERVICES, INC. | |SUB %: 3.34 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 2.80 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 0.94 | | | | RAYMOND PAINTING, INC. | |SUB %: 0.11 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 9.80 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.49 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.17 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.63 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.71 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.05 | | | | KIRK CONCRETE CONSTRUCTION, INC. | |SUB %: 1.83 | | | | ALLIED DRILLING COMPANY | |SUB %: 0.23 | | | | RAMBO CONTRACTING, INC. | |SUB %: 0.96 | | | | CUSTOM FENCE COMPANY | |SUB %: 0.12 | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 0.54 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.86 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.05 | | | | TEXAS STAR TRANSPORT, LP | |SUB %: 0.00 | | | | TX DOWN UNDER CONSTRUCTION LLC | |SUB %: 0.00 | | | | | | | | | | CONTRACT 08083201 | TOTALS | 17,185,955.65| 205,404.70| 16,989,861.43| 99.8| ************************************************************************************************************************************ TARRANT 0.2 MI S OF RANDOL MILL AVE. | 2.205 | 15,244,573.52| 10,785.61| 16,770,865.71| 99.9| FM 1938 SH 114 | | | | | | 1978-01-048 | | | | | | STP 2009(880)MM GR, BS, DR, STRUCTURES & PAVEMENT | | | | | | | | | | | | WORK ORDER- 12-03-09 WORK BEGAN- 06-01-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-01-10 | | | | | | CONTRACT WORKING DAYS- 448 ADDL DAYS GRANTED- 44 | | | | | | WORKING DAYS CHARGED- 637 PERCENT TIME USED- 129 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1978-01-048 | | | | | | BREDA COMPANY, INC. | |SUB %: 1.59 | | | | HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, CORP. | |SUB %: 1.40 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 7.15 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.03 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.86 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.27 | | | | BIG BIRD TREE SERVICE, INC. | |SUB %: 0.42 | | | | CRAIG OLDEN, INC. | |SUB %: 1.86 | | | | C.T. AND S. METALWORKS, INC. | |SUB %: 1.13 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.36 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.27 | | | | PAVER CONSTRUCTION COMPANY INC. | |SUB %: 0.74 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 8.58 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.91 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.37 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.87 | | | | LLANO RIVER FENCE | |SUB %: 0.64 | | | | WRIGHT CONSTRUCTION CO., INC. | |SUB %: 0.31 | | | | RICE TUNNELING & BORING, INC. | |SUB %: 0.29 | | | | JUSTIN FARMS | |SUB %: 1.47 | | | | HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, CORP. | |SUB %: 0.00 | | | | FELIX FRAYRE | |SUB %: 0.03 | | | | | | | | | | CONTRACT 08093204 | TOTALS | 15,244,573.52| 10,785.61| 16,770,865.71| 99.9| ************************************************************************************************************************************ TARRANT RM 2871 OVER MARY'S CREEK | 0.291 | 1,796,479.01| 78,940.77| 1,709,607.01| 95.1| RM 2871 . | | | | | | 2855-01-016 | | | | | | BR 1102(208) REHABILITATE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 09-06-11 WORK BEGAN- 04-02-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-15-12 | | | | | | CONTRACT WORKING DAYS- 299 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 283 PERCENT TIME USED- 94 | | | | | | | | | | | | IOWA BRIDGE & CULVERT, LC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2855-01-016 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.61 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 1.79 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 8.58 | | | | A.M.S. COMPANY, INC. | |SUB %: 12.08 | | | | RICE ENVIRONMENTAL SERVICES | |SUB %: 6.83 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.50 | | | | DUSTROL, INC. | |SUB %: 0.78 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.59 | | | | M-CO CONSTRUCTION, INC. | |SUB %: 0.38 | | | | | | | | | | CONTRACT 08113066 | TOTALS | 1,796,479.01| 78,940.77| 1,709,607.01| 95.1| ************************************************************************************************************************************ TARRANT COMMERCE ST. | 0.459 | 10,591,980.89| -47,979.20| 953,802.27| 9.0| SH 183 NICHOLS ST. | | | | | | 0094-01-030 | | | | | | BR 2011(705) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 12-20-11 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-18-12 | | | | | | CONTRACT WORKING DAYS- 524 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0094-01-030 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08113203 | TOTALS | 10,591,980.89| 47,979.20| 953,802.27| 9.0| ************************************************************************************************************************************ TARRANT BRUMLOW/POOL | 0.909 | 11,469,297.64| 183,235.84| 3,390,480.18| 29.5| SH 26 JOHN MCCAIN | | | | | | 0363-01-136 | | | | | | STP 1102(295)MM GRADING, BASE,DRAINAGE AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 10-21-11 WORK BEGAN- 07-16-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-19-12 | | | | | | CONTRACT WORKING DAYS- 394 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 195 PERCENT TIME USED- 49 | | | | | | | | | | | | AUI CONTRACTORS, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0363-01-136 | | | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.04 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 8.28 | | | | DUSTIN ALLEN, INC. | |SUB %: 0.20 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.29 | | | | DUSTROL, INC. | |SUB %: 0.87 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 3.81 | | | | TEXAS STAR SAWING & SEALING | |SUB %: 0.02 | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 0.75 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 0.52 | | | | J/M MATERIALS, INC. | |SUB %: 0.37 | | | | TEXAS INLETS, INC. | |SUB %: 1.87 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 4.14 | | | | HAYDEN CAPITAL CORPORATION | |SUB %: 0.67 | | | | ATS DRILLING, INC. | |SUB %: 2.63 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.08 | | | | | | | | | | CONTRACT 08113208 | TOTALS | 11,469,297.64| 183,235.84| 3,390,480.18| 29.5| ************************************************************************************************************************************ TARRANT BOWMAN SPRINGS RD AT TRIB VILLAGE C | 0.237 | 1,339,195.23| 6,923.69| 1,368,886.49| 99.9| CR . | | | | | | 0902-48-381 | | | | | | BR 99(522) REPLACE BRIDGE | | | | | | | | | | | | TARRANT BOWMAN SPRINGS ROAD | 0.036 | 557,235.24| 5,002.98| 635,142.32| 99.9| CR AT TRIB VILLAGE CREEK | | | | | | 0902-48-739 | | | | | | CC 902-48-739 GR, DR, STRUCTURE & PAVEMENT | | | | | | | | | | | | WORK ORDER- 10-05-11 WORK BEGAN- 01-12-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-04-12 | | | | | | CONTRACT WORKING DAYS- 256 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 240 PERCENT TIME USED- 93 | | | | | | | | | | | | MCMAHON CONTRACTING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-48-381 | | | | | | COPPELL CONSTRUCTION CO., INC. | |SUB %: 31.01 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 1.67 | | | | T-BAR FENCE, INC. | |SUB %: 0.12 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.40 | | | | DUSTROL, INC. | |SUB %: 0.40 | | | | ARK CONTRACTING SERVICES, LLC | |SUB %: 3.78 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.83 | | | | LB TRANSPORTATION | |SUB %: 0.15 | | | | SUPREME SAWING AND SEALING | |SUB %: 0.15 | | | | ORNELAS & SON"S TRUCKING | |SUB %: 5.10 | | | | TEXAS SHAFTS, INC. | |SUB %: 2.09 | | | | JESUS MORALES TRUCKING | |SUB %: 0.00 | | | | J. E. GUZMAN CONSTRUCTION, INC. | |SUB %: 3.58 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 6.98 | | | | BREDA COMPANY, INC. | |SUB %: 0.52 | | | | RG PAINTING | |SUB %: 0.27 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.17 | | | | MICA CORPORATION | |SUB %: 0.43 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.14 | | | | | | | | | | CONTRACT 08113238 | TOTALS | 1,896,430.47| 11,926.67| 2,004,028.81| 99.9| ************************************************************************************************************************************ TARRANT WINSCOTT RD/LAKEWAY | 1.581 | 644,260.85| 0.00| 700,307.99| 99.9| US 377 RM 2871; IN BENBROOK | | | | | | 0080-07-089 | | | | | | NH 1102(454) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 10-19-11 WORK BEGAN- 11-14-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-04-11 | | | | | | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 60 | | | | | | WORKING DAYS CHARGED- 137 PERCENT TIME USED- 72 | | | | | | | | | | | | LEGENDS LANDSCAPES LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0080-07-089 | | | | | | DOWN UNDER CONSTRUCTION | |SUB %: 0.27 | | | | | | | | | | CONTRACT 08113274 | TOTALS | 644,260.85| 0.00| 700,307.99| 99.9| ************************************************************************************************************************************ TARRANT VARIOUS LOCATIONS ON IH 20, IH 35 | 0.100 | 1,048,475.00| 53,156.00| 247,095.60| 23.5| VA AND IH 820 DISTRICTWIDE | | | | | | 0902-00-130 | | | | | | NH 2012(684) CONCRETE PAVEMENT REPAIR | | | | | | | | | | | | WORK ORDER- 09-24-12 WORK BEGAN- 10-08-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-16-12 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 205 PERCENT TIME USED- 56 | | | | | | | | | | | | ROY JORGENSEN ASSOCIATES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0902-00-130 | | | | | | W.O.E. CONSTRUCTION | |SUB %: 1.73 | | | | | | | | | | CONTRACT 08123036 | TOTALS | 1,048,475.00| 53,156.00| 247,095.60| 23.5| ************************************************************************************************************************************ TARRANT EB (WEATHERFORD ST)@ O-K-T BR & UP | 0.320 | 6,582,743.90| 321,120.56| 5,199,908.60| 78.9| SP 347 . | | | | | | 0081-01-040 | | | | | | BR 2011(154) REPLACE BRIDGES AND APPROACHES | | | | | | | | | | | | WORK ORDER- 11-23-10 WORK BEGAN- 06-13-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-23-11 | | | | | | CONTRACT WORKING DAYS- 406 ADDL DAYS GRANTED- 80 | | | | | | WORKING DAYS CHARGED- 468 PERCENT TIME USED- 96 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0081-01-040 | | | | | | ATS DRILLING, L.P. | |SUB %: 3.17 | | | | BREDA COMPANY, INC. | |SUB %: 1.00 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.34 | | | | CLEMONS TRUCKING | |SUB %: 0.50 | | | | C.T. AND S. METALWORKS, INC. | |SUB %: 1.66 | | | | ENVIRONMENTAL STANDARDS | |SUB %: 0.42 | | | | FARR FOUNDATION, INC. | |SUB %: 0.55 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.36 | | | | MICA CORPORATION | |SUB %: 1.98 | | | | RIVER CITIES SAWING, LLC | |SUB %: 0.15 | | | | ROAD MASTER STRIPING LLC | |SUB %: 0.17 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.85 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.56 | | | | W.O.E. CONSTRUCTION | |SUB %: 2.95 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.12 | | | | ENGINEERED EXPLOSIVE SERVICES | |SUB %: 0.92 | | | | TEXAS STAR TRANSPORT, LP | |SUB %: 0.00 | | | | | | | | | | CONTRACT 09103023 | TOTALS | 6,582,743.90| 321,120.56| 5,199,908.60| 78.9| ************************************************************************************************************************************ TARRANT WEST END OF BU 287P BRIDGE | 6.874 | 4,544,378.72| 548,455.43| 2,668,467.44| 58.7| IH 20 FM 157 | | | | | | 2374-05-076 | | | | | | IM 0204(280) REPAIR FAILURES, UTBHMWC AND STRIPE | | | | | | | | | | | | WORK ORDER- 10-18-11 WORK BEGAN- 09-04-12 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-16-12 | | | | | | CONTRACT WORKING DAYS- 107 ADDL DAYS GRANTED- 17 | | | | | | WORKING DAYS CHARGED- 85 PERCENT TIME USED- 68 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-05-076 | | | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.47 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 4.81 | | | | CHEROKEE SERVICES | |SUB %: 9.33 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.14 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 11.33 | | | | DUSTROL, INC. | |SUB %: 24.79 | | | | HALL PAVING, INC. | |SUB %: 16.40 | | | | | | | | | | CONTRACT 09113225 | TOTALS | 4,544,378.72| 548,455.43| 2,668,467.44| 58.7| ************************************************************************************************************************************ TARRANT FM 157 | 5.789 | 5,345,717.22| 0.00| 0.00| 0.0| IH 20 DALLAS/TARRANT COUNTY LINE | | | | | | 2374-05-077 | | | | | | IM 0204(284) RESURFACE ROADWAY | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 05-06-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-17-13 | | | | | | CONTRACT WORKING DAYS- 115 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 7 PERCENT TIME USED- 6 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-05-077 | | | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.10 | | | | DUSTROL, INC. | |SUB %: 13.64 | | | | HALL PAVING, INC. | |SUB %: 13.59 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.10 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 4.49 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 5.63 | | | | | | | | | | CONTRACT 09123042 | TOTALS | 5,345,717.22| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT IH 820 | 3.580 | 120,205,602.75| 0.00| 2,377,317.08| 1.9| IH 35W US 81/287 SPLIT | | | | | | 0014-16-255 | | | | | | IM 0355(151) GR, BSE, DR, SURF & SIGN | | | | | | | | | | | | TARRANT IH 820 | 2.735 | 3,080,289.85| 0.00| 57,450.00| 1.8| IH 35W US 81/287_SPLIT | | | | | | 0014-16-267 | | | | | | NH 2012(657) ROW ACQ, RELOC ASSIT, UTILITY ADJ | | | | | | | | | | | | WORK ORDER- 11-01-12 WORK BEGAN- 04-29-13 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 847 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0014-16-255 | | | | | | JACKSON CONSTRUCTION, LTD. | |SUB %: 2.32 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.53 | | | | USA SWPPP INSPECTIONS, INC. | |SUB %: 0.52 | | | | C.B. SERVICES, INC. | |SUB %: 0.94 | | | | MAVERICK PUMP SERVICES, LLC | |SUB %: 0.04 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.04 | | | | MICA CORPORATION | |SUB %: 5.31 | | | | COWBELL TRAFFIC SERVICES, INC. | |SUB %: 0.01 | | | | CROSSROADS, L.P. | |SUB %: 0.09 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.38 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.02 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.60 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.00 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.04 | | | | LINDAMOOD DEMOLITION, INC. | |SUB %: 0.23 | | | | FARR FOUNDATION, INC. | |SUB %: 1.86 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 0.36 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 0.17 | | | | ANTIGO CONSTRUCTION, INC. | |SUB %: 0.15 | | | | CEN CONCRETE CONSTRUCTION COMPANY, INC. | |SUB %: 0.78 | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.02 | | | | | | | | | | CONTRACT 09123201 | TOTALS | 123,285,892.60| 0.00| 2,434,767.08| 1.9| ************************************************************************************************************************************ TARRANT PARKER/TARRANT COUNTY LINE | 2.066 | 1,479,637.07| 96,711.46| 96,711.46| 6.5| IH 30 LINKCREST | | | | | | 1068-01-201 | | | | | | IM 0304(096) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 10-18-12 WORK BEGAN- 04-24-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-17-13 | | | | | | CONTRACT WORKING DAYS- 48 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 2 PERCENT TIME USED- 4 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-01-201 | | | | | | SCR CONSTRUCTION CO., INC. | |SUB %: 9.05 | | | | CROSSROADS, L.P. | |SUB %: 0.43 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 4.07 | | | | DUSTROL, INC. | |SUB %: 13.19 | | | | PENHALL COMPANY | |SUB %: 0.10 | | | | | | | | | | CONTRACT 09123243 | TOTALS | 1,479,637.07| 96,711.46| 96,711.46| 6.5| ************************************************************************************************************************************ TARRANT SOUTH OF ARBORLAWN DRIVE | 0.100 | 116,646,468.88| 1,673,701.05| 100,540,977.70| 86.2| SH 121 SOUTH OF OVERTON RIDGE BLVD | | | | | | 0504-02-022 | | | | | | STP 2009(485)ES GR, DR, STRUCTURES AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 02-01-10 WORK BEGAN- 03-15-10 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-17-10 | | | | | | CONTRACT WORKING DAYS- 896 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 922 PERCENT TIME USED- 102 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0504-02-022 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.08 | | | | S & S BRIDGE PAINTING, INC. | |SUB %: 0.04 | | | | INTERSTATE FOUNDATION, LLC | |SUB %: 3.14 | | | | W.O.E. CONSTRUCTION | |SUB %: 1.75 | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | |SUB %: 23.31 | | | | ODUM SERVICES, L.P. | |SUB %: 0.67 | | | | ARLINGTON PAVERS, INC. | |SUB %: 0.06 | | | | ANALYTICAL TECHNOLOGY CONSULTANTS, INC. | |SUB %: 2.64 | | | | MICA CORPORATION | |SUB %: 0.34 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 2.98 | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.23 | | | | MUSTANG TURF & LANDSCAPE, LLC | |SUB %: 0.60 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.00 | | | | CRAIG OLDEN, INC. | |SUB %: 5.50 | | | | RAMBO CONTRACTING, INC. | |SUB %: 1.18 | | | | NORTH TEXAS CONTRACTING, INC. | |SUB %: 5.20 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 5.32 | | | | JONA CONTRACTING, INC. | |SUB %: 0.00 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.04 | | | | RMI WORLDWIDE, LLC | |SUB %: 0.11 | | | | GUIDO'S TRUCKS | |SUB %: 1.28 | | | | A R DANIEL CONSTRUCTION SERVICES, INC. | |SUB %: 0.21 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 0.00 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 0.02 | | | | SCOTT DERR PAINTING CO, LLC | |SUB %: 0.14 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.08 | | | | GUIDO CONSTRUCTION, INC. DBA GUIDO"S TRUCKS | |SUB %: 0.08 | | | | SHEA SERVICES, INC | |SUB %: 0.46 | | | | TEXAS CONSTRUCTION SUPPLY, INC. | |SUB %: 1.01 | | | | NORTH TEXAS TRUCKING, INC. | |SUB %: 0.17 | | | | WEBBER BARRIER SERVICES, INC. | |SUB %: 0.43 | | | | BIG DOG DRILLING, LLC | |SUB %: 0.01 | | | | TX DOWN UNDER CONSTRUCTION LLC | |SUB %: 0.02 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.04 | | | | RIVER CITIES SAWING, LLC | |SUB %: 0.10 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.00 | | | | RELIABLE TRUCKING | |SUB %: 0.04 | | | | TEXAS MANHOLES COMPANY, INC. | |SUB %: 0.00 | | | | KD SERVICES | |SUB %: 0.38 | | | | GAMCOR, INC. | |SUB %: 0.07 | | | | EROSION PREVENTION PRODUCTS | |SUB %: 0.00 | | | | J.A. MANNING CONSTRUCTION CO., INC. | |SUB %: 1.24 | | | | | | | | | | CONTRACT 11093001 | TOTALS | 116,646,468.88| 1,673,701.05| 100,540,977.70| 86.2| ************************************************************************************************************************************ TARRANT PEARSON LANE; WEST CITY LIMITS | 6.100 | 1,320,757.45| 33,172.20| 307,491.46| 23.2| FM 1709 SH 114; EAST CITY LIMITS | | | | | | 1603-03-034 | | | | | | STP 2011(228)TE GRADING,DRAINAGE,INSTALL SIDEWALKS | | | | | | | | | | | | WORK ORDER- 12-03-12 WORK BEGAN- 01-28-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-19-12 | | | | | | CONTRACT WORKING DAYS- 149 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 64 PERCENT TIME USED- 42 | | | | | | | | | | | | JAGOE-PUBLIC COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1603-03-034 | | | | | | ENVIRONMENTAL STANDARDS, INC. | |SUB %: 3.97 | | | | CONCRETE PAVER SYSTEMS, INC. | |SUB %: 0.26 | | | | CROSSROADS, L.P. | |SUB %: 0.71 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.52 | | | | MIKE ALBERT, INC. | |SUB %: 30.01 | | | | | | | | | | CONTRACT 11123021 | TOTALS | 1,320,757.45| 33,172.20| 307,491.46| 23.2| ************************************************************************************************************************************ TARRANT DOVE | 1.888 | 204,430.00| 0.00| 0.00| 0.0| SH 114 KIMBALL | | | | | | 0353-03-090 | | | | | | NH 2012(065) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 01-11-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DENALI CONSTRUCTION SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0353-03-090 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12123013 | TOTALS | 204,430.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT 665' N OF MEADOWBROOK | 4.283 | 3,047,531.02| 424,800.17| 814,505.51| 26.7| IH 820 SH 180 (E. LANCASTER) | | | | | | 0008-13-226 | | | | | | IM 8204(287) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 01-29-13 WORK BEGAN- 03-11-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-11-13 | | | | | | CONTRACT WORKING DAYS- 92 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 35 PERCENT TIME USED- 38 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0008-13-226 | | | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.24 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 11.15 | | | | TRP CONSTRUCTION GROUP, LLC | |SUB %: 6.87 | | | | EROSION CONTROL MANAGEMENT SERVICES | |SUB %: 0.40 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.40 | | | | O. TREVINO CONSTRUCTION, LLC | |SUB %: 12.21 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.96 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.44 | | | | | | | | | | CONTRACT 12123028 | TOTALS | 3,047,531.02| 424,800.17| 814,505.51| 26.7| ************************************************************************************************************************************ TARRANT AT BF 1187C (E. MAIN ST) | 0.100 | 129,000.00| 0.00| 0.00| 0.0| FM 1187 IN CROWLEY | | | | | | 1330-03-002 | | | | | | CC 1330-3-2 TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 30 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DURABLE SPECIALTIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1330-03-002 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12123211 | TOTALS | 129,000.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ TARRANT ROGERLINE DRIVE, IN NRH | 0.189 | 223,384.76| 16,160.00| 16,160.00| 7.2| SH 26 IH 820 | | | | | | 0363-01-140 | | | | | | NH 2013(231) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 03-12-13 WORK BEGAN- 04-17-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-28-13 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 7 PERCENT TIME USED- 11 | | | | | | | | | | | | QUALITY EXCAVATION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0363-01-140 | | | | | | IMAGE CONCRETE, INC. | |SUB %: 2.30 | | | | MELS ELECTRIC, L.P. | |SUB %: 0.67 | | | | BUYERS BARRICADES, INC. | |SUB %: 4.02 | | | | GREEN MOUND | |SUB %: 56.85 | | | | | | | | | | CONTRACT 12123229 | TOTALS | 223,384.76| 16,160.00| 16,160.00| 7.2| ************************************************************************************************************************************ WISE 2000' SOUTH OF SH 114 | 3.844 | 940,340.80| 0.00| 0.00| 0.0| US 81 TARRANT COUNTY LINE | | | | | | 0013-08-126 | | | | | | STP 2013(388) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 04-03-13 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 25 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | PEACHTREE CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0013-08-126 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02133229 | TOTALS | 940,340.80| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WISE BU 380F | 10.544 | 36,540,038.06| 45,828.12| 36,966,118.11| 99.9| US 380 DENTON C/L | | | | | | 0134-08-030 | | | | | | NH 2007(235) GR STRS & SURF ADDL LNS | | | | | | | | | | | | WISE CATLETT CREEK | 0.162 | 1,142,183.19| 0.00| 1,125,145.05| 98.5| US 380 . | | | | | | 0134-08-037 | | | | | | BR 2009(429) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 04-08-09 WORK BEGAN- 06-12-09 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-12-09 | | | | | | CONTRACT WORKING DAYS- 598 ADDL DAYS GRANTED- 244 | | | | | | WORKING DAYS CHARGED- 869 PERCENT TIME USED- 103 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0134-08-030 | | | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.53 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.74 | | | | BRENDA PRICE TRUCKING | |SUB %: 1.44 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 1.13 | | | | BREDA COMPANY, INC. | |SUB %: 1.05 | | | | EROSION & RETAINING WALL STRUCTURES, INC. | |SUB %: 0.92 | | | | MICA CORPORATION | |SUB %: 0.41 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.01 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.35 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.67 | | | | C.B. SERVICES, INC. | |SUB %: 0.09 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.32 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 18.71 | | | | PENHALL COMPANY | |SUB %: 0.01 | | | | NORTH EASTERN PAVERS | |SUB %: 3.18 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.09 | | | | CRAIG OLDEN, INC. | |SUB %: 0.81 | | | | MCRYAN HAULING, INC. | |SUB %: 1.56 | | | | LJ TRUCKING | |SUB %: 0.31 | | | | RANGER EXCAVATING, L.P. | |SUB %: 0.68 | | | | COWBOY TRUCKING | |SUB %: 0.43 | | | | | | | | | | CONTRACT 03093026 | TOTALS | 37,682,221.25| 45,828.12| 38,091,263.16| 99.9| ************************************************************************************************************************************ WISE FM 51 | 10.581 | 1,630,082.87| 0.00| 0.00| 0.0| SH 114 US 81 | | | | | | 0352-02-050 | | | | | | STP 2013(538) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 38 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0352-02-050 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133029 | TOTALS | 1,630,082.87| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WISE 800 FT WEST OF US 81 | 0.628 | 544,182.95| 0.00| 0.00| 0.0| BU 380F US 81 | | | | | | 0134-12-004 | | | | | | NH 2013(536) GRADING, BASE, DRAIN. STRUCT. & PAV | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 70 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | O. TREVINO CONSTRUCTION, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0134-12-004 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 04133230 | TOTALS | 544,182.95| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WISE SH 114 | 6.936 | 1,118,566.90| 0.00| 0.00| 0.0| FM 51 PARKER COUNTY LINE | | | | | | 0313-01-051 | | | | | | STP 2013(671) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 42 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0313-01-051 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 05133239 | TOTALS | 1,118,566.90| 0.00| 0.00| 0.0| ************************************************************************************************************************************ WISE AT BRUSHY AND SANDY CREEKS | 0.438 | 3,479,076.48| 191.10| 3,442,267.95| 98.9| FM 1655 . | | | | | | 1751-01-017 | | | | | | BR 2007(274) REPLACE BRIDGES | | | | | | | | | | | | WORK ORDER- 07-19-11 WORK BEGAN- 09-20-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-20-11 | | | | | | CONTRACT WORKING DAYS- 260 ADDL DAYS GRANTED- 12 | | | | | | WORKING DAYS CHARGED- 272 PERCENT TIME USED- 100 | | | | | | | | | | | | COPPELL CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1751-01-017 | | | | | | TEXAS SHAFTS, INC. | |SUB %: 6.41 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 0.26 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 4.65 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.48 | | | | JONA CONTRACTING, INC. | |SUB %: 1.16 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.41 | | | | DUSTROL, INC. | |SUB %: 0.38 | | | | CRAIG OLDEN, INC. | |SUB %: 1.99 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.73 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.84 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.22 | | | | | | | | | | CONTRACT 06113238 | TOTALS | 3,479,076.48| 191.10| 3,442,267.95| 98.9| ************************************************************************************************************************************ WISE AT FM 51 SOUTH | 0.707 | 2,884,899.86| 14,392.09| 2,976,285.22| 99.9| SH 114 INTERSECTION | | | | | | 0352-01-055 | | | | | | STP 1102(294)SB GR, DR, STRUCTURE AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 09-30-11 WORK BEGAN- 11-01-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-16-11 | | | | | | CONTRACT WORKING DAYS- 273 ADDL DAYS GRANTED- 14 | | | | | | WORKING DAYS CHARGED- 341 PERCENT TIME USED- 118 | | | | | | | | | | | | THE LANE CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0352-01-055 | | | | | | THELIN RECYCLING COMPANY, L.P. | |SUB %: 0.62 | | | | BRENDA PRICE TRUCKING | |SUB %: 3.71 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 4.67 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.29 | | | | TEXAS SHAFTS, INC. | |SUB %: 1.71 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.46 | | | | CB SERVICES, INC. | |SUB %: 0.95 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.61 | | | | NORTH TEXAS REBAR, LLC | |SUB %: 0.33 | | | | SOUTH TEXAS PAINTING COMPANY | |SUB %: 0.16 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.85 | | | | MICA CORPORATION | |SUB %: 2.07 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.64 | | | | CEN CONCRETE CONSTRUCTION COMPANY, INC. | |SUB %: 0.09 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.12 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.09 | | | | RG PAINTING | |SUB %: 0.20 | | | | | | | | | | CONTRACT 08113039 | TOTALS | 2,884,899.86| 14,392.09| 2,976,285.22| 99.9| ************************************************************************************************************************************ WISE AT SALT CREEK | 0.099 | 1,968,338.24| 235,829.35| 1,848,292.64| 99.9| FM 2123 AND AT COTTONWOOD CREEK | | | | | | 1606-02-013 | | | | | | BR 1102(297) REPL BRIDGES | | | | | | | | | | | | WORK ORDER- 09-14-11 WORK BEGAN- 12-08-11 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-11 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 376 PERCENT TIME USED- 250 | | | | | | | | | | | | DOUGHTIE CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1606-02-013 | | | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.36 | | | | BROCK ENVIRONMENTAL, LLC | |SUB %: 0.39 | | | | DUSTIN ALLEN, INC. | |SUB %: 1.70 | | | | GORRONDONA & ASSOCIATES, INC. | |SUB %: 0.50 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 1.28 | | | | RG PAINTING | |SUB %: 0.19 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.20 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.54 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.78 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 8.23 | | | | EW WELLS GROUP LLC | |SUB %: 2.13 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 8.30 | | | | J.L. STEEL REINFORCING, LLC | |SUB %: 0.33 | | | | ENVIRONMENTAL SAFETY SERVICES, INC. | |SUB %: 8.95 | | | | JUST GROOVING, LTD. | |SUB %: 0.29 | | | | JTM MATERIALS, INC. | |SUB %: 0.17 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.42 | | | | KYLE ERWIN CONSTRUCTION, LLC | |SUB %: 0.13 | | | | | | | | | | CONTRACT 08113260 | TOTALS | 1,968,338.24| 235,829.35| 1,848,292.64| 99.9| ************************************************************************************************************************************ WISE SH 114 | 12.330 | 4,939,000.01| 594,402.68| 1,729,255.82| 35.0| FM 2123 C.R. 3355 | | | | | | 1606-02-018 | | | | | | STP 2012(736)HES GRADING,BASE,DRAINAGE,STRUCTURE,PAV | | | | | | | | | | | | WORK ORDER- 12-03-12 WORK BEGAN- 01-29-13 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-19-12 | | | | | | CONTRACT WORKING DAYS- 224 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 69 PERCENT TIME USED- 30 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1606-02-018 | | | | | | SIGNATURE CONTRACTING SERVICES, L.L.C. | |SUB %: 2.47 | | | | BUYERS BARRICADES, INC. | |SUB %: 0.39 | | | | W.S. CONSTRUCTION COMPANY | |SUB %: 13.29 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 20.15 | | | | HIGHWAY TECHNOLOGIES, INC. | |SUB %: 2.13 | | | | HJC FARMS, INC. | |SUB %: 2.96 | | | | | | | | | | CONTRACT 11123224 | TOTALS | 4,939,000.01| 594,402.68| 1,729,255.82| 35.0| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 700,685,282.07 DISTRICT ESTIMATES THIS MONTH 10,896,826.14 DISTRICT TOTAL ESTIMATES PAID TO DATE 416,855,156.47