AVERAGE LOW BID UNIT PRICE - MAINTENANCE - DALLAS DISTRICT

Last Update: Friday, August 21, 2015
ITEMS 700 2001 TO 770 6006
Items Items Bid Code Range
0104 - 0169
0216 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0636 - 0678
0700 - 0788
1122 - 1122
3255 - 3267
4100 - 4124
6001 - 6834
7039 - 7658
8251 - 8944
700 2001 - 770 6006
770 6008 - 788 2003
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
700 2001 POTHOLE REPAIR (STANDARD) SY     52,500.000 15.23810 3
700 2005 POTHOLE REPAIR (SAW - CUT) SY     21,500.000 20.46512 3
700 2009 EMERGENCY MOBILIZATION EA     34.000 500.00000 1
700 6001 POTHOLE REPAIR (STANDARD) SY     100,000.000 55.00000 2
700 6002 POTHOLE REPAIR (STANDARD) CY 1,200.000 543.00000 1,750.000 543.00000 2
700 6005 POTHOLE REPAIR (SAW - CUT) SY     2,000.000 65.00000 2
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     387.510 825.15785 2
712 2011 JT / CRCK ROUT / SEAL (RUBBER - ASPHALT) LMI     100.000 1,200.00000 1
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     567.000 460.00000 1
720 2002 SPALLING REPAIR (POLYMERIC) (FLEXIBLE) GAL     3,500.000 40.00000 1
730 2002 FULL - WIDTH MOWING AC     12,204.000 30.00000 1
730 2003 SPOT MOWING AC     95.000 60.00000 1
730 6001 STRIP MOWING AC     3,752.000 28.17697 4
730 6002 FULL - WIDTH MOWING AC     52,483.000 27.50353 6
731 6007 PAVEMENT EDGES, STRUCTURES & FIXTURES MI     656.000 114.90854 4
731 6011 BROADCAST APPLICATION AC     11,579.000 25.29963 6
734 2003 LITTER REMOVAL (SPOT) AC     70.000 12.74000 1
734 2056 LITTER REMOVAL - TRACT (1) CYC     11.000 1,812.00000 1
734 2057 LITTER REMOVAL - TRACT (2) CYC     5.000 604.00000 1
734 2058 LITTER REMOVAL - TRACT (3) CYC     2.000 1,846.36000 1
734 2059 LITTER REMOVAL - TRACT (4) CYC     12.000 789.17000 1
734 2060 LITTER REMOVAL - TRACT (5) CYC     10.000 226.50000 1
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI 4,420.000 15.00000 29,329.040 21.98592 3
735 2004 DEBRIS REMOVAL (FRONTAGE ROADS) MI 332.280 15.00000 2,073.960 21.79570 3
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI 1,269.320 15.00000 11,399.440 22.77301 3
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI 10.000 25.00000 720.000 25.00000 3
735 6002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     36,480.000 20.00000 2
735 6006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     9,600.000 20.00000 2
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI 366.520 200.00000 3,940.680 110.46205 3
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI 167.920 100.00000 3,080.040 91.09038 3
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI 64.000 150.00000 1,209.400 100.82107 3
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI 97.640 122.00000 3,197.280 96.64908 3
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI 160.000 100.00000 2,320.000 125.86207 3
738 2010 CLEANING / SWEEPING (SPOT) MI 25.000 100.00000 180.000 100.00000 3
738 2011 CLEANING / SWEEPING (HANDWORK) SY     5,200.000 2.00000 1
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL MI     226.320 140.00000 2
738 6014 CLEAN / SWEEP - CENTER MEDIAN - AREA (1 MI     256.200 75.00000 2
738 6015 CLEAN / SWEEP - CENTER MEDIAN - AREA (2 MI     383.040 75.00000 2
738 6034 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (1 MI     346.880 75.00000 2
738 6035 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (2 MI     446.800 75.00000 2
738 6054 CLEAN / SWEEP - FRONTAGE ROAD - AREA (1 MI     31.200 75.00000 2
738 6074 CLEAN / SWEEP - (ENTR / EXT RMP) (AREA 1 MI     9.600 75.00000 2
740 2001 GRAFFITI REMOVAL (BLAST CLEANING) SF     10,000.000 1.07000 1
740 2002 GRAFFITI REMOVAL (PAINTING) SF     10,000.000 0.87000 1
740 2003 GRAFFITI REMOVAL (CHEMICAL CLEANING) SF     400.000 1.40000 1
740 2004 ANTI - GRAFFITI COATING (SACRIFICIAL) SF     150.000 6.00000 1
740 2005 ANTI - GRAFFITI COATING (PERMANENT) SF     400.000 5.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     111.000 1,418.01802 2
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     25.500 1,635.29412 2
752 2022 TREE REMOVAL (4" - 12" DIA) EA     1,815.000 79.83471 2
752 2023 TREE REMOVAL (12" - 18" DIA) EA     321.000 103.27103 2
752 2024 TREE REMOVAL (18" - 24" DIA) EA     51.000 268.62745 2
752 2025 TREE REMOVAL (24" - 30" DIA) EA     31.000 370.96774 2
752 2026 TREE REMOVAL (30" - 36" DIA) EA     18.000 388.88889 2
752 2027 TREE REMOVAL (36" - 42" DIA) EA     13.000 438.46154 2
752 2028 TREE REMOVAL (42" - 48" DIA) EA     30.000 420.00000 1
752 2045 STUMP REMOVAL EA     15.000 100.00000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 30,000.000 1.50000 70,000.000 1.50000 3
764 2001 DRAIN INLET CLEANING EA     5,093.000 19.00000 1
764 2004 DOWNSPOUT CLEANING EA     98.000 165.00000 1
764 2011 STORM SEWER CLEANING (PIPE) (43" - 54" DIA LF     152.000 16.50000 1
764 2017 STORM SEWER CLEAN (BOX CULV) (24 - <48 SF) LF     3,155.000 14.85000 1
764 2018 STORM SEWER CLEAN (BOX CULV) (48 - <96 SF) LF     2,555.000 14.85000 1
764 2020 SLOTTED DRAIN CLEANING LF     2,695.000 7.43000 1
764 2023 STORM SEWER CLEAN (PIPE) (18" OR LESS) LF     45,882.000 1.76000 1
764 2024 STORM SEWER CLEAN (PIPE) (19" TO 30") LF     20,337.000 2.86000 1
764 2025 STORM SEWER CLEAN (PIPE) (31" TO 42") LF     1,303.000 7.15000 1
764 2026 STORM SEWER CLEAN (PIPE) (43" TO 48") LF     90.000 16.50000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     69,000.000 14.31884 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     319.000 10.34483 3
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     1,753.000 15.07701 5
770 2006 REALIGN POSTS EA     5,625.000 5.97778 4
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     63.000 9.21429 4
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     22.000 88.81818 3
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     48.000 2,479.16667 3
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     336.000 608.02381 5
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     16,995.000 15.47632 5
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     4,450.000 9.34831 5
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     95.000 2.53684 2
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     275.000 121.01891 5
770 2017 REPAIR RAIL ELEMENT (T4S) LF     175.000 10.00000 1
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     6,800.000 13.73529 5
770 2019 REM / REPL STEEL POST W / O CONC FND EA     250.000 100.20000 3
770 2020 REM / REPL TIMBER POST W / CONC FND EA     210.000 13.02381 3
770 2021 REM / REPL STEEL POST W / CONC FND EA     178.000 131.22472 3
770 2022 REM & RESET SGT IMPACT HEAD EA     698.000 279.65330 4
770 2023 REPLACE SGT OBJECT MARKER EA     343.000 22.95918 5
770 2024 REPLACE SGT CABLE ANCHOR EA     300.000 99.66667 4
770 2025 REPLACE SGT CABLE ASSEMBLY EA     450.000 98.66667 5
770 2026 REPLACE SGT STRUT EA     98.000 44.33673 5
770 2027 REMOVE & REPLACE BLOCKOUT EA     3,065.000 6.78059 4
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     145.000 91.37931 2
770 2033 INSTALL BLOCKOUT EA     125.000 27.60000 2
770 2051 RESET HINGED TOP SGT STL POST EA     60.000 50.00000 1
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     22,000.000 14.00000 2
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     300.000 20.00000 2
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF     50.000 60.00000 2
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 20.00000 2
770 6005 REM / REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 20.00000 2
770 6006 RAISE RAIL ELEMENT LF     4,000.000 3.00000 2