| Item No |
Description |
Units |
Septembe 30, 2009 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 310 2001 |
PRIME COAT (MC - 30) |
GAL |
|
|
100.000 |
9.50000 |
1 |
| 310 2019 |
PRIME COAT (MC - 30 OR SS - 1) |
GAL |
|
|
58.200 |
5.00000 |
1 |
| 340 2011 |
D - GR HMA (METH) TY - B PG64 - 22 |
TON |
|
|
530.000 |
123.50000 |
2 |
| 340 2032 |
D - GR HMA (METH) TY - C SAC - B PG64 - 22 |
TON |
|
|
25.600 |
300.00000 |
1 |
| 340 2034 |
D - GR HMA (METH) TY - C PG64 - 22 |
TON |
|
|
420.000 |
129.80000 |
2 |
| 340 2048 |
D - GR HMA (METH) TY - C SAC - B PG70 - 22 |
TON |
|
|
2,000.000 |
64.99000 |
1 |
| 340 2050 |
D - GR HMA (METH) TY - C PG70 - 22 |
TON |
|
|
2,039.000 |
107.67338 |
2 |
| 346 2014 |
STONE - MTRX - ASPH SMA - D SAC - A PG76 - 22 |
TON |
|
|
4,000.000 |
130.00000 |
1 |
| 351 2006 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (10" |
SY |
|
|
1,225.000 |
46.50000 |
1 |
| 351 2008 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (12" |
SY |
|
|
21,540.000 |
35.82266 |
3 |
| 354 2023 |
PLANE ASPH CONC PAV (0" TO 4") |
SY |
|
|
93,450.000 |
2.03733 |
2 |
| 354 2030 |
PLANE ASPH CONC PAV (0" TO 8") |
SY |
|
|
14,005.000 |
1.61000 |
1 |
| 360 2017 |
CURB (TYPE I) |
LF |
|
|
1,720.000 |
1.30000 |
1 |
| 360 2018 |
CURB (TYPE II) |
LF |
|
|
1,732.000 |
2.00000 |
1 |
| 360 2056 |
CONC PVMT (JOINTED - CPCD) (13") (CL HES) |
SY |
|
|
4,148.000 |
82.50000 |
1 |
| 361 2001 |
FULL - DEPTH REPAIR CRCP (8") |
SY |
|
|
760.000 |
242.68421 |
2 |
| 361 2002 |
FULL - DEPTH REPAIR CRCP (9") |
SY |
|
|
320.000 |
215.00000 |
1 |
| 361 2003 |
FULL - DEPTH REPAIR CRCP (10") |
SY |
|
|
400.000 |
280.00000 |
2 |
| 361 2004 |
FULL - DEPTH REPAIR CRCP (11") |
SY |
|
|
400.000 |
307.50000 |
2 |
| 361 2005 |
FULL - DEPTH REPAIR CRCP (12") |
SY |
|
|
320.000 |
265.00000 |
1 |
| 361 2006 |
FULL - DEPTH REPAIR CRCP (13") |
SY |
|
|
3,600.000 |
317.50000 |
2 |
| 361 2009 |
FULL - DEPTH REPAIR CPCD (8") |
SY |
|
|
7,190.000 |
77.18359 |
2 |
| 361 2010 |
FULL - DEPTH REPAIR CPCD (9") |
SY |
|
|
320.000 |
195.00000 |
1 |
| 361 2011 |
FULL - DEPTH REPAIR CPCD (10") |
SY |
|
|
1,600.000 |
193.00000 |
1 |
| 361 2012 |
FULL - DEPTH REPAIR CPCD (11") |
SY |
|
|
400.000 |
215.00000 |
1 |
| 361 2013 |
FULL - DEPTH REPAIR CPCD (12") |
SY |
|
|
400.000 |
217.00000 |
1 |
| 361 2014 |
FULL - DEPTH REPAIR CPCD (13") |
SY |
|
|
400.000 |
235.00000 |
1 |
| 361 2019 |
FULL - DEPTH REPAIR CPJR (8") |
SY |
|
|
400.000 |
285.00000 |
1 |
| 361 2021 |
FULL - DEPTH REPAIR CPJR (10") |
SY |
|
|
1,600.000 |
315.00000 |
1 |
| 361 2022 |
FULL - DEPTH REPAIR CPJR (11") |
SY |
|
|
400.000 |
330.00000 |
1 |
| 361 2025 |
FULL - DEPTH REPAIR CPJR (13") |
SY |
|
|
400.000 |
350.00000 |
1 |
| 361 2047 |
FULL - DEPTH REPAIR CPCD (8" - 13") HES |
SY |
|
|
890.000 |
204.46000 |
1 |