MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 24 AS OF DEC 11, 2008 PAGE 69 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ BREWSTER PECOS COUNTY LINE | 19.600 | 73,499.25| 0.00| 0.00| 0.0| US 67 US 90 | | | | | | 0075-01-022 | | | | | | STP 2008(224)HES TEXTURIZE SHOULDERS | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 20 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | WEST TEXAS RUMBLE STRIP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0075-01-022 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12083016 | TOTALS | 73,499.25| 0.00| 0.00| 0.0| ************************************************************************************************************************************ CULBERSON 12.56 MI W CULBERSON/JEFF DAVIS C L | 12.520 | 9,306,863.92| 1,097,756.18| 7,390,617.00| 79.4| IH 10 0.04 MI W CULBERSON/JEFF DAVIS C L | | | | | | 0003-03-041 | | | | | | IM 0101(244) MILL AND OVERLAY | | | | | | | | | | | | WORK ORDER- 04-14-08 WORK BEGAN- 06-03-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-30-08 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 112 PERCENT TIME USED- 93 | | | | | | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0003-03-041 | | | | | | HIGHWAY TECHNOLOGIES | |SUB %: 0.51 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 3.83 | | | | ROAD MARKINGS INC. | |SUB %: 2.26 | | | | XPERT ROAD CONSTRUCTION INC. | |SUB %: 10.88 | | | | TEXAS HIGHWAY BARRICADES & SIGNS INC | |SUB %: 0.51 | | | | | | | | | | CONTRACT 03083229 | TOTALS | 9,306,863.92| 1,097,756.18| 7,390,617.00| 79.4| ************************************************************************************************************************************ EL PASO SH 20 (DONIPHAN DRIVE) | 1.111 | 5,239,435.30| 110,998.67| 1,616,846.07| 30.8| CS IH 10 | | | | | | 0924-06-199 | | | | | | STP 2007(686)MM A NON-FREEWAY FACILITY | | | | | | | | | | | | EL PASO SH 20 (DONIPHAN DRIVE) | 1.111 | 1,676,163.25| 23,090.17| 1,227,754.25| 73.2| CS IH 10 | | | | | | 0924-06-293 | | | | | | CC 924-6-293 WATER AND SEWER FACILITIES | | | | | | | | | | | | WORK ORDER- 03-24-08 WORK BEGAN- 05-12-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-09-08 | | | | | | CONTRACT WORKING DAYS- 300 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 128 PERCENT TIME USED- 42 | | | | | | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-199 | | | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 13.39 | | | | ROAD MARKINGS INC. | |SUB %: 0.64 | | | | THREE C'S CONTRACTORS | |SUB %: 1.33 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.32 | | | | SAAB DEVELOPMENT | |SUB %: 24.35 | | | | XPERT ROAD CONSTRUCTION INC. | |SUB %: 2.65 | | | | DH UNDERGROUND, INC. | |SUB %: 7.35 | | | | | | | | | | CONTRACT 01083206 | TOTALS | 6,915,598.55| 134,088.84| 2,844,600.32| 41.1| ************************************************************************************************************************************ EL PASO SH 20 (MESA) | 4.530 | 3,266,903.42| 129,708.85| 3,247,169.81| 99.6| IH 10 LP 375 (TRANSMOUNTAIN) | | | | | | 2121-01-067 | | | | | | IM 0101(243) OVERLAY OF EXISTING FRONTAGE ROADS | | | | | | | | | | | | EL PASO END OF RESLER BRIDGE | 0.640 | 85,737.80| -996.36| 79,767.05| 93.0| IH 10 END OF ON-RAMP | | | | | | 2121-02-124 | | | | | | IM 0101(243) MILL AND OVERLAY | | | | | | | | | | | | WORK ORDER- 04-14-08 WORK BEGAN- 05-05-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-30-08 | | | | | | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 91 PERCENT TIME USED- 113 | | | | | | | | | | | | DAN WILLIAMS COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2121-01-067 | | | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 4.47 | | | | ROAD MARKINGS INC. | |SUB %: 4.59 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 5.84 | | | | RUBEN PEREA TRUCKING | |SUB %: 1.13 | | | | MOUNTAIN STAR CONSTRUCTION | |SUB %: 0.13 | | | | HENRY TRUJILLO, INC. | |SUB %: 0.09 | | | | | | | | | | CONTRACT 03083007 | TOTALS | 3,352,641.22| 128,712.49| 3,326,936.86| 99.4| ************************************************************************************************************************************ EL PASO APPROX. 4 MI. NW OF FM 1109 | 4.073 | 796,068.30| 0.00| 348,190.96| 43.7| FM 76 FM 1109 | | | | | | 0674-02-013 | | | | | | STP 2008(462) MILL, SPOT BASE REPAIR, OVERLAY | | | | | | | | | | | | WORK ORDER- 04-16-08 WORK BEGAN- 05-02-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 05-02-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 42 ADDL DAYS GRANTED- 88 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 115 PERCENT TIME USED- 88 | |**************************************************| | | | | | | | J.A.R. CONCRETE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0674-02-013 | | | | | | DUSTROL, INC. | |SUB %: 3.88 | | | | ROAD MARKINGS INC. | |SUB %: 3.82 | | | | | | | | | | CONTRACT 03083030 | TOTALS | 796,068.30| 0.00| 348,190.96| 43.7| ************************************************************************************************************************************ EL PASO YANDELL DRIVE OVERPASS | 6.347 | 32,478,827.58| 974,708.44| 28,609,546.77| 88.4| US 54 APPROX. 1200 FT N OF HONDO PASS DR | | | | | | 0167-01-081 | | | | | | STP 2006(434)MM GR, BA, CPCR, SURF & STRUC | | | | | | | | | | | | WORK ORDER- 06-05-06 WORK BEGAN- 07-21-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-21-06 | | | | | | CONTRACT WORKING DAYS- 549 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 616 PERCENT TIME USED- 112 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0167-01-081 | | | | | | HARDY HOLE DRILLING | |SUB %: 1.12 | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 21.42 | | | | RAMIREZ BROTHERS CONCRETE CONSTRUCTION COMPANY | |SUB %: 0.63 | | | | MOUNTAIN ELECTRIC CORPORATION | |SUB %: 5.55 | | | | RUTHERFORD DIVERSIFIED INDUSTRIES, INC. | |SUB %: 0.31 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.27 | | | | ROAD MARKINGS INC. | |SUB %: 2.07 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.20 | | | | J.L. STEEL, L.P. | |SUB %: 0.87 | | | | HARDY HOLE DRILLING | |SUB %: 0.28 | | | | TRUJILLO TRUCKING | |SUB %: 0.43 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.06 | | | | | | | | | | CONTRACT 04063217 | TOTALS | 32,478,827.58| 974,708.44| 28,609,546.77| 88.4| ************************************************************************************************************************************ EL PASO @ SH 20 AND SCHUSTER | 3.000 | 1,549,583.75| 37,553.34| 1,698,904.10| 99.9| SH 20 ETC . | | | | | | 0001-03-054 | | | | | | STP 2007(419)HES IMPROVE TRAFFIC SIGNAL | | | | | | | | | | | | WORK ORDER- 05-15-07 WORK BEGAN- 01-08-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-31-07 | | | | | | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 231 PERCENT TIME USED- 231 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0001-03-054 | | | | | | MOUNTAIN STAR CONSTRUCTION | |SUB %: 6.55 | | | | HARDY HOLE DRILLING | |SUB %: 0.89 | | | | ROAD MARKINGS INC. | |SUB %: 3.11 | | | | | | | | | | CONTRACT 04073018 | TOTALS | 1,549,583.75| 37,553.34| 1,698,904.10| 99.9| ************************************************************************************************************************************ EL PASO 2.222 MI W OF FM 1281 (HORIZON BLVD | 3.140 | 18,678,591.87| 700,058.26| 14,577,252.99| 78.0| IH 10 0.911 MI E OF FM 1281 (HORIZON BLVD | | | | | | 2121-04-067 | | | | | | NH 2007(251) RECONSTRUCT INTERCHANGE | | | | | | | | | | | | EL PASO 0.243 MI SOUTH OF IH 10 | 0.518 | 3,320,681.61| 198,913.38| 533,455.45| 16.0| FM 1281 0.275 MI NORTH OF IH 10 | | | | | | 3451-01-024 | | | | | | NH 2007(251) RECONSTRUCT INTERCHANGE | | | | | | | | | | | | WORK ORDER- 06-20-07 WORK BEGAN- 07-16-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-06-07 | | | | | | CONTRACT WORKING DAYS- 360 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 333 PERCENT TIME USED- 92 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2121-04-067 | | | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 1.41 | | | | FARR FOUNDATION, INC. | |SUB %: 0.76 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.10 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.31 | | | | DANIEL CONSTRUCTION SERVICES, INC. (AR DANIEL...) | |SUB %: 0.35 | | | | ACCENT LANDSCAPE CONTRACTORS, INC. | |SUB %: 1.12 | | | | RAMIREZ BROTHERS CONCRETE CONSTRUCTION COMPANY | |SUB %: 7.86 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.29 | | | | TEXAS FAR WEST CONSTRUCTION & ENGINEERING | |SUB %: 0.86 | | | | ROAD MARKINGS INC. | |SUB %: 1.19 | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 15.44 | | | | HENRY TRUJILLO, INC. | |SUB %: 2.07 | | | | EL PASO PAVEMENT SPECIALISTS | |SUB %: 0.34 | | | | STOMPER DEMOLITION | |SUB %: 0.09 | | | | ALLIED PAVING CO. | |SUB %: 0.16 | | | | | | | | | | CONTRACT 04073202 | TOTALS | 21,999,273.48| 898,971.64| 15,110,708.44| 68.6| ************************************************************************************************************************************ EL PASO DISTRICTWIDE | 85.000 | 969,648.25| 0.00| 971,750.96| 99.9| VA . | | | | | | 0924-00-059 | | | | | | STP 2007(395) SIGNING UPGRADE | | | | | | | | | | | | EL PASO US 54 | 8.000 | 229,045.30| 0.00| 191,345.21| 83.5| IH 10 FM 659 | | | | | | 2121-03-136 | | | | | | IM 0101(242) OVERHEAD SIGN BRIDGE SIGN REPLACEMT | | | | | | | | | | | | WORK ORDER- 06-01-07 WORK BEGAN- 08-27-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-17-07 | | | | | | CONTRACT WORKING DAYS- 112 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 119 PERCENT TIME USED- 106 | | | | | | | | | | | | TEXAS CONCRETE AND ASPHALT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-00-059 | | | | | | HARDY HOLE DRILLING | |SUB %: 1.18 | | | | | | | | | | CONTRACT 04073213 | TOTALS | 1,198,693.55| 0.00| 1,163,096.17| 97.4| ************************************************************************************************************************************ EL PASO SH 20 (MESA ST) @ SUN BOWL | 0.750 | 200,437.45| 1,850.00| 193,897.45| 96.7| SH 20 SH 20 (MESA ST) @ EXECUTIVE CENTER | | | | | | 0001-02-050 | | | | | | NH 2007(464) LANDSCAPE MEDIANS | | | | | | | | | | | | EL PASO HAWKINS BLVD @ IH - 10 WEST | 1.750 | 549,473.40| 1,850.00| 568,125.90| 99.9| VA HAWKINS BLVD @ US 62/180(MONTANA AV | | | | | | 0924-06-243 | | | | | | STP 2007(076)MM MEDIAN IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 06-05-07 WORK BEGAN- 07-09-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-21-07 | | | | | | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 11 | | | | | | WORKING DAYS CHARGED- 91 PERCENT TIME USED- 100 | | | | | | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-243 | | | | | | THREE C'S CONTRACTORS | |SUB %: 33.39 | | | | HARDY HOLE DRILLING | |SUB %: 3.46 | | | | XPERT ROAD CONSTRUCTION INC. | |SUB %: 2.84 | | | | | | | | | | CONTRACT 04073222 | TOTALS | 749,910.85| 3,700.00| 762,023.35| 99.9| ************************************************************************************************************************************ EL PASO ZARAGOSA ROAD (FM 659) | 47.829 | 2,165,361.50| 3,980.50| 2,009,297.82| 97.6| US 54 ETC HORIZON BLVD (FM 1281) | | | | | | 0167-01-092 | | | | | | CM 2005(338) UPGRADING LOOP DETECTORS:PHASE I | | | | | | | | | | | | WORK ORDER- 08-04-05 WORK BEGAN- 01-02-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-20-05 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 65 | | | | | | WORKING DAYS CHARGED- 245 PERCENT TIME USED- 100 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0167-01-092 | | | | | | TEXAS FAR WEST CONSTRUCTION & ENGINEERING | |SUB %: 5.97 | | | | ROAD MARKINGS INC. | |SUB %: 1.44 | | | | HARDY HOLE DRILLING | |SUB %: 0.08 | | | | | | | | | | CONTRACT 06053057 | TOTALS | 2,165,361.50| 3,980.50| 2,009,297.82| 97.6| ************************************************************************************************************************************ EL PASO COUNTYWIDE | 1.000 | 315,175.00| 0.00| 343,545.42| 99.9| VA . | | | | | | 0924-06-273 | | | | | | CM 2007(580) TRAFFIC LIGHT SYNCHRONIZATION | | | | | | | | | | | | WORK ORDER- 07-10-07 WORK BEGAN- 08-22-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-26-07 | | | | | | CONTRACT WORKING DAYS- 116 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 115 PERCENT TIME USED- 99 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-273 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 06073011 | TOTALS | 315,175.00| 0.00| 343,545.42| 99.9| ************************************************************************************************************************************ EL PASO VARIOUS LOCATIONS | 1.000 | 1,248,030.00| 7,625.90| 1,062,396.34| 85.1| VA . | | | | | | 0924-06-279 | | | | | | NH 2007(581) ADA CURB RAMP | | | | | | | | | | | | WORK ORDER- 07-24-07 WORK BEGAN- 08-27-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-09-07 | | | | | | CONTRACT WORKING DAYS- 252 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 252 PERCENT TIME USED- 100 | | | | | | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-279 | | | | | | XPERT ROAD CONSTRUCTION INC. | |SUB %: 11.84 | | | | ROAD MARKINGS INC. | |SUB %: 1.83 | | | | | | | | | | CONTRACT 06073222 | TOTALS | 1,248,030.00| 7,625.90| 1,062,396.34| 85.1| ************************************************************************************************************************************ EL PASO 1.238 MI W OF LP 375(JOE BATTLE BLV | 0.964 | 1,050,630.95| 275,716.22| 755,007.54| 71.8| IH 10 0.274 MI W OF LP 375(JOE BATTLE BLV | | | | | | 2121-04-081 | | | | | | IM 0101(245) RELOCATION OF AN EXISTING ON-RAMP | | | | | | | | | | | | WORK ORDER- 07-25-08 WORK BEGAN- 09-03-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-10-08 | | | | | | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 61 PERCENT TIME USED- 76 | | | | | | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2121-04-081 | | | | | | XPERT ROAD CONSTRUCTION INC. | |SUB %: 14.39 | | | | HARDY HOLE DRILLING | |SUB %: 0.04 | | | | BISHOP CONSTRUCTION, INC. | |SUB %: 0.09 | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 0.48 | | | | | | | | | | CONTRACT 06083021 | TOTALS | 1,050,630.95| 275,716.22| 755,007.54| 71.8| ************************************************************************************************************************************ EL PASO FM 1281 & ASHFORD ST INTERSECTION | 1.490 | 1,518,140.40| 115,323.55| 751,209.36| 49.4| CS RYDERWOOD AV & DARRINGTON RD INTERS | | | | | | 0924-06-181 | | | | | | STP 2003(312)MM RECONSTRUCT ASHFORD/RYDERWOOD | | | | | | | | | | | | EL PASO ASHFORD/HORIZON BLVD INTERSECTION | 0.040 | 281,221.95| 9,973.00| 12,263.00| 4.3| FM 1281 . | | | | | | 3451-01-025 | | | | | | STP 2008(412) UPGRADING INTERSECTION AT ASHFORD | | | | | | | | | | | | WORK ORDER- 07-25-08 WORK BEGAN- 08-11-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-10-08 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 74 PERCENT TIME USED- 61 | | | | | | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-181 | | | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 12.28 | | | | ROAD MARKINGS INC. | |SUB %: 1.81 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.32 | | | | | | | | | | CONTRACT 06083028 | TOTALS | 1,799,362.35| 125,296.55| 763,472.36| 42.4| ************************************************************************************************************************************ EL PASO FM 258 (SOCORRO) AT ZEBU | 0.500 | 840,475.90| -5,800.00| 720,499.99| 91.6| FM 258 ETC . | | | | | | 0002-14-030 | | | | | | C 2-14-30 TRAFFIC SIGNAL INSTALLATION | | | | | | | | | | | | WORK ORDER- 08-15-07 WORK BEGAN- 02-13-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-31-07 | | | | | | CONTRACT WORKING DAYS- 160 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 187 PERCENT TIME USED- 116 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0002-14-030 | | | | | | MOUNTAIN STAR CONSTRUCTION | |SUB %: 10.36 | | | | ROAD MARKINGS INC. | |SUB %: 10.13 | | | | | | | | | | CONTRACT 07073214 | TOTALS | 840,475.90| 5,800.00| 720,499.99| 91.6| ************************************************************************************************************************************ EL PASO LEE BLVD; FROM MONTANA AVE_(PHASEII | 1.000 | 2,693,136.85| 0.00| 1,132,784.57| 42.0| CS PRATT AVE | | | | | | 0924-06-251 | | | | | | STP 2006(069)MM NEW LOCATION NON-FREEWAY | | | | | | | | | | | | WORK ORDER- 11-30-07 WORK BEGAN- 03-17-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-16-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 160 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 151 PERCENT TIME USED- 94 | |**************************************************| | | | | | | | TEXAS CONCRETE AND ASPHALT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-251 | | | | | | HENRY TRUJILLO, INC. | |SUB %: 2.20 | | | | NOE TAPIA CONCRETE | |SUB %: 14.81 | | | | ROAD MARKINGS INC. | |SUB %: 2.59 | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 11.81 | | | | PABLO GOMEZ TRUCKING | |SUB %: 0.32 | | | | MEDELLIN TRUCKING | |SUB %: 0.12 | | | | JAT TRUCKING | |SUB %: 0.12 | | | | ALONSO TRUCKING | |SUB %: 0.12 | | | | | | | | | | CONTRACT 07073218 | TOTALS | 2,693,136.85| 0.00| 1,132,784.57| 42.0| ************************************************************************************************************************************ EL PASO CITYWIDE | 10.919 | 2,065,750.50| 0.00| 0.00| 0.0| VA . | | | | | | 0924-06-272 | | | | | | CM 2008(736) NEW DYNAMIC MESSAGE SIGNS | | | | | | | | | | | | WORK ORDER- 08-18-08 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-03-08 | | | | | | CONTRACT WORKING DAYS- 217 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-272 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 07083015 | TOTALS | 2,065,750.50| 0.00| 0.00| 0.0| ************************************************************************************************************************************ EL PASO NORTHWESTERN DR. | 10.579 | 2,467,404.73| 253,007.00| 1,277,606.43| 51.7| LP 375 US 54 | | | | | | 2552-01-046 | | | | | | NH 2008(254) M.B.G.F. AND SEALCOAT | | | | | | | | | | | | WORK ORDER- 08-15-08 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-31-08 | | | | | | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 49 PERCENT TIME USED- 54 | | | | | | | | | | | | MANN CONTRACTORS, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2552-01-046 | | | | | | BLACKTOPPER TECHNOLOGY, INC. | |SUB %: 42.54 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 6.88 | | | | A & R CONTRACTORS | |SUB %: 6.09 | | | | | | | | | | CONTRACT 07083208 | TOTALS | 2,467,404.73| 253,007.00| 1,277,606.43| 51.7| ************************************************************************************************************************************ EL PASO 1.473MI(2.731)E OF FM659 (ZARAGOZA) | 4.035 | 1,719,655.40| 0.00| 1,727,211.13| 99.9| US 62 3.262MI(5.250KM)W OF FM2775(HUECO T | | | | | | 0374-02-072 | | | | | | NH 2007(743) MISCELLANEOUS WORK | | | | | | | | | | | | WORK ORDER- 09-14-07 WORK BEGAN- 11-26-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-30-07 | | | | | | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 25 | | | | | | WORKING DAYS CHARGED- 124 PERCENT TIME USED- 99 | | | | | | | | | | | | DAN WILLIAMS COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0374-02-072 | | | | | | AR DANIEL SERVICES | |SUB %: 15.34 | | | | TEXAS FAR WEST CONSTRUCTION & ENGINEERING | |SUB %: 10.65 | | | | HENRY TRUJILLO, INC. | |SUB %: 1.64 | | | | | | | | | | CONTRACT 08073022 | TOTALS | 1,719,655.40| 0.00| 1,727,211.13| 99.9| ************************************************************************************************************************************ EL PASO BALTIMORE ST. | 0.068 | 146,154.65| 0.00| 0.00| 0.0| SH 20 CINCINNATI AVE. | | | | | | 0001-02-049 | | | | | | STP 2008(668) FY 06 SUPPLEMENTAL REHABILITATION | | | | | | | | | | | | EL PASO CINCINNATI AVE. | 1.279 | 1,971,378.50| 0.00| 0.00| 0.0| SH 20 0.023 MI SOUTH OF E YANDELL ST. | | | | | | 0001-03-053 | | | | | | STP 2008(668) FY 06 SUPPLEMENTAL REHABILITATION | | | | | | | | | | | | WORK ORDER- 09-12-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-01-09 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 86 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | C.F. JORDAN, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0001-02-049 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08083028 | TOTALS | 2,117,533.15| 0.00| 0.00| 0.0| ************************************************************************************************************************************ EL PASO DELTA | 10.000 | 1,634,478.50| 214,432.40| 214,432.40| 13.1| SH 20 LOOP 375 | | | | | | 0002-01-080 | | | | | | CM 2008(825) ALAMEDA TRAFFIC SIGNAL INTERCONNECT | | | | | | | | | | | | WORK ORDER- 09-16-08 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-02-08 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0002-01-080 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 08083213 | TOTALS | 1,634,478.50| 214,432.40| 214,432.40| 13.1| ************************************************************************************************************************************ EL PASO VARIOUS LOCATIONS (ON SYSTEM) | 1.000 | 3,492,312.50| 0.00| 0.00| 0.0| VA . | | | | | | 0924-06-244 | | | | | | CM 2007(579) MISCELLANEOUS: ALTERNATE ROUTES | | | | | | | | | | | | WORK ORDER- 02-11-08 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-27-08 | | | | | | CONTRACT WORKING DAYS- 380 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-244 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09073011 | TOTALS | 3,492,312.50| 0.00| 0.00| 0.0| ************************************************************************************************************************************ EL PASO INTERSECTION AT FRED WILSON BLVD. | 1.000 | 24,733,207.10| 238,206.94| 19,871,786.84| 84.6| CS & AIRPORT RD. | | | | | | 0924-06-258 | | | | | | MG 2005(290) CONSTRUCT INTERSECTION IMPROVEMENTS | | | | | | | | | | | | EL PASO INTERSECTION AT FRED WILSON BLVD. | 1.000 | 875,502.00| 0.00| 946,929.39| 99.9| CS & AIRPORT RD. | | | | | | 0924-06-265 | | | | | | CC 924-6-265 WATER AND SEWER FACILITIES | | | | | | | | | | | | WORK ORDER- 12-02-05 WORK BEGAN- 03-06-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-18-05 | | | | | | CONTRACT WORKING DAYS- 360 ADDL DAYS GRANTED- 83 | | | | | | WORKING DAYS CHARGED- 553 PERCENT TIME USED- 124 | | | | | | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-258 | | | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 2.44 | | | | RAMIREZ BROTHERS CONCRETE CONSTRUCTION COMPANY | |SUB %: 4.07 | | | | J.L. STEEL, L.P. | |SUB %: 0.78 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.12 | | | | LOMELI & SONS LANDSCAPING CO., INC. | |SUB %: 0.85 | | | | ROAD MARKINGS INC. | |SUB %: 0.30 | | | | MOUNTAIN ELECTRIC CORPORATION | |SUB %: 1.97 | | | | AR DANIEL CONSTRUCTION SERVICES, INC | |SUB %: 1.29 | | | | TRUJILLO TRUCKING | |SUB %: 1.52 | | | | M & M FENCE COMPANY | |SUB %: 1.29 | | | | HANSON PIPE & PRODUCTS, INC. (GRAND PRAIRIE) | |SUB %: 0.07 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 2.75 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.12 | | | | HARDY HOLE DRILLING | |SUB %: 0.35 | | | | | | | | | | CONTRACT 10053002 | TOTALS | 25,608,709.10| 238,206.94| 20,818,716.23| 85.5| ************************************************************************************************************************************ EL PASO LOOP 375 | 15.200 | 236,939.10| 0.00| 267,903.37| 99.9| SH 20 FABENS | | | | | | 0002-02-046 | | | | | | MG 2005(694) GDRL PLMT AT EXIS IRR STRUC LOC | | | | | | | | | | | | EL PASO 16.2 MILES EAST ON FM 258 | 16.200 | 355,702.00| 0.00| 274,482.48| 77.1| FM 258 FABENS | | | | | | 0002-14-025 | | | | | | STP 2005(695)SFT GDRL PLMT AT EXIS IRR STRUC LOC | | | | | | | | | | | | WORK ORDER- 11-29-06 WORK BEGAN- 01-04-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-15-06 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 153 PERCENT TIME USED- 127 | |**************************************************| | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0002-02-046 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10063227 | TOTALS | 592,641.10| 0.00| 542,385.85| 94.8| ************************************************************************************************************************************ ECTOR ON IH 10 AND IH 20 | 0.001 | 770,430.00| 0.00| 717,940.65| 98.0| VA . | | | | | | 0906-00-115 | | | | | | ITS 2004(802) INSTALL AMBER ALERT SIGNS | | | | | | | | | | | | EL PASO DISTRICTWIDE | 0.100 | 318,025.00| 0.00| 299,007.75| 98.9| VA . | | | | | | 0924-06-257 | | | | | | ITS 2004(802) AMBER PLAN IMPLEMENTATION ASSISTANC | | | | | | | | | | | | WORK ORDER- 01-04-06 WORK BEGAN- 07-12-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-20-06 | | | | | | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 100 PERCENT TIME USED- 100 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-257 | | | | | | HARDY HOLE DRILLING | |SUB %: 1.42 | | | | TEXAS FAR WEST CONSTRUCTION & ENGINEERING | |SUB %: 3.08 | | | | | | | | | | CONTRACT 12053011 | TOTALS | 1,088,455.00| 0.00| 1,016,948.40| 98.3| ************************************************************************************************************************************ EL PASO BRIDGE OF THE AMERICAS | 1.000 | 1,599,430.00| -112,671.00| 681,865.65| 42.6| VA . | | | | | | 0924-06-280 | | | | | | BOR 2007(093) INTELLIGENT TRANSPORTATION SYSTEM | | | | | | | | | | | | EL PASO ZARAGOZA BORDER SAFETY INSPECTION | 1.000 | 2,740,972.00| 186,272.00| 737,085.35| 26.8| VA FACILITY | | | | | | 0924-06-281 | | | | | | BOR 2007(093) INTELLIGENT TRANSPORTATION SYSTEM | | | | | | | | | | | | WORK ORDER- 01-10-07 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-15-07 | | | | | | CONTRACT WORKING DAYS- 200 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 46 PERCENT TIME USED- 23 | | | | | | | | | | | | TRI STATE ELECTRIC, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0924-06-280 | | | | | | METTLER TOTLEDO | |SUB %: 15.56 | | | | C & C ROAD CONSTRUCTION, INC. | |SUB %: 2.38 | | | | RUSTY'S WEIGH SCALES & SERVICE | |SUB %: 5.97 | | | | DESERT SUN EXCAVATION | |SUB %: 0.42 | | | | MOUNTAIN STAR CONSTRUCTION | |SUB %: 0.78 | | | | | | | | | | CONTRACT 12063211 | TOTALS | 4,340,402.00| 73,601.00| 1,418,951.00| 32.6| ************************************************************************************************************************************ EL PASO 0.4 MI. N OF US 62 | 0.452 | 260,352.00| 0.00| 0.00| 0.0| IH 110 I-10 | | | | | | 0167-01-102 | | | | | | IM 1101(246) BRIDGE MAINTENANCE | | | | | | | | | | | | EL PASO I-10 | 1.200 | 24,692.00| 0.00| 0.00| 0.0| US 54 APPROX. 1.2 MI. NORTH OF IH 10 | | | | | | 0167-01-103 | | | | | | NH 2009(161) BRIDGE MAINTENANCE | | | | | | | | | | | | EL PASO APPROX 1.0 MI W OF SH 20 (MESA) | 0.991 | 33,200.00| 0.00| 0.00| 0.0| IH 10 SH 20 (MESA) | | | | | | 2121-01-077 | | | | | | IM 0101(247) BRIDGE MAINTENANCE | | | | | | | | | | | | EL PASO SH 20 (MESA) | 10.812 | 332,151.00| 0.00| 0.00| 0.0| IH 10 APPROX. 0.6 MI. E. OF US 54 | | | | | | 2121-02-128 | | | | | | IM 0101(247) BRIDGE MAINTENANCE | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0167-01-102 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12083214 | TOTALS | 650,395.00| 0.00| 0.00| 0.0| ************************************************************************************************************************************ HUDSPETH @ THE BORDER CHECKPOINT STATION | 3.000 | 3,330,288.09| 7,696.00| 2,700,214.44| 81.2| IH 10 . | | | | | | 0002-07-041 | | | | | | IM 0101(241) GR,STR EXTS,EMBK,ACP,CRCP,COSS,SIGN | | | | | | | | | | | | WORK ORDER- 07-24-07 WORK BEGAN- 03-17-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-09-07 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 127 PERCENT TIME USED- 105 | | | | | | | | | | | | C & C ROAD CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0002-07-041 | | | | | | TRI STATE ELECTRIC, LTD. | |SUB %: 27.85 | | | | | | | | | | CONTRACT 06073024 | TOTALS | 3,330,288.09| 7,696.00| 2,700,214.44| 81.2| ************************************************************************************************************************************ HUDSPETH IH 10 EASTBOUND | 1.442 | 278,684.39| 0.00| 0.00| 0.0| SP 148 1.4 MILE NORTH | | | | | | 0002-13-009 | | | | | | STP 2009(157) 2009 REHABILITATION PROGRAM | | | | | | | | | | | | CULBERSON SH 54 | 8.752 | 3,383,681.16| 0.00| 0.00| 0.0| US 62 8.752 MI E OF SH 54 | | | | | | 0233-02-025 | | | | | | NH 2009(158) 2" OVERLAY,SHOULDER TEXTURING STRI | | | | | | | | | | | | CULBERSON HUDSPETH/CULBERSON COUNTY LINE | 4.823 | 1,475,926.22| 0.00| 0.00| 0.0| US 62 SH 54 | | | | | | 0374-08-020 | | | | | | NH 2009(158) 2" OVERLAY SHOULDER TEXTURING STRI | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 65 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | DAN WILLIAMS COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0002-13-009 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12083203 | TOTALS | 5,138,291.77| 0.00| 0.00| 0.0| ************************************************************************************************************************************ JEFF DAVIS 6.507 MILES SOUTH OF FORT DAVIS | 8.653 | 3,602,686.86| 98,070.57| 1,669,243.35| 46.3| SH 118 BREWSTER/JEFF DAVIS COUNTY LINE | | | | | | 0358-01-024 | | | | | | STP 2007(026) MILL AND INLAY OF EXISTING ROADWAY | | | | | | | | | | | | WORK ORDER- 08-15-07 WORK BEGAN- 07-07-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-31-07 | | | | | | CONTRACT WORKING DAYS- 110 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 41 PERCENT TIME USED- 37 | | | | | | | | | | | | REECE ALBERT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0358-01-024 | | | | | | NITE LITE, INC. | |SUB %: 2.06 | | | | CHEROKEE SERVICES | |SUB %: 3.87 | | | | 76 MILLING, INC. | |SUB %: 1.11 | | | | | | | | | | CONTRACT 07073009 | TOTALS | 3,602,686.86| 98,070.57| 1,669,243.35| 46.3| ************************************************************************************************************************************ PRESIDIO .8 MI S OF US 90 | 12.247 | 2,025,091.55| 145,401.00| 145,401.00| 7.1| US 67 3.645 MILES N OF PEDIZ CREEK | | | | | | 0104-06-022 | | | | | | STP 2008(705)HES SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | PRESIDIO .1 MI N OF PERDIZ CREEK | 0.200 | 52,044.80| 0.00| 0.00| 0.0| US 67 .1 MI S OF PERDIZ CREEK | | | | | | 0104-07-019 | | | | | | STP 2008(705)HES SAFETY TREAT FIXED OBJECTS | | | | | | | | | | | | WORK ORDER- 10-09-08 WORK BEGAN- 11-17-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-25-08 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 10 PERCENT TIME USED- 5 | | | | | | | | | | | | MANN CONTRACTORS, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0104-06-022 | | | | | | ROAD MARKINGS INC. | |SUB %: 0.82 | | | | W.S. CONSTRUCTION COMPANY | |SUB %: 6.19 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 8.66 | | | | | | | | | | CONTRACT 08083017 | TOTALS | 2,077,136.35| 145,401.00| 145,401.00| 7.0| ************************************************************************************************************************************ PRESIDIO ETC JCT OF US 67/90 | 42.923 | 2,524,741.68| 0.00| 0.00| 0.0| US 67 ETC 15.15 MILES SOUTH OF MARFA | | | | | | 0104-06-023 | | | | | | STP 2009(160) 2009 SEAL COAT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 40 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | COX PAVING COMPANY, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0104-06-023 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12083006 | TOTALS | 2,524,741.68| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 150,984,014.73 DISTRICT ESTIMATES THIS MONTH 4,712,725.01 DISTRICT TOTAL ESTIMATES PAID TO DATE 99,572,738.24