MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 18 AS OF DEC 11, 2008 PAGE 51 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ COLLIN 0.1 MI S OF CR 400 | 3.615 | 7,173,041.43| 0.00| 0.00| 0.0| FM 982 FM 546 | | | | | | 0387-05-016 | | | | | | STP 2008(294) GRD, DRAINAGE, PVM, SIGN & MRKS | | | | | | | | | | | | WORK ORDER- 03-12-08 WORK BEGAN- 12-04-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-08-08 | | | | | | CONTRACT WORKING DAYS- 261 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0387-05-016 | | | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 7.24 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 4.65 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 15.44 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.11 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 3.32 | | | | | | | | | | CONTRACT 01083005 | TOTALS | 7,173,041.43| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COLLIN AT US 380 | 1.052 | 25,662,948.02| 215,946.69| 473,012.98| 1.8| US 75 . | | | | | | 0047-14-063 | | | | | | STP 2008(363)MM STR, GR, PVMT, SIGNS, SIGNALS | | | | | | | | | | | | WORK ORDER- 05-08-08 WORK BEGAN- 10-13-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-13-08 | | | | | | CONTRACT WORKING DAYS- 659 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 16 PERCENT TIME USED- 2 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-14-063 | | | | | | BREDA COMPANY, INC. | |SUB %: 0.90 | | | | C.B. SERVICES, INC. | |SUB %: 0.33 | | | | CRAIG OLDEN, INC. | |SUB %: 1.33 | | | | CROSSROADS, L.P. | |SUB %: 0.28 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.88 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 0.76 | | | | HUERTA'S TRUCKING, INC. | |SUB %: 4.37 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.04 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 1.95 | | | | INTEGRATED ROADWAY SERVICES, INC. | |SUB %: 5.25 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 13.29 | | | | MAS-TEK ENGINEERING & ASSOCIATES, INC. | |SUB %: 0.07 | | | | RAYMOND PAINTING, INC. | |SUB %: 0.08 | | | | RMI WORLDWIDE, LLC | |SUB %: 0.09 | | | | SITESAFE PRODUCTS TEXAS | |SUB %: 0.11 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.25 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.63 | | | | W.W. WEBBER INC. | |SUB %: 0.92 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.59 | | | | | | | | | | CONTRACT 02083201 | TOTALS | 25,662,948.02| 215,946.69| 473,012.98| 1.8| ************************************************************************************************************************************ COLLIN AT LITTLE ELM CREEK AND RELIEF | 0.436 | 2,560,453.77| 22,825.63| 2,564,166.34| 99.9| FM 455 . | | | | | | 0816-04-037 | | | | | | BR 2006(367) REPLACE BRIDGES AND APPROACHES | | | | | | | | | | | | WORK ORDER- 05-16-06 WORK BEGAN- 09-27-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-01-06 | | | | | | CONTRACT WORKING DAYS- 154 ADDL DAYS GRANTED- 200 | | | | | | WORKING DAYS CHARGED- 349 PERCENT TIME USED- 98 | | | | | | | | | | | | COMMERCIAL CONTRACTORS EQUIPMENT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0816-04-037 | | | | | | CROSSROADS, L.P. | |SUB %: 0.76 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.02 | | | | STEVEN RIZO COMPANY | |SUB %: 0.58 | | | | HUDSON, INC. | |SUB %: 0.56 | | | | STORM WATER SOLUTIONS | |SUB %: 0.01 | | | | ODUM SERVICES, L.P. | |SUB %: 1.64 | | | | STRIPE-A-ZONE, INC. | |SUB %: 1.07 | | | | UNITED PAVING CONTRACTORS, INC. | |SUB %: 14.71 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.27 | | | | NORTH TEXAS BRIDGE COMPANY, INC. | |SUB %: 39.05 | | | | BREDA COMPANY, INC. | |SUB %: 0.54 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 2.92 | | | | N.L. SCHUTTE FOUNDATION DRILLING, INC. | |SUB %: 2.92 | | | | JAGOE-PUBLIC COMPANY | |SUB %: 20.67 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.31 | | | | PENHALL COMPANY | |SUB %: 0.15 | | | | RUNNING HORSE CONSTRUCTION, INC. | |SUB %: 0.68 | | | | | | | | | | CONTRACT 03063010 | TOTALS | 2,560,453.77| 22,825.63| 2,564,166.34| 99.9| ************************************************************************************************************************************ COLLIN AT SH 190 NORTHBOUND EXIT RAMP | 0.660 | 706,733.92| 102,118.00| 795,773.10| 99.9| US 75 . | | | | | | 0047-06-124 | | | | | | STP 2007(351)MM ADD LANE FOR DUAL EXIT | | | | | | | | | | | | WORK ORDER- 04-13-07 WORK BEGAN- 05-21-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-29-07 | | | | | | CONTRACT WORKING DAYS- 116 ADDL DAYS GRANTED- 50 | | | | | | WORKING DAYS CHARGED- 120 PERCENT TIME USED- 72 | | | | | | | | | | | | REBCON, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-06-124 | | | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 0.67 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.21 | | | | CRAWFORD YANT | |SUB %: 1.01 | | | | TEXAS SHAFTS, INC. | |SUB %: 0.48 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.18 | | | | MICA CORPORATION | |SUB %: 13.90 | | | | ROAD MASTER STRIPING LLC | |SUB %: 2.66 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.28 | | | | | | | | | | CONTRACT 03073031 | TOTALS | 706,733.92| 102,118.00| 795,773.10| 99.9| ************************************************************************************************************************************ COLLIN AT DESERT CREEK | 0.153 | 1,084,981.75| 63,979.70| 1,165,052.06| 99.9| FM 981 . | | | | | | 1012-03-013 | | | | | | BR 2008(437) REPLACE BR AND APPRS | | | | | | | | | | | | WORK ORDER- 05-16-08 WORK BEGAN- 06-17-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-01-08 | | | | | | CONTRACT WORKING DAYS- 104 ADDL DAYS GRANTED- 29 | | | | | | WORKING DAYS CHARGED- 131 PERCENT TIME USED- 98 | | | | | | | | | | | | L & N BRIDGE, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1012-03-013 | | | | | | EAST TEXAS SIGN & SUPPLY, INC. | |SUB %: 0.32 | | | | GARY A. CRAIN, INC. | |SUB %: 0.69 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 6.81 | | | | HIGHWAY TECHNOLOGIES, L.P. | |SUB %: 0.35 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.21 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 4.41 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 0.59 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 6.70 | | | | | | | | | | CONTRACT 03083019 | TOTALS | 1,084,981.75| 63,979.70| 1,165,052.06| 99.9| ************************************************************************************************************************************ COLLIN STACY ROAD | 1.072 | 6,227,504.83| 249,630.56| 3,004,145.73| 48.2| SH 5 EXCHANGE PARKWAY | | | | | | 0047-09-029 | | | | | | STP 2007(433)MM GR, STRS & SURF | | | | | | | | | | | | WORK ORDER- 06-08-07 WORK BEGAN- 11-13-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-24-07 | | | | | | CONTRACT WORKING DAYS- 361 ADDL DAYS GRANTED- 82 | | | | | | WORKING DAYS CHARGED- 261 PERCENT TIME USED- 58 | | | | | | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-09-029 | | | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.83 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 1.89 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 12.39 | | | | BREDA COMPANY, INC. | |SUB %: 0.77 | | | | PAVER SYSTEMS INTERNATIONAL | |SUB %: 1.14 | | | | RAMBO CONTRACTING, INC. | |SUB %: 5.00 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.46 | | | | MEL'S ELECTRIC SERVICE, INC. | |SUB %: 2.32 | | | | ODUM SERVICES, L.P. | |SUB %: 0.32 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 1.57 | | | | EAGLE AGGREGATE TRANSPORTATION, LLC. | |SUB %: 0.96 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.24 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.72 | | | | LONE STAR MANHOLE & STRUCTURES, LLC | |SUB %: 4.02 | | | | | | | | | | CONTRACT 04073208 | TOTALS | 6,227,504.83| 249,630.56| 3,004,145.73| 48.2| ************************************************************************************************************************************ COLLIN AT PARKER ROAD | 0.814 | 20,172,428.77| 852,151.21| 2,650,441.00| 13.1| US 75 . | | | | | | 0047-06-134 | | | | | | STP 2008(360)MM RECONSTRUCT INTERCHANGE | | | | | | | | | | | | WORK ORDER- 06-18-08 WORK BEGAN- 09-05-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-17-08 | | | | | | CONTRACT WORKING DAYS- 647 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 69 PERCENT TIME USED- 10 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-06-134 | | | | | | CRAIG OLDEN, INC. | |SUB %: 0.46 | | | | PAVER 1 | |SUB %: 0.12 | | | | EVANS ENVIRONMENTAL CONTRACTING, LLC. | |SUB %: 1.14 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.12 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 1.94 | | | | HARDSCAPE SPECIALTIES, INC. | |SUB %: 0.16 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 0.45 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 3.62 | | | | J.T. DERSNER INC. | |SUB %: 3.19 | | | | MICA CORPORATION | |SUB %: 3.65 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.05 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 5.62 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 0.60 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 0.05 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 0.82 | | | | | | | | | | CONTRACT 04083002 | TOTALS | 20,172,428.77| 852,151.21| 2,650,441.00| 13.1| ************************************************************************************************************************************ COLLIN COLLIN COUNTY LINE | 14.047 | 18,075,773.73| 323,352.43| 16,830,631.23| 93.1| US 75 SOUTH OF EXCHANGE PARKWAY | | | | | | 0047-06-115 | | | | | | CM 2006(511) STR, CONC PAV, ITS SIGN & MOUNT BAR | | | | | | | | | | | | WORK ORDER- 07-19-06 WORK BEGAN- 08-28-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-04-06 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 335 | | | | | | WORKING DAYS CHARGED- 528 PERCENT TIME USED- 95 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-06-115 | | | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH) | |SUB %: 0.47 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 5.45 | | | | MICA CORPORATION | |SUB %: 61.88 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.13 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.19 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 2.20 | | | | COLE CONSTRUCTION, INC. | |SUB %: 0.01 | | | | | | | | | | CONTRACT 05063203 | TOTALS | 18,075,773.73| 323,352.43| 16,830,631.23| 93.1| ************************************************************************************************************************************ COLLIN CHASE OAKS | 0.966 | 1,559,000.00| 124,491.59| 760,927.22| 48.8| US 75 BETHANY | | | | | | 0047-06-132 | | | | | | STP 2008(700)MM GR, PVMT, SIGNS, PVMT MKGS | | | | | | | | | | | | WORK ORDER- 08-08-08 WORK BEGAN- 09-02-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-24-08 | | | | | | CONTRACT WORKING DAYS- 158 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 59 PERCENT TIME USED- 37 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-06-132 | | | | | | AUSTIN BRIDGE & ROAD, LP | |SUB %: 5.57 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.63 | | | | DUSTROL, INC. | |SUB %: 0.79 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.83 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 6.44 | | | | MICA CORPORATION | |SUB %: 13.28 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 3.15 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.18 | | | | | | | | | | CONTRACT 06083210 | TOTALS | 1,559,000.00| 124,491.59| 760,927.22| 48.8| ************************************************************************************************************************************ COLLIN W OF OHIO DRIVE | 1.100 | 22,160,870.18| 46,292.17| 22,642,043.19| 99.9| SH 121 E OF HILLCREST | | | | | | 0364-04-043 | | | | | | HP 2006(693) GRADING,BASE,PVMT,SIGNS,STRUCTURES | | | | | | | | | | | | WORK ORDER- 09-05-06 WORK BEGAN- 11-09-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-21-06 | | | | | | CONTRACT WORKING DAYS- 260 ADDL DAYS GRANTED- 254 | | | | | | WORKING DAYS CHARGED- 513 PERCENT TIME USED- 99 | | | | | | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0364-04-043 | | | | | | ALLIANCE GEOTECHNICAL GROUP | |SUB %: 0.06 | | | | AUSTIN BRIDGE & ROAD, LP | |SUB %: 48.94 | | | | BREDA COMPANY, INC. | |SUB %: 0.61 | | | | W.W. WEBBER INC. | |SUB %: 1.85 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.24 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 3.67 | | | | S & J ELECTRIC | |SUB %: 1.59 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.90 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 0.49 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.20 | | | | TEXAS SHAFTS, INC. | |SUB %: 1.42 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.58 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.15 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.19 | | | | TEXAS INLETS, INC. | |SUB %: 0.39 | | | | STOMPER DEMOLITION | |SUB %: 0.05 | | | | FRISCO CONSTRUCTION SERVICES LLC | |SUB %: 0.04 | | | | REBAR SERVICE & SUPPLY CO. | |SUB %: 2.04 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.43 | | | | AXIS CONTRACTING, INC. | |SUB %: 0.21 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 0.06 | | | | | | | | | | CONTRACT 07063205 | TOTALS | 22,160,870.18| 46,292.17| 22,642,043.19| 99.9| ************************************************************************************************************************************ COLLIN N. OF EXCHANGE PKWY | 0.990 | 1,869,778.72| 532,322.69| 1,214,093.57| 64.9| US 75 S. OF STACY RD | | | | | | 0047-06-140 | | | | | | CC 47-6-140 GR, PVMT, STR, PVMT MKGS | | | | | | | | | | | | WORK ORDER- 09-16-08 WORK BEGAN- 10-02-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-02-08 | | | | | | CONTRACT WORKING DAYS- 110 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 39 PERCENT TIME USED- 35 | | | | | | | | | | | | ED BELL CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-06-140 | | | | | | BREDA COMPANY, INC. | |SUB %: 0.61 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.55 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 4.79 | | | | MICA CORPORATION | |SUB %: 7.42 | | | | N.L. SCHUTTE FOUNDATION DRILLING, INC. | |SUB %: 0.38 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 7.94 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.11 | | | | SOUTHWEST ENVIRONMENT SERVICES, INC. | |SUB %: 1.42 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 1.11 | | | | | | | | | | CONTRACT 08083222 | TOTALS | 1,869,778.72| 532,322.69| 1,214,093.57| 64.9| ************************************************************************************************************************************ COLLIN AT WHITE ROCK CREEK | 2.240 | 20,767,941.00| 162,027.42| 21,831,025.98| 99.9| FM 3286 . | | | | | | 3476-02-004 | | | | | | BR 2003(534) REPL BR & APPRS | | | | | | | | | | | | WORK ORDER- 11-12-04 WORK BEGAN- 11-30-04 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-28-04 | | | | | | CONTRACT WORKING DAYS- 767 ADDL DAYS GRANTED- 29 | | | | | | WORKING DAYS CHARGED- 710 PERCENT TIME USED- 89 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3476-02-004 | | | | | | NORTH TEXAS TRUCKING, INC. | |SUB %: 2.03 | | | | RAYMOND PAINTING, INC. | |SUB %: 0.15 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.78 | | | | ARK CONTRACTING SERVICES, LLC | |SUB %: 2.46 | | | | WIMS ENVIRONMENTAL, INC. | |SUB %: 0.18 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH) | |SUB %: 0.17 | | | | TEXAS SHAFTS, INC. | |SUB %: 10.23 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.25 | | | | EVANS UTILITY GROUP, INC. | |SUB %: 0.36 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.21 | | | | CRAIG OLDEN, INC. | |SUB %: 0.33 | | | | W.W. WEBBER INC. | |SUB %: 1.61 | | | | | | | | | | CONTRACT 09043004 | TOTALS | 20,767,941.00| 162,027.42| 21,831,025.98| 99.9| ************************************************************************************************************************************ COLLIN US 380 | 4.432 | 35,046,753.17| 0.00| 0.00| 0.0| SH 289 PANTHER CREEK | | | | | | 0091-04-041 | | | | | | STP 2009(066) GR.,STRS,BASE AND PAVEMENT | | | | | | | | | | | | WORK ORDER- 12-05-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 691 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | MARIO SINACOLA & SONS EXCAVATING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0091-04-041 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10083001 | TOTALS | 35,046,753.17| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DALLAS WEST OF LOOP 12 | 1.107 | 41,735,764.28| 92,037.55| 40,787,032.01| 99.9| IH 30 EAST OF LOOP 12 | | | | | | 1068-04-133 | | | | | | STP 2005(162)MM RECONSTRUCT STRUCTURES AND SURFACE | | | | | | | | | | | | WORK ORDER- 04-01-05 WORK BEGAN- 05-31-05 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-31-05 | | | | | | CONTRACT WORKING DAYS- 650 ADDL DAYS GRANTED- 187 | | | | | | WORKING DAYS CHARGED- 1,037 PERCENT TIME USED- 123 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-04-133 | | | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH) | |SUB %: 0.63 | | | | W.W. WEBBER INC. | |SUB %: 0.93 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.96 | | | | STOMPER DEMOLITION | |SUB %: 0.12 | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.24 | | | | MICA CORPORATION | |SUB %: 2.76 | | | | CRAIG OLDEN, INC. | |SUB %: 0.30 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, SA, INC. | |SUB %: 0.81 | | | | FOUNDATION DRILLERS, INC. | |SUB %: 6.37 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 1.48 | | | | RAYMOND PAINTING, INC. | |SUB %: 0.32 | | | | BRATTON STEEL, INC. | |SUB %: 0.28 | | | | BREDA COMPANY, INC. | |SUB %: 3.83 | | | | HERDEZ TRUCKING, INC. | |SUB %: 0.85 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.07 | | | | DESTRUCTORS, INC. | |SUB %: 0.23 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.12 | | | | CONCRETE CORING COMPANY | |SUB %: 0.01 | | | | H. L. MERRILL & SONS CONSTRUCTION CO., INC. | |SUB %: 0.22 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.52 | | | | | | | | | | CONTRACT 01053002 | TOTALS | 41,735,764.28| 92,037.55| 40,787,032.01| 99.9| ************************************************************************************************************************************ DALLAS AT UNION PACIFIC RAILROAD CROSSING | 0.583 | 11,083,070.46| 494,228.82| 10,037,459.83| 94.6| FM 1382 (DOT NO. 794 952A) | | | | | | 1047-03-049 | | | | | | STP 2006(206)RGS CONST RAILROAD GRADE SEPARATION STR | | | | | | | | | | | | WORK ORDER- 03-20-06 WORK BEGAN- 06-12-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-05-06 | | | | | | CONTRACT WORKING DAYS- 468 ADDL DAYS GRANTED- 72 | | | | | | WORKING DAYS CHARGED- 514 PERCENT TIME USED- 95 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1047-03-049 | | | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 2.85 | | | | SKAGGS ROAD BORING INC. | |SUB %: 2.15 | | | | A. H. BECK FOUNDATION CO., INC. | |SUB %: 3.32 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.54 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 6.38 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.09 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 2.00 | | | | CEN-TEX SEEDING, INC. | |SUB %: 1.14 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 1.15 | | | | MICA CORPORATION | |SUB %: 5.42 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 4.02 | | | | FARR FOUNDATION, INC. | |SUB %: 0.34 | | | | S & S BRIDGE PAINTING, INC. | |SUB %: 0.20 | | | | EVANS ENVIRONMENTAL CONTRACTING, LLC. | |SUB %: 0.24 | | | | | | | | | | CONTRACT 01063202 | TOTALS | 11,083,070.46| 494,228.82| 10,037,459.83| 94.6| ************************************************************************************************************************************ DALLAS SPUR 366 | 10.528 | 1,182,665.00| 36,575.00| 942,122.52| 83.8| US 75 RICHARDSON CITY LIMITS | | | | | | 0047-07-211 | | | | | | CL 47-7-211 LANDSCAPE DEVELOPMENT | | | | | | | | | | | | WORK ORDER- 02-20-07 WORK BEGAN- 03-08-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-08-07 | | | | | | CONTRACT WORKING DAYS- 506 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 437 PERCENT TIME USED- 86 | | | | | | | | | | | | TEXAS TREE & LANDSCAPE, LTD | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0047-07-211 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 01073015 | TOTALS | 1,182,665.00| 36,575.00| 942,122.52| 83.8| ************************************************************************************************************************************ DALLAS TARRANT COUNTY LINE | 16.590 | 6,248,735.21| 19,146.14| 5,951,293.81| 95.2| IH 30 EAST OF SYLVAN AVENUE | | | | | | 1068-04-126 | | | | | | CM 2007(163) CONC PAV, CTB, PAV MKS, SIGNS, ITS | | | | | | | | | | | | WORK ORDER- 02-14-07 WORK BEGAN- 04-09-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-26-07 | | | | | | CONTRACT WORKING DAYS- 281 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 223 PERCENT TIME USED- 79 | | | | | | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-04-126 | | | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (AUSTIN) | |SUB %: 3.73 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 16.95 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, INC | |SUB %: 0.02 | | | | MICA CORPORATION | |SUB %: 40.35 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.13 | | | | | | | | | | CONTRACT 01073209 | TOTALS | 6,248,735.21| 19,146.14| 5,951,293.81| 95.2| ************************************************************************************************************************************ DALLAS HAMPTON ROAD | 1.962 | 1,091,383.26| 39,641.27| 226,243.83| 20.7| FM 1382 IH 35E SB FRONTAGE ROAD | | | | | | 1047-02-045 | | | | | | NH 2008(295) MILL AND INLAY | | | | | | | | | | | | WORK ORDER- 03-07-08 WORK BEGAN- 05-15-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-15-08 | | | | | | CONTRACT WORKING DAYS- 168 ADDL DAYS GRANTED- 1 | | | | | | WORKING DAYS CHARGED- 141 PERCENT TIME USED- 83 | | | | | | | | | | | | LINDSEY CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1047-02-045 | | | | | | JOY LATTIMER, LLC. | |SUB %: 8.34 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 1.20 | | | | STRIPE-A-ZONE, INC. | |SUB %: 3.90 | | | | | | | | | | CONTRACT 01083030 | TOTALS | 1,091,383.26| 39,641.27| 226,243.83| 20.7| ************************************************************************************************************************************ DALLAS 0.29 MI WEST OF LUNA RD | 0.193 | 459,792.69| 14,077.41| 481,764.14| 99.9| IH 635 0.09 MI WEST OF LUNA RD | | | | | | 2374-07-048 | | | | | | CC 2374-7-48 GR, STRS & PAVT. | | | | | | | | | | | | WORK ORDER- 02-13-08 WORK BEGAN- 03-10-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 02-29-08 | | | | | | CONTRACT WORKING DAYS- 38 ADDL DAYS GRANTED- 12 | | | | | | WORKING DAYS CHARGED- 50 PERCENT TIME USED- 100 | | | | | | | | | | | | J.L. STEEL, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-07-048 | | | | | | BRENDA PRICE TRUCKING | |SUB %: 3.51 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 1.10 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 2.41 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 9.37 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 3.98 | | | | ROADMASTER, INC. | |SUB %: 0.63 | | | | W.O.E. CONSTRUCTION | |SUB %: 0.29 | | | | | | | | | | CONTRACT 01083239 | TOTALS | 459,792.69| 14,077.41| 481,764.14| 99.9| ************************************************************************************************************************************ DALLAS IN IRVING ON BELT LINE RD FROM N.OF | 2.427 | 22,509,208.53| 12,291.29| 22,795,493.93| 99.9| MH HUNTER FERRELL TO ROCK ISLAND ROAD | | | | | | 8050-18-042 | | | | | | NH 2005(186) RECONSTRUCT, GRADING, BASE, PAVING | | | | | | | | | | | | WORK ORDER- 04-01-05 WORK BEGAN- 07-18-05 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-30-05 | | | | | | CONTRACT WORKING DAYS- 503 ADDL DAYS GRANTED- 204 | | | | | | WORKING DAYS CHARGED- 700 PERCENT TIME USED- 99 | | | | | | | | | | | | MCCARTHY BUILDING COMPANIES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 8050-18-042 | | | | | | TEXAS ENVIRONMENTAL MANAGEMENT, SA, INC. | |SUB %: 1.87 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.62 | | | | CRAIG OLDEN, INC. | |SUB %: 2.63 | | | | DUSTROL, INC. | |SUB %: 0.27 | | | | GREAT WESTERN ERECTORS | |SUB %: 0.60 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 6.66 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.02 | | | | STOMPER DEMOLITION | |SUB %: 0.28 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.68 | | | | TEXAS SHAFTS, INC. | |SUB %: 2.88 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 2.08 | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.41 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 4.20 | | | | HORTON TREE SERVICE | |SUB %: 0.25 | | | | | | | | | | CONTRACT 02053201 | TOTALS | 22,509,208.53| 12,291.29| 22,795,493.93| 99.9| ************************************************************************************************************************************ DALLAS W OF US 75 | 11.153 | 41,890,721.60| 0.00| 49,597,842.87| 99.9| IH 635 KCS RR (WEST OF SH 78) | | | | | | 2374-01-153 | | | | | | CM 2006(033) PVMT,DRN,CTB,STRIP,SIGN,DYN SIGNS | | | | | | | | | | | | WORK ORDER- 05-26-06 WORK BEGAN- 07-10-06 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-11-06 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 390 ADDL DAYS GRANTED- 73 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 463 PERCENT TIME USED- 100 | |**************************************************| | | | | | | | ZACHRY CONSTRUCTION CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-01-153 | | | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 2.06 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.55 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 1.19 | | | | D'AMBRA STEEL SERVICES, INC. | |SUB %: 0.62 | | | | RENAISSANCE CONTRACTORS PARTNERSHIP | |SUB %: 4.19 | | | | ORP CONSTRUCTION | |SUB %: 0.23 | | | | MICA CORPORATION | |SUB %: 19.01 | | | | SILVER CREEK CONSTRUCTION, INC. | |SUB %: 3.64 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.78 | | | | AUSTIN BRIDGE & ROAD, LP | |SUB %: 11.34 | | | | ATS DRILLING, L.P. | |SUB %: 0.12 | | | | GARY A. CRAIN, INC. | |SUB %: 0.00 | | | | CHOCTAW ERECTORS, INC. | |SUB %: 0.20 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.78 | | | | S & S PAINTING | |SUB %: 0.03 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.16 | | | | | | | | | | CONTRACT 02063001 | TOTALS | 41,890,721.60| 0.00| 49,597,842.87| 99.9| ************************************************************************************************************************************ DALLAS 250' EAST OF HUNNICUT | 6.613 | 13,478,706.38| 0.00| 14,262,723.81| 99.9| IH 30 900' EAST OF NORTHWEST DR. | | | | | | 0009-11-202 | | | | | | CM 2006(202) EXTEND CONTRAFLOW HOV LANE | | | | | | | | | | | | WORK ORDER- 04-11-06 WORK BEGAN- 08-21-06 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-27-06 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 115 ADDL DAYS GRANTED- 231 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 323 PERCENT TIME USED- 93 | |**************************************************| | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-11-202 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.08 | | | | MICA CORPORATION | |SUB %: 13.57 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 0.30 | | | | APAC-TEXAS, INC. | |SUB %: 1.29 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.22 | | | | FLORES TECHNICAL SERVICES | |SUB %: 0.21 | | | | EAGLE BUILDING SYSTEMS, LTD | |SUB %: 0.10 | | | | | | | | | | CONTRACT 02063226 | TOTALS | 13,478,706.38| 0.00| 14,262,723.81| 99.9| ************************************************************************************************************************************ DALLAS ON FTG ROAD FROM S OF COOPER ST | 5.663 | 4,909,030.64| 0.00| 4,617,362.99| 94.0| US 67 NORTH OF COCKRELL HILL ROAD | | | | | | 0261-02-064 | | | | | | NH 2006(691) HMAC OVERLAY | | | | | | | | | | | | WORK ORDER- 03-21-07 WORK BEGAN- 05-03-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-06-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 242 ADDL DAYS GRANTED- 52 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 276 PERCENT TIME USED- 93 | |**************************************************| | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0261-02-064 | | | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (AUSTIN) | |SUB %: 0.81 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 9.27 | | | | SOIL EXPRESS, LTD. | |SUB %: 1.10 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.17 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 0.34 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 2.00 | | | | BROCK PAVING INDUSTRIES, INC. (HUB) | |SUB %: 1.95 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.52 | | | | | | | | | | CONTRACT 02073004 | TOTALS | 4,909,030.64| 0.00| 4,617,362.99| 94.0| ************************************************************************************************************************************ DALLAS IN DALLAS ON HARRY HINES BOULEVARD | 1.398 | 21,020,242.40| 98,824.08| 19,645,331.18| 97.3| LP 354 FROM ROYAL LANE TO IH 35E | | | | | | 0196-06-017 | | | | | | STP 2006(385)MM RECONSTRUCT, GRADING, BASE, PAVING | | | | | | | | | | | | WORK ORDER- 05-01-06 WORK BEGAN- 06-26-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-17-06 | | | | | | CONTRACT WORKING DAYS- 488 ADDL DAYS GRANTED- 65 | | | | | | WORKING DAYS CHARGED- 537 PERCENT TIME USED- 97 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0196-06-017 | | | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 4.71 | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.54 | | | | CEN-TEX SEEDING, INC. | |SUB %: 0.94 | | | | MAGNUM TUNNELING, LLC | |SUB %: 12.38 | | | | BUYER BARRICADES | |SUB %: 0.50 | | | | HUERTA'S TRUCKING, INC. | |SUB %: 4.23 | | | | I & H CONCRETE CUTTING, INC. | |SUB %: 0.09 | | | | ROADWAY SOLUTIONS, INC. | |SUB %: 1.72 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 1.31 | | | | BREDA COMPANY, INC. | |SUB %: 0.22 | | | | AXIS CONTRACTING, INC. | |SUB %: 2.20 | | | | | | | | | | CONTRACT 03063002 | TOTALS | 21,020,242.40| 98,824.08| 19,645,331.18| 97.3| ************************************************************************************************************************************ DALLAS AT SH 161/NW 19TH | 1.837 | 27,988,228.42| 155,501.05| 25,867,753.70| 97.2| IH 30 . | | | | | | 1068-04-115 | | | | | | NH 2006(208) STRS | | | | | | | | | | | | DALLAS AT SH 161/NW 19TH | 0.001 | 72,845.00| 0.00| 69,199.90| 99.9| IH 30 . | | | | | | 1068-04-121 | | | | | | NH 2000(459) ACQ, RELOC & UTIL | | | | | | | | | | | | WORK ORDER- 05-16-06 WORK BEGAN- 07-13-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-01-06 | | | | | | CONTRACT WORKING DAYS- 592 ADDL DAYS GRANTED- 1 | | | | | | WORKING DAYS CHARGED- 425 PERCENT TIME USED- 71 | | | | | | | | | | | | TEXAS STERLING CONSTRUCTION CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1068-04-115 | | | | | | FOUNDATION DRILLERS, INC. | |SUB %: 4.04 | | | | BUYER BARRICADES | |SUB %: 0.60 | | | | TONTO CONSTRUCTION,INC. | |SUB %: 0.74 | | | | CHAMPAGNE-WEBBER INC., TEXAS | |SUB %: 0.75 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 3.98 | | | | ANCHOR FENCE | |SUB %: 0.32 | | | | S & J CONTRACTING | |SUB %: 2.78 | | | | INLET STRUCTURE SPECIALTIES LTD. | |SUB %: 2.21 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.76 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 0.66 | | | | CRAIG OLDEN, INC. | |SUB %: 0.97 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.27 | | | | STOMPER DEMOLITION | |SUB %: 0.31 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.11 | | | | SOUTHWEST CONSTRUCTION SERVICES | |SUB %: 0.18 | | | | BREDA COMPANY, INC. | |SUB %: 0.40 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 1.68 | | | | | | | | | | CONTRACT 03063201 | TOTALS | 28,061,073.42| 155,501.05| 25,936,953.60| 97.2| ************************************************************************************************************************************ DALLAS DISTRICTWIDE | 0.001 | 1,157,767.30| 33,106.80| 732,627.34| 66.6| VA . | | | | | | 0918-00-126 | | | | | | C 918-00-126 SIGN AND SIGN STRUCTURE REPLACEMENT | | | | | | | | | | | | WORK ORDER- 04-17-07 WORK BEGAN- 08-24-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-15-07 | | | | | | CONTRACT WORKING DAYS- 365 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 336 PERCENT TIME USED- 92 | | | | | | | | | | | | MICA CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-00-126 | | | | | | J.L. STEEL, L.P. | |SUB %: 6.17 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.89 | | | | | | | | | | CONTRACT 03073213 | TOTALS | 1,157,767.30| 33,106.80| 732,627.34| 66.6| ************************************************************************************************************************************ DALLAS NORTH OF IH 30 | 5.266 | 215,740,713.74| 12,493,754.29| 128,617,665.80| 59.6| SH 161 SOUTH OF ROCK ISLAND RD. | | | | | | 2964-01-031 | | | | | | C 2964-1-31 GR STRS & SURF | | | | | | | | | | | | WORK ORDER- 04-02-08 WORK BEGAN- 04-21-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-18-08 | | | | | | CONTRACT WORKING DAYS- 949 ADDL DAYS GRANTED- 37 | | | | | | WORKING DAYS CHARGED- 214 PERCENT TIME USED- 21 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2964-01-031 | | | | | | TEXTRO CONSTRUCTION SERVICES | |SUB %: 0.25 | | | | THELIN RECYCLING CO., LLC | |SUB %: 0.10 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 1.36 | | | | ODUM SERVICES, L.P. | |SUB %: 0.15 | | | | CTF STRIPING | |SUB %: 0.11 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.44 | | | | BATTSON CONTRACTING CO., INC. | |SUB %: 0.29 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 3.37 | | | | BROWN'S CONSTRUCTION CO. | |SUB %: 0.18 | | | | LCA ENVIRONMENTAL, INC. | |SUB %: 0.00 | | | | SHAW ENVIRONMENTAL, INC. | |SUB %: 0.00 | | | | HIGHWAY TECHNOLOGIES, L.P. | |SUB %: 0.22 | | | | | | | | | | CONTRACT 03083009 | TOTALS | 215,740,713.74| 12,493,754.29| 128,617,665.80| 59.6| ************************************************************************************************************************************ DALLAS IH 635 | 33.658 | 537,964.01| 131,420.92| 465,430.42| 86.5| IH 30 ROCKWALL COUNTY LINE | | | | | | 0009-11-216 | | | | | | IM 0301(052) GUIDE SIGN REFURBISHING | | | | | | | | | | | | WORK ORDER- 04-14-08 WORK BEGAN- 07-08-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-08-08 | | | | | | CONTRACT WORKING DAYS- 170 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 94 PERCENT TIME USED- 55 | | | | | | | | | | | | TIME STRIPING, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-11-216 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 03083013 | TOTALS | 537,964.01| 131,420.92| 465,430.42| 86.5| ************************************************************************************************************************************ DALLAS AT FIVE MILE CREEK | 1.001 | 975,346.00| 0.00| 400,280.11| 41.0| US 67 ETC IN CITY OF DALLAS | | | | | | 0261-03-056 | | | | | | NH 2008(293) CLEAN & PAINT EXISTING BRIDGES | | | | | | | | | | | | WORK ORDER- 04-08-08 WORK BEGAN- 06-10-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-24-08 | | | | | | CONTRACT WORKING DAYS- 271 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 98 PERCENT TIME USED- 36 | | | | | | | | | | | | GIBSON & ASSOCIATES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0261-03-056 | | | | | | CROSSROADS, L.P. | |SUB %: 1.54 | | | | | | | | | | CONTRACT 03083230 | TOTALS | 975,346.00| 0.00| 400,280.11| 41.0| ************************************************************************************************************************************ DALLAS SB AT FIVE MILE CREEK | 0.050 | 324,106.25| 6,100.00| 332,203.98| 99.9| LP 12 . | | | | | | 0581-02-118 | | | | | | BR 2008(489) REHAB. BR | | | | | | | | | | | | WORK ORDER- 05-05-08 WORK BEGAN- 06-09-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-21-08 | | | | | | CONTRACT WORKING DAYS- 66 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 54 PERCENT TIME USED- 81 | | | | | | | | | | | | ARK CONTRACTING SERVICES, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0581-02-118 | | | | | | D & D DRILLING | |SUB %: 3.42 | | | | INTEGRAL BONDING SYSTEMS | |SUB %: 0.46 | | | | BUYER BARRICADES | |SUB %: 0.23 | | | | | | | | | | CONTRACT 04083029 | TOTALS | 324,106.25| 6,100.00| 332,203.98| 99.9| ************************************************************************************************************************************ DALLAS IH 20 | 4.790 | 1,774,363.43| 186,598.36| 331,195.49| 18.6| IH 35E US 67 | | | | | | 0442-02-143 | | | | | | CM 2008(488) DEPLOYMENT OF ITS | | | | | | | | | | | | WORK ORDER- 05-15-08 WORK BEGAN- 10-21-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-31-08 | | | | | | CONTRACT WORKING DAYS- 120 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 55 PERCENT TIME USED- 45 | | | | | | | | | | | | MICA CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0442-02-143 | | | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.59 | | | | | | | | | | CONTRACT 04083211 | TOTALS | 1,774,363.43| 186,598.36| 331,195.49| 18.6| ************************************************************************************************************************************ DALLAS TOWN EAST BLVD | 1.264 | 9,871,784.30| 59,041.56| 4,186,025.98| 42.4| US 80 0.3 MILE EAST OF TOWN EAST BLVD | | | | | | 0095-10-042 | | | | | | STP 2006(095)MM GR, STRS & SURF | | | | | | | | | | | | WORK ORDER- 07-21-06 WORK BEGAN- 08-31-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-06-06 | | | | | | CONTRACT WORKING DAYS- 669 ADDL DAYS GRANTED- 10 | | | | | | WORKING DAYS CHARGED- 336 PERCENT TIME USED- 49 | | | | | | | | | | | | TISEO PAVING CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0095-10-042 | | | | | | AXIS CONTRACTING, INC. | |SUB %: 1.84 | | | | CONCRETE PAVER SYSTEMS, INC. | |SUB %: 0.04 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.84 | | | | EVANS UTILITY GROUP, INC. | |SUB %: 1.76 | | | | IOWA BRIDGE & CULVERT, LC | |SUB %: 39.53 | | | | K & S UTILITY CONTRACTORS, INC. | |SUB %: 3.61 | | | | MICA CORPORATION | |SUB %: 1.57 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 11.99 | | | | ROAD MASTER STRIPING LLC | |SUB %: 0.63 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH) | |SUB %: 0.95 | | | | THE ANCHOR GROUP, INC. | |SUB %: 0.17 | | | | T & R EXCAVATION, INC. | |SUB %: 4.37 | | | | CONCRETE WALLS, INC. | |SUB %: 0.75 | | | | BREDA COMPANY, INC. | |SUB %: 0.40 | | | | BUSSEY TRUCKING, INC. | |SUB %: 0.04 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.27 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.20 | | | | WYLIE DRILLING & DRAINAGE, INC. | |SUB %: 1.57 | | | | W.W. WEBBER, LLC | |SUB %: 1.22 | | | | ARK CONTRACTING SERVICES, LLC | |SUB %: 4.26 | | | | BRENDA PRICE TRUCKING | |SUB %: 0.37 | | | | | | | | | | CONTRACT 05063029 | TOTALS | 9,871,784.30| 59,041.56| 4,186,025.98| 42.4| ************************************************************************************************************************************ DALLAS 0.095 MILES WEST OF BELTLINE ROAD | 1.136 | 4,034,163.21| 0.00| 3,747,310.83| 98.7| IH 635 0.075 MILES WEST OF OLYMPUS BLVD | | | | | | 2374-07-053 | | | | | | CC 2374-7-53 GRD,STORM SEWER,PVMT,PVMT MARK,SIGN | | | | | | | | | | | | WORK ORDER- 06-13-06 WORK BEGAN- 08-01-06 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 06-29-06 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 262 ADDL DAYS GRANTED- 90 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 447 PERCENT TIME USED- 126 | |**************************************************| | | | | | | | GLENN THURMAN, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2374-07-053 | | | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.39 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 10.12 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 1.61 | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.65 | | | | USA EROSION, INC. | |SUB %: 1.76 | | | | MIKE ALBERT, INC. | |SUB %: 13.15 | | | | A & A CONSTRUCTION | |SUB %: 1.25 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.97 | | | | BREDA COMPANY, INC. | |SUB %: 1.19 | | | | TEXAS INLETS, INC. | |SUB %: 1.76 | | | | E.L. BURNS, INC. | |SUB %: 1.16 | | | | S & J ELECTRIC | |SUB %: 1.62 | | | | | | | | | | CONTRACT 05063241 | TOTALS | 4,034,163.21| 0.00| 3,747,310.83| 98.7| ************************************************************************************************************************************ DALLAS LOOP 12 | 17.047 | 2,400,357.20| 0.00| 2,310,025.46| 96.7| IH 30 NORTHWEST DRIVE | | | | | | 0009-11-217 | | | | | | NH 2007(517) FULL DEPTH REPAIR | | | | | | | | | | | | WORK ORDER- 06-20-07 WORK BEGAN- 10-25-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-06-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 136 ADDL DAYS GRANTED- 177 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 327 PERCENT TIME USED- 104 | |**************************************************| | | | | | | | SILVER CREEK CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0009-11-217 | | | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.70 | | | | | | | | | | CONTRACT 05073028 | TOTALS | 2,400,357.20| 0.00| 2,310,025.46| 96.7| ************************************************************************************************************************************ DALLAS NORTH OF IH 20 | 4.320 | 43,132,516.11| 0.00| 41,796,165.36| 99.9| SH 161 SPUR 303 | | | | | | 2964-01-029 | | | | | | NH 2005(148) GR STRS & SURF | | | | | | | | | | | | WORK ORDER- 08-09-05 WORK BEGAN- 10-17-05 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 08-25-05 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 873 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 811 PERCENT TIME USED- 92 | |**************************************************| | | | | | | | J.D. ABRAMS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2964-01-029 | | | | | | STRIPE-A-ZONE, INC. | |SUB %: 0.38 | | | | TEXAS ENVIRONMENTAL MANAGEMENT, SA, INC. | |SUB %: 2.59 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 1.11 | | | | WITTWER CONSTRUCTION COMPANY, INC. | |SUB %: 2.45 | | | | COWTOWN TRAFFIC CONTROL, INC. | |SUB %: 0.29 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 4.29 | | | | RAMBO CONTRACTING, INC. | |SUB %: 0.88 | | | | MICA CORPORATION | |SUB %: 5.15 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 0.80 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.21 | | | | CRAIG OLDEN, INC. | |SUB %: 0.14 | | | | L & E HART ENTERPRISES, INC. | |SUB %: 0.10 | | | | J.H. PAINTING COMPANY | |SUB %: 0.39 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.82 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.08 | | | | DURABLE SPECIALTIES, INC. | |SUB %: 1.02 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.08 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.14 | | | | RAYMOND PAINTING, INC. | |SUB %: 0.45 | | | | | | | | | | CONTRACT 06053202 | TOTALS | 43,132,516.11| 0.00| 41,796,165.36| 99.9| ************************************************************************************************************************************ DALLAS REBUILD 5 SECT OF MAIN PARK RD. | 2.666 | 4,495,269.97| 180,000.98| 4,877,833.00| 99.9| PW ADD PARKING & DOUBLE ENTRY LN @ HQ | | | | | | 0918-45-487 | | | | | | C 918-45-487 REBUILD 5 SECT OF PARK RD ADD PARKI | | | | | | | | | | | | WORK ORDER- 07-20-06 WORK BEGAN- 09-12-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-05-06 | | | | | | CONTRACT WORKING DAYS- 242 ADDL DAYS GRANTED- 50 | | | | | | WORKING DAYS CHARGED- 304 PERCENT TIME USED- 104 | | | | | | | | | | | | AUI CONTRACTORS, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-487 | | | | | | DALLAS LITE AND BARRICADE INC. | |SUB %: 0.42 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 3.22 | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 1.50 | | | | REYNOLDS ASPHALT & CONSTRUCTION COMPANY | |SUB %: 49.04 | | | | STRIPING TECHNOLOGY, L.P. | |SUB %: 0.84 | | | | FORTSON CONTRACTING, INC. | |SUB %: 0.59 | | | | THELIN RECYCLING CO., LLC | |SUB %: 0.11 | | | | GAUNTT ELECTRIC SERVICE, INC. | |SUB %: 0.27 | | | | | | | | | | CONTRACT 06063210 | TOTALS | 4,495,269.97| 180,000.98| 4,877,833.00| 99.9| ************************************************************************************************************************************ DALLAS JUPITER RD FROM GARLAND RD | 0.445 | 2,139,553.80| 44,740.51| 2,116,535.83| 98.9| MH CENTERVILLE RD IN CITY OF DALLAS | | | | | | 8094-18-005 | | | | | | STP 97(436)MM GRADING, BASE AND PAVING | | | | | | | | | | | | WORK ORDER- 08-14-07 WORK BEGAN- 10-15-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-13-07 | | | | | | CONTRACT WORKING DAYS- 260 ADDL DAYS GRANTED- 6 | | | | | | WORKING DAYS CHARGED- 249 PERCENT TIME USED- 93 | | | | | | | | | | | | JACKSON CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 8094-18-005 | | | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.61 | | | | CEN-TEX SEEDING, INC. | |SUB %: 0.93 | | | | CROSSROADS, L.P. | |SUB %: 1.09 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.58 | | | | PEACHTREE CONSTRUCTION, LTD. | |SUB %: 6.78 | | | | ROAD MASTER STRIPING LLC | |SUB %: 0.55 | | | | STORM WATER MANAGEMENT, INC. | |SUB %: 0.12 | | | | ODUM SERVICES, L.P. | |SUB %: 0.21 | | | | J/M MATERIALS, INC. | |SUB %: 3.40 | | | | INDEPENDENT UTILITY CONSTRUCTION, INC. | |SUB %: 1.22 | | | | | | | | | | CONTRACT 06073006 | TOTALS | 2,139,553.80| 44,740.51| 2,116,535.83| 98.9| ************************************************************************************************************************************ DALLAS IH 635 | 5.470 | 2,567,697.99| 0.00| 2,386,748.37| 92.9| IH 35E PGBT | | | | | | 0196-03-244 | | | | | | CM 2007(609) DEPLOYMENT OF ITS | | | | | | | | | | | | WORK ORDER- 07-24-07 WORK BEGAN- 10-24-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-22-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 240 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 239 PERCENT TIME USED- 99 | |**************************************************| | | | | | | | MICA CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0196-03-244 | | | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 2.66 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.26 | | | | | | | | | | CONTRACT 06073007 | TOTALS | 2,567,697.99| 0.00| 2,386,748.37| 92.9| ************************************************************************************************************************************ DALLAS IH 20 | 8.469 | 2,531,916.69| 41,016.85| 2,527,113.00| 99.8| SP 408 LP 12 | | | | | | 3000-01-017 | | | | | | NH 2007(437) GUIDE SIGN REFURBISHING | | | | | | | | | | | | WORK ORDER- 07-24-07 WORK BEGAN- 11-19-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-19-07 | | | | | | CONTRACT WORKING DAYS- 325 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 215 PERCENT TIME USED- 66 | | | | | | | | | | | | MICA CORPORATION | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3000-01-017 | | | | | | TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. | |SUB %: 0.10 | | | | LAYFIELD CONSTRUCTION, INC | |SUB %: 0.17 | | | | ORVAL HALL EXCAVATING, LTD. | |SUB %: 1.55 | | | | | | | | | | CONTRACT 06073211 | TOTALS | 2,531,916.69| 41,016.85| 2,527,113.00| 99.8| ************************************************************************************************************************************ DALLAS IN DALLAS ON CORINTH STREET | 0.625 | 1,865,329.62| 0.00| 2,066,160.83| 99.9| CS FROM 8TH STREET TO INDUSTRIAL BLVD | | | | | | 0918-45-748 | | | | | | BR 2005(674) REHABILITATE STRUCTURE | | | | | | | | | | | | WORK ORDER- 07-12-07 WORK BEGAN- 10-09-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-28-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 252 ADDL DAYS GRANTED- 6 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 274 PERCENT TIME USED- 106 | |**************************************************| | | | | | | | GIBSON & ASSOCIATES, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0918-45-748 | | | | | | S & J ELECTRIC | |SUB %: 32.80 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 1.47 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.27 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 0.57 | | | | CONCRETE CUTTING BY BOND | |SUB %: 0.44 | | | | LIRA ELECTRIC