AVERAGE LOW BID UNIT PRICE - MAINTENANCE - DALLAS DISTRICT

Last Update: Wednesday, April 3, 2013
ITEMS 700 2001 TO 774 2035
Items Items Bid Code Range
0100 - 0169
0216 - 0251
0310 - 0361
0400 - 0481
0500 - 0556
0618 - 0690
0700 - 0784
1122 - 1122
2065 - 2065
3255 - 3267
4568 - 4568
5236 - 5236
6006 - 6834
7011 - 7629
8368 - 8368
700 2001 - 774 2035
774 2036 - 784 2007
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
700 2001 POTHOLE REPAIR (STANDARD) SY     13,000.000 19.43846 3
700 2002 POTHOLE REPAIR (STANDARD) CY     2,000.000 305.00000 1
700 2005 POTHOLE REPAIR (SAW - CUT) SY     59,000.000 19.43220 3
700 2009 EMERGENCY MOBILIZATION EA     30.000 500.00000 2
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     2,288.561 537.62251 7
712 2011 JT / CRCK ROUT / SEAL (RUBBER - ASPHALT) LMI     40.000 2,250.00000 1
720 2002 SPALLING REPAIR (POLYMERIC) (FLEXIBLE) GAL     10,500.000 23.71429 2
730 2001 STRIP MOWING AC     1,876.000 25.17697 2
730 2002 FULL - WIDTH MOWING AC 34,509.000 24.40775 87,731.000 25.24517 14
730 2003 SPOT MOWING AC     105.000 46.90476 2
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI 11,440.000 21.22000 92,640.240 16.98249 4
735 2004 DEBRIS REMOVAL (FRONTAGE ROADS) MI 810.160 21.21999 7,651.560 16.49379 4
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI 3,576.040 21.22000 13,942.440 18.29100 4
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI 20.000 21.22000 1,043.000 98.48936 3
735 2133 DEBRIS REMOVAL - HOV MI     55.500 45.00000 2
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI 186.640 10.00000 6,975.680 91.05588 3
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI 285.840 10.00000 6,877.840 89.85975 3
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI 62.320 10.00000 3,992.520 89.83304 3
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI 275.080 10.00000 5,749.080 97.46060 3
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI 159.800 10.00000 2,594.800 108.53361 3
738 2010 CLEANING / SWEEPING (SPOT) MI 50.000 10.00000 250.000 87.50000 3
738 2011 CLEANING / SWEEPING (HANDWORK) SY     58,000.000 2.00000 2
738 2226 CLEAN / SWEEP - HOV MI     55.500 200.00000 2
740 2001 GRAFFITI REMOVAL (BLAST CLEANING) SF     33,612.000 0.97000 2
740 2002 GRAFFITI REMOVAL (PAINTING) SF     55,025.000 1.75000 2
740 2003 GRAFFITI REMOVAL (CHEMICAL CLEANING) SF     2,375.000 2.95000 2
740 2004 ANTI - GRAFFITI COATING (SACRIFICIAL) SF     125.000 2.75000 1
740 2005 ANTI - GRAFFITI COATING (PERMANENT) SF     525.000 2.75000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     51.600 960.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     153.000 58.04902 2
752 2023 TREE REMOVAL (12" - 18" DIA) EA     55.000 100.22909 2
752 2024 TREE REMOVAL (18" - 24" DIA) EA     19.000 200.57895 2
752 2025 TREE REMOVAL (24" - 30" DIA) EA     3.000 270.00000 1
752 2026 TREE REMOVAL (30" - 36" DIA) EA     3.000 500.00000 1
752 2027 TREE REMOVAL (36" - 42" DIA) EA     1.000 940.00000 1
752 2028 TREE REMOVAL (42" - 48" DIA) EA     1.000 1,500.00000 1
752 2046 TREE AND BRUSH REMOVAL AC     17.235 960.00000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     85,265.000 2.09501 4
764 2001 DRAIN INLET CLEANING EA     6,855.000 20.00000 2
764 2004 DOWNSPOUT CLEANING EA     145.000 200.00000 2
764 2011 STORM SEWER CLEANING (PIPE) (43" - 54" DIA LF     225.000 20.00000 1
764 2017 STORM SEWER CLEAN (BOX CULV) (24 - <48 SF) LF     4,500.000 15.00000 2
764 2018 STORM SEWER CLEAN (BOX CULV) (48 - <96 SF) LF     3,650.000 15.00000 1
764 2020 SLOTTED DRAIN CLEANING LF     6,165.000 8.15000 2
764 2023 STORM SEWER CLEAN (PIPE) (18" OR LESS) LF     67,020.000 1.75000 2
764 2024 STORM SEWER CLEAN (PIPE) (19" TO 30") LF     26,275.000 3.00000 2
764 2025 STORM SEWER CLEAN (PIPE) (31" TO 42") LF     2,225.000 8.50000 2
764 2026 STORM SEWER CLEAN (PIPE) (43" TO 48") LF     200.000 10.95000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     135,000.000 5.33741 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     708.000 18.90749 4
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     1,315.000 20.55951 5
770 2006 REALIGN POSTS EA     13,250.000 36.13208 5
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     80.000 22.93750 5
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     27.000 111.87037 3
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     146.000 1,123.28767 4
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     260.000 734.23077 5
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     48,350.000 22.01365 5
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     5,000.000 18.20440 5
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     125.000 32.80000 2
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     450.000 81.00000 5
770 2017 REPAIR RAIL ELEMENT (T4S) LF     250.000 10.00000 1
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     7,600.000 33.42974 5
770 2019 REM / REPL STEEL POST W / O CONC FND EA     451.000 233.75543 4
770 2020 REM / REPL TIMBER POST W / CONC FND EA     830.000 52.53012 4
770 2021 REM / REPL STEEL POST W / CONC FND EA     270.000 197.40741 4
770 2022 REM & RESET SGT IMPACT HEAD EA     630.000 450.84762 3
770 2023 REPLACE SGT OBJECT MARKER EA     275.000 20.14545 5
770 2024 REPLACE SGT CABLE ANCHOR EA     385.000 120.88312 5
770 2025 REPLACE SGT CABLE ASSEMBLY EA     410.000 130.34146 5
770 2026 REPLACE SGT STRUT EA     95.000 31.31579 5
770 2027 REMOVE & REPLACE BLOCKOUT EA     1,600.000 33.00031 3
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     50.000 200.00000 1
770 2033 INSTALL BLOCKOUT EA     50.000 25.00000 1
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA     50.000 600.00000 1
772 2001 POST AND CABLE FENCE (REMOVAL) LF     1,100.000 2.19591 3
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA     8.000 100.00000 2
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     3,800.000 7.68026 3
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     90.000 51.52278 3
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     420.000 158.39238 3
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     40.000 127.00500 3
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     31,500.000 3.58921 3
774 2001 REMOVE AND REPLACE (TRACC) EA     50.000 5,072.00000 4
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     40.000 8,687.50000 3
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     22.000 6,998.18182 4
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA     6.000 20,000.00000 2
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     110.000 324.54545 2
774 2006 REPAIR (TRACC) EA     40.000 245.00000 1
774 2008 REPAIR (WIDE TRACC) EA     40.000 245.00000 1
774 2010 REPAIR (REACT) EA     30.000 495.00000 1
774 2011 REPAIR (CATCB - FRNT SECT) EA     16.000 2,437.50000 2
774 2012 REPAIR (CATCB - REAR SECT) EA     9.000 822.22222 2
774 2014 REMOVE AND REPLACE (NARROW QUAD) EA     11.000 4,545.45455 2
774 2015 REPAIR (NARROW QUAD) EA     13.000 124.00000 1
774 2023 REPAIR REACT (N) (MISC HARDWARE) EA     67.000 716.04478 2
774 2024 REPAIR REACT (N) (REAR SEC "S") EA     16.000 550.00000 1
774 2026 REPAIR REACT (N) (FRONT SECTION) EA     37.000 110.00000 1
774 2027 REPAIR REACT (N) (CYLINDERS) EA     78.000 1,177.69231 2
774 2028 REPAIR (QUAD) (N) (BAY) EA     106.000 880.00000 2
774 2029 REPAIR (QUAD) (W) (BAY) EA     255.000 770.58824 2
774 2035 REPAIR REACT (CYLINDERS) EA     4.000 2,000.00000 1